how to - process chain monitoring - v2.00.pdf
TRANSCRIPT
-
7/29/2019 How To - Process Chain Monitoring - V2.00.pdf
1/7
Implementation Guide v1.10 1Copyright 2009 Accenture All rights reserved. Accenture Proprietary and Confidential.This component, containing its documentation and code, is proprietary of Accenture and its use and distribution is restrict. For further information or new technicalgoods, access https://rtl.accenture.com
Implementation Guide Header
Tech Goods BI.E.014L Process chain monitoring Version 2.00
Description This report can help you to analyze the execution trend and to find the point of defect
Category Tools Target Region Global Industry All
Contributor Carlo Maurizio Santoro Reviewer Isha Gupta
Industrialization Factors
Reduction Factor Analyze
2h Per
times Design 4h Build 16h Test 4h
Credential E-NDC
Obligatory Requirements
SAP Version SAP BW 3.x and SAP BI 7.0 Support Package Necessary Package
DependentTech Goods
Version Modified in Responsible Modification
1.00 21.Jul.2009 Carlo Maurizio Santoro Component Creation
2.00 4.May,2010 Carlo Maurizio Santoro Bug Fixing
-
7/29/2019 How To - Process Chain Monitoring - V2.00.pdf
2/7
Implementation Guide v1.10 2Copyright 2009 Accenture All rights reserved. Accenture Proprietary and Confidential.This component, containing its documentation and code, is proprietary of Accenture and its use and distribution is restrict. For further information or new technicalgoods, access https://rtl.accenture.com
Table of Contents1. General Description .......................................................................................................................... 32. Installation Procedure....................................................................................................................... 4
2.1 Pre-Requisites .............................................................................................................................................. 42.2 Install Cockpit procedure.............................................................................................................................. 42.3 Additional Objects Installation ...................................................................................................................... 4
3. Attachment Guide Content................................................................................................................ 74. Version Change Log ......................................................................................................................... 7
-
7/29/2019 How To - Process Chain Monitoring - V2.00.pdf
3/7
Implementation Guide v1.10 3Copyright 2009 Accenture All rights reserved. Accenture Proprietary and Confidential.This component, containing its documentation and code, is proprietary of Accenture and its use and distribution is restrict. For further information or new technicalgoods, access https://rtl.accenture.com
1. General DescriptionThe process chain monitoring is a standard activity that the entire application maintenance project must operate.
Regarding a single chain, there is a set of indicator that you can keep a check on:
Detailed chain analysis: Despite the standard SAP transaction RSPCM that provides only thelast log, with this functionality you can have a global view on the executions run in the requiredperiod regarding the exit status and length.
Number of default: Some times the chain will conclude in the default state due to any error inthe execution, this can be normal if has not happened many times. With this percentageindicator, you can analyze the number of default in relation with the number of execution in theperiod
Global time of execution: In many environments, with the passing of the times the total amount
of data tends to become large, compared with the first execution. Logging the length in term oftimes of any chains run, you can build the progression history.
Single step time of execution: When you need to identify the single point of intervention intothe process chain, is necessary to have a list of single step duration. You can start to make aperformance tuning on the longer steps.
-
7/29/2019 How To - Process Chain Monitoring - V2.00.pdf
4/7
Implementation Guide v1.10 4Copyright 2009 Accenture All rights reserved. Accenture Proprietary and Confidential.This component, containing its documentation and code, is proprietary of Accenture and its use and distribution is restrict. For further information or new technicalgoods, access https://rtl.accenture.com
2. Installation Procedure
2.1 Pre-Requisites
Not Applicable
2.2 Install Cockpit procedure
Not Applicable
2.3 Additional Objects Installation
The following objects must be created in your environment copying the code of technical goods
Object Type Object Name Utilization
PROG ZTL_BIR001P_CHAIN_MONITOR Report on chain analysis
Following is the procurement procedure for tool code:
For use by Accenture Personnel
1. Fill the request form attached to the IG2. Take an approval from Project manager / Client for using this tool.
Raise a request in the ARTL Portal and attach the request form in that, the Service Support Desk will respondproviding the code for the tool.
Note: The code is not included in this implementation guide.
It will be provided only once you fill the form and send it to the ARTL Team.
Create the ZTL_BIR001P_CHAIN_MONITOR program through transaction SE38 as per the following screen-shotscopying the code that you get from ARTL Team:
-
7/29/2019 How To - Process Chain Monitoring - V2.00.pdf
5/7
Implementation Guide v1.10 5Copyright 2009 Accenture All rights reserved. Accenture Proprietary and Confidential.This component, containing its documentation and code, is proprietary of Accenture and its use and distribution is restrict. For further information or new technicalgoods, access https://rtl.accenture.com
Text elements used in the Program:
-
7/29/2019 How To - Process Chain Monitoring - V2.00.pdf
6/7
Implementation Guide v1.10 6Copyright 2009 Accenture All rights reserved. Accenture Proprietary and Confidential.This component, containing its documentation and code, is proprietary of Accenture and its use and distribution is restrict. For further information or new technicalgoods, access https://rtl.accenture.com
-
7/29/2019 How To - Process Chain Monitoring - V2.00.pdf
7/7
Implementation Guide v1.10 7Copyright 2009 Accenture All rights reserved. Accenture Proprietary and Confidential.This component, containing its documentation and code, is proprietary of Accenture and its use and distribution is restrict. For further information or new technicalgoods, access https://rtl.accenture.com
3. Attachment Guide ContentFind attached in this PDF the following documents. Use Menu ViewNavigation PanelsAttachments.
Document Description
BI.E.014L Process chain monitoring -UG - v2.00.doc
User Guide for training of key user in target project.
Request Form.xls Request form for Tool
4. Version Change Log
Version Modified in Responsible Modification
1.00 21.Jul.2009 Carlo Maurizio Santoro Component Creation
2.00 4.May,2010 Carlo Maurizio Santoro Bug Fixing