    SUCCES AND RELIABILITY of HPGR CRUSHING

    at COMPAA MINERA HUASCO in CHILEDr.-Ing. E. Matthies, F.P. van der Meer KHD Humboldt Wedag, Germany

    C.P. Westermeier, V.H. Gallardo Compaa Minera Huasco, Chile

  • 7/27/2019 HPGR HUASCO

    2/16

  • 7/27/2019 HPGR HUASCO

    3/16

    Replace Tertiary and Quaternary Crusher with only OneUnit

    Higher Overall Throughput for Crushing & Grinding

    Reasons for Installation of HPGR at Los Colorados

    Chart 3

    p m se a er a repara on or owns ream rocess zeDistribution)

    Higher Percentage of Fines between -3mm +45m

    Low Energy Consumption: 0.76 kWh/t up to 1.46 kWh/t

    (depending on ore type and applied press force)

  • 7/27/2019 HPGR HUASCO

    4/16

    Pilot Scale HPGR Testing

    Pilot Testing of allrelevant parametersrequired (open &closed circuit) On-Site

    Confirmation PilotTesting at KHDCologne, Germany

    Including:

    Chart 4

    ar a on o ore ype

    Variation of feedmoisture content

    Variation of operatingpressure

    Variation of roll speed

    Wear testing Flake &

    Desagglomerationtesting

    Bond ball mill WI tests

  • 7/27/2019 HPGR HUASCO

    5/16

    Roller Press RP 16-170/180

    Roll diameter: 1700 mm

    Roll width: 1800 mmFeed material: Coarse Iron Ore

    Feed moisture content: 0-1%

    Ball Mill W before RP: 9-14 kWh/t

    Humboldt Wedag HPGR at Los Colorados

    Chart 5

    Feed size 0-63 mm

    Final grain size: < 6.35 mm (55..70 %)

    Throughput: up to 2,000 t/h

    Spec. energy cons.: < 1.2 kWh/t

    Spec. press force: Average 3.5-4 .0 N/mm, max 5.0 N/mm

    Installed power: 2 x 1,800 kW

    Status of roll wear life: > 14,600 operating hours

  • 7/27/2019 HPGR HUASCO

    6/16

    HPGR PERFORMANCE and PRESSURE.

    Wi (kWh/t)

    Bond Wi Comparison CMH Los Colorados Iron OreIn Dependence of Pressure Applied

    COMPARISON OF BOND BALL MILL WI, ORE TYPE M1:MINERAL SECTOR B LOS COLORADOS

    Chart 6

    UNTREATED ORE(Quatern. Crusher Discharge)

    10.70 kWh/t

    HPGR DISCHARGE 8.08 kWh/tDIFFERENCE 2.62 kWh/t

    % REDUCTIONw.r.t. CONE CRUSHER PRODUCT

    24.5 %

    Operating Pressure 40 barPeripheral Speed 1,11 m/s

  • 7/27/2019 HPGR HUASCO

    7/16

    Process Flow Sheet at CMH Los Colorados

    Chart 7

  • 7/27/2019 HPGR HUASCO

    8/16

    Stud-Lined Roll Surface

    after 6 Months of operation

    Good flat wear profile

    Competent autogenous

    wear layer

    Chart 8

    Accelerated edge wear

    Old Design: reweldable edgesegments

  • 7/27/2019 HPGR HUASCO

    9/16

    Edge Wear Observation

    Chart 9

    Can significantly reduce wear life

    Leads to increased bypass

    Hinders effective gap control Leads to less efficient comminution

  • 7/27/2019 HPGR HUASCO

    10/16

    Edge Wear KHD Solution Replaceable Lateral Studs

    Maintained EdgeRim

    Optimal ParallelAlignment of RollSurface

    Minimal MaterialBypass

    Reduced Downtime

    Chart 10

    ImprovedAvailability

    Pre-longed RollSurface Wear Life

  • 7/27/2019 HPGR HUASCO

    11/16

    Chart 11

    Roll Wear Roll Surface Quality Development

  • 7/27/2019 HPGR HUASCO

    12/16

    Chart 12

    Proven KHD Stud-Lined Roll Surface Wear Life.

    Comparison of Guaranteed and Achieved Values

  • 7/27/2019 HPGR HUASCO

    13/16

  • 7/27/2019 HPGR HUASCO

    14/16

    The KHD HPGR at CMH Los Colorados provides a reliable operation atan excellent performance for a track record time of over 11 years.

    Machine and process optimized to improve maintenance and availability > 94% Zero bearing problems

    High classification efficiency of HPGR product (no deagglomeration required)

    Roll surface wear life increased to > 14,600 hours today

    Observations, Experience, Key Data, Conclusions

    Chart 14

    Lower energy consumption (-25%) from a reduced Bond WI and high fines volumein the product

    Improved concentrate quality at constant yield in downstream magneticseparation

    The demonstrated success led to installation of HPGR in CMPs El Romeral plant,for similar crushing duty as Los Colorados

  • 7/27/2019 HPGR HUASCO

    15/16

    New KHD HPGR DESIGN

    RP Swing Frame and Gearbox Support

    Minimized change-out time

    Chart 15

    No deformation tojoints

    Minimal cranerequirements

    increase availability

    to 95-97 %

  • 7/27/2019 HPGR HUASCO

    16/16

    10 years successful operation! To Be Continued!