HOOSIER HEARTLAND HIGHWAY. Public Information Meeting – August 27, 2009 STATE ROAD 25, SEGMENT 2 From 0.42 mile east of Tippecanoe/Carroll County line to 0.20 mile east of CR400W Length of 8.46 miles with 9 Bridges INDOT DESIGN CONSULTANT: Bernardin Lochmueller & Associates, Inc. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/1.jpg)
HOOSIER HEARTLAND HIGHWAY
Public Information Meeting – August 27, 2009
STATE ROAD 25, SEGMENT 2From 0.42 mile east of Tippecanoe/Carroll County line
to 0.20 mile east of CR400WLength of 8.46 miles with 9 Bridges
INDOT DESIGN CONSULTANT:Bernardin Lochmueller & Associates, Inc.
Jeff Whitaker, P.E.
![Page 2: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/2.jpg)
![Page 3: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/3.jpg)
Section 2: Central Segment
Current Design Status Road & Bridge Design - 50%
Complete R/W Engineering – 50% Complete
![Page 4: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/4.jpg)
Section 2: Central Segment Work Schedule
Hydraulic Review & Grade Review(Completed 2007)
Context Sensitive Solution Design (Completed August 28, 2008)
Preliminary Field Check of Road & Bridge (February 23, 2009)
Public Information Meeting (August 27, 2009)
Design Approval (September 2009)
![Page 5: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/5.jpg)
Section 2: Central Segment Right-of-Way Schedule
R/W Engineering & Acquisition (2008-2011)
90 Parcels of Property 26 Relocation R/W Appraising
(Oct/Nov 2009-April 2010) Property Information
![Page 6: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/6.jpg)
Construction Schedule Phase 2A - (November 2010- 2012) Phase 2B – (March 2011-2013) Phase 2C – (December 2011-2013) Phase 2D – (October 2011-2013)
Section 2: Central Segment
![Page 7: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/7.jpg)
Alignment Issues: Alignment was shifted on SR 25 and Connector
Roads to avoid Environmental Sensitive Areas Alignment shifted on SR 218 because of an at-
grade Railroad Crossing Alignment shifted on Connector Road between
the New SR 218 and Existing SR 218 Robinson Branch Bridge Added:
Because of Environmental Stream Impacts & Wetland Seeps
Upstream Bridge Creek Bridge Added: Because of hydraulics & cost savings
Section 2: Central Segment
![Page 8: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/8.jpg)
Main Street Access Local Officials Requested – Main Street
Access Revised Improve Entrance into Delphi Signature Bridge for the Monon Trail
Section 2: Central Segment
![Page 9: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/9.jpg)
![Page 10: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/10.jpg)
![Page 11: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/11.jpg)
Context Sensitive Solutions - Deer Creek Valley Rural Historic District
Committee Stakeholders Total of 4 Meetings, Last Meeting August 28, 2008 Context Sensitive Design Solutions
Texturing & Coloring of the Retaining Walls & Bridge Piers
Shape of Bridge Piers Type of Bridge Railing Type of Landscaping Type of Lighting at Main Street
Section 2: Central Segment
![Page 12: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/12.jpg)
![Page 13: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/13.jpg)
![Page 14: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/14.jpg)
![Page 15: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/15.jpg)
![Page 16: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/16.jpg)
![Page 17: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/17.jpg)
![Page 18: HOOSIER HEARTLAND HIGHWAY](https://reader034.vdocument.in/reader034/viewer/2022051517/5681573e550346895dc4e4ac/html5/thumbnails/18.jpg)
HOOSIER HEARTLAND HIGHWAY
Thank You For ComingQuestions Contact:
Aimee Kindred, Public Involvement DirectorOffice: (317)234-4938Mobile: (317)517-2166
Fax: (317)233-4929Email: [email protected]