00 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 355.63 LOADINGONLY BUS STOP BUS STOP 00 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 355.63 PLAN REFEREN 7 6 5 4 3 2 1 CP CP CP CP L3 A3 FOOD & BEVERAGE L2 A3 FOOD & BEVERAGE L1 A3 FOOD & BEVERAGE L4 A3 FOOD & BEVERAGE L5 A3 FOOD & BEVERAGE L6 A3 FOOD & BEVERAGE D & AGE L7 A3 FOOD & BEVERAGE Escape stair from L15 Staircore 04 STEELFRAMEDMESHCHIMNEY CONTAININGA3UNIT KITCHENSERVICING STEELFRAMEDMESHCHIMNEY CONTAININGA3UNIT KITCHENSERVICING 00 20 40 60 80 100 120 140 180 200 220 240 260 280 300 320 CM 59 TP 42 FP 43 IB 45 FP 37 CM 25 CM 27 CM 26 IB 34 TP 33 CM 20 CM 19 FP 55 CM 17 CM 16 TD 5 FP 24 FP 23 IB 44 IB 46 CM 49 TD 14 TD 12 TT 6 TD 11 TD 21 TD 28 TD 30 TD 31 CD 54 CD 15 CD 52 CD 50 CD 40 CD 38 CD 29 CN 39 TD 3 TD 10 TD 9 FP 01 FP 4 TD 7 TD 48 CD 47 TD 13 TD 8 CM 63 TD 36 CM 53 CM 51 TD 32 CD 22 CD 18 SI 2 CD 35 NOPARKING DELIVERY DROP OFF NOPARKING DELIVERY DROP OFF IB 41 NO ENTRY NO ENTRY NO ENTRY EXIT ONLY NO ENTRY HOUSE OF FRASER BUY & COLLECT HOUSE OF FRASER BUY & COLLECT Phase 3 Phase 2 Skew Bridge Ski Lake Retail Terrace A Retail Terrace B Retail Terrace C Drive thru Visitor Centre Boathouse Access to SSSI Access to SSSI line of sewer SSSI bus drop off A45 Management office substations CP LV panel Proposed Footbridge footpath/ cycleway CP delivery drop-off covered piazza R1 R4 R5 R2 R3 R6 R7 boat store BS delivery drop-off refuse refuse CP delivery drop-off substation substation refuse refuse substation line of gas main Access to lakeside walks reeds refuse refuse hv tx porka B1 B2 B3 B4 B5 B6 C1 C2 C4 C5a covered walkway covered walkway CP A1a A2a A3 A4 A5 A6 A7 A8a A9 A10 A11 A15 A12 A13 A14 C6 Garage/ store boats enclosure substation sprinkler tank pump house lv panel Service Yard Access to boathouse slipway Service Yard substation substation Service Yard refuse gas governor A2b A1b A1c A1d C3 A16 Water Feature plant room Plant room A8b CP CP Cycle parking Trolley bay Reeds Electric car charging point Phase 1 work extents Unregistered land Land outside ownership Future phases

Upload: hakien

Post on 06-Feb-2018

220 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: HPW Architecture Ltd - Rushden · PDF fileTITLE PROJECT DWG NO REV SCALE @ A1 DRAWN STATUS SCALE @ A3 DRAWING INFORMATION Dimensions to be checked on site. All in millimetres unless

PROJECTTITLE DWG NO REV

SCALE @ A1

DRAWN

STATUS

SCALE @ A3

DRAWING INFORMATIONDimensions to be checked on site. All in millimetres unless stated. This drawing and information displayed is the confidential property of hpw partnership ltd and shall not be copied or used for any purpose without the written permission of an agent of the company. © HPW Architecture ltd

Rushden LakesFull Site PlanEX-2904-10-038AS BUILT

1:1000 FEB 2016

1:2000 EJ

DATE

CLIENT

LxB (Rushden) LtdHPW Architecture Ltd Wade Park Farm, Ower, Southampton, Hampshire, SO51 6AG, UKT +44(0)23 80 811808 E [email protected] W www.hpw.co.uk

Leisure Retail:2904 Rushden construction:950 DRAWINGS:10 Plans:0 SITE:SITE PLAN MASTER (setting out & co-ordinates).vwx

00

20

40

60

80

100

120

140

160

180

200

220

240

260

280

300

320

340355.63

LOADING ONLY

BUS

STO

P

BUS

STO

P

00

20

40

60

80

100

120

140

160

180

200

220

240

260

280

300

320

340355.63

25

4

18

bulk

head

up

SITE

PLA

N RE

FERE

NCE

DRAW

ING

SVP

SVP

100m

m R

WP

100m

m R

WP

SVP

TITLE

CLIENT

HPW Architecture Ltd Wade Park Farm, Ower, Southampton, Hampshire, SO51 6AG, UKT +44(0)23 80 811808 E [email protected] W www.hpw.co.uk

DRAWING INFORMATIONDimensions to be checked on site. All in millimetres unless stated. Not to be scaled. This drawing and information displayed is the confidential property of hpw partnership ltd and shall not be copied or used for any purpose without the written permission of an agent of the company. © HPW Architecture ltd

1/1/15

1/1/15

The Lakes Boathouse

slatwall

1000350

4350

A

1000

1000

A

7

6

5

43

2

1

CP

CP

cpd

1000

wall

foldin

g sea

t

foldin

g sea

t

A

CP

CP

CPCP

L3A3 FOOD & BEVERAGE

L2A3 FOOD & BEVERAGE

L1A3 FOOD & BEVERAGE

L4A3 FOOD & BEVERAGEL5

A3 FOOD & BEVERAGE

L6A3 FOOD & BEVERAGE

L8A3 FOOD & BEVERAGE

L7A3 FOOD & BEVERAGE

Escape stair from L15Staircore 04

Staircore to First FloorStaircore 05

STEEL FRAMED MESH CHIMNEYCONTAINING A3 UNIT KITCHEN SERVICING

STEEL FRAMED MESH CHIMNEYCONTAINING A3 UNIT KITCHEN SERVICING

00

20

40

60

80

100

120

140

180

200

220

240

260

280

300

320

CM 59

TP 42

FP 43

IB45

FP 37

CM 25

CM 27

CM 26

IB34

TP 33

CM 20

CM 19

FP 55

CM 17

CM 16

TD 5

FP 24

FP 23

IB44

IB46

CM 49

TD 14

TD 12

TT 6

TD 11

TD 21

TD 28

TD 30

TD 31

CD 54

CD 15

CD 52

CD 50

CD 40

CD 38

CD 29

CN 39

TD 3

TD 10

TD 9

FP 01

FP 4

TD 7

TD 48

CD 47

TD 13

TD 8

CM 63

TD 36

CM 53

CM 51

TD 32

CD 22

CD 18

SI 2

CD 35

NO PARKING

DELIVERY DROP OFF

NO PARKING

DELIVERY DROP OFF

IB41

NO ENTRY

NO ENTRY

NO ENTRY

EXIT

ONLY

NO ENTRY

HOUSEOF

FRASERBUY

&COLLECT

HOUSEOF

FRASERBUY

&COLLECT

Phase 3

Phase 2

Skew Bridge Ski Lake

Retail Terrace A

Retail Terrace B

Retail Terrace C

Drive thru

VisitorCentre

Boathouse

Access to SSSI

Access to SSSI

line of sewer

SSSI

bus drop off

A45

Management office

substations

CP

LV panel

ProposedFootbridge

footpath/ cycleway

CP

delivery drop-off

covered piazza

R1

R4

R5

R2R3

R6

R7

boatstore

BS

delivery

drop-off

refuse

refuse

CP

delivery drop-off

substation

substation

refuse

refuse

substation

line of gas main

Access tolakeside walks

reeds

refuse

refuse

hv tx

porka

B1 B2 B3

B4

B5

B6

C1C2

C4 C5a

covered walkway

covered walkway

CP

A1a

A2aA3 A4 A5 A6 A7 A8a

A9 A10 A11

A15

A12 A13 A14

C6

Garage/ store

boatsenclosure substation

sprinkler tankpumphouse

lv panel

Service Yard

Access to boathouse

slipway

Service Yard

substation

substation

Service Yardrefuse

gas governor

A2b

A1b A1c A1d

C3

A16

Water Feature plant room

Plant room

A8b

CP

0 25 50 75 100 125 150 175 200 225 250 M

CP Cycle parking Trolley bay Reeds

Electric car charging point

Phase 1 work extents Unregistered land Land outside ownership

Future phases