horizontal drilling and the pre-ca/ca issue petroleum accounting society of oklahoma february 11-12,...

31
Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Upload: joseph-valentine-henderson

Post on 17-Dec-2015

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Horizontal Drilling and the Pre-CA/CA issue

PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMAFEBRUARY 11-12, 2015

Page 2: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

DISCUSSION OUTLINE

ONRR Perspective

Industry Perspective

BLM Framing the Issue•BLM Workloads/Backlogs•Components of a Communitization Agreement

• Allocation Schedule

• Reservoir Management

• Lease Retention

Page 3: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

DISCUSSION OUTLINE

Proposed Solution to CA Processing Backlog

•BLM process streamlining

•BIA Role and Responsibility

Departmental Goal

Top Hole/Bottom Hole?

Page 4: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Well Completed on Federal Lands before CA Approval

Well Completed on Federal Lands

before CA Approval

Gusher #1 well, API # 51030086000

Tract 1Federal

Tract 2Federal

Tract 3State or Fee

ONRR

Page 5: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Well Completed on Federal Lands before CA Approval

Key Points – Before CA Approval:

•OGOR Reports – Report aslease basis until CA approval.

•ONRR-2014 – Report as leasebasis until CA approval.

Tract 1Federal

Tract 2Federal

Tract 3State or Fee

ONRR

Page 6: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Well completed before CA approval; located on non-Federal Tract 3

Question: What if the well 3 was located on Fee land?

Answer:

Before CA Approval - Because the well

is not located on a Federal Lease, no

OGOR Reports or Form ONRR-2014s are

required.

 

After CA Approval - File original OGOR Reports and

Form ONRR-2014s retroactive to the CA effective date.

Tract 1Federal

Tract 2Federal

Tract 3State or Fee

ONRR

Page 7: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Reporting on Indian Properties Prior to Agreement Approval

• Assume 640 acre spacing with 4 Indian allotted leases, each 160 acres

• State spacing calls for a CA

Indian Lease 1 Indian Lease 2

Indian Lease 4Indian Lease 3

ONRR

Page 8: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

What’s the Problem - Perspective of Individual Indian Mineral Owners:

Royalty Reporting Pending CA Approval – Well Located in Indian Allotted Lease •Indian lease 1 would receive 100% of royalties until the CA is approved. •Leases 2-4 are each rightfully entitled to 25% of royalties, but would receive nothing without an allocation schedule. Until BLM approves a CA or PA, there is no allocation schedule from which ONRR can distribute royalties. Until a CA or PA is approved, ONRR can only distribute royalties based on the lease upon which the well is located. •Many individual mineral owners rely on royalties for their livelihood but until an agreement is approved, ONRR cannot pay the mineral owners of Indian Leases 2, 3 and 4.

ONRR

Page 9: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

What’s the Problem - Perspective of an Indian Lessee with a Royalty Overpayment

Royalty Reporting After CA Approval - limitation on recoupment of overpayments •Once the CA is approved, the production from the well must be reallocated to all of the leases in the CA and the OGOR and 2014s must be corrected.

•The lessee of Indian Lease #1 must reallocate production and royalties but because Indian lands are involved, the lessee’s ability to recoup the overpayment is limited. Recoupment of overpayments resulting from retroactive agreement approvals are limited on Indian lands: • No more than 50% recouped per month for allottees • No more than 100% recouped per month for tribes •The 50% recoupment is meant to protect the income of individual mineral owners, many of whom rely on royalties for their livelihood.   

ONRR

Page 10: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Historic Problems with Delayed CA Approval

• Delay in royalty reporting

• All royalties knowingly paid incorrectly until CA is approved

• Duplicate royalty payments

• Higher interest on underpaid than overpaid amounts

• Causes a famine/feast effect with regards to States and Counties

• Complex correction process

Industry Perspective

Page 11: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Benefits of PCA/Streamlined CA Process

• More timely and accurate reporting to all royalty owners

• State and County agencies able to budget more accurately

• Time for BLM to perform due dilligence

• Reduces/eliminates the need for large amendments

• Reduces/eliminates *challenges* of recouping royalties

• PCA process/Streamlined CA process working well in North Dakota and New Mexico

Industry Perspective

Page 12: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Challenges of Recouping Overpaid Royalty

• Recoupment limits• Tribe – 100% of net current

revenue• Allottee – 50% of net current

revenue

• Variable production rates can impact recoupment

Industry Perspective

Page 13: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Causative Factors for the Backlog

Not Rocket Science•BLM is fully capable of performing the technical work associated processing CAs

•However it does take a certain level of technical expertise.

•If it isn’t Rocket Science then what is the problem?

BLM

Page 14: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Causative Factors for the Backlog

Budget and Staffing

Budget

•BLM Oil and Gas Program Funding declined from 2008 to 2013

•A portion of funding for the existing program is from onshore rental receipts which are declining as industry is either relinquishing leases or drilling them, thus taking them out of rental status.

•A portion of the funding is from APD fee receipts. The National Defense Authorization Act raised the APD fee to $9,500 indexed to inflation, with a portion of the collections being distributed back to the office which processed the APD.

BLM

Spisak, Timothy
Take out the chart.Say, we have a heavy workload and trying to priortize what we get.
Page 15: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Causative Factors for the Backlog

Budget and Staffing

Staffing

• Loss of oil and gas staff to industry.

• Aging workforce resulting in the retirement of key individuals. So though while not rocket science this work does require a certain level of expertise and training to achieve that level.

• High cost of living in certain areas makes it difficult under the federal salary structure to attract applicants.

BLM

Spisak, Timothy
Drop this slide.talk to the issues, but not in a slide.Back log is becuase of not enought peiople.heavy workload then resources availabile
Page 16: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Causative Factors for the Backlog

Deficient CA Applications

The Big Three

• Survey errors, many of which are associated with rivers and streams

• Properly described or matched leases (Federal/Indian) to acceptable surveys

• Not recognizing prior existing rights associated with existing CAs

BLM

Page 17: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Causative Factors for the Backlog

Deficient CA Applications

Other Causes

• Commodity Errors

• Formation Errors

• Vertical vs. Horizontal

• Missing working interest owner signatures

BLM

Page 18: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Causative Factors for the Backlog

Delays - Additional Wells in and Existing CA

• Commodity Errors

• Formation Errors

• Operator Errors

• Timing Errors

BLM

Page 19: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Possible Deficiency Solutions

Submit a Better CA Application:

•Have your irregular/river surveys reviewed by BLM’s Cadastral Survey prior to submission

•Submit your CA applications timely, perhaps even before drilling the first well

•Make sure your CA application matches the description and acreage in your BLM/BIA lease documents

•Obtain signatures for all working interest owners

•Make sure commodity and formation match your well

•Check for prior existing CAs

BLM

Page 20: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

 30 U.S.C. § 226(m), third unnumbered paragraph.  It reads as follows:

When separate tracts cannot be independently developed and operated in conformity with an established well-spacing or development program, any lease, or a portion thereof, may be pooled with other lands, whether or not owned by the United States, under a communitization or drilling agreement providing for an apportionment of production or royalties among the separate tracts of land comprising the drilling or spacing unit when determined by the Secretary of the Interior to be in the public interest, and operations or production pursuant to such an agreement shall be deemed to be operations or production as to each such lease committed thereto.

Authority and Criteria for a

Communitization Agreement

BLM

Page 21: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

The Three Criteria for a

Communitization Agreement

1. Lease cannot be independently developed and operated in conformity with an established well-spacing or development program; (Reservoir Management – BLM)

2. Provides for an apportionment of production or royalties; and, (Allocation Schedule – BLM & ONRR)

3. Operations or production pursuant to such an agreement shall be deemed to be operations or production as to each such lease committed thereto. (Lease Management –

BLM/BIA)

BLM

Heath, Geoffrey
Page 22: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

Pre-CA’s: Concerns

The benefit: an allocation schedule for ONRR thus earlier distribution of royalties on an agreement basis and less reporting burden for industry

BLM’s concerns: •legal insufficiency – no BLM official has approved the allocation schedule.•Does not hold leases past their primary term (federal leases are held by ability to produce; Indian leases are held by actual production. (BLM/BIA – lease management)•No incentive for further development (BLM - reservoir management)•Additional workload for understaffed BLM and BIA offices

BLM

Page 23: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

BLM STREAMLINING

Resolution of Backlogs by re-engineering the CA submittal and approval process

•Require Communitization Agreement application as Condition of Approval with the Application for Permit to Drill

•Adjudicate only the Federal/Indian Interests

•Allow the Operator to self certify possession of signatures

Page 24: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

BLM STREAMLINING

Resolution of Backlogs by re-engineering the CA submittal and approval process

•Federal/Indian Leases provided by the Operator,

•A single aggregate submittal of the State leases and of the fee interests.

Page 25: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

FORM B

Page 26: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

FORM B

Page 27: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

BIA STREAMLINING

BIA Roles and Responsibilities

•BLM recommends to BIA whether to approve an Indian CA or not to approve it.

•BIA has been adjudicating the leases in the same manner that BLM has been adjudicating the leases.

•The BIA then approves or rejects the CA. BIA is the authorized officer.

Page 28: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

BIA STREAMLINING

BIA Roles and Responsibilities

•To streamline the BIA process, BIA and BLM will develop operating procedures to eliminate duplicative work.

•Thus after BLM adjudication, BIA will only have to do a quality check of the trust leases, and then obtain the Authorized Officer’s signature.

Page 29: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

DEPARTMENTAL GOAL

The Departmental Goal is to sunset the Pre-CA process as soon as practicable.•For all states, with the exception of ND and WY, BLM believes the streamlined CA process will achieve this goal in the next few months.•For ND and WY a greater staffing emphasis will be provided to expedite achieving the goal. •A “Strike Team” has been developed for ND, deployment expected by mid year.

Page 30: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

TOP HOLE/BOTTOM HOLEEVOLUTION OF THE ISSUE

Federal Lease #1

Under vertical well technology – there was no issue as both locations were on the same lease.

Each well bore could be entered into AFMSS as a discrete entity with a single lease affiliation.

Federal Lease #2

Page 31: Horizontal Drilling and the Pre-CA/CA issue PETROLEUM ACCOUNTING SOCIETY OF OKLAHOMA FEBRUARY 11-12, 2015

TOP HOLE/BOTTOM HOLEEVOLUTION OF THE ISSUE

Federal Lease #1

Tieing the APD to the top hole federal lease is logical because this is where the well pad resides. Tieing the APD to the bottom hole lease was a logical extension from directional wells where the target was the bottom hole.

BLM CA Handbook last updated July 7, 1988 – did not provide guidance. AFMSS has not been updated to accept more than one lease number per APD.

With Hydraulic Fracturing regulations nearing completion, updating the CA Handbook has become a priority for BLM.

Federal Lease #2

FeeLease #1

Indian Lease #1