    Wall-Ties & Forms, Inc, (WTF) is one of the world's largest

    companies in the concrete forming business, as well as the premier

    designer and manufacturer of concrete forming systems. Over 33

    years ago as a new business, WTF manufactured ties - thousands of

    them. Today we produce and ship over 30 million ties a year and

    over 200,000 aluminum concrete forms.

    It started in 1976 when Orval Engelken and Ross Worley, two menwith extensive knowledge of the construction industry. They left long

    and successful careers, one a national sales manager and the other

    a product design and manufacturing expert, knowing they could do a

    better job.

    Three principles guided them:

    1. Produce the best quality and most labor friendly product.

    2. Offer unsurpassed customer service.

    3. Provide it all at a competitive price.

    The rest is history!

  • 8/7/2019 Housing Construction Process

    3/64

    WTF Manufacturing Facility

    160 Employees

    Over a 120,000 Sq. Ft.

  • 8/7/2019 Housing Construction Process

    4/64

    The WTF Formwork System (manufactured byWall Ties & Forms, Inc.) is unique because itforms all of the components in the structureincluding, walls, floor slabs, columns, beams,stairs, window details, balconies, and variousdecorative features in exact accordance with

    the architect's design. No other system canmatch WTF Formwork flexibility to handle alldesign conditions.

  • 8/7/2019 Housing Construction Process

    5/64

    The WTF System is erected by unskilled labor andwithout the need of hoisting cranes. The largestcomponent weight is not more than 32 kgs (70 Lbs).This enables a single worker to handle the WTFformwork components. The forms and other sections aresecured and fixed with steel pins and wedges with

    formwork ties. The only tool required is a hammer. TheWTF System can save as much as 10 - 20% of the totalcost of construction and increase speed as much as 30 -50% over traditional methods such as block andpost/beam construction.

  • 8/7/2019 Housing Construction Process

    6/64

    The WTF Aluminum Formwork System for concreteconstruction is the most versatile construction system inthe world. Unlike other systems, it is equally suited toconstruct both high and low rise structures.

  • 8/7/2019 Housing Construction Process

    7/64

    The WTF Formwork System is specifically designed to allow the rapid construction of multiple unit projects.The system is cycled daily to achieve optimum productivity.

    One and two story duplex project in Mexico consisting of 8,500 units

  • 8/7/2019 Housing Construction Process

    8/64

    The simplicity of the WTF aluminum

    formwork is ideal for unskilled labor andenables unskilled labor to achieve thehighest of production rates.

    Every component is light enough to behandled by one worker, minimizing theneed for heavy lifting equipment.

    The only toolneeded to erectthe formwork is ahammer.

  • 8/7/2019 Housing Construction Process

    9/64

    WTF aluminum formwork enables the developer tocast most if not all elements of the structure.

    This includes structural, non-structural, andarchitectural elements

  • 8/7/2019 Housing Construction Process

    10/64

    The formwork for these structures included all elements, structural, non- structural, and architectural. Thearchitectural elements include, radius headers, decorative columns, pitched concrete roof, and rain gutters castdirectly into the decorative moldings.

  • 8/7/2019 Housing Construction Process

    11/64

    Casting all elements achieves a costsavings of 10-20% over traditional methods.This home was constructed by Homex ofMexico. Homex is the largest builder inMexico with 51,000 home starts a year as of2009.

  • 8/7/2019 Housing Construction Process

    12/64

    Casting all elements also speedsconstruction 30 - 50% over traditionalmethods. This is achieved by thespeed of the formwork system, thereduction of follow-on trades, and theease of finishing the surfaces.

  • 8/7/2019 Housing Construction Process

    13/64

    One of the principal technical features whichenables the speed to be attained using asingle set of formwork is the unique deckbeam system. This allows the formworkremoval to take place while leaving the decksupports undisturbed. The deck panels canthen be reused immediately.

  • 8/7/2019 Housing Construction Process

    14/64

    The precision of the WTF Formwork enables doors and window frames to be directly installed on sitewith no re-sizing required.

  • 8/7/2019 Housing Construction Process

    15/64

    Because openings are so precise, the developer can beconfident in the pre-purchase of doors and windows.Often times the developer can purchase these items foran entire project with huge cost savings.

    Th t f d d ith th

  • 8/7/2019 Housing Construction Process

    16/64

    The concrete surface produced with theformwork allows the achievement of a highquality wall finish without the need forextensive plastering.

  • 8/7/2019 Housing Construction Process

    17/64

    Formwork set for final inspection at manufacturing facility in Shawnee, Kansas, USA.

    Because the WTF Formwork is constructed with the highest quality aluminum and

    welded with robotics, developers can expect 2,000 uses or more with proper care.

  • 8/7/2019 Housing Construction Process

    18/64

    Often times the formwork outlives the life of the project and can be cycled to a new project. Because

    the formwork is modular 70- 90% of the forms are easily adapted to new construction projects.

  • 8/7/2019 Housing Construction Process

    19/64

    From foundation to multi-story construction, the following pages illustrate the WTF Formwork process.

  • 8/7/2019 Housing Construction Process

    20/64

    The process begins with compaction of the site. Trenches are

    then dug, plumbing installed, and WTF slab formwork is set.

  • 8/7/2019 Housing Construction Process

    21/64

    Once structural footings are dug, slab steel isinstalled in accordance with local code.

  • 8/7/2019 Housing Construction Process

    22/64

    Concrete is then placed using local methods.

  • 8/7/2019 Housing Construction Process

    23/64

    Wall steel is then tied in accordance with local building codes.

  • 8/7/2019 Housing Construction Process

    24/64

    Electrical boxes and conduit are attached to the wall steel. Rigid or flexibleconduit may be used depending on local building codes.

  • 8/7/2019 Housing Construction Process

    25/64

    When constructing mass housing projects it is wise toprep slabs well in advance. The WTF FormworkSystem can be cycled daily for very rapid construction.

  • 8/7/2019 Housing Construction Process

    26/64

    The beginning of the WTF formwork process normallystarts in a corner or multiple corners depending on thenumber of workers. This process continues until all

    walls are erected.

  • 8/7/2019 Housing Construction Process

    27/64

    Once wall forms are set, decking can begin.Decking like wall formwork is hand-set andbegins in a corner.

  • 8/7/2019 Housing Construction Process

    28/64

    Upon completion of

    decking, steel andelectrical is installedin preparation ofconcrete placement.

  • 8/7/2019 Housing Construction Process

    29/64

    When all prep work is complete,concrete is placed monolithically inwalls and deck. Concrete placementis normally completed using a boompump but is dictated by local marketequipment. This can include trailer

    pumps, crane buckets, and evenhand bucketing.

  • 8/7/2019 Housing Construction Process

    30/64

    The WTF formwork is removed

    the very next day to begin thecycle again.

    F lti t t t

  • 8/7/2019 Housing Construction Process

    31/64

    For multi-story structuresscaffolding is then attached.The scaffolding not onlysupports the weight of theworkers but also supports theexterior wall forms.

  • 8/7/2019 Housing Construction Process

    32/64

    Steel is tied, forms set, andconcrete placed repeatingthe daily cycle.

  • 8/7/2019 Housing Construction Process

    33/64

    For markets with extreme climates, the WTFFormwork System easily incorporatesinsulation into the construction process. Theexpanded foam insulation is installed betweenformwork ties prior to setting exteriorformwork.

  • 8/7/2019 Housing Construction Process

    34/64

    After concrete placement and curing, formwork is removed leavingfoam insulation permanently bonded to the concrete.

  • 8/7/2019 Housing Construction Process

    35/64

    The WTF Formwork Systemis in use in over 45 countriesworldwide. The followingpages are just a fewexamples of the WTF globalpresence.

  • 8/7/2019 Housing Construction Process

    36/64

  • 8/7/2019 Housing Construction Process

    37/64

  • 8/7/2019 Housing Construction Process

    38/64

  • 8/7/2019 Housing Construction Process

    39/64

  • 8/7/2019 Housing Construction Process

    40/64

  • 8/7/2019 Housing Construction Process

    41/64

  • 8/7/2019 Housing Construction Process

    42/64

  • 8/7/2019 Housing Construction Process

    43/64

  • 8/7/2019 Housing Construction Process

    44/64

  • 8/7/2019 Housing Construction Process

    45/64

  • 8/7/2019 Housing Construction Process

    46/64

  • 8/7/2019 Housing Construction Process

    47/64

  • 8/7/2019 Housing Construction Process

    48/64

  • 8/7/2019 Housing Construction Process

    49/64

  • 8/7/2019 Housing Construction Process

    50/64

  • 8/7/2019 Housing Construction Process

    51/64

  • 8/7/2019 Housing Construction Process

    52/64

  • 8/7/2019 Housing Construction Process

    53/64

  • 8/7/2019 Housing Construction Process

    54/64

  • 8/7/2019 Housing Construction Process

    55/64

  • 8/7/2019 Housing Construction Process

    56/64

  • 8/7/2019 Housing Construction Process

    57/64

  • 8/7/2019 Housing Construction Process

    58/64

  • 8/7/2019 Housing Construction Process

    59/64

  • 8/7/2019 Housing Construction Process

    60/64

  • 8/7/2019 Housing Construction Process

    61/64

  • 8/7/2019 Housing Construction Process

    62/64

  • 8/7/2019 Housing Construction Process

    63/64

  • 8/7/2019 Housing Construction Process

    64/64