HSM Use and Training. Karen K. Dixon, Ph.D., P.E. Oregon State University. Presentation Summary. 1. 2. 3. 4. 5. Overview of the new HSM. I. WHAT IS THE HSM?. What is the HSM?. The Vision of the HSM - A Document Akin To the HCM. 1. 2. 3. What the HSM is NOT. vs. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/1.jpg)
HSM Use and Training
Karen K. Dixon, Ph.D., P.E.Oregon State University
![Page 2: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/2.jpg)
Presentation Summary
11
22
33
44
55
![Page 3: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/3.jpg)
I. WHAT IS THE HSM?Overview of the new HSM
![Page 4: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/4.jpg)
What is the HSM?
![Page 5: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/5.jpg)
The Vision of the HSM - A Document Akin To the HCM
11
22
33
![Page 6: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/6.jpg)
WHAT THE HSM IS NOT
• The HSM does not set requirements or mandates• The HSM is not a best practice document for design or
operations.• The HSM contains no warrants or standards
and does not supersede other publications that do.
vs
![Page 7: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/7.jpg)
The HSM does not establish a legal
standard of care nor does it create a duty
to the public.
![Page 8: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/8.jpg)
II. WHY DO WE NEED THE HSM?
Overview of the new HSM
![Page 9: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/9.jpg)
Is This Road “Safe” or “Unsafe”?
What does safety really mean?
![Page 10: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/10.jpg)
Examined in reference to compliance with standards, warrants, guidelines and sanctioned design procedures
The expected or actual crash frequency and
severity for a highway or roadway
Highway Safety Has Two Dimensions
*Ezra Hauer, ITE Traffic Safety Toolbox Introduction, 1999
![Page 11: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/11.jpg)
CR
AS
H R
ISK
DESIGN DIMENSIONLane Width, Radius of Curve, Stopping Sight Distance, etc.
CR
AS
H R
ISK
DESIGN DIMENSIONLane Width, Radius of Curve, Stopping Sight Distance, etc.
Unlike Nominal Safety, Substantive Safety is a
Continuum
Substantive Safety Nominal Safety
![Page 12: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/12.jpg)
Nominal Safety versus Substantive Safety
CR
AS
H R
ISK
DESIGN DIMENSIONLane Width, Radius of Curve, Stopping Sight Distance, etc.
Low NominalLow
Substantive
Low NominalLow
Substantive
Low NominalHigh
Substantive
Low NominalHigh
Substantive
High NominalLow
Substantive
High NominalLow
Substantive
High NominalHigh
Substantive
High NominalHigh
Substantive
![Page 13: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/13.jpg)
Substantive Safety May Vary When Nominal Safety Does Not
Existing ConditionsExisting Conditions Alternative 1Alternative 1
Alternative 2Alternative 2 Alternative 3Alternative 3
![Page 14: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/14.jpg)
We’re Interested in Other Impacts for Project Level Decisions – What About
Substantive Safety?
Safety Environmental Traffic Right-of-Way Costs Impacts Impacts Operations
• Traffic Noise Model 1.0
• CAL3QHC• Mobile 5a• 3-D Visualization• CITYGREEN
• HCM• CORSIM• PASSER• TRANSYT7F• VISSIM
•Construction Plans•Cost Models•Real estate appraisals•DOT databases
Design Criteria (nominal
safety)
Mor
e qu
antit
ativ
e
Gre
ater
wei
ght
The HSM
![Page 15: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/15.jpg)
The HSM Contains Best Science &
Research
• Synthesis of previous research
• New research commissioned by AASHTO and FHWA
![Page 16: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/16.jpg)
III. HOW WAS THE HSM DEVELOPED?
Overview of the new HSM
![Page 17: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/17.jpg)
The HSM – A Ten-year Research And Development Effort
19991999 20002000 20032003 FutureFuture
Research, research and more research
2010201020072007
![Page 18: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/18.jpg)
Significant Effort & Professional Support
Produced the HSM• Joint
Subcommittee sponsored by 7 TRB committees
• Thousands of hours of volunteer effort
• Research program funded by NCHRP, AASHTO & FHWA
![Page 19: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/19.jpg)
Research Path to the HSM v.1
![Page 20: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/20.jpg)
IV. WHAT IS COVERED BY THE HSM?
Overview of the new HSM
![Page 21: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/21.jpg)
Outline of the HSM
![Page 22: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/22.jpg)
![Page 23: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/23.jpg)
PART AINTRODUCTION, HUMAN FACTORS, &
FUNDAMENTALS
![Page 24: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/24.jpg)
Part BRoadway Safety Management Process
Network
Screening
Diagnosis
Countermeasure
Selection
Economic
Appraisal
Prioritization of
Improvement
Projects
4 5 6 7 8 9
Safety
Effectiveness
Evaluation
![Page 25: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/25.jpg)
Part CPredictive Method
• Methodology• Applications • Safety issues not
explicitly addressed by the methodology
• Example problems• References
Special Part C Special Part C Common ProceduresCommon Procedures
• Calibration• Combining predicted
with observed crashes
![Page 26: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/26.jpg)
Definition of HSM Terms
• Safety Performance Function (SPF) – a regression equation used for estimating the predicted crash frequency at a site for a given “base condition”
• Accident Modification Factor (AMF) – used to adjust the “base condition” in the SPF to specific site characteristics
• Calibration Factor (C) – adjusts average crash frequencies calculated from the SPF to local site conditions
![Page 27: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/27.jpg)
Predicting Crashes – Defining Roadway Segments and
Intersections
![Page 28: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/28.jpg)
HSM Regional SPF Calibration
Step 5 – Compute calibration factors for use in Part C predictive model
Step 1 – Identify facility types of interest
Step 2 – Select sites for calibration of each facility type
Step 3 – Obtain data for each facility type applicable to the calibration period
Step 4 – Apply the appropriate Part C predictive model to estimate expected crash frequency for each site during the calibration period
![Page 29: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/29.jpg)
Part DAccident Modification Factors
![Page 30: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/30.jpg)
V. WHO SHOULD USE THE HSM?
Overview of the new HSM
![Page 31: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/31.jpg)
Who Should Use the HSM?
![Page 32: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/32.jpg)
• Assess the system needs & identify projects/studies
• Program projects• Evaluate system-wide safety effects of
programs
![Page 33: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/33.jpg)
• Define problem(s) and assist in scoping• Identify potential solutions• Assess or evaluate multiple alternatives and
expected quantitative safety effects • Aid in identification of a preferred alternative
![Page 34: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/34.jpg)
• Evaluate safety of alternative design approaches• Assist in review & documentation of design
exceptions, variances and waivers• Inform decisions on construction staging, work
approaches, etc.
![Page 35: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/35.jpg)
• Monitor operations to maintain balance among safety, mobility and access.
• Evaluate the effectiveness of implemented improvements
![Page 36: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/36.jpg)
VI. WHEN WILL THE HSM BE AVAILABLE?
Overview of the new HSM
![Page 37: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/37.jpg)
Implementation Schedule
![Page 38: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/38.jpg)
Training & Outreach Activities
• Sept 2009 – Jan 2010– Conduct two or three multi-state pilot
courses• August 2009
– TRB Task Force Meeting• TRB 2010 Annual Meeting
– One-day workshop • Training materials, including “Train-the-
trainer” available upon HSM release
![Page 39: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/39.jpg)
VII. WHERE CAN ONE FIND MORE INFORMATION ABOUT THE HSM?
Overview of the new HSM
![Page 40: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/40.jpg)
http://www.highwaysafetymanual.org
![Page 41: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/41.jpg)
DATA NEEDS GUIDE
http://www.highwaysafetymanual.org
![Page 42: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/42.jpg)
Key Contacts
• AASHTO– Ken Kobetsky: [email protected], (202) 624-
5254– Jim McDonnell: [email protected], (202)
624-5448– Joel McCarroll: [email protected],
(202) 624-3632• AASHTO JOINT TASK COMMITTEE
FOR THE HSM– Don Vaughn, ALDOT,
[email protected], (334) 242-6319
![Page 43: HSM Use and Training](https://reader033.vdocument.in/reader033/viewer/2022061513/5681406c550346895dabea48/html5/thumbnails/43.jpg)
Key Contacts
• TRB/ NCHRP – Rick Pain: [email protected], (202)334-2964– Chuck Niessner: [email protected], (202) 334-1431
• TRB HSM TF: Development of a Highway Safety Manual– John Milton, [email protected], (360)704-6363
• TRB HSM TF: User Liaison– Geni Bahar (User Liaison Subcommittee of the TRB HSM
Task Force): [email protected], (416) 932-9272• TRAINING
– Karen Dixon (PI of NCHRP Project 17-38): [email protected], (541) 737-6337