A Superpave TM Hot Mix Asphalt Mix Design Completed in Conjunction with Testing Lab Set-up and Procedures By Stephen J. Palmer April 2001 A Research Paper Submitted in Partial Fulfillment of the Requirements for the Master of Science Degree Department of Civil Engineering Southern Illinois University Edwardsville

Upload: dinhquynh

Post on 27-Apr-2018

221 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

A SuperpaveTM Hot Mix Asphalt Mix Design Completed in Conjunction with Testing Lab Set-up and Procedures

By

Stephen J. Palmer

April 2001

A Research Paper Submitted in Partial Fulfillment of the Requirements for the Master of Science Degree

Department of Civil Engineering

Southern Illinois University Edwardsville

Page 2: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Abstract

The major focus of this Masters project was to develop a familiarity with the Hot Mix Asphalt (HMA)

mix design process using both Superior Performing Asphalt Pavement (SuperpaveTM) methods and

Illinois Department of Transportation (IDOT) specifications. In order to facilitate understanding the

mix design process, a bituminous testing lab was needed to verify the target value specifications for the

mix design. As a further part of this project, a bituminous lab in the new Engineering Building was

established. In conjunction with the move to the new building, the Civil Engineering Department had

purchased much of the necessary testing equipment to facilitate completing HMA mix designs. The

goal was to utilize the HMA mix design as a means to set-up the lab and the related equipment.

Through the mix design process the asphalt and aggregate testing equipment would be set-up,

calibrated, and made operational by the end of Fall 2000 semester. Furthermore, a procedures manual

for both instructors and students would be authored to aid in the development of a pavement design lab

course.

Procedures and methods published from the Asphalt Institute, the American Association of State

Transportation Officials (AASHTO), ASTM, and IDOT were followed for the mix design and testing.

For new equipment operation, manufacturer’s provided documentation was utilized.

Due to a lack of equipment, functional problems with existing and new equipment, and time

constraints, much of the data obtained from the HMA mix design did not meet target values. However,

the aggregate testing values for soundness and sand equivalent did meet prescribed criteria.

In summary, the project goal of establishing a bituminous testing lab was achieved. Through the mix

design process, all the equipment was calibrated and used. However, the results of the HMA

experiment were inconclusive due in part to the reasons stated above.

2

Page 3: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

TABLE OF CONTENTS

ABSTRACT………………………………………………………………………………………. 2

ACKNOWLEDGEMENTS……………………………………………………………… ………4

DISCLAIMERS……………………………………………………………………………………4

LIST OF TABLES…………………………………………………………………………………5

CHAPTER

I. INTRODUCTION………………………………………………………………………6

II. PROBLEM STATEMENT…………………………………………………………….9

III. METHODS…………………………………………………………………………….11

IV. RESULTS…………………………………………………………………………….. 19

V. SUMMARY……………………………………………………………………………..21

VI. REFERENCES……………………………………………………………………….. 23

VII. APPENDICES………………………………………………………………………..25

A. EXPERIMENTAL DATA AND SAMPLE CALCULATIONS……………. 25

B. RECOMMENDATIONS TO THE CIVIL ENGINEERING DEPARTMENT……………………………………………………………….. 28

C. RAINHART GYRATORY COMPACTOR PROBLEM LOG……………..29

D. STUDENT LAB MANUAL……………………………………………………31

E. INSTRUCTOR LAB MANUAL ………………………………………………36

F. APPARATUS……………………………………………………………………42

3

Page 4: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Acknowledgements

I would like to thank several individuals for their help and contribution in making this project a

success. First I would like to acknowledge the contribution from my advisor Dr. Chiang Lin, Ph.D.,

who was the calm in the storm. Furthermore, this project could not have been completed in the time

frame established without the dedication of Mr. Brent Vaughn, CE Department Lab Specialist, who’s

instrumentation experience and attention to detail proved invaluable. Finally I would like to thank Mr.

Roger Hayden of Reese Construction, Cahokia, IL. Through Roger, Reese Construction donated all the

asphalt and aggregate materials necessary for the HMA mix design and provided unlimited access to

their own lab, which proved extremely beneficially. Roger and Ken also provided considerable insight

into the nuances of IDOT’s specifications and mix design criteria.

Disclaimers

For this project mineral aggregates were sampled from stockpiles located at Reese Construction’s yard.

Data on average gradation and specific gravity of each individual aggregate was utilized since these

values were previously tested and found to be in conformance to IDOT’s specifications. Furthermore,

the asphalt binder used was provided by Reese Construction and certified by the manufacturer, so no

other attempt was made to verify that it met SuperpaveTM criteria as testing for these properties was

beyond the scope of this project.

4

Page 5: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

List of Tables

Table 1 IL 9.5mm Mixture Aggregate Gradation by Percent Passing

Table 2 Aggregate Testing Employed

Table 3 Aggregate Stockpile Gradations (Reese Construction)

Table 4 Trial Aggregate Blend

Table 5 Trial Batch Weights

Table 6 CA16 Batch Weights

Table 7 FA21 Batch Weights

Table 8 FA01 Batch Weights

Table 9 MF Batch Weight

Table 10 Asphalt Binder Batch Weight

Table 11 LA Abrasion Test Results

Table 12 Sand Equivalent Test Results

Table 13 Sulfate Soundness Test Results

Table 14 Asphalt Binder Content Ignition Oven Method Results

Table 15 Specific Gravity Results

Table 16 Volumetric Mix Results

5

Page 6: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Introduction

Superior Performing Asphalt Pavements (SuperpaveTM) were developed through the Strategic Highway

Research Program (SHRP) in an attempt to improve overall highway pavement performance. The

primary areas of improvement sought were in pavement rutting, low temperature cracking, and fatigue

cracking. This was achieved by orienting the pavement design methodology towards the environmental

conditions that the pavement could expect to experience during the design life, together with the

traditionally used loading expectations (13).

SuperpaveTM is a performance based mix design and analysis process that evaluates both constituent

materials and final mixture performance. The liquid asphalt binder is evaluated for performance based

on the criteria of temperature, time of loading, and aging factors, while the constituent mineral

aggregates are evaluated based on surface characteristics, particle shape, and gradation (13). Finally,

once combined into an HMA mixture, this mixture is evaluated for performance under various loading

and environmental field conditions.

The asphalt binders are selected for a particular mix design specification based primarily on the climate

that the binder will experience. This was accomplished by reviewing climate history, high and low air

temperatures, and relating the air temperature history to corresponding pavement temperatures. A

statistical model was then employed to determine the probability of occurrence of these high and low

temperatures. Based on the climatic variation, the asphalt binders are tested and labeled according to

performance. An asphalt binder that is expected to perform adequately in a climate with an average 7-

day maximum temperature of 64oC and a minimum pavement design temperature of –22oC would be

labeled PG 64-22(13). The PG stands for performance grade and the numbers correspond to the high

6

Page 7: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

and low temperature variation. For practical reasons, many states implementing SuperpaveTM, employ a

system of designating a particular performance grade asphalt binder to the various districts or

geographic areas, thus saving the designer time.

Mineral aggregate performance-based gradation selection is accomplished through the use of what is

termed in SuperpaveTM the 0.45 power chart (13). Although such characteristics as material toughness,

soundness, angularity, elongation, blend clay content, and deleterious percentage are used in selecting

aggregates for use in the mix design, the aggregate blend gradation is the most mix specific

characteristic. The 0.45 power chart is simply a graph of the sieve sizes in millimeters raised to the

0.45 power, placed along the x-axis, and the percent passing of the aggregate blend, placed along the y-

axis. The chosen trial blend gradation is plotted on the chart and compared to a maximum density line

and certain restricted zones and control points, included to promote friction and point-to-point contact

of the aggregate, thus reducing rutting. As previously stated, the researchers involved in developing

SuperpaveTM attempted to reduce the rutting of in-place pavements. This was accomplished by

restricting an area of the gradation curve in the fine aggregate region so that point-to-point contact of

the particles was encouraged. This area is known as the restricted zone and the blend cannot pass

through this region. The maximum gradation line represents the densest possible arrangement of the

aggregate. It is established by running a line from the origin to a point of 100 percent passing at a sieve

size one size larger than the nominal maximum sized for the aggregate blend (13). An example of an

Illinois 9.5 mm (surface mix) follows, as shown in Figure 1, to demonstrate how the 0.45 power chart

works.

7

Page 8: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Figure 1. 0.45 Power Chart for an IL 9.5 mm Surface Mixture

The final parameter used in a SuperpaveTM mix design is a traffic loading termed designated as

Equivalent Single Axle Loading (ESAL), which relates the damage to a pavement by a single

equivalent 18-kip axle load. This term is related empirically to the traffic volume that the in-place

pavement would be expected to experience at the end of the design life (13). The completed mix is

evaluated in the lab by compaction in a gyratory compactor, specifically designed for the SuperpaveTM

method. Using the calculated ESAL’s, the number of gyrations the mix is subjected to is determined

and this number is designated as Ndesign (13). Thus, the loading component the pavement will

experience is simulated by compacting the mix specimen at a pre-set pressure of 600 KPa and a

determined number of gyrations.

8

Page 9: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Finally, the mix as a whole is volumetrically evaluated by calculating the Voids in Mineral Aggregate

(VMA) and the Voids Filled with Asphalt (VFA) at a target value of 4% Air Voids (Va). Many states

set target values for VMA and VFA at the 4% air voids point. If the values for VMA and VFA are not

met, the mix is rejected and cannot enter production.

The Illinois Department of Transportation (IDOT) has implemented most of the SuperpaveTM criteria

with some modifications. Since pre-SuperpaveTM IDOT specifications already addressed the aggregate

properties of toughness, soundness, and deleterious material, the SuperpaveTM guidelines were not

specifically incorporated into the IDOT specifications. Also, IDOT uses the control points in the 0.45

power chart as a guide only. Meeting VMA and VFA criteria is considered a more important factor in

the overall pavement performance.

Problem Statement

The primary goal of this endeavor was to gain an understanding of the SuperpaveTM mix design

methodology. In order to achieve this, the task was undertaken to complete an actual HMA mix design

using a combination of IDOT and general SuperpaveTM guidelines. A hypothetical highway design

situation was chosen so that as many of the SuperpaveTM parameters as possible could be applied, and

also to utilize all of the testing equipment available in the SIUE CE Department’s lab. It was decided

not to evaluate mix characteristics and material properties if appropriate equipment was not available.

The control road design project and mix design methodology are specified as follows:

Mix design method and specifications: IDOT and SuperpaveTM

Highway Design Criteria

Functional classification: Rural collectorHighway type: county roadAverage Daily Traffic (ADT) = 1500Design ESAL’s = 1,000,000

9

Page 10: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Geographic area: southwest central Illinois, IDOT Collinsville District 8Type of mixture: Surface mixMaterials: virgin materials

Based on the previously stipulated design criteria the following mixture design was determined based on IDOT’s specifications.

Mix Designation

IL 9.5 mm (9.5 mm maximum size of aggregate particle)Mixture Type C (IDOT friction requirement, ADT<2000)SuperpaveTM design gyrations: Ndesign = 50 (ESAL’s 0.3 to 3 million)Asphalt Binder: PG 64-22 (Collinsville District 8)

Mineral Aggregate SelectionCourse Aggregate: CA 16- crushed LimestoneFine Aggregate: FA 01 – river sand

FA 21 – slag sandMineral Filler: MF – Limestone dust

Volumetric RequirementsVMA = 15% minimumVFA = 65-78%Va = 4% standard target

Table 1. IL 9.5mm Mixture Aggregate Gradation Percent PassingSieve Size

12.5 mm

(1/2”)

9.5 mm

(3/8”)

4.75 mm(#4)

2.36 mm(#8)

1.18 mm

(#16)

300 µm

(#50)

150 µm

(#100)

75 µm

(#200)

Minimum -------- 90 24 16 10 4 3 4Maximum 100 100 65 48 32 15 10 16

Table 2. Aggregate Testing Employed

Properties Test Designation IDOT Requirement

Toughness LA Abrasion AASHTO T96-94 45% maximum loss

Sand Equivalent Sand Equivalent AASHTO T176-

86

40% minimum

Soundness Sulfate Soundness AASHTO T104-

87

20% maximum loss

10

Page 11: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

The constituent aggregates will be tested following the procedures detailed above. The asphalt binder

used in the mix design was certified by the manufacturer. Actual testing of asphalt binder is beyond the

scope of the project due to a lack of proper testing equipment. The actual mixture will be evaluated for

VMA, VFA, and Percent Air Voids using the SuperpaveTM gyratory compactor, bulk specific gravity

apparatus, and maximum theoretical specific gravity pycnometers. Final asphalt binder content will be

verified using the NCAT Asphalt Ignition Oven.

Methods

The mineral aggregate testing followed the AASHTO and ASTM specifications referenced. Since the

new lab was equipped with a Los Angeles Abrasion machine, Sulfate Soundness apparatus, and Sand

Equivalent testing equipment, only the toughness, soundness, and sand equivalent tests on the

aggregates were performed. Due to the specific nature of the AASHTO and ASTM testing procedures,

the particular methods used for these tests will not be repeated.

The asphalt binder was selected using IDOT’s PG Binder Grade Selection-Full Depth Asphalt Table

for Districts 7-9 (29). Again no attempt was made to verify the chemical or physical properties of the

liquid asphalt binder material as this was beyond the scope of this project.

The coarse aggregate, CA 16 (Limestone), was selected because it met the friction requirements as

shown in IDOT’s Table 3 Friction Aggregates in Surface Mixtures (29). All mineral aggregates were

donated by Reese Construction, Cahokia, IL, and their stockpile average gradation results and specific

11

Page 12: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

gravities were used to determine the mix blend, which is required to meet IDOT’s general gradation

chart and the parameters of the 0.45 power chart. No attempt was made to verify the stockpile averages

as these values are verified by IDOT for use in state highway projects.

The basic methodology for the SuperpaveTM system involves blending the mineral aggregate in proper

proportion so that gradation requirements are met. The standard IDOT SuperpaveTM batch weight

target value is 14,000g. Therefore, once the proportion of each aggregate is selected, it is then plotted

on the 0.45 power chart to determine whether that particular blend will meet the gradation

requirements. Then based on the designer’s experience, an asphalt binder content is selected. Finally,

the batch weights of each material are calculated so that a sample mixture can be made. Then the

aggregates and asphalt binder are batched with the correct weights and preheated to 295oF or a

particular specification. Once heated, the aggregates and asphalt binder are combined in a blending

apparatus, which is operated until all the aggregate is coated with asphalt binder. Following the

blending operation, the mix is placed in the oven to condition. This conditioning operation is done to

simulate what happens to the mixture during transport to the job site. After the conditioning process is

complete, part of the batch is utilized in conjunction with the gyratory compactor and the remaining

mix is used to determine the theoretical maximum specific gravity.

The mix selected for use in the gyratory machine is placed in a heated mold and then subjected to the

specified gyratory compaction effort. The number of gyrations was previously determined as Ndesign =

50 based on the design ESAL’s = 1,000,000. In the compactor, the mix is compacted into a disk shape.

The Bulk Specific Gravity, Gmb, of the disk or puck, as it is sometimes referred to, is then determined.

The remaining mixture is used in loose form to find the Maximum Theoretical Specific Gravity, Gmm.

Using these two values along with the Aggregate Percentage By Weight, Ps, and the Combined Bulk

Specific Gravity of the Aggregate Blend, Gsb, the volumetric properties of the mix, namely the Voids

12

Page 13: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

in Mineral Aggregate (VMA), Voids Filled with Asphalt (VFA), and Percent Air Voids (Va) can be

calculated. Refer to Appendix A for sample calculations.

If the standard 4% Air Voids value is met along with the VMA and VFA criteria, the designer is done

and the mix can go into production. This, however, almost never happens so exactly on the first

attempt. Generally several asphalt binder contents are selected for a particular aggregate blend. All the

trials are then batched and evaluated for their volumetric characteristics. Then the asphalt binder

content is plotted against Percent Air Voids and used to determine the optimum asphalt binder content

for that particular aggregate blend at the 4% air voids mark. The following plot illustrates this

situation.

Figure 2. Optimum Asphalt Binder Content

Due to equipment problems and time constraints, only one asphalt binder content for the aggregate trial

blend was selected. IDOT suggestions and testing criteria in batching and conditioning the mixture

were closely followed.

13

Page 14: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Mix Design Steps

The following steps illustrate the method used in formulating the mix design values. It should be noted

that the asphalt binder content selected was based on the author’s previous experience as a highway

design engineer. Otherwise, there is no particular method for determining the optimum binder content

except to select various percentages and plot them against percent air voids results as previously

illustrated.

(1) The first step involves determining the gradations of the individual mineral aggregates. The

gradations listed in Table 3 are average percent passing values from Reese Construction’s stockpiles.

Table 3. Aggregate Stockpile Gradations (Reese Construction) Percent Passing

AggregateSpecification

½” 3/8” #4 #8 #16 #30 #50 #100 #200

CA 16 100 98 30 4 3 3 3 3 2.4

FA 01 100 100 99 92 73 30 9 1 0.1

FA 21 100 100 100 77 53 34 21 12 7.2

MF 100 100 100 100 100 100 100 98 93

14

Page 15: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

(2) Next, using the gradations in Table 3 and the following selected aggregate percentages, the trial

aggregate blend is determined. An example for calculating the 3/8” sieve size follows:

CA 16 98*(0.575) = 56.4FA 01 100*(0.19) = 19.0FA 21 100*(0.22) = 22.0MF 100*(0.015) = 1.5

TOTAL 98.9 Trial Blend 1 (3/8” Sieve)

Table 4. Trial Aggregate Blend

SieveSize

TrialBlend 1

IDOTSpecs

CA 1657.5%

FA 0119%

FA 2122%

MF1.5%

Min Max½” 100 -- 100 57.5 19.0 22.0 1.5

3/8” 98.9 90 100 56.4 19.0 22.0 1.5

#4 59.6 24 65 17.3 18.8 22.0 1.5

#8 38.2 16 48 2.3 17.5 16.9 1.5

#16 28.8 10 32 1.7 13.9 11.7 1.5

#30 16.4 -- -- 1.7 5.7 7.5 1.5

#50 9.5 4 15 1.7 1.7 4.6 1.5

#100 6.0 3 10 1.7 0.2 2.6 1.5

#200 4.4 4 16 1.4 0.0 1.6 1.4

15

Page 16: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

(3) Once the trial blend is determined, it needs to be plotted on the 0.45 power chart to ensure it

doesn’t enter in the restricted zone. As can be viewed from the plot below, the aggregate trial blend

does meet the SuperpaveTM gradation criteria.

Figure 3. Trial Aggregate Blend Chart

16

Page 17: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

(4) The next step is to determine the aggregate batch weights. This is necessary because the percent

passing values do not indicate the amount of mineral aggregate needed in the batch. The sample batch

weight for the mix design is established at the standard target 14,000g for the mineral aggregate

portion. The asphalt binder content will be added to the aggregate amounts to form the total batch

weight to be used.

(5) Next, the individual sieve sizes for each aggregate need to be calculated from the total batch so that

after sieving and drying, the individual weights for material retained on the sieves can be added for

batching. An extrapolated example of the CA 16 aggregate is shown. The other aggregate batch

weights are simply presented in their final form.

Table 5. Trial Batch Weights

Aggregate Calculation Batch Weight (g)

CA 16 14,000*57.5% 8050

FA 01 14,000*19.0% 2660

FA 21 14,000*22.0% 3080

MF 14,000*1.5% 210

Aggregate Batch Total 14,000 g

CA 16 Table 6. CA 16 Batch Weights

Sieve SizePassing

Sieve SizeRetained

PercentRetained

Weight (g) AccumulatedWeight (g)

½” 3/8” 2 0.02*8050 = 161.0 161.0

3/8” #4 68 0.68*8050 = 5474.0 5635.0

#4 #8 26 0.26*8050 = 2093.0 7728.0

#8 #30 1 0.01*8050 = 80.5 7808.5

#30 PAN 3 0.03*8050 = 241.5 8050.0

17

Page 18: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

(6) Notice that the trial batch weight summed to 14,000 g. Finally, an asphalt binder percentage of 5%

was chosen as a beginning point. The final computation for batch weight is shown.

FA 01 Table 8. FA 01 Batch Weights

PassingSieve

RetainedSieve

PercentRetained

Weight (g) AccumulatedWeight (g)

-- #8 8 212.8 11342.8

#8 #30 62 1649.2 12992.0

#30 PAN 30 798.0 13790.0

FA 21 Table 7. FA 21 Batch Weights

PassingSieve

RetainedSieve

PercentRetained

Weight (g) AccumulatedWeight (g)

-- #8 23 708.4 8758.4

#8 #30 43 1324.4 10082.8

#30 PAN 34 1047.2 11130.0

MF Table 9. MF Batch Weights

PassingSieve

RetainedSieve

PercentRetained

Weight(g)

AccumulatedWeight (g)

#30 PAN 100 210.0 14000.0

Table 10. Asphalt Binder Batch Weight

AC Binder Percentage Batch Weight (g) AccumulatedWeight (g)

Asphalt Binder % = 5% 0.05*14,000.0 = 736.8 g 14736.8 g

18

Page 19: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Results

The results of the mineral aggregate testing follow:

Table 13. Sulfate Soundness Test Results

AggregateDesignation

Sieve Size

Percent (%) Retained

Weight of TestFractions (g)

Percent PassingAfter Test

Weighted PercentLoss

IDOTSpec

FA 01 #50 21 111.66 1.3 0.3

FA 01 #30 43 118.51 1.9 0.8

FA 01 #16 19 119.70 3.4 0.7

FA 01 #8 7 116.15 7.2 0.5

Table 11. LA Abrasion Test Results

LA Abrasion

Result IDOTSpec

Remarks

Test 1 51% 45% max loss Does not meet spec5005g retained on the #4 sieve

Test 2 27% 45% max loss Meets spec4003.8g retained on the #4 sieve

1001.6g retained on the 3/8”

Sand Equivalent(Clay Content)

Result IDOTSpec

Remarks

Test 1 100% 40% min Meets spec

Table 12. Sand Equivalent Test Results

19

Page 20: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

FA 01 #4 1 110.82 7.2* 0.1

Total 2 20% max

CA 16 #4 68 118.90 13.8 9.4

Total 9 20% max

* % Loss of next smaller sieve as per AASHTO T104-97

The results of the HMA testing follow:

Table 14. Asphalt Binder Content Ignition Oven Method Results

Result Batched % Remarks

Test 1 5.0% 5.0% Matched indicated value

Table 15. Specific Gravity Results

Maximum Theoretical Specific Gravity of Loose HMA, Gmm 2.425

Bulk Specific Gravity of Compacted HMA, Gmb 2.277

Bulk Specific Gravity of Combined Aggregate, Gsb 2.630

Table 16. Volumetric Mix Results Result IDOTSpec

Remarks

Voids in Mineral Aggregate, VMA 18% 15% Meets spec

Voids Filled with Asphalt, VFA 66% 65-75% Meets spec

Air Voids, Va 6.1% 4.0% Higher than target value

20

Page 21: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Summary

The results of the aggregate and HMA tests show some inconsistency compared to the IDOT

specification target values. This was attributed to either lack of necessary equipment or equipment

functioning improperly. The results of the Sand Equivalent Test and the Sulfate Soundness Test were

the only accurate results determined. This is due to the fact that for both tests, appropriate testing

equipment was available for use. For all the other tests, there was a missing link in the process, as

either a lack of equipment existed or the equipment that was available functioned improperly.

However, this is not considered a problem. In fact, since the primary goal of the project was to

complete a HMA mix design as a means of establishing the Department’s testing lab, it only follows

that there would be some roadblocks in the way. These roadblocks caused problems with the results,

but more importantly, justified the need to make improvements to the lab. The inconsistent results

pointed out in a rather glaring way the need for improvement to the asphalt lab facility. The

improvements are detailed in recommendation form in Appendix B.

From the mix design process, it was discovered that the lab needed a more accurate pycnometer and

vacuum pump so that a more precise value for Maximum Theoretical Specific Gravity could be made.

Furthermore, the Rainhart Superpave Gyratory Compactor never did work properly, although it was

purchased new by the Department. This piece of equipment is of the utmost importance in achieving

accurate results in a SuperpaveTM mix design process. At the time of this report, another new gyratory

compactor was shipped and received by the Department. Mr. Brent Vaughn verified that it was indeed

working properly by the end of the Fall 2000 Semester.

Since the lab was functioning at the end of Fall 2000 Semester, the project was considered to be

successful. The original goal of developing an operational bituminous testing lab was met. There are

21

Page 22: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

some needed improvements to be made, but with a small investment the Department can expect to

provide a quality environment in the future for the student to learn about HMA mix design and testing.

References

1) AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test.” T176-86, Washington D.C.

2) AASHTO. (1997). “Standard Specification for Soundness of Aggregate by Use of Sodium Sulfate or Magnesium Sulfate.” T104-97, Washington D.C.

3) AASHTO. (1994). “Standard Specification for Resistance to Degradation of Small-size Course Aggregate by Abrasion and Impact in the Los Angeles Machine.” T96-94, Washington D.C.

22

Page 23: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

4) AASHTO. (1997). “Standard Specification for Sieve Analysis of Fine and Course Aggregate.” T27-97, Washington D.C.

5) AASHTO. (1991). “Standard Specification for Clay Lumps and Friable Particles in Aggregate.” T112-91, Washington D.C.

6) AASHTO. (1995). “Standard Specification for Sieve Analysis of Mineral Filler for Road and Paving Materials.” T37-95, Washington D.C.

7) AASHTO. (1989). “Standard Specification for Resistance of Compacted Bituminous Mixture to Moisture Induced Damage.” T283-89, Washington D.C.

8) AASHTO. (1993). “Standard Specification for Bulk Specific Gravity of Compacted Bituminous Mixtures Using Saturated Surface-Dry Specimens.” T166-93, Washington D.C.

9) AASHTO. (1995). “Standard Specification for Specific Gravity and Absorption of Fine Aggregate.” T84-95, Washington D.C.

10) AASHTO. (1991). “Standard Specification for Specific Gravity and Absorption of Course Aggregate.” T85-91, Washington D.C.

11) AASHTO. (1999). “Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method.” T308-99, Washington D.C.

12) AASHTO. (1995). “Standard Specification for Specific Gravity of Soils.” T100-95, Washington D.C.

13) Asphalt Institute. (1996). “Superpave Mix Design: Superpave Series No. 2 (SP-2).” U.S.A.

14) Asphalt Institute. (1996). “Performance Graded Asphalt Binder Specification and Testing: Superpave Series No. 1 (SP-1).” U.S.A.

15) Asphalt Institute. “Construction of Hot Mix Asphalt Pavements, Manual Series No. 22, 2nd Edition.” Lexington, Kentucky.

16) ASTM. (1998). “Standard Test Method for Uncompacted Void Content of Fine Aggregate (as Influenced by Particle Shape, Surface Texture, and Grading).” C1252, West Conshohocken, Pa.17) ASTM. (1995). “Standard Test Method for Flat Particles, Elongated Particles, or Flat and Elongated Particles in Course Aggregate.” D4791, West Conshohocken, Pa.

18) ASTM. (1995). ”Standard Test Method for Sand Equivalent Value of Soils and Fine Aggregate.” D2419, West Conshohocken, Pa.

19) ASTM. (1999a).” Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate.” C88, West Conshohocken, Pa.

20) ASTM. (1996). ”Standard Test Method for Resistance to Degradation of Small-0size Course Aggregate by Abrasion and Impact in the Los Angeles Machine.” C131, West Conshohocken, Pa.

23

Page 24: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

21) ASTM. (1996a).” Standard Test Method for Sieve Analysis for Fine and Course Aggregates.” C136, West Conshohocken, Pa.

22) ASTM. (1994). ”Standard Test Method for Sieve Analysis of Mineral Filler for Road and Paving Materials.” D546, West Conshohocken, Pa.

23) ASTM. (1993). ”Standard Test Method for Specific Gravity and Absorption of Course Aggregate.” C127, West Conshohocken, Pa.

24) ASTM. (1997). ”Standard Test Method for Specific Gravity and Absorption of Fine Aggregate.” C128, West Conshohocken, Pa.

25) Foo, Kee Y., and Kandhal, Privthi S. (1998). “Adapting Superpave Technology to Design of Hot Recycled Mixes.” Journal of Testing and Evaluation 26.3, 203-212.

26) Illinois Department of Transportation. (1997). “Standard Specifications for Road and Bridge Construction.” State of Illinois.

27) Illinois Department of Transportation. (2000). “Illinois Modified Test Procedure: Standard Specification for Superpave Volumetric Mix Design.” State of Illinois.

28) Illinois Department of Transportation. (2000). “Illinois Modified Test Procedure: Standard Practice for Superpave Volumetric Design for Hot-Mix Asphalt (HMA).” State of Illinois.

29) Illinois Department of Transportation. (1996). “Illinois Superpave Mix Design and Bituminous Level III Update Course.” State of Illinois.

30) Kandhal, Prithvi S., Parker Jr., Frazier, and Mallick, Rajib B. (1997). “Aggregate Tests for Hot Mix Asphalt: State of the Practice.” NCAT Report No. 97-6, Auburn University, Al.

31) NAPA Research and Education Foundation. (1996). “Hot Mix Asphalt Materials, Mixture Design and Construction.” 2nd Edition, Lanham, Maryland.

32) National Center for Asphalt Technology. (1998). “Professor Training Course in Asphalt Technology.”

33) SHRP. (1994). “Level One Mix Design: Materials Selection, Compaction, and Conditioning.” National Research Council, Washington D.C.

Appendix A

Experimental Data and Sample Calculations

A. Sand Equivalent Test (AASHTO T176-86)

Temperature = 67oFOriginal Fine Aggregate Amounts

FA 01 = 804.9 g

24

Page 25: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

FA 21 = 695.1 g

Total = 1500.0 g

Sand Reading = 4.0Clay Reading = 4.0

Sand Equivalent = (Sand Reading/Clay Reading)*100 = (4.0/4.0)*100 = 100%

B. Los Angeles Abrasion Test (AASHTO T96-94)

Test 1 Counter set to 500 revolutions

Mass of oven dried CA 16 Retained on #4 Sieve = 5005.0 gMass of sample Retained on #8 Sieve after testing = 2455.0 g

Calculation of Percent Loss = ((5005.0 g -2455.0 g) / 5005.0 g) * 100 = 51 %

Test 2 Counter set to 500 revolutions

Mass of oven dried CA 16 Retained on #4 Sieve = 4003.8 gMass of oven dried CA 16 Retained on 3/8” Sieve = 1001.6 g

Total Mass Retained 5005.4 g

Mass of sample Retained on #8 Sieve after testing = 3647.4 g

Calculation of Percent Loss = ((5005.4 g -3647.4 g) / 5005.4 g) * 100 = 27 %

C. Sulfate Soundness Test (AASHTO T104-97)

Aggregate Sieve Mass Retained Mass Retained Loss (g) Before Test After Test

FA 01 #50 111.66 g 110.22 g 1.44FA 01 #30 118.51 g 116.23 g 2.28FA 01 #16 119.70 g 115.61 g 4.09FA 01 #8 116.15 g 107.80 g 8.35FA 01 #4 110.82 g 81.23 g 29.59CA 16 #4 118.90 g 102.54 g (Ret. #5) 16.36

25

Page 26: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Solution Used – Na2SO4 (Anhydrous Sodium Sulfate)Temperature = 71oFSpecific Gravity = 1.174 of Na2SO4 solution

Sample calculation: using FA 01 #50 sieve

i. Grading original sample (% Retained)

Sieve % Passing % Retained#16 73#30 30 43#50 9 21#100 1 8

ii. Percent Passing After Test

Loss = 1.44 gOriginal mass Retained = 111.66 g

Percent Passing = (1.44g/111.66g) *100 = 1.3%

iii. Weighted Percent Loss

Original Sample Percentage * Percent Loss = 21*0.013 = 0.3%

D. Asphalt Content Ignition Method (AASHTO TP308-99)

Oven Temperature = 538oC

Original Mass of Sample = 1778 gMass After Burning = 1688 g

Percentage of Asphalt in Specimen = ((1778-1688)/1778)*100 = 5.0%

E. Bulk Specific Gravity Test (AASHTO T166-93)

Temperature = 22oCTemperature Correction Factor, K = 1.000728

Sample Mass in Air, A = 4875.6 gSample Mass in Water, C = 2776.8 gBlotted Air Dry Mass, B = 4919.3 g

Calculation, Gmb = K*(A/(B-C)) = 1.000728*(4875.6/(4919.3-2776.8)) = 2.277

26

Page 27: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

F. Maximum Theoretical Specific Gravity (AASHTO T209)

Mass of Type F Pycnometer filled with water @ 25.5oC, D = 22860 gMass of Oven Dried Sample, A = 1285 gMass of Container Filled with sample and water, E = 23615 g

Calculation, Gmm = A/(A+D-E) = 1285/(1285+22860-23615) = 2.425

G. Combined Bulk Specific Gravity of Aggregate Blend

Equation,

Gsb = 100CA16/Gsb1 + FA01/Gsb2 + FA21/Gsb3 + MF/Gsb4

= 100 = 2.630

58.0/2.639 + 19.0/2.603 + 22.0/2.627 + 1.0/2.670

H. Air Voids (Va)

Va = 100*(Gmm-Gmb)/Gmm = 100*(2.425-2.277)/2.425 = 6.1%

I. Voids in Mineral Aggregate (VMA)

VMA = 100-(Gmb*Ps)/Gsb = 100 – (2.277*95)/2.630 = 17.8% Reported as 18%

J. Voids Filled with Asphalt (VFA)

VFA = 100*(VMA-Va)/VMA = 100*(17.8 – 6.1)/17.8 = 65.7% Reported as 66%

Appendix B

Recommendations to the Civil Engineering Department

It is recommended that the Department obtain the following items:

12” diameter brass sieves matching the existing Department ones in the following sizes:

27

Page 28: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

3/8”, 1/4”, #4, #8, #30, #50, #100, #200

(2) 2500 gram aluminum pyconometers

(1) Vacuum pump capable of pulling 30 mm Hg

(4) Small C-clamps to fix and hold the Sand Equivalent Shaker in place

(1) Additional hose for use in the Sulfate Soundness back flushing process

(5) One gallon metal pots for transferring hot asphalt liquid to the batch sample

The Department should have on-hand one copy of the IDOT publication titled “Illinois Superpave Mix Design and Bituminous Level III Update Course”

Obtain a copy of the batch weight mix design software available from IDOT. Although this is a Lotus 1-2-3 spreadsheet type, it could be very useful for quickly adjusting aggregate percentages and producing batch weights. Doing this operation by hand is very time consuming and tedious. By having this program, or a similar one, the instructor or teaching assistant could make up different mix designs for several lab groups in a relatively short period of time.

Based on my experience with mix designs, operating and setting-up the asphalt lab, and being an assistant to Dr. Lin for the soils lab, I respectfully suggest a few things pertaining to the use of the asphalt lab as it relates to the Department curriculum.

Introduce the students to the asphalt lab in a lower level materials course. Let them get hands on experience with the equipment and actually making up batches of HMA. Such an introduction could possibly take place in conjunction with the existing concrete material course. Since the actual mix design process is rather time consuming and difficult to understand, it is recommended that this aspect of the HMA process be included in a more advanced pavement design course where lecture time can be dedicated to allowing the student to more fully understand just what they are doing.

Appendix C

Rainhart Gyratory Compactor Problem Log

Date Status

August 2000 Compactor and computer arrive at Engineering Building. Software that runs the compactor already installed by manufacturer.

28

Page 29: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

September 2000 Contacted by Rainhart Co. and told that the compactor needed a new piston face. Took approximately 2 weeks to receive. Brent Vaughn installed.

October 4, 2000 Calibrated compactor. Load cell that was provided not working properly. Brent contacted manufacturer about problem. He recalibrated the existing load cell himself.

October 5, 2000 Finished calibration routine.

October 23, 2000 Batched mix design sample #1. Compactor malfunctioned. The Ram extended down to the mold but would not go up without restarting the computer software program. The process took approximately one hour by which time the sample was considerably colder than specifications. Also, the angle indicator did not work on the compactor and the computer did not register it in the data file.

October 24, 2000 Contacted Rainhart. Reviewed problems from the previous day. Talked to Butch. Upon recommendations from Butch, I ran a second sample. Angle display not working and neither did the Ram.

October 25, 2000 Called Rainhart. Told them of the recurrent software compactor interface problems. Butch told me that the programmer would be contacted and we would receive a 2nd edition of the software. The company had updated the first version due to customer complaints but had never bothered to inform us or send out the new version.

November 9, 2000 Received the 2nd version of the software via email. Brent installed it to the computer. Brent and I tried to run the new version. Ram would not even extend down to the mold. Called Rainhart and informed them of the problem. They suggested we recalibrate. After recalibration Ram still not working. Unable to do a test. Cancelled batching for scheduled 11/10/00.

November 10, 2000 Brent contacted Rainhart salesperson. Told him of the continued problems. Saleperson suggested that Rainhart send out a customer representative.

November 15, 2000 Brent installed another version of the software and nothing worked at all. Over the phone, Butch said they would overnight mail Brent a new processor board which Brent would have to install.

November 16, 2000 Received new processor board and installed. Installed new software. We tried the machine with two asphalt samples. The angle doesn’t stay fixed once set and the Ram extends down, hits the top of the mold and stops the test. This is the same problem we originally had with the machine.

29

Page 30: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

November 30, 2000 Brent installed another version of software. Nothing worked. Rainhart will send a new machine and software complete with a technician to install next week.

December 8, 2000 New compactor arrives.

December 13, 2000 Compactor and software properly working.

Appendix D

Student Lab Manual

Procedures for the Preparation of Hot Mix AsphaltTest Specimens using the SuperpaveTM Method

30

Page 31: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Introduction

This manual will outline to the civil engineering student the steps necessary to prepare a hot mix asphalt (HMA) specimen, which is used in the mix design process, using the SuperpaveTM (Superior Performing Asphalt Pavements) mix design criteria. SuperpaveTM has been recently adopted by many state highway departments, replacing the Marshall and the Hveem methods for asphalt mix design. The purpose of the manual will be to outline the fundamental steps involved in the SuperpaveTM method.

Furthermore, this procedures manual shall only address preparation of the hot mix specimen. Such related topics as aggregate blending, asphalt binder selection, material properties, and equipment calibration are not made a part of this document. Students wishing to learn more about the total SuperpaveTM process can contact the instructor for a list of additional resources.

Materials

The following materials will be used in the specimen production.

Performance Graded Asphalt Binder Course Aggregate Fine Aggregate Mineral Filler

Equipment

The following equipment will be utilized in the specimen production.

Ovens, thermostatically controlled Mechanical Mixer, 10 qt. Flat bottom metal pans Metal Scoop, spatula, and spoons WD-40 or other light lubricating fluid Pouring Pots, for heating asphalt Thermometers, armored glass Balances, 10 kg capacity Heat resistant gloves Yellow lumber crayon, for specimen identification marking Paper disks, 6 inches, for gyratory compaction Computer and Gyratory Compactor, for compacting and recording specimen data

Definitions

31

Page 32: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Although students should be familiar with the basic terminology of the asphalt mix design process from lecture, the following definitions are provided for ease of reference as these are used throughout the manual.

Asphalt Binder: the asphalt cement used to mix and bind the aggregate and mineral filler. Course Aggregate: rock particles generally larger than the #4 sieve. Fine Aggregate: sand, silt, and clay particles generally smaller than the #4 sieve but larger than

the #200 sieve. Mineral Filler: dust size particles used to fill small voids in the hot mix asphalt specimen. Gyratory Compactor: a piece of equipment used to compact the asphalt mix design specimen

at a specified pressure, angle of tilt, and revolution cycles. Ndesign, Design Gyrations: the number of gyrations the compactor is set at for the particular mix

design specimen.

Procedures

The following steps outline the basic procedures in the HMA specimen production. Following these detailed procedural steps, a flowchart is provided as a quick reference aid for student. These basic steps are taken from Asphalt Institute. (1996). “Superpave Mix Design: Superpave Series No. 2 (SP-2).” U.S.A.

32

Warning: The asphalt mix design specimen procedure involves the use of heavy aggregates and hot asphalt liquid. Students should follow all lab safety procedures to avoid injury.

Page 33: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Materials Step 1

You will be given a batch mix design sheet by the instructor that shows the batch weights of course and fine aggregate, asphalt, and mineral filler to be used for the HMA specimen production. Place the individual materials in separate metal containers in the oven and heat for 2 hours at 170oC.

Step 2

After the 2- hour time period, remove materials from oven.

Mixture Step 3

Using the provided batch sheet, place the proper amount of material into the mechanical mixing bowl. Turn on the mixer and mix the batch until it is visually observed that all the aggregate is fully coated with the asphalt binder. Turn off mixer.

Step 4

Remove all the specimen material from the mixer and place mixture into a shallow metal dish. Spread mixture to an even thickness and place in the oven for 4 hours at 135oC. This time in the oven is done to simulate short term aging that occurs during the actual production of plant generated HMA.

Compaction Step 5

While the mixture is aging in the oven, prepare the gyratory compactor for use. A computer is connected to the gyratory compactor via a serial port. The computer software that operates and collects the data from the compactor is installed by the instructor and the compactor has its power to the “on” position. For this operation, the student simply verifies the compaction pressure of 600 kpa, inclination angle of 1.25o, and enters the Ndesign = 50 into the software at the appropriate location on the screen. Next, take the compaction mold and place it in the oven for 60 minutes at the 135oC temperature.

Step 6

Remove the mixture and the compaction mold from the oven at the same time. Spray a light layer of WD-40, or other light lubricant, to the inside of the mold. Next, place a paper disk on the bottom plate of the mold. Then, using a scoop and spatula, place the specimen mixture into the mold, being careful not to leave any material behind in the pan. Finally, level the specimen and place another paper disk on top of the specimen mixture in the mold.

33

Page 34: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Step 7

Place the mold with the specimen into the gyratory compactor and click on the start button on the computer screen. During the compaction process, the computer will monitor the specimen height, make sure the correct compaction pressure is applied, and stop the test once the designated gyrations have been completed.

HMA SpecimenStep 8

Once the compaction is complete, remove the mold from the center hold. Then, center the mold over top of the extraction piston on the compactor base. Next, press the extraction button on the compactor and extrude the specimen from the mold. Finally, let the specimen cool to room temperature, remove the paper disks, and using a lumber crayon, mark the top of the specimen with your lab group number for future identification.

Conclusion

The steps outlined previous illustrate the fundamental procedures necessary to produce a HMA specimen using the Superpave criteria. The Superpave method is the most recent advance in relating the mix design process to what actually is produced in the field. For this reason, many state highway agencies have adopted the method. Following the prescribed steps as outlined in this manual is a key element in producing quality HMA specimens, and therefore, increasing the accuracy of the hot mix asphalt process from the initial design to actual production. The production of the HMA specimen is one of the most critical elements in the Superpave Mix Design Method, and therefore, care should be taken to ensure accurate results. The student/technician should realize that careful preparation, attention to the details outlined in the procedures, and practicing good lab safety result in a quality specimen and a job well done.

HMA SpecimenProduction Flowchart

34

#1 Heat aggregates & asphalt to specified

temperature.

BEGIN

Page 35: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Appendix E

Asphalt Mix Design and Lab Manual for Instructors

Procedures for Developing a SuperpaveTM Mix Design

Introduction

In order for the efficient use of the civil engineering student’s time in the asphalt lab, the instructor must complete the mix design used for making the batch specimen. This manual will cover the

35

#2 Remove aggregates & asphalt

from ovens.

#3 Place proportioned aggregates & asphalt into

mixer. Mix until aggregate is fully coated.

#4 Place mix in oven for 4 hours at 135oC.

#5 Prepare the gyratory compactor. Place molds in oven

#6 Remove mix & molds from oven. Place mix into

mold.

#7 Center mold in compactor. Start compactor. Let run to N

#8 Remove mold. Extract specimen. Let cool. I.D.

specimen.

END

Page 36: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

essentials to the SuperpaveTM Mix Design process. The emphasis will be on developing the final batch weights and percentages, which should be summarized on a mix design worksheet that the students will use for making the hot mix asphalt specimen. A brief outline of materials, material testing, and equipment will be included so that familiarity for the new instructor can be developed. For a more in-depth look at these related topics, the instructor is urged to consult additional resources. This manual is predicated on the assumption that the instructor already has a working understanding of the basic terms and procedures involved with the asphalt mix design process, and thus much of the more basic terminology will not be covered in this manual.

Materials

The following materials will be used in the trial batch and the hot mix asphalt (HMA) specimen production. The aggregate designations are based on the Illinois Department of Transportation (IDOT) Specifications.

Performance Graded Asphalt Cement (AC) Binder: AC 64-22 Course Aggregate: CA 16 Fine Aggregate: FA 01 Fine Aggregate: FA 21 Mineral Filler: Standard limestone crusher dust

Equipment

The following equipment will be utilized in the mix production and testing.

Ovens, thermostatically controlled (400o F) Mechanical Mixer, 10 qt. Metal pans, scoops, and spatulas Light weight lubricating fluid Metal pouring pots (1 gallon), for heating asphalt Thermometers, armored glass (400o F) Balances, 10 kg capacity (accurate to 0.1 gram) Heat resistant gloves Yellow lumber crayon, for specimen identification marking Paper disks, 6 inches, for gyratory compaction Computer and Gyratory Compactor, for compacting and recording specimen data Bulk Specific Gravity tank and balance Aluminum pycnometer (2000 gram)

Design Criteria

The following specifications are presented to highlight the primary design target values necessary for approval of the mix under IDOT’s criteria for the IL 9.5 mm mix designation only. For other mixes, refer to appropriate sources for the target values.

Mix Specification Illinois 9.5mm

Equivalent Single Axle Loads (ESAL’s) 1 million

36

Page 37: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Required Density (N design) 50Voids in Mineral Aggregate (VMA) 15.0%Percent (%) Air Voids (Va) 4.0 %Voids Filled with Aggregate (VFA) 65-78%

Gradation Requirements: Mix Composition

Note: Superpave uses the 0.45 power chart for plotting the mix gradation. The following example illustrates how this is accomplished for the IL 9.5 mm mix. The final mix gradation must be out of the restricted zone and between the control points. To increase or decrease VMA change the gradation such that the mix line moves above or below the maximum density line as indicated.

Percent Passing Control Points

Sieve Size Minimum Maximum Minimum Maximum12.5 mm(1/2”)

100 100 ---

9.5 mm(3/8”)

90 100 90 100

4.75 mm(#4)

24 65 --- 90

2.36 mm(#8)

16 48 32 67

75 µm(#200)

4 6 2 10

Restricted Zone

Sieve Size Min Max2.36 mm 47.2 47.21.18 mm 31.6 37.60.6 mm 23.5 27.50.3 mm 18.7 18.7

37

Page 38: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Procedures

Step 1…..Choose percentages of aggregate and asphalt cement for the trial batch. Guidelines are provided below for use in the IL 9.5 mm mix.

Material Percentage Range

CA 16 55-60%FA 01 18-23%FA 21 20-25%Mineral Filler (MF) 1-2%AC 64-22 4.5-6.0%

Step 2…..Compute the total batch percentage from the individual material gradations. The example for the 2.36 mm sieve that follows will help with this rather tedious task.

Total Batch Percentage (for the aggregate materials) is calculated by summing the trial percentage of each aggregate by its gradational percent passing value.

Eg. Batch Percentage = (0.575*4) + (0.19*92) + (0.22*77) + (0.015*100) = 38.2% (2.36 mm sieve)

Sieve Size CA 16 FA 01 FA 21 MF AC 64-22Trial Batch % 57.5 19.0 22.0 1.5 5.02.36 mm 4 92 77 100 NA

38

Page 39: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

NOTE: Using this example, every sieve size that is included in the trial batch must be calculated in the same manner so a batch percentage passing (for the aggregates) can be obtained. It should be noted that the asphalt cement binder is simply added to the mix based on its percent weight, due to the fact it is a liquid component of the batch.

Step 3…..Plot the total batch percentages for each sieve size computed in Step 2 on the 0.45 power chart.

Step 4…..Verify that the batch gradation stays out of the restricted zone and in between the control points. If it doesn’t, then choose different material percentages, recalculate the batch percentages, and plot the new batch.

NOTE: The trial batch must be within the parameters of the 0.45 power chart in order to proceed.

Step 5…..Having successfully obtained the trial batch gradation percentages, make a batch of asphalt mix. For specific instructions on how to make the asphalt mix refer to Appendix D Student Manual “Procedures for the Preparation of Hot Mix Asphalt Test Specimens using the SuperpaveTM Method”.

Step 6…..Finally, determine if the trial batch meets the IDOT specification. Follow the steps in this manual titled Volumetrics to determine Va, VMA, and VFA. These are the last criteria that the mix design must meet. Having met these remaining criteria, you will have successfully completed a proper Superpave mix design.

Volumetrics

In order to determine if the trial batch meets the Design Criteria, the mix needs to be tested to ascertain whether the target values have been met for the particular gradation chosen. The following procedures highlight the final process of the mix design and the results will determine whether the mix is adequate based on the criteria.

HMA Maximum Theoretical Density, GmmRefer to ASTM D 2041-95

HMA Bulk Specific Gravity, GmbRefer to ASTM D 2726-96a

Combined Bulk Specific Gravity of Aggregate Blend, Gsb

When the total aggregate trial blend consists of aggregates with different specific gravities, which is usually the case, then the Bulk Specific Gravity for the blend must be calculated using:

Gsb = P1 + P2 + ……+ Pn

P1 + P2 + …. + Pn

G1 G2 Gn

39

Page 40: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

Where, Gsb = bulk specific gravity of total aggregate blendP1, P2, Pn = individual percentages by mass of aggregateG1, G2, Gn = individual specific gravities of aggregate

Aggregate Percentage by Volume, Ps

Total percentage by mass of the batch that the aggregate makes up

Calculations

Using the above values, substitute into the following equations to determine VMA, Va and VFA.

Property Target Value

VMA = 100 – (Gmb * Ps)/Gsb 15.0

Va = 100 * (Gmm – Gmb)/Gmm 4.0%

VFA = 100 * (VMA – Va)/VMA 65% - 78%

Conclusion

Creating a HMA design that meets the Superpave criteria is a time consuming and detailed task but one that must be completed by the instructor if the asphalt lab is to run efficiently. There is more to mix design than just mixing aggregate with hot asphalt to form a HMA specimen. Careful attention to the details of aggregate gradation and meeting target values will ensure that the asphalt mix batched in the lab and the test results found by the students is valid. By creating a sound mix design, the students will gain a more advanced knowledge of the mix design process and the necessity for properly designed pavements.

40

Page 41: Hot Mix Asphalt Mix Design using IDOT and … · Web view... AASHTO. (1997). “Standard Specification for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent

HMA Specimen Production Flowchart

41

#1 Heat aggregates & asphalt to specified

temperature.

#2 Remove aggregates & asphalt from

#3 Place proportioned aggregates & asphalt into

mixer. Mix until aggregate is fully coated.

#4 Place mix in oven for 4 hours at

135oC.

#5 Prepare the gyratory compactor. Place molds in

oven for 60 minutes.

#6 Remove mix & molds from oven.

Place mix into mold.

#7 Center mold in compactor. Start compactor.

Let run to N design.

#8 Remove mold. Extract specimen. Let cool. I.D.

specimen.

END

BEGIN