Get involved in the CityConnect project.Have your say on the CityConnect plans.We will be holding a number of public consultation events in your area. Keep an eye out for posters or check Facebook, Twitter and our website for dates, times and venues.
MetroWellington House40 - 50 Wellington StreetLeedsLS1 2DE e-mail: [email protected]: 0113 2517366
This document is available in other formats and languages on request
Leeds
Bradford
Stanningley bypass via Stanningley Centre.
For more information about routesand improvements in your local area visit:
www.cyclecityconnect.co.uk
This path is madefor walking (and cycling)
www.cyclecityconnect.co.uk
CityConnect1
cyclecityconnect
How the CityConnect route might look in Leeds City Centre
Artist’s Impression
Section F
Leeds
Bradford
Stanningley Centre
For more information about routesand improvements in your local area visit:
www.cyclecityconnect.co.uk
This path is madefor cycling (and walking)
Leeds
Bradford
Leeds City Centre
For more information about routesand improvements in your local area visit:
www.cyclecityconnect.co.uk
This path is madefor cycling (and walking)
City Connect Leaflet F.indd 1 27/05/2014 11:33
Central Area Frontage Plan
Leeds City Centre
About CityConnect
This section runs through the City Centre between Wellington Road in the west through to A64 York Road in the east via Wellington Street, Boar Lane, New York Street and Marsh Lane.
Objectives:
• Provide improved pedestrian and cycle accessin the heart of the City Centre.
• Maximising safety and minimising obstruction along the Cycle Superhighway.
• Provide segregated cycle facilities wherever possible.
• Provide cycle facilities at side roads and junctions.
• Minimise confl ict between pedestrians,cyclists and motorists.
Key Features:
• Provides cycle routes to access proposed cycle parking hubs.
• Provides sections of a City Centre cycle loop.
• Shared areas between pedestrians and cyclists minimised.
• Approximately 50% of the route is Type 1 cycle track with the remaining sections being Type 2 cycle track.
• Optimisation of signal controlled crossings to allow quick and safe use by cyclists.
• Coordination with City Centre projects including the New Generation Transport (NGT).
Leeds Train Station
Marsh
Lane
Wellington Street
LEEDS CICC TY CENTREY N E
River Aire
Kirkstall Road
Leeds + Liverpool Canal
Whitehall R
oad
Nev
ille
Stre
et
River Aire
Central Bus Station
St Peter’s CoEPrimary School
Agnes Stewart CoE High School
New York Road
Mount St Mary’sCatholic High School
Park LaneCollege of Further
EducationTown Hall
SECTIO
N G
SECTIO
N F
SECT
ION
ESE
CTIO
N F
Area being developed in liaison with NGT
Area being developed
in liaison with Network Rail
N
Type 1 cycle track
Type 2 cycle track
Cycle Lane
Bus stop
Formal Crossing
Road - Cycle Track
Side Road - Cycle Lane
Side Road - Table
Private Accces
Cycle parking hub
Existing 20mph zone
Proposed 20mph zone
School/College
Key Destination
New Generation Transport (NGT) Route
City Cycle Loop(proposed as part of CityConnect or existing)
City Cycle Loop(alignment to bedetermined as part of future scheme)
Key
This leafl et is part of a series of leafl ets designed to give you information on changes happening in your area to enhance walking and cycling opportunities. There will be a consultation team at various venues near you to answer questions, show you more detailed plans and let you have your say. You can contact us by phone, e-mail and by post, comment directly on our interactive website www.cyclecityconnect.co.uk, as well as fi nd out where and when these events are happening.
The Cycle Superhighway is a dedicated, segregated cycle track running from East Leeds to Bradford City Centre. In this leafl et you will fi nd examples of the types of proposed cycle tracks, junctions and crossings. If you want to talk to us about any of these proposals please contact us directly.
City Connect Leaflet F.indd 2 27/05/2014 11:33