Honolulu Rail Transit Project Farrington Highway Station
Group Construction Contract RFB-HRT- 798316
Pre-Submittal Conference January 12, 2015
Presenters
HART Director of Procurement and Contracts
Nicole Chapman
Project Construction Resident Engineer
Roland Libby
HART Deputy Director of Project Management
John Moore
HART Chief Safety and Security Officer
Henry Miranda
HART Civil Rights Officer
Charles Bayne
Pre-Bid Conference Objectives
Discuss the RFB Documents
Provide Clarifications Where Needed
Provide Feedback
Respond to Questions
General
This is a non-mandatory meeting
Oral responses are unofficial
Submit written questions later in accordance with RFB
Questions and official responses will be provided in addendum
RFB-HRT-798316
Submittals are due:
March 3, 2015 at 2:00 p.m.Honolulu Authority for Rapid Transportation
1099 Alakea Street, Suite 1700Honolulu, HI 96813
Other Procurement Dates (Subject to Change)
Final Date to Submit Questions Jan 30, 2015
Final Date for Substitution Requests Feb 12, 2015
Anticipated NTP: Apr 1, 2015
Substantial Completion: 29 months from issuance of written NTP
HIGHLIGHTED RFB Requirements
ITB Section 6.0: All submissions required with Bid Proposal
Form 01: Joint Contractor/Subcontractor Listing; Specialty Licenses. PVL website: http://cca.hawaii.gov/pvl.
Form 05: Buy America Certification
Form 06: Certification Regarding Lobbying
Bid Security
NOTE: The General Conditions are Revised General Conditions
Compliance with Applicable Laws and Regulations
Federal Transit Administration (FTA)
Hawaii Revised Statutes (HRS)
Hawaii Administrative Rules (HAR)
Rules of Contact
Contact between the bidders and HART only through the Transit Mailbox, [email protected];
No bidder contact with other HART employees regarding this Contract;
No bidder contact with stakeholder staff regarding this Contract;
Improper contact may result in disqualification; and
HART is not responsible for any oral communication or any other communication outside the official communication process.
Basis of Award
Award will be made to the lowest responsive, responsible bidder based
on the criteria in the Instructions to Bidders.
Locally Preferred Alternative ROUTE MAP
Contract Overview
Scope of Work – Bid Technical Elements
Station Group Overview
Typical Station Features & Design Changes
Station-Specific Highlights
Bid Package Technical Elements
3 Stations’ Drawings
Common Drawings
Standard Drawings
Standard Canopy Drawings
Technical Specifications
Geotechnical Data Report
Reference Documents
HART Plans and Procedures
Environmental Documents
Geotechnical Recommendations
Farrington Highway Stations Group Location
Farrington Highway Stations Group (FHSG)
Alignment
Stations
West Loch StationWest Loch Station
Waipahu StationWaipahu Station
Leeward Community College StationLeeward Community College Station
Typical Station Features
240-foot long platforms
Saddlebag stairs
Tensile fabric canopies
Platform Screen Gate System (PSGS)
Balustrade system
Station entries/Fare Gate Entry Module
Elevator shafts
Warren truss bridges
Train Communications & Control Room/Uninterruptible Power Supply (TCCR/UPS)
Ancillary spaces
Thermoplastic polyolefin (TPO) roofing
Typical Station Features (Cont.)
Anti-graffiti coating Utilities relocations mostly under Guideway Contract Signage Plaza paving Art integration No building permits Peripheral Devices Third party coordination
HART Contractors: KIWC (WOFH), AHJV (CSC), Schindler (EEC)
State of Hawai'i: HDOT, UH
City permitting agencies: DPP, DTS
Typical Plan Changes One Designer Concrete Slab Finishes
No Exposed Aggregate
Limited Stamped/Colored Concrete
Fly Ash Concrete Masonry Unit (CMU): Standard Blocks Balustrades Downspouts Fencing Metal Ceilings and Chase Enclosures Standardized Lighting
West Loch Station Park and ride lot
Alteration to Don Quixote parking lot
Traction Power Substation (TPSS) by KIWC
Double entry
Fare Gate Entry Modules
Drilled shaft and mat foundations
67’ + 99’ steel bridge segments with median support by KIWC
CMU Ancillary building TCCR/UPS
Concrete walls
Steel-framed roofs with standing seam
Side platform
West Loch Plan Changes
Roofs
Doors
Escalator Cladding
Ancillary Structure Foundation
Bus Shelters
Parking Lot
Vertical Raceway Columns
Emergency Generator Pad
Waipahu Transit Center Station
Single entry Drilled shaft foundations Suspended deck over fill 78’ + 118’ steel bridge
segments with median support by KIWC
Fare Gate Entry Module CMU Ancillary building TCCR/UPS Concrete walls Steel-framed roofs with standing seam Side platform
Waipahu Plan Changes
Planter
Roofs
Doors
Vertical Raceway Columns
Makai Stair to Grade
Drilled Shafts
Leeward Community College Station Parking lot modifications
Unique Single entry
Concourse tunnel partly by KIWC
Spread footings
Integrated TCCR/UPS
Concrete walls
Hollow-core roof
Steel and aluminum framed “Lantern” roof
At-grade center platform
LCC Plan Changes
Fencing Along Tracks
Delete Lighted Bollards and Simplify Site Lighting
Simplify Floor Finishes
Porcelain Floor Tile
Sawcuts
Addenda
Waipahu Mauka demolition
Waipahu Makai grading
Vertical Raceway Columns
Electrical bonding
Fire sprinklers
Bid and Pricing Form
Bid and Pricing Form (cont.)
Special Provision Highlights
Elevator – Escalator Co-ordination requirements
Co-ordination with other contractors
Expected location of contaminated soils
LCC start date
Environmental Compliance
Ensure pertinent environmental commitments and permit conditions are met during construction
Archaeological
Storm Water
Noise
Contaminated Materials
Others
Allowance provided for removing contaminated soils
Environmental post-construction compliance reporting
Quality Management
This is a federally funded project and QA/QC will be required; and
A Quality Assurance Plan will be required and shall meet the applicable sections of HART’s Quality Management Plan.
HART Safety and Security
Safety and Security is high priority for HART
FTA 5800 Requirements for Safety and Security
HART Safety and Security Management Plan
HART Safety and Security Certification Plan
CILS and Specification Conformance
HART Construction Safety and Security Plan
Disadvantaged Business Enterprise Participation
HART has established a DBE program in accordance with the regulations of the U.S. Department of Transportation, Title 49, Code of Federal Regulations, Part 26
The overall DBE goal of 13.00% has been established.
Bidders and its subcontractors shall not discriminate on the basis of race, color, national origin, or sex in the performance of this Contract.
Disadvantaged Business Enterprise Participation (cont.)
All the FTA terms and conditions shall apply to this Contract. Failure to comply with these requirements could result in a material breach of Contract.
There will be a requirement to report DBE participation/accomplishments with each invoice.
Civil Rights
Davis Bacon Act Requirements – Certified Payrolls
Rapid Transit Stabilization Agreements
The Rapid Transit Stabilization Agreement dated November 17, 2009
The Rapid Transit Stabilization Agreement Hawaii Building and Construction Trades of Council Affiliates
Questions
Mahalo!