how can cidb & industry players works hand in hand to...

25
SEMINAR ON MODERN CONSTRUCTION TECHNOLOGIES 17 MAY 2017 WISMA REHDA BY DATUK Ir. ELIAS ISMAIL TECHNOLOGY DEVELOPMENT SECTOR CIDB MALAYSIA IBS SCORING: How can CIDB & Industry Players Works Hand in Hand to Promote usage of IBS

Upload: vokien

Post on 08-Mar-2018

226 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

SEMINAR ON MODERN CONSTRUCTION TECHNOLOGIES

17 MAY 2017

WISMA REHDA

BY DATUK Ir. ELIAS ISMAIL

TECHNOLOGY DEVELOPMENT SECTOR

CIDB MALAYSIA

IBS SCORING: How can CIDB & Industry Players Works Hand in

Hand to Promote usage of IBS

Page 2: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

PART I: WHY IBS

PART II: IBS SCORING CONTENT SYSTEM (SCORE)

PART III: HOW WE CAN WORKS TOGETHER

Page 3: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

PART I: WHY IBS

Page 4: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

ROADMAP IBS 2003-2010

ROADMAP IBS 2011-2015

Construction Industry

Transformation Program

(CITP 2016-2020)

Page 5: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

increase in productivity to

per worker1

1. US$16,500 is equivalent to RM 61,939 as stated in the 11th Malaysia Plan; 2.5x

increase uses 2011 as a base as compared to 11th Malaysia Plan where 1.6x

increase in labour productivity uses 2015 as a base. Both sets of numbers are

consistent

2.5x US$16,500

Page 6: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

CONSTRUCTION CONTRACT (RM 124.96 BN)

PUBLIC SECTOR

RM 29.07 BN

PRIVATE SECTOR

RM 95.89 BN

RESIDENTIAL

RM 0.60 BN

NON RESIDENTIAL

RM 6.12 BN

INFRASTRUCTURE

RM 22.35 BN

RESIDENTIAL

RM 28.62 BN

NON RESIDENTIAL

RM 32.07 BN

INFRASTRUCTURE

RM 35.20 BN

77% 23%

2%

21%

77%

30%

33%

37%

SOURCE FROM CIDB :BULETIN STATISTIK PEMBINAAN SUKU TAHUNAN – TAHUN 2016

Private sector must

take the lead to improve productivity by using IBS

Page 7: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

POLICY AGREEMENT

PUBLIC SECTOR

- Treasury Circular -

October 31, 2008

PRIVATE SECTOR

- RMK 11

- Mesyuarat Jemaah

Menteri (9 September

2015)

- Economic Council

Meeting (24 Oktober

2016)

- Mesyuarat Majlis

Negara Kerajaan

Tempatan (MNKT)

(8 Jun 2017)

Page 8: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

Circular issued on IBS by

Treasury on 25 July 2005

“Encourage”

2004 2005 2006 2007 2008 2009 2016 2003

MS 1064: Modular

Coordination as Guideline

for Building Design

IBS Roadmap 2003-2010

Manual for IBS Content

Scoring

“Published”

1999

IBS Strategic

Plan 1999

IBS Roadmap

Review 2008-2010

2010

Malaysia IBS

International

Exhibition ’06

(MIIE06)

Approved By M’sia

Cabinet

Construction Industry Master Plan

2006-2015

2001 2015

Follow-up Treasury Circular

on IBS issued on 31 Oct 2008

“Mandate”

Manual for IBS

Content Scoring

CIS18 2010

2017

CITP

2016-2020

Page 9: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

PART II: IBS CONTENT SCORING SYSTEM (SCORE)

Page 10: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

10

A systematic and structured

assessment system

Used to measure the usage of IBS

Content Scoring System in

building projects

Page 11: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

Prefabricate components

Use of standard components from

Malaysian Standard MS 1064

Repetition design

Page 12: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

12

Prefabricate components

Page 13: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

13

Use of standard components from Malaysian Standard MS 1064

Page 14: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

14

Repetition Design

Page 15: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

15

• To encourage development of open system for building components

• To support the development of catalogue system for building components

Modular coordination concept is a standard

measurement for building components

Page 16: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

Part 1: STRUCTURAL SYSTEM

Part 2: WALL SYSTEM

Part 3: OTHER SIMPLIFIED CONSTRUCTION SOLUTION

STRUCTURAL

SYSTEM

50 +

WALL SYSTEM

20 +

OTHER

SIMPLIFIED

CONSTRUCTION

SOLUTION

30

= 100

20

30 (S)

IBS SCORE FORMULA

Page 17: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

17

•Part 1: Structural system = 50 Score

•Precast components i.e. Beam, Column & Slab.

•Precast load bearing wall

•Steel column and beam

•Timber frame system

• Prefabricated/Precut Roof system

IBS SCORE COMPONENT

Page 18: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

18

•Part 2 : Wall system = 20 Score

•Precast concrete panel

•Metal cladding

•Prefabricated timber panel

•Drywall system

•Precision blockworks

•Full height glass panel

IBS SCORE COMPONENT

Page 19: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

19

•Part 3 : Other simplified construction solution = 30 Score

•Standard components based on MS1064

•Other prefabrication components (modular, 3D components, volumetric)

•Repetition of structure system

IBS SCORE COMPONENT

Page 20: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS
Page 21: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS
Page 22: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

PART III: HOW WE CAN WORKS

TOGETHER

Page 23: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

RESOURCES

OPEN SYSTEM POLICY

PROMOTION

IBS Centre > One stop centre for IBS

Integrated information on Database & Mapping of IBS in IBS Net

IBS Training Facilities

IBS Library

IBS Component Gallery

IBS Village Showhouse

Professional (1809) 5,000 Professional to be trained by 2020

IBS Manufacturer / Distributor (227) 300 IBS Manufacturer / Distributor by 2020

IBS Contractor (8,170) 2,500 IBS Contractor to be trained every year beginning 2017

Installer (39,271) 850 IBS Installer to be trained every year beginning 2017

IBS Catalogue

MS 1064 – Modular Coordination

IBS Score Manual

JKR PAPs Building information Modelling (BIM) > BIM Library – Digital IBS Component Volumetric System Requirements for Public Projects

> RM10mil to have 70 IBS Score

MANDATING

INCENTIVES

Requirements for Public Projects > RM5mil to have 70 IBS Score Requirements for

Private Projects > RM50mil to have

50 IBS Score

IBS Tax Incentive > Tax Holiday

Acceleration of Capital Allowances for IBS Supplier

for buying a mould (2006)

Levy Exemption on private sector residential project with minimum 50 IBS Score (2006)

IBS Promotion Fund by SME Bank (2015)

Machineries Supplier > Exemption import duty heavy

machineries

Media Engagement

MIIE

Seminars / Roadshows

Makmal Kerja Raya & CREAM

1999: IBS Strategic Plan

2003: IBS Roadmap

2006: CIMP

2016: CITP

2011: IBS Roadmap

MCIEA

Virtual Warehouse

Supplier Development Program (SDP) Coordinated & Integrated Training

Development of localized Contractor + IBS Manufacturer based on projects

Intervention from Government to implement actual projects as IBS showcase

IBS CENTRE

Page 24: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

More implementation using IBS in construction projects

Adoption of new Technologies

R&D in new construction methods

(IBS, BIM)

Joining and collaboration in IBS

training

Encourage and promoting the implementation of IBS

Page 25: How can CIDB & Industry Players Works Hand in Hand to ...rehdainstitute.com/wp-content/uploads/2017/05/3.-Datuk-Elias.pdf · Use of standard components from Malaysian Standard MS

THANK YOU

(03) 9281 6909

Pusat IBS

Galeri Komponen IBS

Lot 8, Jalan Chan Sow Lin

55200 Kuala Lumpur

@JomIBS_CIDB

(03) 9281 5870

[email protected]

Tweet to us