Page 1: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

HPE’s Lignite Technology

Horst-Dieter Berten

Belchatow Conference 2nd – 4th th November 2013 Hitachi Power Europe GmbH

Page 2: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

Lignite coal qualities

2

Page 3: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

HPE know-how for a wide range of coal qualities

3

0

10

20

30

40

50

60

70

80

0 10 20 30 40

Net Calorific Value MJ/kg

Vola

tile

Mat

ter

(daf

) %

Lignite

Low VolatileCoal

Low-BtuBrown Coal

Hard Coal

Elbistan B Boxberg R

Page 4: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

Lignite Characteristics

4

0.0

5.0

10.0

15.0

20.0

25.0

30.0

40.0 45.0 50.0 55.0 60.0 65.0 70.0

water content ( % )

Ash

con

tent

( %

)

Schkopau

Hambach

Megalopolis IV

Garzweiler

Lippendorf

Jänschwalde

Boxberg

Elbistan

Obrenovac

Matra

Loy Yang A

35.030.0

Turow 2012

Turow 2013

Page 5: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

HPE’s selected references: Lignite fired Steam Generator – New Installations

Project Country Unit MWelSteam parameters

t/h / °°°°C / barContract award

Schkopau A & B Germany 2 450 1360 / 545 / 262 1992

Lippendorf R & S Germany 2 933 2420 / 554 / 267 1994

Niederaußem K Germany 1 1012 2514 / 580 / 262 1995

Boxberg Q Germany 1 907 2423 / 545 / 265 1995

Elbistan B Turkey 4 360 1068 / 540 / 195 1998

Neurath F & G Germany 2 1100 2898 / 600 / 272 2003

Boxberg R Germany 1 670 1760 / 600 / 285 2005

5

Page 6: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

� 1 x 907 MWel / 1 x 2420 t/h

� Once-through steam generator, Benson®

� Lignite

Hu = 8.6 MJ/kgA = 5.2 %W = 56.1 %

� Design parameters:SH: 545 °C / 285 barRH: 580 °C / 66 bar

� Commissioning: 2000

158,125

85,5

0,0

PS Boxberg Q, Germany

6

Page 7: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

P.S. Boxberg R (670 MW)Supercritical steam parameters

7

� 1 x 670 MWel / 1 x 1760 t/h

� Once-through steam generator, Benson®

� LigniteHu = 8.6 MJ/kgA = 5.2 %W = 56.1 %

� Design parameters:SH: 600 °C / 315 bar aRH: 610 °C / 72 bar a

� Commissioning 2012

0.000 m

+135,000m

+124,400m

+64,500m24 RS® burners„All-wall“ firing

Page 8: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

Burner Level 2 (27.4 m)

6

7

Temp.

[°C]

O 2[vol.-%, tr.]

P.S. Boxberg R (670 MW)O2 and Temperature distribution

Oxygen Temperature8

Page 9: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

P.S. Boxberg R(and Boxberg Q)

9

Page 10: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

EXAMPLE MAIN PRODUCTS – Firing Components

Belt conveyor

Pulverizers

Coal feeding

Burn-out grate

Ash removal

Burners

10

Page 11: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

DGS®- and NV-Mills for lignite

11

Page 12: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

2 Beater Section on common Shaft

2

3 Fan wheel on common Shaft

3

1 Inlet Housing

1

4 Outlet Housing4

5

5 Shaft Bearing

56 Free end connected to

cooling system

6

7 Coupling7

8 Drive

8

DGS® Mill – HPE‘s technology without classifier

HPE‘s solution for lignite / browncoal grinding

12

Page 13: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

2

5

4

11 Admission box

2 Pulverizing chamber door

3 Beater wheel

4 Adapter Piece

5 Classifier

6 Bearing

7 Motor

6 73

Lignite Mill with Classifier, N- / NV-type

HPE‘s solution for lignite / browncoal grinding II

13

Page 14: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

Technology lead supported by numerous references

Reference list NV mills Reference list DGS mills

14

Page 15: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

Development RS® burner

15

Page 16: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

Overfire air

Central air

Under fire air

Pulverized coal

Jet Burner Development for Lignite

Over fireair

Central air

Pulverized coal

Core air

1975 1995

Under fireair

In addition over-fire air systemsin upper furnace area

16

Page 17: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

RS® Burner

Secondary airdeflection throat

Flame-stabilizer

Swirl insert

Pulverizedcoal

Secondary air

RadiationProtectionTube

Cooling air

17

Page 18: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

RS® Burner - Best solution for all lignites

HPE’s key component (patented) for advanced lignite combustion.

Development started together

with TES at Sostanj Power Plant

in the beginning of the Nineties.

Continuous improvements

for best and reliable technology.

18

Page 19: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

m/s kg/m³

Velocity Distribution Particle Concentration

RS® -burner – details

19

Page 20: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

Temperature distribution in the flame

1450

1350

1250

1150

1050

950

850

750

650

550

450

350

250

150

ºC

20

Page 21: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

General advantages of RS® Burner compared to former burner technology:

� Excellent combustion results (wide fuel range, low load operation)Good availability for ignition combined with excell ent flame stability for all lignites

� Lowest NOx and CO emissions

� Effective measure against furnace wall corrosion Protection against sulphur driven corrosion process by secured minimum air supply

better operation reliabilitylonger operation time without boiler cleaningPerfect protection against furnace wall corrosionLow investment cost to meet NOx regulations

RS® Burner - Best solution for all lignites

21

Page 22: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH 22

RS® Burner of Today

Page 23: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

RS® Burner References

No. Customer / Unit Country

Fuel

Number

Burner

Load

MW

Year of

Commis-

sioning

LCV

KJ/kg

Volatile

matter

%

Ash

%

1 Sostanj III, Block 4 Slovenien 9.000 35 - 40 19 - 22 4 31 1994

2 Niederaußem Block A Germany 8.415 51 12 6 76 1998

3 Niederaußem Block B Germany 8.415 51 12 6 76 1996

4 Ljubljana, Kessel 3 Slovenien 9.630 – 20.000 22 - 27 2 - 35 12 23 2000

5 Neurath Block A Germany 8.000 – 10.500 51 – 55 2 – 12 18 58 2000

6 Neurath Block B Germany 8.000 – 10.500 51 - 55 2 - 12 18 58 2000

7 Niederaußem Block C1/C2 Germany 8.415 51 12 2x6 7 6 2001

8 Sostanj IV, Block 5 Slovenien 8.400 - 11.300 58 - 68 10 – 24 24 46 2003

9 Ljubljana, Kessel 1/2 Slovenien - - - - - -

10 Boxberg R * Germany 8.000 – 9.200 54 - 57 3-7 24 79 2011

11 TENT A5 Serbia 6.280 – 6.900 56 - 58 12 - 25 18 58 2013

* Boxberg R is new installation, all other refere nces are for rehabilitation

23

Page 24: HPE’s Lignite Technology · Hitachi Power Europe GmbH HPE’s Lignite Technology Horst-Dieter Berten Belchatow Conference 2nd – 4th th November 2013 Hitachi Po wer Europe GmbH

Hitachi Power Europe GmbH

Thank you for your attention