horizon charter school · chapter i: introduction and ... 22 chapter v: updated school-wide ... hcs...
TRANSCRIPT
Horizon Charter School
THREE-YEAR TERM
PROGRESS REPORT
2800 Nicolaus Rd. Suite 100
Lincoln, CA 95648
1-800-338-8003
www.horizoncharterschools.org
Horizon Charter School
April 27th & 28th, 2015
Accrediting Commission for Schools
Western Association of Schools and Colleges
Horizon WASC Final 2015.docx Page 2 of 48
Table of Contents
Chapter I: Introduction and Basic Student/Community Profile Data ........................................................... 3
Introduction .............................................................................................................................................. 3
Community Profile Data ............................................................................................................................ 6
Chapter II: Significant Changes and Developments .................................................................................... 10
Changes in Instructional Support and Curriculum .................................................................................. 10
Changes in Assessment and Accountability ............................................................................................ 10
Changes in Personnel and Organizational Structure .............................................................................. 11
Changes in Culture and Support ............................................................................................................. 13
Chapter III: Process for the Development of the Progress Report ............................................................. 14
Chapter IV: Critical Areas of Follow-up Progress ........................................................................................ 15
Critical Area of Need #1 .......................................................................................................................... 15
Critical Area of Need #2 .......................................................................................................................... 17
Critical Area of Need #3 .......................................................................................................................... 18
Critical Area of Need #4 .......................................................................................................................... 20
Critical Area of Need #5 .......................................................................................................................... 22
Chapter V: Updated School-wide Action Plan ............................................................................................ 25
CONTINUOUS IMPROVEMENT ACTION PLAN: FOCUS AREA 1-MATH .................................................... 27
CONTINUOUS IMPROVEMENT ACTION PLAN: FOCUS AREA 2-ELA ........................................................ 34
CONTINUOUS IMPROVEMENT ACTION PLAN: FOCUS AREA 3-CAHSEE ................................................. 41
Glossary of Terms........................................................................................................................................ 47
Horizon WASC Final 2015.docx Page 3 of 48
Chapter I: Introduction and Basic Student/Community Profile Data A brief general description of the school, the school-wide student goals, the student
demographics, and the faculty/staff demographics,
A summary of the disaggregated and interpreted student achievement data since the
last full self-study, and how it may have impacted the entire school and designated
subgroups of students,
The status of the school with respect to governing authority expectations, e.g.,
program improvement school, year three; Academic Performance Index (API); audit
and resulting corrective action plan integrated into the single school plan.
Introduction Horizon Charter School (HCS) was established in 1993 and is chartered through the sponsoring
district, Western Placer Unified School District. In June of 2013, the HCS charter was renewed
for five years. HCS serves approximately 1,369 students in grades Kindergarten through 12th
grade providing “Quality Education through Personalized Learning”. Our students reside within
six counties: Placer, Nevada, Sutter, Yuba, Sacramento, and El Dorado. The Administrative
offices and Curriculum Resource Center (CRC) are located in Lincoln, California. The CRC
houses our school-recommended, standards-based curricula, along with a vast amount of
curricular options for families to choose from, when personalizing their child’s educational plan.
HCS has two locations, Roseville Learning Center and the Special Education location, as well as
access to other geographical facilities which are hubs for independent study resources provided
to support student learning. These resources are as follows: multiple class offerings (as described
below), a location for the necessary labs for the A-G class offering with such requirements, an
optional meeting place for Supervising Teachers and families and tutoring and/or intervention
class support, and an available location for state and school wide assessment testing for all
students.
Vision Statement
Quality Education through Personalized Learning. HCS is dedicated to the belief that each
and every student can succeed. This singular purpose will be achieved through personalized
learning, using a variety of instructional methodologies.
Personalized Choices
The personalized learning approach embraces the idea that parents should have a voice in how
their students learn and how their educational plan is designed. As such, a Personalized Learning
Plan (PLP) is developed for each independent study student based on the Common Core Content
Standards and on each child's abilities, interests, and aptitudes. Students and families are largely
responsible for their educational inquiry and pursuits. Special education services are provided to
eligible students.
Horizon WASC Final 2015.docx Page 4 of 48
Governance
HCS is governed by a Board of Directors that governs both Horizon Charter School and
Partnership for Student-Centered Learning. In concert with Administration, the Governing
Board makes decisions based on fiscal soundness and the commitment of “Quality Education
through Personalized Learning”.
The Governing Board works under the Carver Model of Governance. As such, the Board has
developed Board ENDS, also known as Expected School-wide Learning Results. These Ends
are reviewed and analyzed systematically over the course of each school year. The last update to
these Ends occurred in October 2014 to reflect the changes in the common core state standards.
The adopted Ends are as follows:
Expected School-wide Learning Results or Board Ends
Horizon Charter Schools exist to ensure students achieve academic excellence that meets or
exceeds common core state standards as demonstrated by multiple measures. Horizon Charter
Schools will support parental choice and personalized learning, exercise fiscal prudence, and
provide a safe environment.
As a result of our efforts, students will:
1. Demonstrate reading, writing, mathematics, history, and science content understanding that
meets or exceeds the common core state standards. Effective use of technology, project-based
learning, and the integration of critical thinking strategies are essential components woven
throughout all content areas.
a. Reading/Language Arts
Demonstrate understanding of reading, writing, written and oral English language
conventions, and listening and speaking within a balanced and comprehensive language
arts program.
b. Math
Demonstrate understanding of mathematical concepts in the elementary and middle grades,
as described by the common core content standards, through the application of the
standards for mathematical practice.
c. Social Studies
Demonstrate knowledge, understanding, and comprehension of the political process, and
awareness of people, cultures, events and movements in history and contemporary society.
d. Science
Demonstrate an understanding of earth, life, and physical sciences through subject matter
study as well as the application of the scientific method through investigation and
experimentation.
2. Pursue their own special interests and talents while challenging and improving their abilities in
the following areas:
a. Effective use of technology.
b. Problem solving, reasoning and critical thinking strategies.
c. Visual and performing arts.
Horizon WASC Final 2015.docx Page 5 of 48
Educational Offerings
The educational offerings at HCS are extensive and provide many opportunities for parents to
personalize the educational experience for their child(ren). These offerings are as follows:
Home Study
o In the home study option, parents are responsible for the day-to-day instruction of
their children under the guidance and support of a credentialed Supervising Teacher
(ST). STs meet with each student a minimum of once every 20 school days. In this
model, parents are actively involved in the lesson planning, instruction, and
correcting of assignments.
o Additional Educational Support Services (AESS) is available for high school
students. Students meet weekly or monthly with the Supervising Teacher and study
independently all other school days.
Hybrid Model
o In this option, a credentialed classroom teacher provides cooperative learning
opportunities and instruction to students for one or more classes. These include
many A-G approved classes and are offered through two manners of delivery in this
model:
The A-G support classes occur twice weekly for a total of three hours of direct
instruction in one of the four core academic areas (Mathematics, English
Language Arts, Science and/or Social Science). In addition, elective classes
are offered once a week for three hours each.
Virtual Learning classes (VLI) are offered for high school students. Students
attend these online interactive classes once a week for 90 minutes. Classes are
recorded for viewing at any time. Students have the opportunity to meet with
their VLI teacher during on-line office hours within the week.
Enrichment Classes
o In addition to the core academic instruction, HCS offers several enrichment classes.
These classes run from 6 to 12-week increments. These offerings are based on
student interest and need, as well as parent and teacher feedback. The classes
expand the range of available learning experiences for our students, through such
offerings as: LEGO Engineering, robotics, art, music, drama, cooking, sewing,
tutoring and many more. Some of these classes are taught by credentialed teachers
and others by experienced vendors.
Horizon WASC Final 2015.docx Page 6 of 48
Community Profile Data
Enrollment Data
HCS enrollment has remained stable since the last WASC visit.
Grade 2011 2012 2013
KN 72 58 59
1 56 79 63
2 76 67 84
3 73 77 80
4 84 86 80
5 71 85 86
6 77 86 88
7 84 87 101
8 81 98 78
9 84 97 96
10 134 134 123
11 155 151 159
12 271 215 207
Totals 1,318 1,320 1,304
Student Demographics
Of particular note, since the last WASC visit, the socio-economically disadvantaged population
percentage has decreased from 61% to 35%.
41%
14%
45%
Grade Level, Sept 2014
K-6
7-8
9-12
35.00%
12.40%
3.60%
0.00% 20.00% 40.00%
Socio-economicallyDisadvantaged
Students withDisabilities
English Learners
Horizon 2014-15 Sub-Groups
1%
91%
8%
Language of English Learners
Other
English
Spanish
Horizon WASC Final 2015.docx Page 7 of 48
Academic Performance Index (API)
Year 2010-11 2011-12 2012-13
Actual Growth 730 733 726
Target Base 733 728 739
Chinese-Mandarin
6%
Filipino -Tagalog
3%
Hmong3%
Rumanian8%
Russian51%
Spanish24%
Ukrainian5%
Horizon 2013/14 English Language Learners
First Entry39%
Withdrawal -Non-dropout
38%
Re-Entry7%
Completion12%
Exit Grade1%
Rollover1%
Withdrawal
- Dropout
2%
Horizon 2013/14 Mobility
Horizon WASC Final 2015.docx Page 8 of 48
School-wide Action Plan, Goals #1 and #2
The charts below represent our goals for proficiency rates in Mathematics for grades 2-7 and
Algebra, and for proficiency rates in English Language Arts for grades 2-11. The information
below is based on the STAR test data, which concluded in 2013.
Proficient &Above
Increase
Below/FarBelow Basic
Decrease
Proficient &Above
Increase
Below/FarBelow Basic
Decrease
Proficient&AboveIncrease
Below/FarBelow Basic
Decrease
Proficient &Above
Increase
Below/FarBelow Basic
Decrease
Grades 2-7 Algebra 1 Grades 2-7 Algebra 1
June 2012 June 2013
Base 46 30 16 55 52 30 25 45
Goal 52 20 25 45 57 20 30 35
Actual 44 23 11 67 42 32 10 70
0
10
20
30
40
50
60
70
80
Incr
eas
ed
Pro
fici
en
cy P
erc
en
tage
s
Horizon Charter School Mathematics Action Plan, Goal #1
Proficient &AboveIncrease
Below/Far BelowBasic Decrease
Proficient &AboveIncrease
Below/Far BelowBasic Decrease
June 2012 June 2013
Base 53 22 60 12
Goal 60 12 65 2
Actual 55 18 52 18
0
10
20
30
40
50
60
70
Incr
eas
ed
Pro
fice
ncy
Pe
rce
nta
ges
Horizon Charter School ELA Action Plan, Goal #2
Horizon WASC Final 2015.docx Page 9 of 48
School-wide Action Plan, Goal #3
CAHSEE RESULTS HORIZON CHARTER SCHOOL
English Language Arts Mathematics
Year Number Tested
Percent Passed
Number Not
Passed
Percent Not
Passed Year
Number Tested
Percent Passed
Number Not
Passed
Percent Not
Passed
2009-2010* 284 82 50 18 2009-2010* 279 79 58 21
2010-2011 95 84 15 16 2010-2011 89 72 25 28
2011-2012 136 80 27 20 2011-2012 130 82 24 18
2012-2013 112 82 32 24 2012-2013 109 79 23 21
2013-2014 98 79 21 21 2013-2014 95 78 21 22
*Students tested in March and not February
While maintaining focus on the school-wide goals of improvement in Mathematics, English Language Arts, and CAHSEE, the school has shifted toward integrating the new Common Core State Standards, common assessments and Smarter Balanced testing. Data derived from these will be used to update the School-Wide Action Plan, as well as the implementation steps to improve student learning.
82
50
18
84
15 16
80
2720
82
3224
79
21 21
0
50
100
Percent Passed Number Not Passed Percent Not Passed
CAHSEE English Language Arts
2009-2010* 2010-2011 2011-2012 2012-2013 2013-2014
79
58
21
72
25 28
82
2418
79
23 21
78
21 22
0
20
40
60
80
100
Percent Passed Number Not Passed Percent Not Passed
CAHSEE Mathematics
2009-2010* 2010-2011 2011-2012 2012-2013 2013-2014
Horizon WASC Final 2015.docx Page 10 of 48
Chapter II: Significant Changes and Developments
● Include a description of any significant changes and/or developments. i.e., program
additions since the last full visit, changes in student enrollment, staffing changes. ● Describe the impact these changes and/or developments have had on the school and/or
specific curricular programs.
Since the 2011 WASC visit, the school has implemented several significant changes. These
changes are related to the identified critical areas of need and have had an impact school-wide.
Since the last report our school has experienced several significant changes in instructional
support and curriculum.
Changes in Instructional Support and Curriculum
1. Increased student instructional support: Over the past few years, there have been several
significant changes to the instructional support offered to students and parents. After the
2011 WASC visit, the school worked through the charter renewal process. A Master
Schedule of classes was created which included Virtual Learning Instruction to allow
increased access for educational support services. This increase in academic support
enabled students to access more services at multiple learning centers in a wide variety of
geographical locations and/or virtually.
2. AESS/Excel Services: In the past, students in need of additional support or credit recovery
were served by Excel teachers, however there was a consistent need for more Excel
teachers to serve an increasing number of students. In order to increase accessibility to this
additional academic support, Excel was restructured in 2013-2014. This restructuring has
led to fewer designated Excel teachers, but an increase in the number of teachers serving
this population overall as regular Supervising Teachers. STs are now serving the same
population through Additional Educational Support Services (AESS B). This change has
resulted in more students receiving additional support.
Since the last report, our school has experienced several significant changes in assessment and
accountability.
Changes in Assessment and Accountability
1. Implement new Common Core Support Services (CCSS) aligned assessments - In
order to more accurately monitor student achievement and as a result of the extinction of
Standardized Testing and Reporting (STAR) measurements for mathematics and ELA, the
school purchased a new online diagnostic and instruction tool called i-Ready Diagnostic
and Instruction. The i-Ready Diagnostic and Instruction tool was piloted in 2012 to
determine its effectiveness with the independent study model. The success of the pilot
resulted in the school-wide purchase and implementation of i-Ready in November 2014.
i-Ready provides common assessment data at a school-wide level and has given the school
Horizon WASC Final 2015.docx Page 11 of 48
the ability to disaggregate data. It is also a data warehousing tool. i-Ready assessments and
instruction are aligned to CCSS math and reading which will help monitor student
achievement going forward. With this tool, the school can monitor the student’s progress
over the course of the year as well as students’ year to year progress. This is accomplished
by having students take multiple assessments throughout the year, such as a beginning-of-
the-year and end-of-the year assessment. The school plans to continue the use of i-Ready
in the 2015-2016 school year and beyond.
2. Revise the Response to Instruction and Intervention (RtI2) School-wide Plan - During
the 2014-2015 school year, the School-Wide RtI2 Plan is in the process of revision. Some
of the revisions include the new CCSS aligned math curricula as well as the new assessment
tool (i-Ready) the school is using. The levels of intervention are being updated to reflect
the Multi-Tiered Systems of Support (MTSS) recommended by the CDE. In addition to
interventions described in the previous RtI2 plan, more specific interventions will be added
for each tier to ensure all students achieve. One goal of the plan is to revise the intervention
support model in order to service a greater number of students. Another example is making
the Individualized Learning Plan (ILP), the document where all intervention and pertinent
student data are recorded, available online in Google Drive. This allows teachers to share
the document in real-time which will facilitate better and timelier communication between
a student’s various teachers and administrators.
Since the last report our school has experienced several significant changes in: personnel and
organizational structure.
Changes in Personnel and Organizational Structure
1. Change in Chief Executive Officer (CEO)/Chief Academic Officer (CAO) - Since, the
last WASC visit, changes in leadership have had significant impact on the school’s
organization and has led to staff working together more cohesively and narrowing the focus
to student achievement. The school has undergone multiple executive and administrative
changes and vacancies. In 2011 a new CEO was responsible for implementing the vision
and mission of the school. Specifically he was responsible for implementing policies,
procedures, and staffing to address the identified critical areas of need and to meet the
school-wide goals. At that time, the CAO position was vacant. A new CAO began at the
start of the 2012-2013 school year, however, the CAO was absent part of spring 2014. In
November 2014 the CEO position was vacated and an interim CEO (the previous CAO)
was appointed by the Governing Board, absorbing duties related to both positions. She has
focused efforts on maintaining stability in school leadership and programs, while also
continuing the forward momentum on school-wide goals and critical areas of need.
The Governing Board exercised its authority to appoint the Superintendent/CEO of
Horizon Charter Schools. They evaluated Dr. Cynthia Wood’s (the current interim CEO)
work performance, her commitment to Horizon, and her integrity. In addition, they
thoroughly evaluated the responses to the CEO Survey distributed to all stakeholders in
late January. Having taken all this into account, it was with great pleasure and confidence
that the Board unanimously appointed Dr. Wood as Superintendent/CEO at the February
26, 2015 public meeting.
Horizon WASC Final 2015.docx Page 12 of 48
2. Change in Chief Business Officer (CBO) - In spring of 2013 the CBO position was
vacated. The school has posted and interviewed for the position several times without
success. The absence of the CBO slowed the ability to access financial information which
affected decision making school-wide. The school engaged the services of Delta Managed
Solutions (DMS), an administrative services firm, to temporarily assume CBO duties.
Initially, access to financial information was limited, however, access to this information
has consistently improved.
3. Director level changes - There have been changes to director level positions since the last
WASC visit. The position of Director of Curriculum, Instruction and Professional
Learning, had been vacant since spring 2011. The position was filled in July 2014. The
position of Director of Special Education had been vacant since spring 2011 as well, and
was filled in summer 2014. The absence of leadership in these positions created a lack of
consistency in these departments. It has also impacted the school’s ability to address goals
and critical areas of need. Now that these positions have been filled, there has been
consistent progress in implementing goals and meeting the needs of students. For example,
Special Education has implemented a new method of communication between special
education and general education teachers in order to better serve students. Leadership in
these positions has also led to an increase in the number of staff trainings, as indicated in
our Action Plan and the LCAP. This increase has contributed to new CCSS aligned math
curriculum being purchased and teachers trained in its implementation. Another significant
change to the director level was the addition of the Director of Innovation and Marketing
position. This position has been instrumental in facilitating new methods of communication
like recording the CEO updates and posting them online. Staff and families are utilizing
social media more effectively for communication and marketing.
4. Regional Administrator changes - There have been significant changes to the Regional
Administrator (RA) positions. In 2011, there were six Regional Administrators. The
number of RAs who oversee teachers has been reduced incrementally to the present number
of three, each providing leadership to about 30 teachers. With fewer RAs monitoring and
evaluating a greater number of teachers and operating in a larger geographic area, the
school is meeting this challenge by developing more efficient methods of service delivery.
5. Counselors - The Guidance Department has shown steady improvement in the last three
years by expanding the number of full-time counselors devoted specifically to guidance.
In fall 2014, two dedicated full-time counselors were hired, with one having extensive
charter school experience. This department is now able to better support students and staff.
This was done by offering more meeting times with parents and students, regularly
schedule regional visits, the implementation of student outreach (college readiness
workshop, college fair, and 8th grade orientation), accurately reviewing transcripts,
disseminating CSF and scholarship information, developing a school-wide course catalog,
aligning A-G courses and requirements, and developing and adopting Board policies. This
has positively impacted teachers, students, and administrators by clearly communicating
course offerings, prerequisites, and college awareness.
Horizon WASC Final 2015.docx Page 13 of 48
6. Department Head Positions created - Department Head positions were created for Math,
English, Science, Social Studies, Foreign Language, and VAPA in fall 2013. Department
Heads are responsible for the monitoring, facilitating, and supporting of teachers for all
grade levels. Additionally they are responsible for the development of UC approved A-G
courses and training of other staff in their curricular area. Regular department meetings
have created opportunities for more subject matter collaboration and training which has
resulted in greater consistency in instruction. Regular communication with the Guidance
Department has ensured that A-G courses are current and support the development of new
courses aligned to CCSS and NGSS.
Changes in Culture and Support
1. Communication changes - The school has increased use of its website and social media
to improve communication, interaction, and sharing of resources. It created a
parent/teacher friendly portion of the school website, The Homeschool Hub, which is
referred to as “The Hub”. These improvements have provided easy access to information
for parents. The Hub is an all-in-one spot for parents, teachers, and students to find
information that is continuously updated with news and events. It is used by Roseville
Learning Center to disseminate assignments and classroom information pending the
opening of the Roseville Learning Center. The Hub also houses parent and teacher
resources aligned with common core. The use of School Pathways’ student/parent portal
in place of Jupiter Grades has increased availability (school-wide, K-12 - not only LC
classes or limited courses) to student assignments, grades, reports, and online courses. Use
of Facebook, YouTube Channel, and social media has promoted sharing of school culture
and student work, outreach to prospective families, timely information of events to
students/families (example: 8th grade orientation, school updates), and the
interaction/sharing of resources.
Horizon WASC Final 2015.docx Page 14 of 48
Chapter III: Process for the Development of the Progress Report
• Describe the process to prepare this progress report. Include to what extent stakeholders
were involved in the preparation of the report.
• Describe the process to present the progress report to the governing board.
The process for developing the progress report for Horizon Charter School focused on the
involvement of and input from all stakeholders.
In preparation for this report, the school referred to the critical areas of need and school-wide
action plan, and facilitated informative, thought provoking discussions with administration,
teachers, classified staff, students, and parents. A PowerPoint was created and presented to
stakeholders. It gave the background of WASC and how accreditation relates to a school’s success
and student achievement. The PowerPoint also centered on the school’s self-study, goals and
expectations for this school year, including a visit from the WASC accreditation team.
Weekly WASC oversight committee meetings were scheduled at the district office. Information
and activities from these meetings were reviewed, discussed and prepared at monthly school
administrator meetings. Regular staff meetings allowed for teachers to give feedback and share
insights to address progress on the identified critical areas of need and the school-wide action plan.
Staff also created online surveys for parents and students to share information and relevant data
regarding our program and student achievement.
All stakeholders were involved in the preparation of this report. Stakeholders included students,
parents, Supervising Teachers, learning center teachers, classified staff, and Governing Board. A
wide variety of activities were used to present information and generate specific feedback from
our stakeholders including: email, Google Docs, surveys, school sponsored events, staff meetings,
learning record meetings, the school websites, PowerPoint presentations, and videos shared on the
school’s YouTube channel.
An initial PowerPoint presentation was shared with the Governing Board in October 2014 which
included an overview of the WASC process and how it relates to our school. Regular updates to
the Board occur each month. In March 2015 the final version of the progress report was presented
to the Board.
Horizon WASC Final 2015.docx Page 15 of 48
Chapter IV: Critical Areas of Follow-up Progress ● List the critical areas of follow-up and reference the school-wide action plan sections
where each critical area for follow-up has been addressed. If any critical areas for
follow-up were not included in the school’s action plan, indicate what actions have
been taken to address the issue.
● Comment on the progress made to date for each critical area for follow-up and cite
evidence and examples of the impact on student learning.
Critical Area of Need #1: The primary and most important area for follow-up and growth is
for instructional development and improvement. The obvious need for administrative
reorganization and staff development for improving instruction is apparent throughout the system.
The lack of emphasis on instructional development and improvement, while common, must be
addressed “from top to bottom” and system-wide.
Update on progress and how the recommendation was incorporated.
As mentioned in Chapter 2, the school has experienced several areas of leadership change. Many
of these changes focused on improving instructional strategies and leadership throughout the
school. Positions that need to be highlighted here are the addition of Director level positions, a
Math Coach, and subject matter Department Heads. Department Heads are responsible for the
monitoring, facilitating, and supporting of teachers for all grade levels. Leadership in these
additional positions have led to an increase in the number of staff trainings, as indicated in our
Action Plan and the LCAP.
In an effort to further improve academic achievement, the school moved to the Common Core
State Standards (CCSS) in the 2014-2015 school year. The shifts required by the new standards,
both in content and in practice, necessitated a refocus on math and ELA. Historical data
demonstrates that school-wide achievement in mathematics and ELA has been limited and
inconsistent. This inconsistency in achievement concerned school leaders and led them to
determine that math and ELA would continue to be focus areas for 2014-2015, while building
instructional strategies to support the new CCSS implementation. By concentrating resources on
these areas, school leaders agreed that change would be implemented and supported more
effectively. In July of 2014 the position of Director of Curriculum, Instruction and Professional
Learning was created for the purpose of increasing achievement through professional development
by building capacity in instructional strategies and implementation of CCSS.
An important action was taken to improve instruction and achievement in math to provide high
quality CCSS aligned curriculum to all students. New A-G course offerings were written,
submitted, approved, and offered to students as online and learning center courses. A Mathematics
Department Head/Coach position was created and filled to oversee the writing, training, and
implementation of math courses. The Math Coach, working closely with a member of the
Sacramento State University faculty and the Director of Curriculum, Instruction and Professional
Learning, began training teachers in CCSS standards and the applicable math shifts during summer
2014. Additional full-day training opportunities with the Sacramento State partnership are being
offered throughout the 2014-2015 year. These trainings are open to all stakeholders and cover
Horizon WASC Final 2015.docx Page 16 of 48
engagement strategies applicable across all curricular areas. The Math Coach has provided
demonstration lessons, lesson co-planning and co-teaching opportunities, and lesson observations
and feedback. One goal is to provide three coaching opportunities for each learning center teacher
this year. Going forward it will be written into the LCAP/LCFF that Professional Development
(PD) support in mathematics and the Math Coach position continue another year (2015-2016),
targeting Supervising Teachers and parents in order to better support Home/Independent Study
Instruction.
In preparation for the implementation of ELA CCSS, Horizon developed supplemental projects
and identified other resources to address the common core standards. During the 2014 Summer
Institutes, participants developed Project Based Learning for all grade levels.
Evidence and reference to the school-wide action plan.
Evidence School-Wide Action Plan
Director of Curriculum, Instruction & Professional
Learning
Math 1.4, 1.5, 2.1, 2.2, 2.3, 2.4, 3.1, 3.2,
5.2
ELA 1.1, 1.2, 1.3, 1.4, 2.3, 2.5, 3.1, 3.2,
3.3, 4.1, 4.2, 5.1, 5.2
CAHSEE 1.4,1.8, 2.1, 2.2, 2.3, 2.4, 3.2,
4.1
Department Heads Math 1.1, 1.2, 1.4, 2.1, 2.2, 2.3, 5.3,
ELA 1.2, 1.4, 2.1, 2.2, 5.1, 5.2
CAHSEE 1.4, 2.4, 3.2, 4.1
LCAP Math 1.1, 1.2, 1.3, 1.5, 2.1, 2.2, 2.3, 3.2,
4.2, 5.1, 5.2, 5.4, ELA 1.1, 2.3, 3.2, 4.2,
CAHSEE 1.3, 2.1, 2.2, 2.3, 4.1
Math Coach Math 1.1, 1.2, 2.1, 2.2,
CAHSEE 1.4, 2.4, 4.1,
Project Based Learning- Project/Lesson
development summer opportunities.
Math 1.1, 2.2, 2.3, ELA 1.1, 1.4, 3.1,
Horizon WASC Final 2015.docx Page 17 of 48
Critical Area of Need #2: The school needs to provide – by providing careful but appropriate
budgeting-management with the ability to increase time/opportunity for all staff - access to
additional quality professional development.
Update on progress and how the recommendation was incorporated.
During the 2012-13 and 2013-14 school years, travel and conferences were frozen due to budget
constraints. Throughout this time Horizon communicated and offered professional development
opportunities that included webinars and internal trainings that were at no cost to the school.
Horizon also accessed curriculum support tools and professional development through current
vendors and various online resources. These were largely included as part of curriculum packages
or recommended by staff through research and development that connected back to the school’s
goals.
In the past year, the school has focused on increasing staff access to Professional Development
through funding from CCSS grant funds connected to our implementation and budgeting process.
With input from all stakeholders, the school created an on-going three-year Local Control
Accountability Plan (LCAP). The LCAP was approved by the Governing Board in June 2014. The
Schoolwide Action Plan identifies annual academic goals and specific actions for implementing
those goals, including methods of measuring student progress based on performance indicators set
by the state. In connection with the Local Control Funding Formula (LCFF), the school has
allocated specific budget line items in the LCAP to support this area. Examples of Professional
Development implementations are listed under the Critical Areas of Need #3. This critical area for follow up has undergone a natural progression within the last three years.
With the changes from the State of California as to how the school assesses its students and the
shift to Common Core, it has been a necessary movement to increase time for collaboration and
professional development. While monthly meetings with teachers were already in place, those
meetings focused on soliciting feedback about curriculum development needs and how best to
deliver that information. Program Decision Teams (PDTs) were formed which included all
stakeholders in order to make informed decisions in regards to the plan for implementing the new
testing requirements, roll out, and movement to Common Core.
During the 2013-14 school year, CCSS one-time implementation funding was received from the
state in order to more effectively implement the Common Core State Standards. Administration
decided on allocation of the funding to best meet the Board Ends. With these one-time monies, the
school distributed 25% to professional development, 25% to Common Core math aligned
curriculum, and 50% to technology in support of data-driven assessment and student access to 21st
century skills.
As a part of the Individualized Education Plan (IEP) process, the school has pursued medical
billing of the family’s insurance as a reimbursement for services offered to special education
students when this avenue of funding is applicable. The special education medical billing form is
provided at the IEP meeting for parents to authorize permission for billing. These monies are
applied to the benefit of each individual student, as specified in the IEP.
Horizon WASC Final 2015.docx Page 18 of 48
During the summer of 2014, the school applied for and was awarded funding from the Microsoft
California Education Technology K-12 Voucher Program. This allowed for the purchase of
Microsoft Office Suite for use by all staff and students. In the latest edition, staff and students can
stay current with the industry standards in these communication tools.
Evidence and reference to the school-wide action plan.
Evidence School-Wide Action Plan
LCAP/LCFF Math 1.3, 1.5, 2.1, 2.2, 2.3, 3.2, 4.2, 5.1, 5.2, 5.4,
ELA 1.1, 2.3, 2.5, 3.2, 4.2,
CAHSEE 1.3, 2.1, 2.2, 4.1
CCSS one time implementation funding Math 1.1, 4.2, 2.2,
ELA 1.1, 1.3, 2.3, 3.1
Prof. Development Opportunities and
curriculum support tools/packages
Math 1.1, 1.2, 1.4, 1.5, 2.2, ELA 1.1, 1.3, 1.4, 2.3, 3.1, 5.1,5.2, 5.3 CAHSEE 1.3, 2.1, 2.3, 2.4, 3.2
Critical Area of Need #3: A very significant – as demonstrated by this oft repeated theme –
need exists for “more targeted and professional development” for teachers and parents, particularly
in intervention planning and prevention. Teachers also need to have professional development and
collaboration time to develop a plan for and strategies to address key learning issues in EL and
SED (socially economic disadvantaged) students.
Update on progress and how the recommendation was incorporated.
The effort to ensure that teachers and parents receive the professional development and
collaboration time needed to improve their skills in educating students has taken several routes.
These routes, while listed separately in this narrative, were designed to interact and to be mutually
supportive, driven by the unifying philosophy that students learn best when the instructional
approach is targeted, driven by data, and when teachers and parents utilize similar approaches.
Perhaps this approach is best epitomized by the school’s Response to Instruction and Intervention
which is, “a plan developed…to ensure that all students (including EL and SED) receive the
support and individualized instruction that they need in order to master grade level standards”.
One example of a measure taken to ensure equal access to instructional support materials includes
the issuing of student laptops for SED students who are enrolled in online courses.
Teachers received training through the California Math Project at CSUS and the Summer
Institutes. The monthly Regional Administrator meetings provided teacher training in the use of
ELA, writing and math benchmarks, Smarter Balanced on-line practice tests, how to use Go Math
and i-Ready for diagnostic and instructional purposes, and how to use the results of CELDT testing
to inform instruction. In addition to teachers, parents were also trained in the use of benchmarks,
Horizon WASC Final 2015.docx Page 19 of 48
(GoMath! and i Ready) through sessions offered at the learning centers and the training offered by
the Supervising Teachers. The Guidance Department’s College Readiness and 8th Grade
Orientation programs provided additional opportunities for collaboration and planning.
A significant and positive consequence of this focused teacher and parent training is the mutual
use and incorporation of the iReady and GoMath! instructional strategy systems. The learning gaps
for students are being discovered and remediated. The inclusion of this training in the regional
meetings has ensured the increase of teacher collaboration and planning time.
Given that Horizon covers a large geographic area, encompassing six counties, focus is placed on
offering online professional development as much as possible. School staff use Adobe Connect for
scheduled and impromptu online collaboration and trainings. Most recently, the Math Department
Chair established rich opportunities for teachers and parents to learn more about Common Core
math and how to incorporate these methods of teaching. Teacher trainings start during the summer
and continue throughout the school year. Sessions focus on the sharing of videos of one-on-one
teaching, collaboration days with parents and students, and end with a day concentrated on
teaching Common Core math from grade 5 to Algebra. Trainings are posted on the Hub portion of
the school website for teachers who need help with our new online reporting system allowing them
to view Professional Development on demand.
Online learning was also used to implement school-wide training, including instructional
strategies, curriculum implementation, technology and safety-related training. In addition to
teacher and parent related information, there are required safety courses for each staff member
with other options available. Supervisors have the ability to recommend or assign resources based
on need.
The increase use of online collaboration has resulted in a more productive environment for the
school. Google Docs and other collaborative tools are utilized to share information and develop
ideas across the school. A collaborative Google Doc was recently developed linking general
education teachers, special education teachers, and providers in order to facilitate collaboration.
Problem solving, tracking use of accommodations, and adjustments to instruction may be easily
done using this medium. Using Google Docs, staff is able to get real-time information which
creates a cohesive team within our school for the benefit of the student and it helps ensure that all
instructional strategies, accommodations and modifications are being appropriately delivered.
As a part of the Common Core Implementation Plan, professional development opportunities
continue to be an important component of our school-wide action plan. For example, members of
the staff attend conferences, trainings, workshops, and webinars. These assist staff in keeping
abreast of recent research-based methodologies related to assessment, curriculum development
and the latest regulations in special education and independent study. Outside vendors also trained
staff on appropriate use of online programs and Common Core curriculum. Continuous training
on the school-wide RtI2 program provides data, allowing staff to better track and serve all students,
including our EL and SED student population, with Individualized Learning Plans.
Horizon WASC Final 2015.docx Page 20 of 48
Evidence and reference to the school-wide action plan.
Evidence School-Wide Action Plan
Online/real-time Professional Development trainings and
webinars.
MATH 1.1, 2.1, 2.2, 5.5 ELA 1.4, 2.1, 2.5, 3.1, 5.2
CCSS Implementation and Summer Institutes MATH 1.1, 2.1, 2.3, 2.4 ELA 1.2, 1.3, 2.2, 3.1,
Increased use of online collaboration MATH 3.2, ELA 1.4, 5.2, CAHSEE 1.8
Variety of Professional Development opportunities MATH 1.1, 2.1, 5.5, ELA 2.5, 3.1, 5.2, 5.3
Special Education and Regular Education collaborative on-
line forms/communication.
MATH 2.3, ELA 5.1 CAHSEE 1.4, 1.7, 2.3
Individualized Learning Plan (ILP) MATH 3.1, 4.2, ELA 2.1, 4.1 CAHSEE 1.4, 1.7, 2.3
Critical Area of Need #4: Time and consideration for analyzing and application of
assessment data must be attended to, with the goal of improving instruction for all staff.
Update on Progress and how the recommendation was incorporated.
This critical area for follow up has undergone a natural progression within the last three years.
With the changes from the State of California as to how we assess our students and the shift to
Common Core, it has been necessary to make improvements in the area of data
assessment. Several Program Decision Teams (PDTs) were formed which included all
stakeholders in order to make informed decisions in regards to the plan for implementing the new
testing requirements, roll out, and movement to Common Core. The Assessment Department sent
regular emails to share assessment data with staff and collaborated with the Guidance Department
to share graduation statistics. In addition, data from parent surveys, statewide STAR testing,
transcripts, and CalPads indicated subject areas that needed improvement, (particularly math) and
our Course Catalog was aligned to meet the needs.
Horizon continues to progress toward developing stronger processes for collecting, disseminating
and disaggregating data to all stakeholders to improve student achievement. As part of this process,
the school is continually assessing their tools for effectiveness and ease of use. Due to staff input
Horizon WASC Final 2015.docx Page 21 of 48
regarding Data Director, budget cuts, and ineffective benchmark assessments, this program was
discontinued in early 2012.
The school has faced additional challenges in this area that has had a direct impact in disseminating
and disaggregating school-wide student data. These challenges include changes in management,
vacant positions such as the Chief Academic Officer, the Director of Curriculum, Instruction, and
Professional Learning, and the Assessment Coordinator. In an effort to establish a more systematic
and centralized approach to collect, disseminate, and disaggregate student achievement data, the
school hired a Director of Curriculum, Instruction, and Professional Learning and an Assessment
Coordinator who are spear-heading efforts to strengthen and develop uniform processes and
procedures school-wide.
In the absence of school-wide benchmark assessments, processes have been developed and piloted
in an attempt to best meet this need. Examples of these processes are curriculum-based embedded
assessments, Quick Reading Inventory, CST data, and grade reports for progress monitoring.
i-Ready, a universal diagnostic tool, was piloted with the RtI2 staff as its use for intervention and
targeted instruction. As a result of their success, i-Ready’s pilot was expanded the following year
to include a small group of Supervising Teachers, with the same positive results. This combined
success resulted in a school-wide implementation of this program for the 2014-15 school year. i-Ready was purchased and implemented in order to identify students needing additional
instructional support. Parents received a letter about the use of i-Ready throughout Horizon, giving
them information about testing procedures and timelines. i-Ready reports demonstrate that
students in grade 1-11 have completed their diagnostic assessment.
Data was used to identify areas of needed professional development. Staff received training to
analyze data and administer the RtI2/i-Ready. Staff meetings were held for professional
development related to assessment with the goal of improving instruction for all staff. Most
recently, our Math Department Chair established rich opportunities for teachers and parents to
learn more about Common Core math and how to incorporate these methods of teaching to
improve instruction across all subject areas. The school continues to incorporate data analysis to
inform instructional practices across all curricular areas.
Horizon WASC Final 2015.docx Page 22 of 48
Evidence and reference to the school-wide action plan.
Evidence School-Wide Action Plan
i-Ready Diagnostic Assessment MATH 2.3, 3.1, 3.2,5.2 ELA 1.3, 2.1, 2.3, 4.1, 5.1, 5.2
PLC/ST/Administrative meetings MATH 2.1, 2.3, 3.1,3.2,5.5 ELA 1.4, 2.1, 2.3 5.1,5.2 CAHSEE 1.1, 1.3, 3.1, 4.2
Guidance data MATH 4.4, ELA 3.3, 4.1, 4.2 CAHSEE 1.2
RtI2 Implementation Plan MATH 1.5 ELA 1.5, 2.1, 2.3, 2.5, 4.1, 5.1 CAHSEE 1.3, 2.1,
Program Decision Team meetings ELA 1.4
Critical Area of Need #5: In the realm “School Culture and Support for Student Personal and
Academic Growth,” a comprehensive review of program, services, and strategies needs to be
undertaken; the goal must be to provide more and better targeted services to a wider, diverse body
and school community.
Update on Progress and how the recommendation was incorporated.
Over the past three years the school has improved stakeholder access to information and resources
to support student personal and academic growth, including: a school webpage, called the “Hub”,
was created to supplement the school website with up-to-date information for parents, students and
teachers. One example of the usefulness of this site is the Learning Center tab on the Hub page.
Teachers and Administrators have been using the Hub to post weekly assignments, assignment links,
announcements, and teacher contact information. Parents and students have access to the Master
Schedule, school calendar, course catalog, vendor information, and Instructional Support Resources
on the Hub. Parents have systematically gained greater ease of access to instructional support
through the Hub.
In order to provide more and better targeted services to a widely diverse group of students, access to
online curricula has increased. All students have access to high quality online CCSS aligned
curricula and resources to support student learning goals. By providing these resources, all
stakeholders have access regardless of geographical location.
The use of school-wide newsletters, the new school marketing website, Podcasts, YouTube,
Facebook, and our school-wide message service, up-to-date information and resources are
Horizon WASC Final 2015.docx Page 23 of 48
provided to the whole school community. Regional parent events, monthly school update
meetings, monthly teacher and administrator meetings, and board presentations all serve to
improve overall school culture and capture input from all stakeholders regarding best practices for
supporting student academic and personal growth.
Student personal and academic growth has been more widely targeted through the development of a
Guidance Professional Development plan that includes: regular student access to guidance services,
regular transcript review and 4-year planning for students, dissemination of scholarship and financial
aid information, a published Course Catalog with increased course offerings, on-going outreach
through the Hub, event flyers, emails, social media, and one-on-one student meetings. Participation
in College Readiness programs (PSAT, SAT. ACT, AP) has shown a steady increase (+44%) since
2011 due to increased college prep course offerings and greater college awareness through the
delivery of annual College Readiness Seminars, College and Career Fair, and 8th Grade Orientation.
While Supervising Teachers and Administrators gather on-going input from families and students,
more formal online Student/Parent surveys are administered in order to better target our services
to the school community and to assess overall satisfaction and effectiveness of our programming.
Teachers regularly complete feedback questionnaires after teacher trainings and professional
development workshops. Teachers were formally surveyed on the effectiveness of “GoMath!”
resulting in greater usage of this tool to help improve the quality of instruction. The student
performance data generated from the use of benchmark tests and the i-Ready diagnostic tool
(recently implemented in 2014) are regularly analyzed to help measure the effectiveness of
instruction and define programming decisions for instructional interventions.
With overall improvement in communication, increased access to resources, and streamlined
program offerings, strides are being made in providing quality services targeted to a wider, diverse
student body and school community.
Horizon WASC Final 2015.docx Page 24 of 48
Evidence and reference to the school-wide action plan.
Evidence School-Wide Action Plan
HUB Resources MATH 1.4, 5.5 ELA 1.4 CAHSEE 1.8
Guidance Deliverables MATH 1.5, 2.2, 4.4
Parent Surveys; Master Schedule; course offerings MATH 5.1 ELA 1.2, 3.1 CAHSEE 2.4, 3.2
Teacher surveys: GoMath!, Workshops, PD MATH 1.1 ELA 5.2
Data analysis of programs - RtI2, college prep data MATH 1.2, 2.1, 2.2, 3.2, 5.1 ELA 2.1, 2.4, 4.1, 5.1 CAHSEE 1.1, 1.3, 4.2
Horizon WASC Final 2015.docx Page 25 of 48
Chapter V: Updated School-wide Action Plan
● Comment on the refinements made to the school-wide action plan since the last full self-
study visit to reflect school-wide progress and/or newly identified issues. ● Include a description of the school’s procedures for the implementation and monitoring of
the single school-wide action plan. ● Comment on the integration of plans into one single school-wide action plan. ● Include a copy of the school’s latest updated school-wide action plan.
The school-wide action plan has been significantly modified to stream-line goals. The school
identified that the 2011/2012 action plan was too large and broad. Staff agreed that it was necessary
to narrow the scope. With the critical areas of need in mind, the school revised the action plan into
the three Focus Areas and goals for math, ELA, and CAHSEE.
Due to several changes in administration, along with programmatic changes following the charter
renewal in June of 2013, some momentum was lost in the on-going updating of the school-wide
action plan during the 2012/2013 and 2013/2014 school years. Consequently, a WASC committee
was formed and has been meeting weekly since early fall. This committee convened several
school-wide meetings to facilitate conversations and activities to reconnect programs and
initiatives to the school-wide action plan itself.
A column was created within the current action plan to show the connections between the refined
Action Plan Goals and the WASC Identified Critical Areas of Need. This tool is used to evaluate
progress toward the identified goals.
During the last WASC visit, the standard measures of student progress in mathematics and ELA
were Benchmark Assessments purchased from Action Learning Systems. These reports were
uploaded into Data Director and used to gauge progress toward standards mastery in mathematics
and ELA. In the spring of 2012 a Benchmark Task Force that included teachers, administrators,
and parents was formed to review the accuracy and effectiveness of the Benchmark Assessments. The Task Force found that the Benchmarks were not a reliable measure of academic student
progress because of several factors: 1) a lack of uniform pacing as a result of the great variety of
curricula used in “personalized learning”, 2) the need for modified instruction as a result of
assessment data that occurs regularly in the independent study setting, 3) the need for better
alignment of assessment of standards at preset points, quarterly, by Benchmark Assessments. For
example, standards might be covered in a different sequence in the first quarter and some of the
assessment results would therefore be less reliable.
The Task Force found that a more flexible and adaptable approach to assessment of progress
(standards mastery) was needed. It was identified that the use of multiple methods of assessment
were more appropriate for the diverse, personalized approach of the school.
During 2012/2013, the school became largely focused on charter renewal, which it gained.
Administrative infrastructure was still impacted by prior budget cuts and consequently a
Curriculum and Instruction Director position had not been filled. During this time, teachers used
Horizon WASC Final 2015.docx Page 26 of 48
multiple measures and forms of progress monitoring assessment, such as student work and
projects, as well as chapter tests and other curriculum-embedded assessments.
Last year, the state moved away from the previous STAR test to Smarter Balanced Testing, and
Horizon, like all districts and charters, began to educate staff and students on the new Common
Core State Standards. A new diagnostic and instruction tool called i-Ready was piloted by a group
of teachers and students and was officially adopted over the summer of 2014 as the school-wide
assessment tool. Not only is this an adaptive assessment, but this 21st century on-line diagnostic
tool results in personalized instruction based on the student’s individualized needs.
Included in the updated RtI2 Implementation Plan, all students in grades 1 through 11 will take the
i-Ready Diagnostic assessment. i-Ready Instruction will serve as the first layer of intervention
support for students identified as academically at-risk.
RtI2 Implementation is woven throughout each of the academic achievement goals identified in the
current school-wide action plan. The school-wide action plan, which focuses on improving the
school’s system of intervention, has been refined to help educators effectively address the diverse
needs of every student by providing timely and individualized academic support. Going forward, the school-wide action plan and the incorporation of the WASC Critical Areas of
Need will be regularly updated and monitored. With the LCAP directly relating to the school-wide
action plan, there will be a layer of yearly accountability for reviewing, revising, and monitoring
the implementation of the school-wide action plan. The school administrative leadership team will
be monitoring and updating the school-wide action plan monthly based upon on-going stakeholder
feedback. Regular reports to the Board on the progress toward the school-wide action plan goals
and WASC critical areas of need will be provided.
With a focus on student academic achievement, professional development, and common
assessment data, the school believes it is primed for overall steady student academic growth and
success. In keeping with the Board Ends and the school-wide action plan, Horizon is committed
to providing Quality Education through Personalized Learning.
Horizon WASC Final 2015.docx Page 27 of 48
CONTINUOUS IMPROVEMENT ACTION PLAN: FOCUS AREA 1-MATH
Goal 1: Increase Proficiency in Mathematics
By June 2015:
All students will have taken a math diagnostic to be assessed on the CCSS for mathematics with individual learning plans developed to address instructional needs.
Barrier(s): Academically at-risk students do not engage in a sufficient amount of standards-based learning while studying math and need more CCSS-based instruction, while teachers need more professional development. There is a need for more general education and support in all geographical areas.
Program Objective: All students will implement usage of CCSS aligned mathematics curriculum incorporating ongoing, curriculum-based assessment. Academically at-risk students will be quickly identified and provided with necessary intervention as determined by multiple-measures of assessment.
1. Identify and make accessible CCSS-based curriculum with diagnostic tools and embedded CBM.
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--1.1 Disseminate strategies and resources to deliver effective math instruction in the home/independent study environment using recommended and CCSS aligned curricula, including on-line resources.
RAs, C&I Dept., Principals
RAs, CRC Staff, C&I Dept., Teachers, Math Coach, Instructional Support Providers, HR, Business Office, LCAP, CCSS Implementation Grant
Education on CCSS math shifts, web-based training, CSUS Math Project Training participation, Online Project Development, Observations, Implementation of school-wide math assessment, sign-in sheets
On-going
Curriculum selection completed; PCOE trainings; PD opportunities for teachers and administrative staff; Provided Teacher, Parent, and Staff training for full implementation of CCSS; i-Ready training provided and continuous
Self-Identified Areas: 1, 4, 5 VT Identified: 7, 8
Horizon WASC Final 2015.docx Page 28 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--1.2 Continue to align services based on assessment data to build an effective math intervention program with strategies based on peer-reviewed research.
RtI2 Team RtI2 Team, Math Dept., RAs, C&I Dept., LCFF, LCAP, Instructional Support Teachers
Class offerings, specialists and tutors trained, progress monitoring to indicate growth; Math intervention program implementation; Data reports
On-going & In Progress
Intervention assigned to all identified Tier 1-3 students using initial i-Ready diagnostic to identify struggling students; Instructional Support Provider position to be posted fall 2015.
Self-Identified Areas: 1, 4 VT Identified: 6, 7, 8
--1.3 Continue to revise, update and streamline access to effective Tier 1-3 Intervention resources and programs.
RtI2 Team C&I Director
C&I Dept., RAs, Business Office, Math Dept., Instructional Support. Providers, LCAP, LCFF
Problem Solving Teams have a list of web resources and programs and assign to students based on identified needs; Use data and technology tools to measure growth and instruction
Begin Revised RtI2 Plan- fall 2014, in progress
Tier 1-3 students identified and i-Ready tier 1 interventions are available to all students; On-going training in progress; Tier 2 and 3 interventions being researched
Self-Identified Areas: 1, 4, 5, VT Identified Areas: 6, 7, 8
--1.4 Develop specific post–diagnostic instructional strategies.
C&I Director Math Department Head, RAs, Math Coach, Instructional Support Providers
Create template to report assessment data and recommend targeted instructional strategies
Jan. 2012-fall 2014 /On-going
Parent/Student information nights implemented; On-going training conducted with staff; Information posted on The Hub portion of school website.
Self-Identified Areas: 1, 4, 5 VT Identified Areas: 6, 7, 8
Horizon WASC Final 2015.docx Page 29 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--1.5 Ensure accessibility to services, instruction, and CCSS aligned curriculum for all student populations.
C&I Dir., Guidance Dept.
RAs, STs, C&I Dept., Dir. Innovation. & Marketing, CRC, IT Dept., LCAP, LCFF, LEA Plan
Student demographic and achievement data to identify at-risk groups
In Progress, reassess each semester
Implementation of i-Ready, expansion of virtual learning, improved communication to stakeholders via The Hub portion of school web-site, improved access to technology for all students
Self-Identified Areas: 1, 4, 5 VT Identified Areas: 7, 8
2. Conduct ongoing curriculum-based assessment.
--2.1 Provide regional and online training in teaching strategies of the content standards to build consistency in math instructional strategies and necessary learning time with students; Utilize Teachers with math subject-matter expertise to lead instruction and curriculum training.
Math Dept., C&I Dir.
Instructional Support Providers, Math Dept., Math Coach, Business Office, LCAP, LCFF, PCOE materials and training
All Staff In-Service, Intervention website via the Hub portion of the school website, PD opportunities, sign-in sheets, participation feedback, PLC meetings
Monthly Diagnostic data available for all students; Multiple measures of assessment used to identify student academic achievement levels and instructional needs; i-Ready CCSS aligned instruction and intervention piloted by teachers
Self-Identified Areas: 1, 4, 5 VT Identified Areas: 6, 7, 8
--2.2 Develop and provide parent workshops on math instruction, CCSS aligned curriculum, and assessment for students.
C&I Dir. Instructional Support Providers, C&I Dept., Math Coach, LCAP, LCFF
Web-based/face to face training on instructional strategies available on The Hub portion of the school web-site; Parents are encouraged to attend intervention sessions with student; sign-in sheets
Quarterly Videos posted on the Horizon YouTube Channel and The Hub portion of the school web-site for parent access
Go Math PD
Trainings throughout the year via the Math coach geared toward the CCSS in Math
Self-Identified Areas: 1, 4, 5 VT Identified Areas: 6, 7, 8
Horizon WASC Final 2015.docx Page 30 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--2.3 Provide training to staff and parents in the use of multiple measures of assessment.
C&I Dept., RtI2 Team, RAs
Math Dept., C&I Dir., RAs, Instructional Support Providers, LCAP, LCFF
Identify and utilize multiple measures of assessment; Curriculum embedded assessments, i-Ready diagnostic and student work
On-going Presentations at Regional PLC meetings and meetings/On-line
Self-Identified Areas: 1, 4, 5 VT Identified Areas: 6, 7, 8
--2.4 Develop and provide training to staff in the implementation of a school-wide response to instruction and intervention system, including math intervention strategies.
RtI2 Team and C&I Director
C&I Dept., IT, RAs, Inst. Sup. Providers
Presentations at Regional PLC meetings; Semester or quarterly conferences with STs to review and focus upon Individualized Learning Plans
On-going ST and RA conferences to review student achievement data and develop and monitor ILPs for Tier 1-3 identified students
Self-Identified Areas: 1, 4, 5 VT Identified Areas: 6
3. Use multiple measures of assessments to determine individual student needs to inform instruction and appropriate curricular choices
--3.1 Identify Tier 1-3 intervention students based on analysis of diagnostic and other multiple measures of assessment results; Provide curricular and instructional options determined appropriate by the RtI2 Team.
Instructional Support Providers and C&I Director
C&I Dept., RtI2 Team, RAs, PLCs
Continuation of PLCs to follow up on all academically at-risk students i-Ready diagnostic results, written diagnostic option.
Diagnostic tool adopted fall 2014
Continuing PST implementation; Referring students to intervention as recommended by ST via the use of the Individualized Learning Plans and the Problem Solving Teams
Self-Identified Areas: 1, 4, 5 VT Identified Areas: 6
Horizon WASC Final 2015.docx Page 31 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--3.2 Use diagnostic tools aligned to CCSS for all students.
C&I Dept. and Teachers
C&I Dept., RAs, Teachers, IT, Dir. Innovation and Marketing, LCAP, LCFF, LEA
Pilot new online diagnostic tool; Paper assessments CRC/Warehouse
On-going New Diagnostic fall 2014
Math and ELA screening tools identified and available from CRC/Warehouse i-Ready on-line diagnostic implemented in grades 1-11
Self-Identified Areas: 2 VT Identified Areas : 6, 7, 8
4. Require parent accountability for student learning
--4.1 Additional ST services and/or CCSS aligned curricula for students identified as Tier 1-3 intervention.
STs RAs, STs Increase to weekly student meetings Increase in use of CCSS-aligned curriculum
Quarterly Continuous monitoring, academic achievement recognition
Self-Identified Areas: 1, 4, 5 VT Identified Areas: 7
--4.2 Consistent usage of CCSS aligned math intervention program when recommended by Problem Solving Team (PST).
STs RAs, PSTs, LCAP, LCFF, CCSS Implementation grant
Written in ILPs and on-line intervention
Quarterly Progress made through use of ILPs and PSTs
Self-Identified Areas: 1, 4 VT Identified Areas: 7, 8
--4.3 Implement the procedure that failure to follow required intervention plan results in: disallow work permit, Drivers Training, and/or elective classes.
RAs, Guidance STs, Guidance PSTs review progress periodically Guidance Policies
Quarterly monitoring for semester implement-ation
Board Policies in place, Course catalogue draft that identifies prerequisites
Self-Identified Areas: 1, 5
Horizon WASC Final 2015.docx Page 32 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--4.4 Encourage, recognize and reward goal attainment for student performance.
RAs HCS Administration, Guidance Dept.
Regional Events, class rank reports, G.P.A. reports, report cards and attendance data
Semester District Newsletter, Certificates, Board meetings, Social Media, Board Policy 14-23, Graduation ceremony
Self-Identified Areas: 1, 5 VT Identified Areas: 6
5. Offer math support in all geographic areas
--5.1 Improve course offerings meeting A-G requirements.
Administration, HR, CEO, CAO
Guidance Dept., HQTs, C&I Dept., LCAP, LCFF
Master Schedule of Instructional Support and Virtual Learning courses
On-going Master Schedule development of Instructional Support and Virtual Learning Courses On-line course offerings increased Board Policy 14-20 regarding A-G instructional requirements implemented fall 2014
Self-Identified Areas: 1 VT Identified Areas: 7, 8
--5.2 Provide intervention support and tutoring for students identified in Tiers 2 & 3.
RtI2 Team, C&I Dir.
C&I Dept., Inst. Sup. Providers, RTI Team, Assessment Dept., facilities for support and tutoring, LCFF, LCAP
Support classes and tutoring attendance/feedback from Supervising Teachers
Spring 2015
Revised Intervention Services delivery model being developed with a Spring 2015 roll-out and planned Fall 2015 full implementation school-wide
Self-Identified Areas: 1 VT Identified Areas: 6, 8
Horizon WASC Final 2015.docx Page 33 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--5.3 Standardize course descriptions aligning to State Content Standards.
Guidance Guidance Dept., Dept. Heads, HQTs.
High School Course list published and available on Hub portion of the school website under guidance Revised course offerings
In Progress Course catalog revised and trained on yearly at In-Service and ongoing during monthly PLC meetings Math courses revised as needed to meet CCSS Department Head finalizing description for course catalogue
Self-Identified Areas: 1, 4, 5
--5.4 Offer distance learning opportunities (e.g. videotape classes, videoconferencing) and web conferencing.
Administration Dir. Innovation & Marketing, IT, equipment, LCAP, LCFF, VLI Administrator
Master Schedule of Virtual Learning Instruction courses Increase in students enrolled in a virtual learning opportunity
In Progress Adobe Connect secured. Classes in Progress Master Schedule reflects improvement of virtual offerings
Self-Identified Areas: 1, 4, 5 VT Identified Areas: 6, 7, 8
--5.5 Provide regular communication to all stakeholders and establish ongoing staff professional development opportunities.
Administration Staff Marketing: track enrollment data, website ‘hits’, and queries Professional development: participation rates, student achievement data
Monthly In Progress
Develop a long-term marketing/public awareness plan, including website improvement and communicate regularly with stakeholders at staff meeting/Parent Informational meetings and Board meetings
Self-Identified Areas: 1, 3, 4, and 5 VT Identified Areas: 6
Horizon WASC Final 2015.docx Page 34 of 48
CONTINUOUS IMPROVEMENT ACTION PLAN: FOCUS AREA 2-ELA Goal 2: Increase proficiency in English-Language Arts By June 2015: All students will have taken a reading diagnostic to be assessed on the CCSS for reading with individual learning plans developed to address instructional needs. Barrier(s): Because there exists a variety of curricula used to address the CCSS, there is a lack of consistent assessment and measurable data. More emphasis is needed on writing instruction, practice, and evaluation. Continued refinement and improvement of communication on curricular options and learning opportunities is needed. Program Objective: All students will begin using CCSS aligned English-Language Arts curriculum (including writing) incorporating ongoing, curriculum-based assessment. Academically at-risk students will be quickly identified and provided with necessary intervention as determined by multiple-measures of assessment.
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
1. Encourage widespread usage of CCSS aligned curriculum
--1.1 Provide and encourage teachers to use CCSS aligned curriculum to support and evaluate standards based instruction through increased teacher understanding and familiarity.
RAs, C&I Dept. RAs, CRC staff, C&I Dept., LCAP, LCFF, Business Office
CRC circulation, purchasing summary, increased use of CCSS aligned materials results in improved student achievement and reduced referrals to PSTs
Fall 2014
A focus directed towards implementing and training staff/parents/students in the new CCSS Curriculum research in progress for adoption for the 2015/2016 school year
Self- Identified Areas: 2, 4, 5 VT Identified: 7, 8
Horizon WASC Final 2015.docx Page 35 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--1.2 Investigate research-based writing programs and/or strategies and implement school-wide. Increase teacher collaboration about writing-standards and evaluation.
RAs, C&I Dept. English Dept., C&I, RAs
Review regional PLC recommendations Identify effective program(s)
Fall 2014 Regional teams conducted preliminary investigations and used Institute for Excellence In Writing and Prentice Hall Success Net The English Dept. and C&I Dept. are analyzing current best options going forward
Self-Identified Areas: 2 VT Identified: 7
--1.3 Provide access to effective intervention curriculum that supports students’ re-entry into grade-level standards-based curriculum. Teachers use CCSS aligned resources to improve instruction.
RtI2 Team C&I Dept.
C&I Dept., RAs, Business Office
Intervention curriculum program purchased Instructional Support Providers trained, classes/tutoring provided for identified students Progress monitoring to show growth and/or additional need
Begin Fall 2014
Tier 1-3 students identified and tier 1 interventions are available to all identified students On-going training in progress Tier 2 and 3 interventions being researched
Self-Identified Areas: 2, 4, 5 VT Identified Areas: 6, 7, 8
Horizon WASC Final 2015.docx Page 36 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--1. 4 Provide education for parents and teachers including the value, purpose and use of multiple measures of assessment including CBM, Key assessments, and SBAC testing as a means to better teach/re-teach CCSS. Provide training to all teachers and parents in understanding the testing results to inform instruction.
C&I Director Department Head, RAs,
Parent focus group meetings, Regional staff meetings, In-service/PD, Trainings and information posted via the Hub portion of the school web-site
Begin fall 2014
Parent/Student information nights implemented On-going training conducted with staff
Information posted on the Hub portion of school web-site
Self-Identified Areas: 2, 4, 5 VT Identified Areas: 6, 7
2. Conduct on-going assessment
--2.1 Use and analyze multiple measures of assessment to gauge student learning and determine the need for Tier 1-3 supports and intervention.
Teachers RAs, C&I Dept., Dept. Head.
Use of PSTs, ILPs based on comprehensive analysis
On-going RtI2 program in process of being revamped Increased requirements for curriculum and instructional time to be implemented On-going staff professional development
Self-Identified Areas: 2, 4, 5 VT Identified Areas: 6, 7
--2.2 Use pacing guides and common assessments developed by Highly Qualified Teachers to monitor mastery of essential state standards.
Teachers RAs, Dept. Heads, C& I Dept., School Pathways, Brain Honey, Website
Posted on the Hub portion of the school web-site, key assessments and final exam results
On-going Guidelines/Board Policy Continuous Professional Development with HQTs and training for all teachers
Self-Identified Areas: 2, 4, 5 VT Identified Areas: 6, 7
Horizon WASC Final 2015.docx Page 37 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--2.3 Use on-line research based CCSS aligned Reading assessments.
C&I Dept Dir. Inn. & Marketing, Dir. C & I, RAs, IT, Assessment Dept., LCFF, LCAP, CCSS implementation grant
Implementation of i-Ready on-line CCSS diagnostic, mid-year benchmark and end of the year benchmark Funding in LCAP for purchase
Begin fall 2014
i-Ready diagnostic fully implemented with all students grades 1-11 Encouraged and provided access to mid and end of year assessment
Self-Identified Areas: 2, 5 VT Identified Areas: 6, 7, 8
--2.4 Create “testing days/centers” for parents to bring students for diagnostic/mid-year and end of course exams.
RtI2 Team C&I Dept., IT, RAs, Teachers
Utilize Horizon learning centers and other contracted venues in each region, equipped with staff, computers and printer
Accessibility of assessment devices
Begin fall 2014
Horizon learning centers are providing weekly open lab times for STs to administer i-Ready diagnostic/mid-year and end of course assessments
Self-Identified Areas: 2, 4, 5 VT Identified Areas: 6, 7
--2.5 Implement an RtI2 system to continuously monitor progress of academically at-risk students.
RtI2 Team, C&I Dept.
RtI2 Team, C& I Dept., RAs, IT, Dir. I & M, Instructional Support Providers
Revised RtI2 implementation plan and guide disseminated
Prof. Development for teachers and parents in new RtI2 program
Results of on-line RtI2 instruction and assessments
Funding secured for Research based RtI2 Program
Revised Plan: Fall 2014 Full implement-ation: Fall 2015
RtI2 system revised and redeveloped with implementation using the i-Ready on-line program beginning fall 2014 Ongoing training for all staff continues Tier 1-3 utilizing i-Ready Tier 2 and 3 increased interventions roll-out planning in progress
Self-Identified Areas: 2, 4, 5, VT Identified Areas: 6, 7, 8
Horizon WASC Final 2015.docx Page 38 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
3. Provide effective instructional strategies, including intervention
--3.1 Develop, disseminate, and model strategies for effective instruction.
RAs, C&I Dept., Instructional Support Providers, Teachers
Teachers, RAs C&I Dept., School Web-site, Instructional Support Providers, CCSS implementation grant
PLC staff meetings, web-based demonstration videos, Prof. Dev. Trainings, All school In-Service, PCOE Prof. Dev. Trainings, Project based Units, Social Media including Facebook and Twitter
On-going C& I trainings at staff meetings. Web-site resources provided
Project Based Units/Lessons (available on website) developed and peer training provided at All School In-Service
Weekly strategies, articles, and instructional helps posted via social media
Self-Identified Areas: 2, 4, 5, VT Identified Areas: 6, 7, 8
--3.2 Provide English Language Development support services by itinerant ELL specialists for identified ELL who meet Tier 2-3 criteria.
C&I Department
C&I Dept., HR, Business office, RAs, Instructional Support Providers, LCAP, LCFF
Secure with designated funding.
On-going
New ELD courses added to H.S. course offerings Implementation of i-Ready for all students
Self-Identified Areas: 2 VT Identified Areas: 8
--3.3 Ensure accessibility to services, instruction, and CCSS aligned curriculum for all student populations.
C&I Director, Guidance Dept.
RAs, Teachers, C&I Dept., Dir. I &M, CRC, LEA
Student demographic and achievement data to identify at-risk groups
In Progress, reassess each semester
Increased enrollment in ELD courses such as developmental reading, literacy, and spelling and handwriting
Self-Identified Areas: 1, 4, 5
Horizon WASC Final 2015.docx Page 39 of 48
4. Develop, implement and monitor policies and procedures that support student mastery of standards
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--4.1 Monitor a mandatory, multi-level system of prevention, early identification, and effective intervention.
RtI2 Team, C&I Dept.
RAs, C&I Dept., Guidance.
RAs review ILPs, and facilitate PST meetings for identified students On-line Diagnostic to identify and implement timely intervention
Monthly RtI2 Implementation plan addresses the early identification of academically at-risk students and potential struggling students
Tier 2 and 3 implementation being carefully designed to address the prior attendance barrier
Follow recommended high school course sequence and 4- year planning
Self-Identified Areas: 2, 4, 5 VT Identified Areas: 6, 7
--4.2 Develop and implement a credit recovery program.
C&I Director & Guidance Dept.
C&I Dept., Guidance Counselors, RAs, LCAP, and LCFF
Research successful models
Spring 2015
Additional credit recovery options being explored for implementation
Self-Identified Areas: 2 VT Identified Areas: 7, 8
Horizon WASC Final 2015.docx Page 40 of 48
5. Provide training, support, and coaching to teachers on interpreting and reporting results to students and parents
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--5.1 Provide and use beginning, middle, and end of year assessments, including a process for easily accessing assessment materials.
RtI2 Team, C&I Dept.
RAs, C&I Dept., Dept. Chairs, Spec. Ed., CRC, Dir. I & M, school website
On-line assessment tool, written diagnostic assessment available through CRC.
Monthly Revised fall 2015
Implementation of i-Ready early diagnostic, mid and end of year assessments aligned to CCSS
Self-Identified Areas: 2, 5 VT Identified Areas: 6, 7
--5.2 Incorporate regular training for all teachers highlighting various aspects of the diagnostic materials.
RAs, Principals, C&I Director
C&I Dept., Dept. Head, RtI2 Team, Assessment Dept.
Agendas to reflect staff training and professional development in the on-line diagnostic tool
Fall 2014 On-going training in the new and improved RtI2 implementation plan provided by the Curriculum and Instruction Dept. in collaboration of the RtI2 Team
Self-Identified Areas: 2, 4, 5 VT Identified Areas: 6, 7
--5.3 Provide regular communication to all stakeholders and establish ongoing staff professional development opportunities.
Administration Staff, Dir. I & M. Marketing: track enrollment data / website ‘hits’ and queries Professional development: participation rates, student achievement data PCOE PD opportunities/email list serves
Monthly Develop a long-term marketing/public awareness plan, including website improvement and communicate regularly with stakeholders at staff meetings, Board Meetings and Parent Information Meetings, via email and social media
Self-Identified Areas: 1, 3, 4, 5 VT Identified Areas: 6
Horizon WASC Final 2015.docx Page 41 of 48
CONTINUOUS IMPROVEMENT ACTION PLAN: FOCUS AREA 3-CAHSEE
Goal 3: Increase passing rate of the California High School Exit Examination (CAHSEE) By June 2015: 1) The percentage of 10th grade students passing the ELA portion of the CAHSEE will increase from 79% to 84%. 2) The percentage of 10th grade students passing the Math portion of the CAHSEE will increase from 78% to 83%. Barrier(s): There is a need for increased interaction for targeted curriculum and instruction school-wide with the ST, Intervention Teacher and/or Parent. Due to geographic challenges, it is difficult to enforce participation in CAHSEE support services. Program Objective: Horizon will implement CAHSEE support services that (1) mandate intervention and test attendance incorporated into identified students’ learning plans and (2) connect to on-going professional development for staff and parents.
1. Develop and implement procedures to enable increased student pass rates.
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--1.1 After each CAHSEE administration, identify Tier 1-3 Intervention Groups of students (by region and ST) who failed or are in danger of failing the math and/or ELA portion of the exam.
Assessment Dept.
Assessment Dept., RAs, STs, state testing reports
Reports generated Students referred to PSTs based on non-passing results as needed
After each CAHSEE - Jan, March, June 2015
Administrators and teachers identified students based on state CAHSEE result reports
Self- Identified Areas: 3 VT Identified: 6
--1.2 Identify students who could be eligible for a CAHSEE waiver and monitor completion of required activities (take exam, pass Alg. 1).
Assessment Dept. and Guidance Dept.
RAs, STs, Special Ed. Dept.
Reports generated and monitored by PSTs
On-going Assessment
Guidance, STs, and RAs monitor and submit to school board for CAHSEE waiver approval
Self-Identified Areas: 3 VT Identified: 6
Horizon WASC Final 2015.docx Page 42 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--1.3 Analyze skill strands that need remediation for every student after each CAHSEE administration.
STs, Instructional Support. Providers
PLCs, STs, RAs, CAHSEE reports, RtI2 Team, LCAP, LCFF
STs develop and implement ILPs
After each CAHSEE - Jan, March, June 2015
RtI2 implementation plan includes intervention and instruction using on-line i-Ready instruction to address skill strand remediation
Self-Identified Areas: 3 VT Identified Areas: 7, 8
--1.4 Develop targeted intervention plan into each student’s Master Agreement and Individualized Learning Plan.
C&I, RtI2 Team RAs, STs, C&I Dept., Regional PLCs.
STs complete and implement ILPs CAHSEE Review courses reflected on MAs
On-going & In progress
Master Agreements reflect CAHSEE review courses ILP reflects boot-camp or specified CAHSEE intervention curriculum
Self-Identified Areas: 3 VT Identified Areas:
--1.5 Require AESS A/B to implement CAHSEE intervention if student did not pass.
RAs STs and RAs. Increased AESS A/B enrollment
On-going & in progress.
Develop AESS monitoring tool for CAHSEE intervention
Self-Identified Areas: 3
--1.6 Monitor implementation of individual student intervention plans through progress monitoring, including monitoring of Master Agreements.
RAs PSTs, STs, RAs. STs review progress of identified students and refine/revise ILPs As needed students are referred to PSTs
On-going RAs reviewing MAs at the end of the Spring semester and also on the student dashboard
Guidance reviews MAs and 4- year plans throughout the school year
RAs complete periodic review of ILPs
Self-Identified Areas: 3
Horizon WASC Final 2015.docx Page 43 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--1.7 Implement the policy that failure to follow required intervention plan results in: disallowed work permit, Drivers Training, and/or elective class enrollment.
RAs STs, Guidance Dept., and RAs.
STs review progress of identified students periodically
In progress RAs review MAs to ensure adherence to the ILPs
Self-Identified Areas: 3, 5
--1.8 Provide regular communication to all stakeholders and establish on-going staff professional development opportunities.
Administration Staff Marketing: track enrollment data, website ‘hits’ and queries Professional development: participation rates, student achievement data CAHSEE communication at school-wide in-service
Monthly Develop a long-term marketing/public awareness plan, including website improvement and communicate regularly with stakeholders at staff meetings, Board Meetings, Parent Information Meetings and parent email
CAHSEE flyer sent with new enrollee packet. (Aug. 2014)
Self-Identified Areas: 3, 4, 5
2. Develop and disseminate effective instructional strategies for using CAHSEE intervention materials and resources
--2.1 Identify and acquire successful school-wide CAHSEE intervention strategies, curriculum and CAHSEE pre-assessment.
C&I Director, RtI2 Team
C&I Director, RtI Team, Dir. of Inn. & Marketing, LCAP, LCFF
Implementation of i-Ready on-line CCSS diagnostic, instruction and on-going assessments CAHSEE data reports
Fall 2014 RtI2 Team implementation plan includes intervention options for students struggling to pass the CAHSEE
Self-Identified Areas: 3
Horizon WASC Final 2015.docx Page 44 of 48
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--2.2 Select, hire, and train CAHSEE Instructional Support Providers to work with STs and identified students regionally.
C&I Director , HR
C&I Director, RAs, HR, LCAP, LCFF
Instructional Support Providers , Identified Intervention funding in LCAP, RAs, PLCs
Fall 2015 Instructional Support Provider job to be posted fall 2015
Self-Identified Areas: 3 VT Identified Areas: 8
--2.3 Provide laptops and access to selected CAHSEE intervention online intervention for identified students, grades 11-12.
C&I Director and Dir. I & M.
Director of Innovation and Marketing, C&I Director, IT, LCAP, LCFF
Funding in LCAP for purchase Report of laptop rentals and i-Ready participation reports
Jan. 2012-On-going
i-Ready diagnostic fully implemented with all students grades 1-11 and non-passing 12th graders i-Ready remediation/instruction provided based on results of diagnostic STs monitor progress, report on ILPs
Self-Identified Areas: 3 VT Identified Areas: 7, 8
--2.4 Develop and provide access to intervention classes, targeted tutoring, and intervention curriculum within existing instructional funding. Train STs, instructors, and tutors on selected curriculum.
RtI2 Team, C&I Director, RAs, Assessment Dept.
C&I Dept., RAs, STs, Tutors, LCAP, LCFF, Business office, Assessment Dept.
Increased class enrollment, Instructional Support Providers, Intervention program
On-going CAHSEE intervention Boot camps held 2 times yearly Implementation of i-Ready Instruction & Intervention Training by Assessment Dept. at ST meetings (Jan 2015)
Self-Identified Areas: 3 VT Identified Areas: 7, 8
Horizon WASC Final 2015.docx Page 45 of 48
3. Use On-going assessment to analyze student academic needs
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--3.1 Develop, implement, and monitor the effectiveness of a school-wide tracking system to identify students not passing the CAHSEE.
Assessment Dept., RAs
STs, RAs, Assessment Dept.
Reports generated and provided to RAs
On-going Assessment Dept. has identified students not passing the CAHSEE
Self-Identified Areas: 3, 5 VT Identified Areas: 6
--3.2 Ensure accessibility to services, instruction and curriculum for all student populations.
C&I Director, Guidance Dept.
RAs, STs, C&I Dept., Dir. I & M., CRC.
Student demographic and achievement data to identify at-risk groups
In Progress, reassess each semester
Teachers teaching teachers best practices about curriculum and services to address all populations Boot Camps (face to face), i-Ready (online), released test questions (paper)
Self-Identified Areas: 3, 5 VT Identified Areas: 6
Horizon WASC Final 2015.docx Page 46 of 48
4. Ensure all students who are sophomores adequately prepare for and take the CAHSEE
Implementation Steps Individual(s) Responsible
Resources (People, Time, Materials)
Means to Assess Improvement
Timeline Progress Reporting Critical Area(s) of Need Addressed
--4.1 Secure effective test prep materials, assign, evaluate, work and review prior to test administration.
RtI2 Team, C&I Dept.
RAs, STs, C&I Dept., LCAP, LCFF, CRC, Warehouse
Identified materials, secured intervention program Number of students enrolled in CAHSEE review courses has increased
On-going CAHSEE Boot Camps are being held regionally each semester CAHSEE skills review elective courses Released Test Questions available in print form through CRC/Warehouse
Self-Identified Areas: 3 VT Identified Areas: 8
--4.2 Pre-assess and Identify CAHSEE readiness.
STs RAs, STs Identified Diagnostic tool, ELA and Math reports from 9th Grade
On-going Utilizing i-Ready diagnostic to identify readiness
Self-Identified Areas: 3 VT Identified Areas: 6, 7
Horizon WASC Final 2015.docx Page 47 of 48
Glossary of Terms
AESS Additional Educational Support Services
API Academic Performance Index
Board Ends Also known as Expected School-Wide Learning Results.
Brain Honey Online Learning Management System
C&I Curriculum and Instruction
CAHSEE Boot Camp Support sessions to help students prepare for CAHSEE
CAT Curriculum, Assessment and Technology meetings
CBM Curriculum Based Measurement
CCSS Common Core State Standards
CRC Curriculum Resource Center
CSUS California State University System
DI&M Director of Innovation and Marketing (Dir Inn and Mark)
ELD English Language Development
HQT Highly Qualified Teachers
HR Human Resources
IEP Individualized Education Plan
ILP Individualized Learning Plan
LCAP Local Control Accountability Plan
LCFF Local Control Funding Formula
LEA Local Education Accountability
NGSS Next Generation Science Standards
MA Master Agreement
PCOE Placer County Office of Education
PD Professional Development
PDT Program Decision Team
PLC Professional Learning Community
PST/SST Problem Solving Team/Student Study Team
RA Regional Administrators
RtI2 Response to Intervention and Instruction
SBAC Smarter Balanced Assessment Consortium
SED Socio-Economically Disadvantaged
ST Supervising Teacher