how much convergence is enough for traffic assignments used in feedback? john gibb dks associates...

28
How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications Conference *Annotated version* - see notes.

Upload: robin-boas

Post on 29-Mar-2015

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

How much convergence is enough for traffic assignments used in feedback?

John Gibb

DKS Associates

For the 14th TRB National Transportation Planning Applications Conference

*Annotated version* - see notes.

Page 2: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Partners, Sources, Assistance• Sacramento Area Council of Governments• Puget Sound Regional Council• John Bowman, Mark Bradley, RSG• Carson Area Metropolitan Planning Organization• Spokane Regional Transportation Council• Citilabs• PTV America• Caliper• Inro Consultants

Page 3: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Convergence of traffic assignments: How much is enough?

David Boyce

Biljana Ralevic-Dekic

Hillel Bar-Gera

• Link flow stability – avoid random noise• Relative gap → 0.0001

ASCE Journal of Transportation Engineering 130, 49-55 (2004)

Page 4: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Skims

Assignment

Link volumes

Demand model

Skims

Assignment

Demand model

Skims

Assignment

Demand model

Skims

Assignment

Demand model

Link timesLink timesLink times

The rest of the assignments

Page 5: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Skim comparison statistics

Iteration vs. PreceedingIteration vs. Equilibrium

Used paths vs. Shortest path = Relative Gap

Page 6: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Convergence Progress of a Trip-Based Model – AM Skim Change

2 3 4 5 6 7 8 9 10 11 12 13 14 150.0001

0.001

0.01

0.1

1

RG≈0.05

RG≈0.01

RG≈0.003

RG≈0.001

RG≈0.0004

RG≈0.0002

Iteration (demand model)

Re

lati

ve

Av

era

ge

Sk

im C

ha

ng

e

Page 7: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Convergence Progress of a Trip-Based Model – AM Displaced Trips

2 3 4 5 6 7 8 9 10 11 12 13 14 150.0001

0.001

0.01

0.1

1

RG≈0.05

RG≈0.01

RG≈0.003

RG≈0.001

RG≈0.0004

RG≈0.0002

Iteration (demand model)

Re

lati

ve

Dis

pla

ce

d T

rip

s

Page 8: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Convergence Progress of draft Sacramento Activity-Based Model

2 3 4 5 6 7 8 9 100.0001

0.001

0.01

0.1

1

ev2h05h06h07h08h09h14h15h16h17md4ni9Max RelGapRel Gap Criterion

Demand Model Iteration (during newest skim)

Re

lati

ve

Av

g-A

bs

olu

te S

kim

De

lta

fro

m

pre

vio

us

ite

rati

on

;R

ela

tiv

e G

ap

Period of Day

Page 9: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Skim error study

Well-converged assignment

Less-converged assignment

Skim Skim

Poorly-converged assignment

Skim

Comparison statistics

Comparison statistics

Trip Table & Network

Page 10: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Skim comparison:unconverged vs. best equilibrium

0 10 20 30 40 50 60 70 80 90 1000

20

40

60

80

100

RG 0.016RG 0.0012

Best Equilibrium Skim (min)

Sk

im a

t in

dic

ate

d R

ela

tiv

e G

ap

Page 11: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Skim Error v. Relative Gap: Sacramento AM (F-W)

0.000001 0.0001 0.01 10.000001

0.00001

0.0001

0.001

0.01

0.1

1

Relative Gap (posterior)

Re

lati

ve

Sk

im E

rro

r

Average-Absolute

Extreme

RMS

convergence

Page 12: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

0.000001 0.0001 0.01 10.000001

0.00001

0.0001

0.001

0.01

0.1

1

Relative Gap (posterior)

Re

lati

ve

Sk

im E

rro

rSkim Error v. Relative Gap: Sacramento Mid-Day

Extreme

RMS

Average-Absoluteconvergence

Page 13: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

0.000001 0.0001 0.01 10.000001

0.00001

0.0001

0.001

0.01

0.1

1

Relative Gap (posterior)

Re

lati

ve

Sk

im E

rro

rSkim Error v. Relative Gap: Reduced congestion (AM)

Extreme

RMS

Average-Absoluteconvergence

Page 14: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Skim Error v. Relative Gap: Increased congestion (AM)

Extreme

RMS

Average-Absolute

0.000001 0.0001 0.01 10.000001

0.00001

0.0001

0.001

0.01

0.1

1

Relative Gap (posterior)

Re

lati

ve

Sk

im E

rro

r

convergence

Page 15: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Skim Error v. Relative Gap: BPR^8(AM)

Extreme

RMS

Average-Absolute

0.000001 0.0001 0.01 10.000001

0.00001

0.0001

0.001

0.01

0.1

1

Relative Gap (posterior)

Re

lati

ve

Sk

im E

rro

r

convergence

Page 16: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Skim Error v. Relative Gap: Visum (Spokane)

Extreme

RMS

Average-Absolute

0.000001 0.0001 0.01 10.000001

0.00001

0.0001

0.001

0.01

0.1

1

Relative Gap (posterior)

Re

lati

ve

Sk

im E

rro

r

convergence

Page 17: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Skim Error v. Relative Gap: TransCAD (Carson City)

Extreme

RMS

Average-Absolute

0.000001 0.0001 0.01 10.000001

0.00001

0.0001

0.001

0.01

0.1

1

Relative Gap (posterior)

Re

lati

ve

Sk

im E

rro

r

convergence

Page 18: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Convergence Progress of a Trip-Based Model – AM Average Skim Change

2 3 4 5 6 7 8 9 10 11 12 13 14 150.0001

0.001

0.01

0.1

1

RG≈0.05

RG≈0.01

RG≈0.003

RG≈0.001

RG≈0.0004

RG≈0.0002

Iteration (demand model)

Re

lati

ve

Sk

im C

ha

ng

e

Page 19: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

0.0001 0.001 0.01 0.1 10.0001

0.001

0.01

0.1

1

Relative Gap (posterior)

Re

lati

ve

Sk

im E

rro

rSkim Error, AM changes v. Relative Gap

Extreme

RMS

Average-Absolute

Page 20: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Convergence Progress of a Trip-Based Model – Mid-Day Avg. Skim Change

2 3 4 5 6 7 8 9 10 11 12 13 14 150.00001

0.0001

0.001

0.01

0.1

1

AM 0.05AM 0.01AM 0.003AM 0.001AM 0.0004AM 0.0002RG≈0.05RG≈0.01RG≈0.003RG≈0.001RG≈0.0004RG≈0.0002

Iteration

Re

lati

ve

Sk

im C

ha

ng

e

AM

Mid-Day

Page 21: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

0.00001 0.0001 0.001 0.01 0.1 10.00001

0.0001

0.001

0.01

0.1

1

Relative Gap (posterior)

Re

lati

ve

Sk

im E

rro

rSkim Error, MD changes v. Relative Gap

Extreme

RMS

Average-Absolute

Page 22: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Conclusions• Relative Gap seems to imply relative skim errors.• Successive skim differences can be misleading – less than skim error implied by RG – esp. in low congestion.

• Choose Relative Gaps to create small skim errors compared to skim changes. • Low RGs don’t seem to accelerate demand convergence,

but high RGs limit it.• Doing so should avoid the misleading-differences problem.

• This is a small study of a few models. Test your own!

Page 23: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Convergence Progress of draft Sacramento Activity-Based Model

2 3 4 5 6 7 8 9 100.0001

0.001

0.01

0.1

1 ev2

h05

h06

h07

h08

h09

h14

h15

h16

h17

md4

ni9

Max RelGap

Rel Gap Criterion

Expected ErrorDemand Model Iteration (during newest skim)

Re

lati

ve

Ch

an

ge

, E

rro

r, G

ap

Page 24: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Contact

John Gibb

jag (at) dksassociates (dot) com

Page 25: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications
Page 26: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Extra slides

Page 27: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Example of spurious flow change

Page 28: How much convergence is enough for traffic assignments used in feedback? John Gibb DKS Associates For the 14th TRB National Transportation Planning Applications

Skim comparison statisticsRelative Gap

(links)

(skims)

= link cost = link flow = virtual shortest-path flow

= demand (trip table) = used-paths average travel time = shortest-path skim travel time

Average Absolute(trip-weighted)

= equilibrium travel time

RMS(trip-weighted)

Max Absolute