Model Defect Defect cause Corrective actionTCJ1900 LABEL - Dented Mark NG During remove of label hole excess material , i) Improve existing stopper to guide and stop for
existing stopper can't proper stop for label moving during remove excess material at label
label moving with cause for punching pin hole surface.
not in-center punched for label hole.
Supplier : Sanko Sangyo
TAS9700 Lower Case Wrong judgement for part surface sink mark i) Tooling down re-matching & servicing to improve the part
( Sink Mark NG ) after improved the moulding condition to parting line.
improve the part parting line.
ii) Educate the operators and inspector to aware :-
a) Part defect rootcaused & action taken.
b) Moulding process flow.
for better understanding.
Supplier : Luster
TAS9700 PWB On line V-Cut PIC not proper set up V-Cut i) Educate PIC V-Cut regarding V-Cut setting arrangement
( V - Cut NG ) machine by using PWB thickness 1.00mm with must using PWB thickness 1.60mm during V-Cut testing.
V-Cut testing before mass production.
( Not follow machine specification standard ii) Improve V-Cut Inspection Method such as.
must use PWB thickness : 1.60mm ) Before : Using Range 7X scale Scope.
After : Using Range 10X scale Scope.
Supplier : AE Corp.
Supplier : Bumicircuit
Sink Mark NG
No Sink Mark OK
Defect : Dented Mark ( NG Condition )
Before Improvement After Improvement
Existing Stopper
V-Cut Spec :-
T1 & T3 = 0.20 ~ 0.25mm.
T2 =0.40~0.60mm
Avearge Measurement data
for Rejected sets.
V-Cut T1 = 0.50mm
T2 = 0.20mm
T3 = 0.30mm
![Page 2: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/2.jpg)
No. Model Part Name Defect Detected Rejected Ratio Defect (Rootcaused)
1 TCJ1900 LABEL Dented Mark 241/12000 During remove of label hole excess material ,
existing stopper can't proper stop for
label moving with cause for punching pin
not in-center punched for label hole.
Worst Defect 1 ( AUG 2013 )
Defect : Dented Mark ( NG Condition )
OLD JIG - EXISTING STOPPER, Label has movement and pin not in-center punch
at label center hole area during remove the excess material.
Existing
Stopper ( NG )
Before Improvement
Attention Note
Existing Stopper
Training Record
![Page 3: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/3.jpg)
Training Record
![Page 4: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/4.jpg)
Supplier Improvement activties
i) Improve existing stopper to guide and stop for
label moving during remove excess material at label
hole surface.
iii) Update work instruction for future monitoring.
iv) Provide training to related PIC regarding defect
rootcaused and action taken.
After Improvement
Work Instruction
![Page 5: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/5.jpg)
Work Instruction
![Page 6: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/6.jpg)
No. Model Part Name Defect DetectedRejected
RatioDefect (Rootcaused) Supplier Improvement activties
1 TAS9700 Lower Case Sink Mark 42/2000 Wrong judgement for part surface sink mark i) Tooling down re-matching & servicing to improve the part
( Cav.4-2 ) after improved the moulding condition to parting line.
improve the part parting line.
ii) Educate the operators and inspector to aware :-
a) Part defect rootcaused & action taken.
b) Moulding process flow.
for better understanding.
Worst Defect 2 ( AUG 2013 )
Defect : Sink Mark ( NG Condition )
Attention Note
Repairing Sheet Moulding Process Flow
Training Record
![Page 7: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/7.jpg)
![Page 8: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/8.jpg)
![Page 9: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/9.jpg)
1.IQC Failure Frequency
KGM IQC不良率 4月 5月 6月 7月
Lot inspectioned 382 323 318 335
不良Lot数 10 11 12 12
不良率(%) 2.6 3.4 3.8 3.6
Target 6.0% MAX
IQC failure all list ( JULY 2013 )
Product Name
TKC0800-T
TKC0600-T-0-T0T
TAS9700-T-0-NIK
Others
2.SMT Pick-Up rate and Working rate
4月 5月 6月 7月
Working days/Month 17 21 20 22
Working Time/day 22 16 16.25 17
Working Time/Month (h) 4114 3696 3575 4114
Total time (s) 14,810,400 13,305,600 12,870,000 14,810,400
Mounting point 39,461,861 48,305,731 34,223,467 41,243,219
Mounting theoretical value /Qty 205,245,900 183,322,000 158,262,100 191,973,000
Total Mounting Time (s) 2,796,711 3,506,025 2,782,494 3,181,273
Working rate (Target 50% Min)(%) 19.23 26.35 21.62 21.48
STD Pick-Up rate (Target 99.950% Min)(%) 99.955 99.951 99.950 99.940
ODD Pick-Up rate (Target 99.950% Min)(%) 99.945 99.946 99.945 99.945
Pick-Up rate (Target 99.950% Min)(%) 99.952 99.952 99.950 99.949
Lead Dirty Contamination
Upper Case Moisture
T1
Location No. Defect Contents
-,+ Mould Soft Feeling NG
0
50
100
150
200
250
300
350
400
450
500
4月 5月 6月 7月 8月 9月
Lot inspectioned KGM
SMT pick up rate
![Page 10: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/10.jpg)
Date Model Qty Qty/sheet Feeder No
3.Production Failure Frequency
By Production section 4月 5月 6月 7月
PCBA Inspection 394 220 231 68
ICT 1019 472 407 326
FCT 103 54 51 33
Final FCT 0 0 0 0
FINAL Inspection 0 0 0 0
Total 1516 746 689 427
Inspection Qty 436,790 242,096 246,690 140,220
By Production DPPM 4月 5月 6月 7月
PCBA Inspection 902 909 936 485
ICT 2333 1950 1650 2325
FCT 236 223 207 235
Final FCT 0 0 0 0
FINAL Inspection 0 0 0 0
Dppm (overall ) 3471 3081 2793 3045
単位:ppm
2500
DPPM 不良率(ppm)
Month 99.900
99.910
99.920
99.930
99.940
99.950
99.960
99.970
99.980
99.990
100.000
4月 5月 6月 7月 8月 9月 10
pick up rate SMT pick up rate
Month
吸着率(%)
![Page 11: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/11.jpg)
4.OQC Failure Frequency
KGM OQC不良率 4月 5月 6月 7月
Lot inspectioned 4086 903 1910 1153
不良数 0 1 0 2
不良率(%) 0.0 0.1 0.0 0.2
Target 3.0% MAX
発生場所 4月
市場 6 速報件数
Defect
0
500
1000
1500
2000
2500
4月 5月 6月 7月 8月 9月
0
500
1000
1500
2000
2500
3000
3500
4000
4500
4月 5月 6月 7月 8月 9月
Lot inspectioned KGM OQC
6 6
8
[5] 市場クレーム発生推移
![Page 12: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/12.jpg)
6
1 1 2
0 0
2
4
6
4月 5月 6月 7月 8月 9月 10月 11月
個
![Page 13: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/13.jpg)
8月 9月 10月 11月 12月 1月
329
13
4.0
Qty Lot Qty Frequency
15 3000 1
13 6000 1
11 5000 1
57
96
8月 9月 10月 11月 12月 1月
Lead Dirty Contamination
Moisture
Defect Contents
Mould Soft Feeling NG
月 10月 11月 12月 1月 2月 3月
KGM IQC不良率
Month
working rate
![Page 14: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/14.jpg)
Pickup Error Mount Error
8月 9月 10月 11月 12月 1月
8月 9月 10月 11月 12月 1月
Action TakenContent
Production LDR KGM 工程不良率
0.00
10.00
20.00
30.00
40.00
50.00
60.00
70.00
80.00
90.00
100.00
10月 11月 12月 1月 2月 3月
working rate
Pick-Up rate (Target 99.950% Min)(%)
STD Pick-Up rate (Target 99.950% Min)(%)
ODD Pick-Up rate (Target 99.950% Min)(%)
Working rate (Target 50% Min)(%)
稼働率(%)
![Page 15: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/15.jpg)
8月 9月 10月 11月 12月 1月
2
#DIV/0!
5月 6月 7月 8月 9月 10月
1 1 2 0
9月 10月 11月 12月 1月 2月 3月
Month
9月 10月 11月 12月 1月 2月
KGM OQC不良率
Month
![Page 16: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/16.jpg)
12月 1月 2月 3月 速報件数
![Page 17: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/17.jpg)
2月 3月 合計
1687
58
3.4
2月 3月 合計
80
15499
55,796,400
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0
Lot inspectioned
不良率(%)
不良率
working rate
![Page 18: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/18.jpg)
Result
2月 3月 合計
913
2224
241
0
0
3378
1,065,796
2月 3月 合計
3232.11585
8257.330599
900.9449311
0
0
Action Taken
working rate
Pick-Up rate (Target 99.950% Min)(%)
STD Pick-Up rate (Target 99.950% Min)(%)
ODD Pick-Up rate (Target 99.950% Min)(%)
Working rate (Target 50% Min)(%)
![Page 19: HQ Meeting 2013 08 IQC SMT Prod n OQC DataIsa](https://reader030.vdocument.in/reader030/viewer/2022020404/577cc3ca1a28aba711972f61/html5/thumbnails/19.jpg)
2月 3月 合計
8052
5
0.1
11月 12月 1月 2月 3月 合計
10
3月
PCBA Inspection
ICT
FCT
Final FCT
FINAL Inspection
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3月 Lot inspectioned
不良率(%)
不良率(%)