http www.ci.malibu.ca.us download index

Upload: andrew-obermeyer

Post on 09-Apr-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    1/36

    PlanningCommission Meeting05-01-

    Commission Agenda Report Item

    To: Chair Randall and Members of the Planning CommissionPrepared by: Stefanie Edmondson , AICP , Associate P anReviewed by: CJ Amstrup, AICP, Planning Manage

    \ AtVictor Peterson, Community Develo ent DirectorApril 1 0, 2007 Meeting date: May 1 , 2007Approved by:Date prepared:

    Subject: Coastal Development Permit No. 07-015 and Administrative PlanReview No. 07 -042 - An application for the conversion of non-habitable understructure into basement area, the enclosure of acarport to a qaraqe and a 1.400 SQuare foot. first-floor addition to anexistinq, sinqle-familv residence.Application Number:Application Filing Date:Applicant:Owner:Location:

    Coastal Development Permit No. 07-015February 8 , 2007Kirkor SuriPacific Home Developers3510 Sweetwater Mesawithin the coastal zone4452-017-007Rural Residential - 1 Acre (RR-APN:Zoning:

    RECOMMENDED ACTION Adopt Planning Commission Resolution No. 07-(Attachment 1) approving Coastal Development Permit (CDP) No. 07-015.DISCUSSION: The issue before the Planning Commission is whether to adoptResolution No. 07-30 approving Coastal Development Permit (CDP) No. 07-015 andAdministrative Plan Review (APR ) No. 07-042. The proposal includes the conversion ofnon-habitable understructure at an existing residence into habitable basement area , theenclosure of a carport to a garage , and a 1,400 square foot, first-floor addition to anexisting, single-family residence.

    Page 1 of 10 Agenda Item 6.

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    2/36

    Chronoloav of ProiectIn April 2003 , the existing 4 200 square foot residence and 425 square foot guest housewere permitted via a fire re-build Coastal Commission issued exemption (No. 4-02-144-X).In May 2003 , the City issued an approval (Plot Plan Review No. 00- 144) for constructionof 5 294 square foot house at the same location. The City s permit was legallychallenged by a neighboring property owner and the applicant chose to proceed with theCoastal approved 4 200 square foot residence and guesthouse. This information isprovided to show that the City has previously considered and approved a largerresidence for the subject property. The current application is for development belowgrade and wil have no impact on the views from neighboring properties.On February 8 , 2007 , an application for CDP No. 07-015 and APR No. 07-042 wassubmitted by Kirkor Suri , on behalf of property owner Pacific Home Developers.On April 19 , 2007 , a Notice of Public Hearing was published in a newspaper of generalcirculation within the City of Malibu. In addition , on April 19 , 2007 , a Notice of PublicHearing was mailed to all property owners and occupants within a 500-foot radius of thesubject property.Surroundina Land Use and SettinaThe site is located on the south side of Sweetwater Mesa Road , overlooking SurfridersState Beach and the Malibu Pier. Surrounding land uses consist of residentialdevelopment to the north (Sweetwater Mesa Road), commercial development to thesouth (on PCH), residential development to the east (Sweetwater Canyon Drive) andvacant land (residential development currently under review) directly adjacent to thewest. Attachment 2 - Aerial PhotoThe subject property lies within the Appealable Jurisdiction as depicted on the Post LCPCertification Permit and Appeal Jurisdiction Map. The property is not. designatedEnvironmentally Sensitive Habitat Area (ESHA). Residential properties situated in thisstretch of Sweetwater Mesa Road above PCH are generally zoned Rural Residential.Proiect DescriptionThe proposed project consists of the following (Attachment 3 - Project Plans):

    939 square feet of non-habitable understructure tobasement area;291 square foot conversion of carport to garage; and1,400 square foot first-floor addition.Page 2 of 10

    be converted to habitable

    Agenda Item 6.

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    3/36

    In accordance with Malibu Municipal Code (M. Sections 17.02.060 and17.40.40(A)(13), "Total development square footage" (TDSF) includes the squarefootage primary and accessory structures (including interior and exterior walls), less theinitial one-thousand (1 000) square feet of the combined area of basements , cellarsand/or subterranean garages. The area of the basement/cellar/subterranean garage inexcess of the 1 000 square feet are included in the TDSF calculation at a ratio of onesquare foot for every two square feet proposed.For the proposed project , the existing square footage includes the 4200 square footresidence and the 425 square foot guesthouse totaling 4 625 square feet. In accordancewith the TDSF calculation parameters , the first 1 000 square feet of proposed basementarea is not included in the TDSF , therefore , the 939 square foot basement/conversion isnot added to the TDSF total. With the addition of the 291 square foot carportconversion , and 1 400 square foot first-floor addition the site s TDSF is 6 316. The totalallowable TDSF on the site is 7 329 square feet.Local Coastal ProaramThe Malibu Local Coastal Program (LCP) consists of a Land Use Plan (LUP) and a LocalImplementation Plan (LIP). The LUP contains programs and policies to implement theCoastal Act in Malibu. The purpose of the LIP is to carry out the policies of the LUP.The LIP contains specific policies and regulations to which every project requiring acoastal development permit must adhere.There are 12 sections within the LIP that potentially require specified findings to bemade , depending on the nature and location of the proposed project. Of these 12 , threeare for conformance review only and require no findings. These three sections , whichinclude Zoning, Grading and Archaeological/Cultural Resources , are discussed underthe "Conformance Analysis" section below.There are nine remaining sections that potentially require specific findings to be made.These findings are found in the following sections: (1) Coastal Development PermitFindings; (2) ESHA; (3) Native Tree Protection; (4) Scenic Visual and Hillside Protection;(5) Transfer of Development Credits; (6) Hazards (7) Shoreline and Bluff Development;(8) Public Access; (9) Land Division. .Additionally, M. C. Section 17.62.060 , regardingbasements as part of CDP applications applies to this project and the required findingsare made below:Table 1 shown below provides a summary of the lot dimensions and lot area of thesubject parcel. Table 2 provides a summary of development standards (pursuant to LIPSections 3. , 3.6 and 6.5) and Table 3 provides a summary of the grading quantities.

    Page 3 of 10 Agenda Item 6.

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    4/36

    Table1-- PropertvDataLot Oepth 208 feetLot Width -228 feetGross Lot Area (including driveway easements) 49,482 sq. ft. (1. acres)Net Lot Area 49,482 sq. ft. (1. acres)Net Lot Area = Gross Lot Area minus the area of public or private easements and 1: 1 slopes.Table 2 below provides a summary and indicates that the proposed project meets theproperty development and design standards as set forth under LIP Section 3. , 3.and 6.5. As shown the project complies with the relevant development standards.

    Table2--LCPZol1ingConforrllal1ceDevelopment Requirement Allowed Proposed CommentsSETBACKSFront Yard 20% feet 42' Existing Non-whichever is less conformingRear Yard 15% feet 31' 76' Complieswhichever is greaterMinimum Side Yard 23' 23' Complies10% minimum each sideCumulative side yard setbacks 57' 71' Complies= 25% of lot widthPARKING 2 enclosed 3 enclosed Complies-1 enclosed brought intocomplianceTOTAL OEVELOPMENT 329 sq. ft. 316 sq. ft. CompliesSQUARE FOOTAGE maximum

    2/3ROS RULE/ N/A N/A N/Afloor sq. ft.HEIGHT 1 8 feet 18 feet CompliesIMPERMEABLE COVERAGE 845 sq. ft. 095 sq. ft. CompliesmaximumCONSTRUCTION ON SLOPES 3:1 3: 1 or less CompliesSECONO UNIT SIZE 900 sq ft living 425 Compliesarea maximumFencelWali HeightFront N/A N/A N/ASide(s) N/A N/A N/ARear N/A N/A N/ARetaining wall height N/A N/A N/ATable 3 , below , identifies the amount of grading associated with this project.

    Page 4 of 10 Agenda Item 6.

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    5/36

    Table3--LCPGrading ConformanceExempt Non-R&R Understructure Safety Exempt Remedial TotalCut 337 337FilTotal 337 337ImportExportNote: All quantities in cubic yards unless otherwise indicated. R&R = removal and recompactionExempt grading includes all removal and recompaction (R&R), understructure, and safety grading.Safety grading is the incremental grading required for fire department access (such as turnoutshammerheads, and turnarounds and any other increases in driveway width above 15-feet required by theLos Angeles County Fire Department).Gradinq

    As indicated above , the project proposes no non-exempt grading. Therefore , the projectconforms to the grading requirements as set forth under LIP Section 8.Archaeoloqical/Cultural ResourcesThe project area lies beneath the existing residence and consists of previously disturbedsoils. As such , it has been determined that the area has a very low probability ofcontaining archeological or paleontological resources. Standard conditions of approvalinclude protection of such resources. Should any potentially important cultural resourcesbe found in the course of geologic testing or during construction , work shall immediatelycease until a qualified archaeologist can provide an evaluation of the nature andsignificance of the resources and until the Planning Manager can review this information.FindingsThe proposed project has been reviewed for conformance with the LCP by the PlanningDivision staff, City Environmental Health Administrator, City Geologist and the LosAngeles County Fire Department (LACFD). Staff has determined that , subject to theproposed conditions of approval , the project conforms to the LCP. The required findingsare made below.

    General Coastal Development Permit (LCP - Chapter 13)Pursuant to LIP section 13. 9 the following four findings need to be made on all coastaldevelopment permits.

    Page 5 of 10 Agenda Item 6.

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    6/36

    Finding A. That the project as described in the application and accompanyingmaterials as modified by any conditions of approval, conforms with the certified. City of Malibu Local Coastal Program.The proposed project conforms to the certified City of Malibu LCP and the requireddevelopment standards (see Tables 2 and 3).Finding B. The project is located between the first public road and the sea. Theproject conforms to the public access and recreation policies of Chapter 3 of theCoastal Act of 1976 (commencing with Sections 30200 of the Public ResourcesCode).The project is not located between the first public road and the sea and the proposedproject and related construction activities will not interfere with the public right toaccess the coast as the site is inland and offers no direct or indirect beach access.addition , there are no known trails on the subject property. Therefore, the projectconforms to the public access and recreation policies.Finding C. The project is the least environmentally damaging alternative.Pursuant to the California Environmentally Quality Act (CEQA), this project is listedamong the classes of projects that have been determined not to have a significantadverse effect on the environment and is categorically exempt from CEQA. Theproposed. project would not result in significant adverse effects on the environmentwithin the meaning of CEQA and there are no further feasible alternatives that wouldfurther reduce any impacts on the environment. The project complies with thedevelopment standards of the LCP and M. C. The proposed carport conversion andbasement are permitted uses within the RR-1 zoning classification of the subjectproperty. The project wil not result in potentially significant impacts on the physicalenvironment. Due to the topography of the subject site , a second story addition wouldhave the potential for impacts to private and public views. The proposed conversion ofunderstructure to basement and first floor addition is the least environmentally damagingalternative.

    Environmentally Sensitive Habitat Area (EsHA) Overlay (LIP - Chapter 4)The subject parcel is not designated as ESHA and the project is not expected to result inany new biological impacts. Accordingly, the findings in the ESHA Overlay are notapplicable.

    Native Tree Protection Ordinance (LIP - ChapterThe proposed project does not require the removal of any native trees. Thereforaccording to Section 5. , the native tree findings are not applicable.

    Page 6 of 10 Agenda Item 6.0.

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    7/36

    Scenic Visual and Hilside Resource Protection Ordinance (LIP - Chapter 6)The Scenic, Visual and Hillside Resource Protection Ordinance governs those CDPapplications concerning any parcel of land that is located along, within , provides views toor is visible from any scenic area , scenic road , or public viewing area. Due to the sitetopography, the location of the proposed carport conversion , basement, and first flooraddition projects are not visible from a scenic road (PCH). Therefore , the Scenic , Visualand Hilside Resource Protection Ordinance do not apply.

    Transfer of Development Credits (LIP - Chapter 7)Pursuant to Malibu LIP Section 7. , transfers of development credits only apply to landdivision and/or new multi-family development in specified zoning districts. The proposedCDP does not involve land division or multi-family development. Therefore , LIP Chapter7 does not apply.

    Hazards (LIP - Chapter 9)The proposed project is not anticipated to result in the potential to create adverseimpacts on site stability or structural integrity. The project consists of the realignment ofa driveway. The proposed realignment is five feet to the east of the existing driveway.The project has been reviewed by the City Geologist , and City Public Works Departmentand has been determined to be consistent with all applicable policies and regulations.According to the geotechnical reports prepared by RJR Engineering Group, Inc. whichwere reviewed and approved by the City Geologist, the project will not be subject togeotechnical hazards from landslides , slippage , or excessive settlement. Further , theproject will not adversely affect the stability of the site or adjacent properties. Consistentwith City policy, the project is proposed to be conditioned to require that therecommendations in all geotechnical reports prepared for the project are followed andthe designs , grading and construction are properly and adequately executed; thereforeaccording to LIP Section 9. , LCP hazard findings need not be made.

    Shoreline and Bluff Development (LIP - Chapter 10)The project does not include development of a parcel located on or along the shorelinea coastal bluff or bluff top fronting the shoreline as defined by the Malibu Local CoastalProgram. Therefore , in accordance with Section 10.2 of the Local Implementation Planthe requirements of Chapter 10 of the LIP are not applicable to the project and thefindings need not be made.

    Page 7 of 10 Agenda Item 6.

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    8/36

    Public Access (LIP - Chapter 12)No issue of public prescriptive rights has been raised.Vertical Access. The project is not adjacent to the Pacific Ocean and access to thePacific Ocean from the project site is not possible. Therefore , no conditions or findingsfor vertical access are required.Lateral Access. The project is not located on a beach. Therefore, no conditions orfindings for lateral access are required.Bluff Top Access. The project site is not a bluff and does not provide bluff top access.Therefore , no conditions or findings for bluff top access are required.Trail Access. Neither the LCP , the General Plan , nor the Trails Master Plan show anytrails on or adjacent to the property. Therefore , no conditions or findings for trail accessare required.

    Recreational Access. The project site does not include or have any access ways toexisting or planned public recreational areas. Therefore , no conditions or findings forrecreational access are required.Land Division (LIP - Chapter 15)

    This project does not involve a division of land as defined in LIP Section 15. 1; thereforeChapter 15 of the LCP does not apply.Onsite Wastewater Treatment System (LIP Chapter 18)

    LIP Chapter 18 addresses Alternative Onsite Wastewater Treatment Systems (AOWTS).LIP Section 18.7 includes specific siting, design , and performance requirements. Theproject was reviewed by the City s Environmental Health Administrator and the existingOWTS was found to meet the minimum requirements of the Malibu Plumbing Code , theC. and the LCP.Administrative Plan Review for a basement (M. C. Section 17.62.030 &17.62.060)

    The proposed project includes the conversion of non-habitable understructure area tobasement area. According to M. C. Section 17.62. 060 , development projects deemedcomplete after October 27 , 2004 which require a CDP and which propose a basementshall obtain an APR. This project was deemed complete on March 26 , 2007; thereforethe basement for the project is subject to the current basement regulations. Therequirements for approval of a basement are enumerated below:

    Page 8 of 10 Agenda Item 6.

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    9/36

    The project is consistent with the City s development standards.The proposed development has been reviewed for conformance with the propertydevelopment and design standards of the M. C Section 17.40.040. As shown in Table, the proposed project conforms to the property development and design standards ofthe M.

    The project is consistent with M. C. Section 17.40.040(A)(13)(c) through (f)for basements.The square footage of the basement has been included in the calcuiation of totaldevelopment square footage consistent with the formula provided in M. C. Section17.40.040(A)(13)(f). The proposed basement is located beneath the first floor footprintof the structure above , and does not exceed twelve (12) feet in height.CORRESPONDENCE: To date , no correspondence has been received from the publicregarding this project.ENVIRONMENTAL REVIEW: Pursuant to the authority and criteria contained in theCalifornia Environmental Quality Act ("CEQA"), the Planning Division has analyzed theproposed project. The Planning Division has found that the project is among the classesof projects listed that have been determined to have less than significant adverse effectson the environment and therefore , is exempt from the provisions of CEQA. Accordingly,a CATEGORICAL EXEMPTION will be prepared and issued pursuant to CEQAGuidelines Section 15301 (a) - Additions to Existing Facilities. The Planning Divisionhas further determined that none of the six exceptions to the use of categoricalexemption applies to this project (CEQA Guidelines Section 15300.2).PUBLIC NOTICE: Pursuant to Malibu Local Coastal Program LIP Section 13. 12. , staffpublished the required 10-day public hearing notice in the Malibu Surfside News on April, 2007. In addition , a Notice of Public Hearing was mailed to property owners andoccupants within a 500-foot radius of the subject property on April 19 , 2007 (Attachment4 - Public Hearing Notice).SUMMARY: The required findings can be made that the project complies with the LCP.Further , the Planning Division s findings of fact are supported by substantial evidence inthe record. Based upon the analysis contained within this report , staff is recommendingapproval of this project subject to the conditions of approval contained in Section 4(Conditions of Approval) of Planning Commission Resolution No. 07-30.

    Page 9 of 10 Agenda Item 6.

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    10/36

    ATTACHMENTS:1. Planning Commission Resolution No. 07-2. Aerial PhotosProject Plans4. Public Hearing / Mailing Notice

    Page 10 of 10 Agenda Item 6.

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    11/36

    CITY OF MALIBU PLANNING COMMISSIONRESOLUTION NO. 07-A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OFMALIBU APPROVING COASTAL DEVELOPMENT PERMIT NO. 07-015AND ADMINISTRATIVE PLAN REVIEW NO. 07-042 - AN APPLICATIONFOR THE CONVRSION OF NON-HAITABLE UNDERSTRUCTUR INTOBASEMENT AREA, THE ENCLOSURE OF A CARPORT TO A GARAGEAND A 1 400 SQUARE FOOT FIRST FLOOR ADDITION TO AN EXISTINGSINGLE-FAMILY RESIDENCE. (PACIFIC HOME DEVELOPMENT)

    Section 1. Recitals.A. In April 2003 , the existing 4 200 square foot residence and 425 square foot guest housewere permitted via a fire re-build Coastal Commission issued exemption (No. 4-02- I44-X). anapplication was submitted by J. Scott Carer on behalf of property owner Pacific Development for therelocation of the existing driveway.B. In May 2003 , the City issued an approval (Plot Plan Review No. 00- 144) for constructionof 5 294 square foot house at the same location. The City s permit was legally challenged by aneighboring property owner and the applicant chose to proceed with the Coastal approved 4 200 squarefoot residence and guesthouse. This information is provided to show that the City has previouslyconsidered and approved a larger residence for the subject property. The curent application is fordevelopment below grade and wil have no impact on the views from neighboring properties.C. On February 8 , 2007, an application for CDP No. 07-015 and APR 07-042 was submitted

    by Kirkor Suri, on behalf of property owner Pacific Home Developers.

    D. On April 19, 2007 , a Notice of Public Hearing was published in a newspaper of generalcirculation within the City of Malibu. In addition , on April 19 , 2007 , a Notice of Public Hearing wasmailed to all property owners and occupants within a 500-foot radius of the subject property.E. . On May 1 , 2007, the Plannng Commission held a duly noticed public hearing on thesubject application, reviewed and considered the staff report, reviewed and considered written reportspublic testimony, and other information in the recordSection 2. Environmental Review.

    Pursuant to the California Environmentally Quality Act (CEQA), this project is listed among the classesofprojects that have been determined not to have a significant adverse effect on the environment and iscategorically exempt from CEQA. The proposed project would not result in signficant adverse effects onthe environment, within the meaning of CEQA and there are no further feasible alternatives that wouldfuher reduce any impacts on the environment. The project complies with the development standards ofthe LCP and M. C. The proposed carort conversion and basement are permitted uses within the RR-zoning classification of the subject property. The project wil not result in potentially signficant impactson the physical environment. Due to the topography ofthe subject site , a second story addition would

    Planning Commission Resolution No. 07-Page 1 of8

    Attachment 1

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    12/36

    have the potential for impacts to private and public views. The proposed conversion of under strctue tobasement and first floor addition is the least environmentally damaging alternative.Section 3. Coastal Development Peimit Approval and Findings.

    Based on substantial evidence contained within the record and pursuant to Sections 13. B and 13.9 ofthe City Malibu Local Coastal Program (LCP) Local Implementation Plan (LIP), the PlaningCommission adopts the findings in the staff report, the findings of fact below, and approves CoastalDevelopment Permit (CD P) No. 07-015 for the conversion of non-habitable understructue into basementarea, the enclosure of a carport to a garage , and a 1 400 square foot first floor addition to an existingsingle-family residence.The project has been reviewed by the City Environmental Health Administrator, City Geologist and theLos Angeles County Fire Department. The project is consistent with all applicable LCP codes, standardsgoals, and policies. The required findings are made below.A. General Coastal Development Permit (LIP - Chapter 13)Finding A. That the project as described in the application and accompanying materials , as modifiedby any conditions of approval, conforms with the certified City of Malibu Local Coastal Program.The proposed project conforms to the certified City of Malibu LCP and the required developmentstandards (see Tables 2 and 3 of the associated staff report).Finding B. If the project is located between the first public road and the sea, that the project conformsto the public access and recreation policies of Chapter 3 of the Coastal Act of 1976 (commencing withSections 30200 of the Public Resources Code).The project is not located between the first public road and the sea and the proposed project and relatedconstruction activities wil not interfere with the public s right to access the coast as the site is inland andoffers no direct or indirect beach access. In addition, there are no known trails on the subject property.Therefore, the project conforms to the public access and recreation policies.Finding C. The project is the least environmentally damaging alternative.Pursuant to the California Environmentally Quality Act (CEQA), this project is listed among the classesofprojects that have been determined not to have a significant adverse effect on the environment and iscategorically exempt from CEQA. The proposed project would not result in significant adverse effects onthe environment, within the meaning of CEQA and there are no further feasible alternatives that wouldfuher reduce any impacts on the environment. The project complies with the development standards ofthe LCP and M. C. The proposed carport conversion and basement are permitted uses within the RR-zoning classification of the subject property. The project wil not result in potentially signficant impactson the physical environment. Due to the topography of the subject site, a second story addition wouldhave the potential for impacts to private and public views. The proposed conversion of understructue tobasement and first floor addition is the least environmentally damaging alternative.

    Planning Commission Resolution No. 07-Page 2 of8

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    13/36

    Finding D. If the project is located in or adjacent to an environmentally sensitive habitat area (ESHA)pursuant to Chapter 4 of the Malibu LIP (ESHA Overlay), that the project conforms with therecommendations of the Environmental Review Board, or if it does not conform with therecommendations, findings explaining why it is not feasible to take the recommended action.B. Environmentally Sensitive Habitat Area (LIP - Chapter 4)The subject parcel is not designated as ESHA and the project is not expected to result in any newbiological impacts. Accordingly, the findings in the ESHA Overlay are not applicable.C. Native Tree Protection Ordinance- (LIP - Chapter

    The proposed project does not require the removal of any native trees. Therefore , according to Section, the native tree findings are not applicable.D. Scenic, Visual and Hilside Resource Protection Ordinance (LIP - Chapter 6)The Scenic, Visual and Hilside Resource Protection Ordinance governs those CDP applicationsconcerning any parcel ofland that is located along, within, provides views to or is visible from any scenicarea, scenic road, or public viewing area. Due to the site topography, the location of the proposed carortconversion , basement, and first floor addition projects are not visible from a scenic road (PCH).Therefore, the Scenic , Visual and Hilside Resource Protection Ordinance do not apply.E. Transfer Development Credits (LIP - Chapter 7)Pursuant to Malibu LIP Section 7.2, transfers of development credits only apply to land division and/ornew multi-family development in specified zoning districts. The proposed CDP does not involve landdivision or multi-family development. Therefore, LIP Chapter 7 does not apply.F. Hazards (LIP - Chapter 9)The proposed project is not anticipated to result in the potential to create adverse impacts on site stabilityor structural integrity. The project consists of the realignent of a driveway. The proposed realignment isfive feet to the east of the existing driveway. The project has been reviewed by the City Geologist , andCity Public Works Department, and has been determined to be consistent with all applicable policies andregulations. According to the geotechnical reports prepared by RJR Engineering Group, Inc. which werereviewed and approved by the City Geologist, the project wil not be subject to geotechncal hazards fromlandslides, slippage, or excessive settlement. Further, the project wil not adversely affect the stability ofthe site or adjacent properties. Consistent with City policy, the project is proposed to be conditioned torequire that the recommendations in all geotechnical reports prepared for the project are followed and thedesigns, grading and construction are properly and adequately executed; therefore, according to LIPSection 9. , LCP hazard findings need not be made.

    Planning Commission Resolution No. 07-Page 3 of8

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    14/36

    G. Shoreline and Bluff Development (LIP - Chapter 10)The project does not include development of a parcel located on or along the shoreline , a coastal bluff orbluff top fronting the shoreline as defined by the Malibu Local Coastal Program. Therefore, inaccordance with Section 10.2 of the Local Implementation Plan, the requirements of Chapter 10 of theLIP are not applicable to the project and the findings need not be made.H. Public Access (LIP - Chapter 12)No issue of public prescriptive rights has been raised.Vertical Access. The project is not adjacent to the Pacific Ocean and access to the Pacific Ocean from theproject site is not possible. Therefore, no conditions or findings for vertical access are required.Lateral Access. The project is not located on a beach. Therefore, no conditions or findings for lateralaccess are required.Bluff Top Access. The project site is not a bluff and does not provide bluff top access. Therefore , noconditions or findings for bluff top access are required.Trail Access. Neither the LCP , the General Plan, nor the Trails Master Plan show any trails on oradjacent to the property. Therefore , no conditions or findings for trail access are required.Recreational Access. The project site does not include or have any access ways to existing or planedpublic recreational areas. Therefore , no conditions or findings for recreational access are required.

    Land Division (LIP - Chapter 15)This project does not involve a division ofland as defined in LIP Section 15.1; therefore, Chapter 15 ofthe LCP does not apply.

    Administrative Plan Review for a basement (M. C. Section 17.62.030 & 17.62.060)The proposed project includes the conversion of non-habitable understructure area to basement area.According to M. C. Section 17.62.060 , development projects deemed complete after October 27 2004which require a CDP and which propose a basement shall obtain an APR. This project was deemedcomplete on March 26 2007; therefore, the basement for the project is subject to the current basementregulations. The requirements for approval of a basement are enumerated below:

    The project is consistent with the City' s development standards.The proposed development has been reviewed for conformance with the propert development and designstandards ofthe M. C Section 17.40.040. As shown in Table 2 , the proposed project conforms to theproperty development and design standards of the M.

    Planning Commission Resolution No. 07-Page 4 of8

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    15/36

    The project is consistent with M. C. Section 17.40.040(A)(13)( c) through (f) for basements.The square footage of the basement has been included in the calculation of total development squarefootage consistent with the formula provided in M. C. Section 17.40.040(A)(13)(f). The proposedbasement is located beneath the first floor footprint of the structure above, and does not exceed twelve(12) feet in height.Section 4. Conditions of ApprovalBased on the foregoing findings and evidence contained within the record, the Planing Commissionhereby approves CDP No. 07-015 subject to the conditions listed below:

    Standard ConditionsThe applicants and property owners, and their successors in interest, shall indemnify and defendthe City of Malibu and its officers, employees and agents from and against all liability and costsrelating to the City s actions concerning this project, including (without limitation) any award oflitigation expenses in favor of any person or entity who seeks to challenge the validity of any ofthe City s actions or decisions in connection with this project. The City shall have the sole right tochoose its counsel and property owners shall reimburse the City' s expenses incured in its defenseof any lawsuit challenging the City s actions concerning this project.Approval of this application is to allow for:

    939 square feet of non-habitable understructue to be converted to habitable basement area;291 square foot conversion of carport to garage; and

    400 square foot first-floor addition.Pursuant to LIP Section 13. 18.2 (page 237), this permit and rights conferred in this approval shallnot be effective until the property owner signs and retus the Acceptance of Conditions Affidavitaccepting the conditions set forth herein. The applicant shall fie this form with the PlaningDivision within 10 days of this decision and prior to issuance of any development permits.This permit shall be null and void ifthe project has not commenced within two (2) years afterissuance of the permit. Extension to the permit may be granted by the approving for due cause.Extensions shall be requested in writing by the applicant or authorized agent at least two (2)weeks prior to the expiration of the two-year period and shall set forth the reasons for the request.This resolution and the referral sheets attached to the agenda report for this project shall be copiedin their entirety and placed directly onto a separate plan sheet behind the cover sheet of thedevelopment plans submitted to the City of Malibu Environmental and Building Safety Divisionfor plan check and the City of Malibu Public Works/Engineering Services Department for anencroachment permit (as applicable).The applicant shall submit three (3) complete sets of plans to the Planing Division forconsistency review and approval prior to the issuance of any building or development permit.

    Planning Commission Resolution No. 07-Page 5 of8

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    16/36

    13.

    14.

    Questions of intent or interpretation of any condition of approval will be resolved by the PlanngManager upon written request of such interpretation.Minor changes to the approved plans or the conditions may be approved by the PlaningManager, provided such changes achieve substantially the same results and the project is stil incompliance with the Malibu Municipal Code and the Local Coastal Program. An application withall required materials and fees shall be required.All structues shall conform to the City of Malibu Environmental and Building Safety Division, CityGeologist, City Environmenta Health Specialist, City Biologist, City Public Works Deparent, andthe Los Angeles County Fire Deparment requirements. Notwithstanding this review, all requiredpermits shall be secured.

    10. The applicant shall request a final planing inspection prior to final inspection by the City ofMalibu Environmental and Building Safety Division. A Certificate of Occupancy shall not beissued until the Planing Division has determined that the project complies with this CoastalDevelopment Permit. A temporary certificate of occupancy may be granted at the discretion ofthe Planning Manager, provided adequate security has been deposited with the City to ensurecompliance should the final work not be completed in accordance with this permit.11. In the event that potentially important cultural resources are found in the course of geologictesting, work shall immediately cease until a qualified archaeologist can provide an evaluation ofthe nature and significance of the resources and until the Planing Manager can review this

    information. Thereafter, the procedures contained in Chapter 11 of the LCP and those in Section17.54.040(D)(4)(b) of the City of Malibu Municipal Code (MMC) shall be followed.

    12. If human bone is discovered during geologic testing or during construction, work shallimmediately cease and the procedures described in Section 7050.5 of the California Health andSafety Code shall be followed. Section 7050.5 requires notification of the coroner. If the coronerdetermines that the remains are those ofa Native American, the applicant shall notify the NativeAmerican Heritage Commission by phone within 24 hours. Following notification of the NativeAmerican Heritage Commission, the procedures described in Section 5097.94 and Section5097.98 of the California Public Resources Code shall be followed.Earthmoving during the rainy season (extending from November 1 to March 1) shall be prohibitedfor development that includes grading on slopes greater than 4: 1. Approved grading operationsshall not be undertaken unless there is sufficient time to complete the grading operations beforethe rainy season. If grading operations are not completed before the rainy season begins , gradingshall be halted and temporary erosion control measures shall be put in place to minimize erosionuntil grading resumes after March 1 , unless the Planing Manager determines that completion ofgrading would be more protective of resources.Minor changes to the approved plans or the conditions of approval may be approved by thePlanning Manager, provided such changes achieve substantially the same results and the project isstil in compliance with the Municipal Code and the Local Coastal Program. An application withall required materials and fees shall be required.

    Planning Commission Resolution No. 07-Page 6 of8

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    17/36

    18.

    19.

    Section 5.

    15. Violation of any of the conditions ofthis approval shall be cause for revocation and terminationof all rights thereunder.16. This CDP runs with the land and binds all future owners of the property.17. Pursuant to LIP Section 13.20 , development pursuant to an approved coastal development permitshall not commence until the coastal development permit is effective. The coastal development

    permit is not effective until all appeal , including those to the California Coastal Commissionhave been exhausted. In the event that the California Coastal Commission denies the permit orissues the permit on appeal , the coastal development permit approved by the City is void.All recommendations of the consulting Certified Engineering Geologist or Geotechncal Engineerand/or the City Geologist shall be incorporated into all final design and construction includingfoundations, grading and drainage. Final plans shall be reviewed and approved by the CityGeologist prior to the issuance of a grading permit.Final plans approved by the City Geologist shall be in substantial conformance with the approvedcoastal development permit relative to construction, grading and drainage. Any substantialchanges may require amendment to this coastal development permit or a new CoastalDevelopment Permit.

    Certification.The Planning Commission shall certify the adoption of this Resolution.

    PASSED, APPROVED AND ADOPTED this 1st day of May 2007.

    ATTEST:CAROL RANDALL, Planning Commission Chair

    ADRIENNE FURST, Recording SecretaryLocal Appeal - Pursuant to Local Coastal Program Local Implementation (LIP) Section 13.20. 1 (LocalAppeals), a decision of the Planing Commission may be appealed to the CityCouncil by an aggrievedperson by written statement setting forth the grounds for appeal. An appeal shall be fied with the CityClerk within 10 days and shall be accompanied by an appeal form and filing fee of$655. , as specifiedby the City Council. Appeal forms may be found online at ww. ci.malibu.ca.us or in person at City Hallor by calling (310) 456-2489, ext. 245 or ext. 256.COASTAL COMMISSION APPEAL - An aggrieved person may appeal the Plannng Commissiondecision to the Coastal Commission within 10 working days of the issuance of the City s Notice of FinalAction. Appeal forms may be found online at ww.coastal.ca.gov or in person at the Coastal

    Planning Commission Resolution No. 07-Page 7 of8

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    18/36

    Commission South Central Coast District office located at 89 South California Street in Ventura, or bycalling 805-585- 1800. Such an appeal must be fied with the Coastal Commission, not the City.I CERTIFY THAT THE FOREGOING RESOLUTION NO. 07-30 was passed and adopted by thePlanning Commission of the City of Malibu at the regular meeting thereof held on the 1 st day of May2007 , by the following vote:AYES:NOES:ABSTAIN:ABSENT:

    ADRIENNE FURST, Recording Secretary

    Planning Commission Resolution No. 07-Page 8 of8

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    19/36

    Attachment 2

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    20/36

    -c .!-C 0)c= .

    s. .!

    .+ U

    s.-CCD .-

    c.s.a. u

    o 0co c:CD

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    21/36

    GENERALNOTES

    1TneohUowniopo"O1CoosemO0cmeJCEPMCFOC

    O

    :

    F

    ;:C;

    ,e1o0::::sediments

    oehpMmb

    i

    :e

    oOo1

    -oo

    ;h

    :o

    oohdownmnoamy1ceoncoo

    ;?f:

    t

    :

    :E:Fn

    i

    f;

    b

    !?

    \eedp1.tnaeowceetnOnbc"no

    ?I

    e

    cu

    nahcbo"JPOooeTd

    ;C

    r

    :

    iu

    oC

    :dnh

    .codnoMOYe0emay

    .u(ndcCuofohcoooh

    .Q

    .ConLrect?'

    .M0mncy

    cm.hhgnnp,pce

    nwo,omdngaooo

    mcp,occyouy""o

    o

    nonpooono

    ,nob1uuemay.oc

    rnma

    mO.Yapo

    a"pC01po'onm

    CdnAuyoipmmop

    aohn"popnUao

    poyhnhonhn

    Ihndnooaocepoo

    cmn".Nu

    b0ta

    .0Cn,npo.beopm

    mep

    nppnthk

    -On.hplahpoC

    bdn

    pmOcooIhplooh

    pmo1

    5TohocOMo,oaodoom

    bOonaoooooo

    cmnooonOoodpbn

    2TcodmC0h1on6SmOdohmeOomnObo

    :

    T

    o

    b

    "hb

    bo.ho"enKNom'ombOndoinohPUc"

    JSNuoccooAdod

    mbpumooy

    4TU2oycolculolions..amnbOondnbrono0

    .5AOOOmcoInp"1om

    "e01oom

    Se

    :O

    :d"0'1.o

    2Te0h9oounbwn"wo

    ooainohnaoo

    o

    lonooheu

    O

    cmeopod.omdOnnewhhRZON

    .OkuthCoEochgn

    :1o"

    dmtobomobhon r

    oaooogdo"oco

    Uod28nC

    2Wh,oontodOnopco

    thcospodthdontoh

    :5

    :i

    :C

    'b

    demnordnQy0meoa

    1Ca.hoyaCOO"ndoQu.pmndgoomdCOaEon'uonon0

    !:1

    ;1J

    ;

    nob

    ?'64"O

    uzm11Z

    :?e

    I

    :;omOOytoPM.ec0.

    f

    ;

    ga

    :o

    o

    :o\o5OnnnOOC10ohno

    iobo'om1ooo0noo0npmdoc

    o.n.kohnoc1qoino5w

    0omocsbo"a1ooaN

    OOn1b01"hcOToo

    :

    1O9Co.ob0

    :D

    f!:em

    hm1onS0nMn

    t"neOBdhoOnO

    cdaUaecodmoo6PoopOooncmYuUh

    'o

    n

    :E

    dOcbdoooy,ooamo

    8"JmooOpmlunnduh

    co'"bnoO,01a001

    EOe'uy1"oOanam

    ca

    .poOn1Io1Cookmp

    to

    oHobeohpc

    9SdOn,omcoocpoodo

    pomc,nom"bO

    aoh.nomo"obbme1o

    oceooon1nroNpo

    0"o0cmoo.hbcm

    !

    iUloDOdb

    1hAoOoI1on.Ondd

    aqUoaOhnooh0na

    thm0thmaaomnp

    "odooinamo"ponn

    "OhUSObn

    1hcoosgooaopoh

    .okoonaoinmooaokmhpI

    opo0oyomhdo0cmoo

    1pooT"nooaoo

    opmomoa.oUd9o

    oo 1Oonanapm"mhSo

    CmmOCo,1

    oSoypo1Ih

    :

    t

    IAmeoe;pmoWdOonlc

    tm0oonnObCoobcoo

    0fhmyoe0O."N

    :a

    0

    'c

    ,momooC

    o,1nOythoco

    ,n7dO0nnhco1CVCO

    0"p"ominOonnIamoosans

    oo

    1Cooouohaoo

    On"ntO.n0nnocof

    cNoa"boCoohpo

    oOUnahmSD1,oon

    lhdsb0otohoc1n

    "0ONo

    'oonbopbloadm

    ,onokdnCuo,O1

    Inns.udmtoamoo

    "pooanCoonPo

    ,aonWOkoo

    ,ndodO,ohObopbo

    1'On0coa1

    .Uo00sobood1h~o

    .ccoaoo01.o

    ,ncoccninomo.ntno8anCOO6

    codm

    1

    h0POo

    r%

    :

    2Nn11tpooSMopOd0dobnm1boh

    0uddanuo8nCO61&6

    JNen1donh1po

    .b

    i"0;0

    1 2

    po0codmo11omoom0hoOINoa0

    "OcCn.nWizlumn1th

    Nythoa;moy.hccon2nhnmn1indadO.8dnC

    6

    2TOnopoyooohg1lo

    ohcOooomOocon

    c

    oOhhpoolnOhon

    .se1'ouns'oomooS

    IuaOpmnlabnodbth

    coonc

    owhpoo

    Tn0ovhghnadn

    thco1od"o.oomcO

    b"on"ntoodCnfomh.ok

    .h1cosmbnOdOdny0

    pn1moopaobbmU

    aoo"bhFnyOoopoo

    ;dnpoao,mmoa0h

    ooofnFlocOPaaln

    ,npobqooaan

    o

    ySm3coacmo'u

    mcUpoohFocoUo

    51OSOhPAoPm

    JTo(966FfOCo

    10"nbh00oo0hab

    mnonpCb1

    1Podoooaomc,$no

    1emSmpoloOopao

    inooFC0

    AmFRCN

    LE.Ot00oolomhind

    .hhu0o0oPCOkO

    0oUTUH3C

    '1

    'O0dms

    Jdun1bpo0bdnnua

    pOo1bpany""botgbmlh

    o0oonthP"ymn0

    cohhbo1J

    4Smdeoe1bdo"bay

    bano

    o

    DWIN

    HDCU

    DLWAS

    CLRE

    IH

    D

    ABBREV1ATIONS

    YM 8 8

    BLNDAM

    INOMO

    ZN

    BWINCgcES

    OARRdU

    UGo

    TOC

    T BWGSQ

    ES

    D

    (C IEE9.c

    CfO4SOT

    U

    ooCo

    CO20

    COd1Co

    15OT

    1155oOT

    Fn8OdnSAo65SO

    aDoo

    "kDn

    0AOO

    Bd.8o,d

    88 .B;n

    8B1

    mU

    cnCcpna

    CPCnCo"y

    CCoo

    OnOo..n

    owOonWooV

    IOOaam

    FUF

    UU

    J.Floo'Jo;ll

    C.f"n,.nC,odo

    GCa

    GCoz

    IYCum

    LuoPOom

    110ou(O)

    oO0Oodcom

    OO0u

    Ooood

    PWPyw

    RqRO"

    RRJsR

    DSomOon

    SSau

    TTc

    CTCoo

    TPTopolPly"OOd

    Shn

    UU

    o

    Laoe

    HHUVnWooa

    "COnUV Wd

    Wo./w,1)

    In.'n.ort

    PEL1N

    1SWEIEAR

    wBC

    L

    PO

    L0looonaRCO

    TO10bSLCm

    loOOW1fTASWoA

    CoCotoNWRua

    19T9TeA

    Io

    nPooL2

    TMB

    MAPPAGE

    EINOMO

    VuOCyOc

    4TOroR

    Vu0CO

    T865

    FA(65

    S

    uRCVL

    :,n

    1M5J

    SmOC9A

    T(618t10A2.

    M

    CA

    FumIAon

    A4

    1Wona8So205A2.

    lOMoaC

    T09560

    FA396

    LcAnnp"

    SeeOm

    25Vn0d$0

    WooHC9

    T(62

    FA824

    E

    M

    CUB5uk

    6RC

    SmnC9

    T85

    FA(85

    SHEETINDEX

    GRAG

    CS

    A

    PENEGNTlLE-24A4

    PHANH

    PEA

    G2ENTL2

    :OoRG

    cN

    A

    AOWNGPARVWA

    PACMEOM

    ELCNO

    KRSUU

    2VuoB2SVSU

    WOaMC9J6N&D

    A

    T619SRWIGN&D

    PA

    F679$RW2RNNWA

    AT

    BWINHGAVAH

    L1L

    P

    wHG1

    I7LCo81.d.L2.

    FUMFCOP

    LA

    HT:OPLAN

    ALA44SOTA0TP

    JUAWALPEDCPNA6AEFOPLANMECHAICA

    IPECOVRAE-14.8SO

    eU

    :

    :C11

    PROCEOLEGD

    PO

    lA1

    PA

    IPEC

    206SOLMoohknhA1.1.1.

    FOPLA\1.22NDFLOOR

    RDN52SO

    04OCP

    O

    dRtY

    R

    NPA11

    :;WAY:

    F"oPbookA1.rD

    O

    NUEN

    HUPAO25SOA

    OPANM01/4-1-0GG

    Oo

    PNDPEINO4

    001A1.14D1

    O

    NSO

    OP

    PNNIP01C

    AF

    U

    OS

    iN

    CCM5OEXpOSUV080SF

    40uX120

    Sn&Onn.a

    A16FWFWOPANP

    0SaA17HWOPLASFMNPA

    (1ULA-9SONhVa51'001,AI1fFWRPLASL

    JOWHLBSOJSOT

    6A2NO?R!,LASL

    wUPECOVERAE"14.6SOF

    618=

    SL

    soiLA1.2,1

    L

    \OP

    :oneo

    A2R2NOCLNPASW2SWAP

    LMOCyabOtlcoAI

    2NFPLASODVWABDP

    pcCMho04

    5OVWABDP

    abC9A1

    RPLA5OL

    T(O469D08RP04

    A1

    FP(GH

    A4RCLNP(GH

    AFDFOUNDATIONP

    (GH

    EE

    O

    SOE

    O

    WEE

    O

    NE

    O

    E

    O

    (GH

    SOSOSOSOSOSOSOSOSOSOC

    SOJ&GH

    AAAAAAAAAAAA

    AA

    SOCDL

    SO0CL

    SOJ&CL

    (GH

    FRDL

    G

    oDL

    FO

    NP

    &E

    O

    SBDAM

    SBDAM

    D&WINW

    S

    AAAA

    RNOE

    O

    T

    INOE

    O

    KTINOE

    O

    INOE

    O

    INOE

    O

    INOE

    O

    E

    C

    EBBML

    E

    CP

    E

    1FE

    CP

    E

    1FE

    CP

    E2NHE

    CP

    E4E

    CP

    (GHE

    CDL

    E

    c ,t8

    .o:w

    W

    PAM

    PH 3SWEETWATERMESA

    RMBC SS

    i212CR

    f.10mRo

    A1l/28/CtR

    A1211/0"o

    A01/10/010&CY

    fAOm0U

    AO1/O/O

    A01/i/0G

    ib01/\1/0'i"R

    AroM/07R

    Om0IZ

    A01/01/07r"RmuA

    OS

    Og0O

    JAV

    HT

    !1A

    O

    lOGIECoIuO7O"

    'QmOWNER

    poOu

    .\U8"1"

    rA11U

    L

    DCP

    ICOOloWoW'_O

    S(qTJT

    I_

    fN0

    S5N

    C G0

    TdoninpOy

    JVAa"d

    tOooKn

    rnpn1buo

    oohpoeoob

    ,unooO

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    22/36

    inS9Px

    11

    S"2

    J

    lJ

    pCCCC,SKY

    tG

    IoFOlNICWEAP516USOEND

    PTHY

    E

    IROV-

    JOlCV'6QH1.31ACC'

    AETL#emCB04

    DpUCOrLH0n5QSPA

    wwO

    C0ElASiCPD51

    O5AA1ER13

    310ROALTOITNAEMLAN

    Svn

    DanSvc

    4HhYSLAQuC9Q6

    I38IOl7Fa;:(381

    TO

    HCSUO3SWEWAMAR

    MBAFOA

    RSO31

    JO

    A9O

    D61

    DOSU150

    ORBS

    PHGUESTHOUSE

    3SEWAMA

    RMABC

    '0

    RS

    f2to/18Lw

    .!01/1/

    .&02ItCJ

    OA

    020.2

    JAVAT

    1OOo(O2O

    ucmOWNPOoQL

    !U&O-6

    fu8&O

    L

    D

    P

    tGCOLWo"bc

    rgnJnM

    w

    -o5M

    OO

    SoSGuA

    SU SV0

    Tdonhoy

    "yVA

    d"MI

    1b10CTcno

    'TpIn1uO

    .neh1o

    b

    'uoQ

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    23/36

    SlAruR

    Te

    ehay

    JV"ceo"

    (V-."d

    .parU"\0bu

    ohpooo

    'u

    ,e

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    24/36

    I- !I Iv

    rCD8 i'f; I II---0

    -

    (7CD

    1 r"

    -f=

    IYYIII

    :r-0L

    ,J-

    ---II

    O

    a)

    i

    'c'cu

    (G

    ---UnoelCnA

    ,1 0

    L- IU.Jl

    0

    cmc

    J"Ln,54

    7

    '1:I

    (70EcPc"P

    /"noP

    .2PWS_Co"

    o25_"O

    "1

    M

    E2'_o"C

    aW.RM

    0120251

    'nS-&

    8"_6

    86"a&ew

    lsC

    RU

    :""

    f !9=,

    =

    WO

    10T1_og !n

    ooI1O

    _0"ac

    (21

    ooo

    g

    ImFn(S"3o

    02gOCcs

    ISoooC5b

    CoPocc9 -

    gb

    =O1

    0ZXoS0

    3"orG

    (CRJ

    GEP"c"P

    0.nTDrp0g

    (TU,eoA

    PIROO

    oPO

    R

    !HCAISeoAU

    oA

    og

    -"n0

    1""gO

    GO1C

    IDRI"SPOOcYo

    .Pp_"

    .ISopV;1

    BXUbSn"to

    OSOTT

    1GC

    LZMtSad'

    "cuou"

    .EcSomKOJ

    oJ

    R-

    ;

    'moog

    lP3p

    ESno""

    'S0'0F-9

    (3."3F

    h

    GOP"H

    .S fZ7_""o"

    .Pon"oZS

    (cUoZ"O0

    .ooPoZSuO

    SIJOP

    .z_oe

    JQoc

    ILI"0BdQ'op"0EyLe

    C

    r0

    SWS"oo"O.n

    ,ce"

    ICO_ "D

    U"

    S""

    J"PSoOP

    H

    =1"P

    LRn3M

    .o"P-

    G11RX'"uuD

    f

    i=Go"0

    IU o"E

    SoC

    o=.:o;

    :o

    i"=

    O

    PH 3SWEETWATERMESA

    RMBC

    NO

    SOY

    b.IC/M/IY,R

    iQ20R"

    A12CR

    A12/n!0r"Df",tml1t

    ibC'M/C71J0id&

    C

    1OIm/Q8Mt

    A1CaU

    A1r/06/C71)",(;I.

    fA01001

    &ObR

    .2o/

    l!04!'2/II\..IlRtNo

    O

    A

    O

    DS

    03/1/O71/.

    JAVAT

    IClOM11uoJrlJ:(J')2O

    ImOWNER

    .IHOOMlOltl!C

    T81Or11O!3

    LAD5CPON

    t$C(a0-In.

    i5st'99&

    A

    uPOZ

    M4o

    SCT

    BMFLOORPLAN

    AB

    T"owhoy

    JV"AcOdn

    Ib"odoon

    opOIntoa"d

    .nnpoc"ob

    rund"

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    25/36

    CL I-W '"!;J

    t B

    it 1 .t3

    ;s: cr H!;! iI' 116i:!n d; ijill Iii II I

    a: I;" I- 5

    ! HHLllHHHHHi!!!i" .,.;-:'I.:.:.:"'1J"';;.;&'r

    " 8-.--'e--

    _ _ __ __

    . I; I ii I i

    i _ J.-

    8 e G 4

    I -J J.

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    26/36

    I n :I rf!:o - ru:1=C3 !j!.;IH!.H!t! oaLa :: 6aSSS8a;;

    z fi;;t 815 iI j J:3 :;

    E Ct ! i

    5 w ., ,jd JZ'i,?\i;i;o: U::.. )0 'i- !i5 CI 'idElE !hll 11/111

    ,j31S0""-

    _ _

    8--8--

    8--

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    27/36

    (L f- '"I- ;% z t

    !L B13 ii J:!::

    a i11 - II "'

    w .... oc f i. 0: 6 w I iH .J f';;bZ 1:5 .t=:; S JE!2 g!hl!

    ILlja. :I ;.H! l i1i.:.:"i"' !! 11. 1111O;;!1oJl ;: E

    '0 1.

    5 i13J1S ! I

    a:

    LL0 Si. z'". N IlIj!1

    H! !I!:3:1---

    _u_I = , u

    l-

    1'.

    , w-'-8-

    r,I ,

    3rs J-:!

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    28/36

    IESNE

    nO,NC

    (oo_"P

    nO020op

    .2PW_o

    ,ZSdSmFs

    "oCH1So/oC

    oRCoh"

    .1PW02SdH

    12"S"_S

    '15-Io

    7e"ecw"

    8eoRP

    o80

    :fo

    !9lo

    !I"//TG

    (CoRoF

    0aCoCP"

    OoooU

    o

    (111&PhRn

    P_"c'"h

    %17erR

    (SUo"A"oc_RP

    oW.Mo

    'Z0

    mOf

    ln"S'"OO.v

    'IToO.19?Otm"2oo2

    OJ.hFm1 io ;O

    .T

    "o

    UU9

    iw fEDOMZ0K9.2R9.E

    S"Oo

    0

    "oR

    .9

    ""9

    C(9

    tTCCW

    1-$151 '2H93&CB

    E_G

    tO

    E0I0ok"9

    tIJT3H_3

    .209

    (2"T10C9

    ICP09 o)

    C"e9

    fEopo3w

    !Son0".BM

    0F9

    1_-3

    SaTOOBP"

    .15 1125v_"o

    0po2Pw5

    Eooc

    20O

    0oP2S"

    E&r

    O"p

    OzOO

    o=O

    SSS""O"oOoO

    ICo

    Icm"_Ooe"oo

    s9 =P_

    -_ct

    "W

    .ARI2J.1""UOo

    GNRO

    0

    JO90CpN

    1R8U

    'JFoU

    !3H

    .9

    OcnCoOHOoC

    "o ."Sm'fo

    W/O

    PH 3SWEETWATERMESA

    RMBC

    ?

    R

    A11/28R"

    A21nOo1

    A0'/1/0Iod&

    1C2CWoWo

    Aff/CD&1

    A01/IJ/Dt\,Co\l

    &ff!t/07StIoRN

    .&OOO

    AOJ/'/07""9/z.!

    0C0k

    Oo1

    01O141

    JAVAT

    tS-Ca1CWJ

    :D2r#wm9

    ucmOWNER

    .OO

    'C

    7EM1

    _C9J

    T1r#O1m

    L

    DCU

    \0U_o aT

    E9UTT

    "Wt_O

    Au"DH1

    SSAME

    EASTELEVATlON

    A Tdownnoy

    JV"co"n

    to"OOOCin"

    On.11.d0

    Oohpoodo

    rd0

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    29/36

    A

    !1K"

    1I

    I:1, I

    II rr- c0 .YJ-

    .A(J8__"a

    OL"oDp"

    012PW5

    G

    .1'_UT_

    "C!21Z_G

    oo"'IJlvlhon.

    .12Pw2Sd1H

    '2'-8/2S_6

    I8C

    8Ok

    A_SJLgM

    ,_"

    I5

    ob

    AoO

    _01CQ

    (EoSaC11_oSC

    (28T"GoCPB

    E8O""

    MUnD

    (3Hd4

    o29/OcSo

    (SnoJSb

    11PoCo

    I

    O0)

    OAh_R

    -_Q"o

    tCg"

    "("_o

    00_02OOO3P0

    iSS"10wO"o"

    :".c

    SV

    (TIIU2

    I&eo

    S"2

    P-o/..R910Oo

    :1&TRm="G.C

    rn

    rn

    (RCYEm

    m

    ocCS"J

    0"o

    t

    O9

    tOP3Po

    ISoJO08M03"p09

    13h"3PoF

    !SOGPPo

    02SM1212

    o

    Oo"

    0po12Wo2S

    Sc"Uo-2loD

    OOoPS

    IhoTP1.P

    020O

    0

    e_-

    fE

    _oU

    sC "PSOPO

    I" H"0-9/9

    bOPp

    IESNE

    ONOCHANGEI

    2(B .J

    UU

    .UD

    .U .lI1 .o_

    oPo_w

    f$-O"oBO

    JO"Bc"D

    -Db0Q

    1FuF

    IO (OOouC f

    '"_Do

    -0-

    PH 3SWEETWATERMESA

    RMAUBU,CA

    '0

    RoS

    fA12Cd

    ,omR"o

    A11/26

    R

    !2U.1

    .&OO0IcdC

    b.OI/'/0U/a

    0MOC

    &rt!IJ/O51x

    .&MObO20z

    .00Ik

    QS

    03/1/O71/4."0

    JAVAHT

    t

    i(AX

    IDO1MJF/J.(m2OU

    ImOWNPOHM

    :"rme1-

    re1Dn

    L

    D

    P

    lCOO

    tw_"I

    (q9n91s

    "oOoZ

    AP0

    SSCU

    SHn

    WEE

    O

    A TdonOpOy

    .VAcLM

    lo

    oo"

    "POnOo"

    oooooo

    "

    '"

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    30/36

    C ii'4

    ;

    -t""

    ":95'-"_.I

    '!!EW!n

    '!!UL

    .!EUL

    IESNE

    O,NC

    II,

    /"!un8c'E';$I;nGC

    (1

    inf.L.-,-.-.-.-.-.-._

    I-

    SOWOK\L-

    i6

    l-_mmm_

    _

    m

    (mm

    lnOB;dn

    11ecoO"P

    OL"o2oP

    enPW$w_O

    c2S_

    1

    "0f2S"ooAc

    owco012PW2s1H

    Enooe

    E2S_6

    5h""CW.oO

    SeC

    qA.nP

    w"""-

    '

    e2

    ;.e

    Joo8cB

    (EoJ0r"

    18EPo""

    .h1pg

    C=:Po""../

    :7

    X

    lwFM'6cPRKP

    .W

    ."h1

    rnJZ0d

    iO

    IT:"SOOvo

    .sPpv

    tJYSwZ

    C"QTr

    '6;"d\

    "Ug

    (WT

    ao

    oo5

    .FSoJ

    O"RoO=

    :uw:.:""OOllg

    0D

    3_o

    1ap1SI&CO

    hA

    oOI&C

    1aPoh_9

    .nCFTI"HJ

    .zgoeSb

    !snOeSb

    (pPocSo

    ;:%

    O"GFAoO

    -"9"9

    Eeq

    .Jg_o_

    .u.ZQoJO1

    eP3p

    ( .DM

    PW'g

    !3"1

    p1J

    :KPP"

    21Sy_

    1

    '"I2"Z5"

    SC=2e

    .ohP2S

    'aI

    D"o

    .z1_8OU

    $S""o"

    '9

    ,oC-e

    -C"O

    wom-0

    B1A_ID

    r

    ,ch

    AJ-oO1o

    oEoS"So

    .

    6

    0

    IE"ejg_WA.e"OU

    S"

    "

    s==PB_

    o="0

    GHm

    HUb

    PH 3SWEWAM

    RMAlIBU,CA

    '0DIR1

    i210/20

    R

    :bIO/2,)C6R''',",n

    Arr/2CR

    A12/19/.Dm

    AOI/10/C1",,,id&

    G

    fAO20D

    iAOaw

    iO0a01

    il0'/l7/C1S1IoRt..

    .&O1ObRM

    AOJ/2/O""9/Z1

    ij04/02/af1llllAt

    IPO

    OS

    011014

    JAVAT

    1SAQ1O

    lOCOm

    JO:zo9U3O:zO

    l1n OWNPOJJ

    rA3e1O

    L

    D

    PO

    "lh_"-

    s1c.9tJn-

    ._a"_

    APNPZOC

    5A5CAU

    N

    E

    O

    A Td"9hS"o

    JV"Aooo"

    to8

    'o

    onnod

    oohpooOo

    '"nq

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    31/36

    :r I. ..oma. I" a::J

    UJ ""

    I; . z fYi;.L ,it :.e

    . iII ;; f: W U :;!h T 0 M iMl:n d !h!J i

    . J If!J I

    l!a a a

    ; I I i :: J.

    8---1-'0--

    (Vir-

    e-8--

    mi11!! Jt:.! 1::;

    . Ioj rj , 3i! J t.,,I . t... 1 i! U : i J Iir" nh !"i JiP !I'iil,. ..I.: 9 l' . ;tioII lE i'fI S: IS iI ,. . t 1

    1 I I II P! Ji dP. It!WIIMIE IICi OOII00 I!! i, i . U"".; h ,

    I;'i S.'" I ... I . I' . . m2' Gtp.

    I I !J!J'$I fS z :'Will" h' ':"'.I! ;" , 1 iJ;;S II n ! t I! ' ': IH!j!j1 p n; j ! n;.u;;;i!iIfjlPlil!

    jtrI! I r Wjl iSt,. I 1: t= 1G.1! lit i h!i;!11 I;!i illHU'I'!. ;I!13 I: lE 813. f !if i! il U:! 1:-;i s,hJ t'1 ' f ' )! Ja1. .. i . U'Um KSRim I! 13 13 G G8

    . i', 1 :111lJ ""i;1 11 I, I II J' ,:t,:1h:.o h, J J ,.' !P' 1!'1 !J: ! ! J H H !t: (ln! I

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    32/36

    \-J IL"T

    fY

    C A-

    OE

    IL

    'Y'Y

    PH 3SWEETWATERMESA

    RMBCAOS

    b.10/1/IR

    1mRo

    A11/28IR

    .A12/19/rOm"

    A01/10/0!od&C

    i101/2/0IWIW

    Ao,/O94

    A0IC

    iIrn/11/01g.WRm

    .&010R

    .f03/2/aM

    i10wW1

    OJ/I'/0'/."

    JAVAT

    "SUCa

    lOIOQ.guJomo

    IQOWNpoCu

    CE9Co

    Ooed&RomoS

    -5CeCCRNoS

    CoB1

    Wop

    "onPOocOonPp

    (1ecooPdCPe

    .ohoP

    .n

    '(O

    02S"OSmPT"

    1CH

    E212Soo"G

    00""a",,,,,.

    onlozSdH

    s-ooeSo_O

    EOC"oCW-

    !hC"RMn

    Iuo

    !E 1

    1"

    !9HO

    := l fY J_S1C8

    (COoF

    G1a_"C

    o

    ooPozT0roOPp0Fn

    pOR-

    Ouc"

    0Spw11

    I8AC

    'oc-Oon",0o

    oc1o

    S-10-d""

    0

    mRO

    G '"C

    fY

    !DIUI.a00000oo

    .sPHo

    I1a,_-2

    0JaoT"TP

    m.o

    :""".o

    "_wn"9

    (G oROo

    oECS3H

    o

    Rd

    :'C

    ICJ4O(51C8

    EH"SCO

    JaTpoO

    C8

    'e0LhF9

    MF(Hd0ZF900!:SI.

    IS00e$

    (CPOCSo

    :7o4&

    O_oo

    f1%02C0Pw

    Ja

    S(s_Do""

    :CC

    1c_CjgW-WA_"ooU

    s =P!1

    (COPOO4WO

    So-"

    oOMo&oF

    I."0JO0

    eBP

    !bSOY

    001

    .P

    ozS

    SC"01"a

    .LhP2S

    h

    opo

    02_o

    8HoH__"-I

    .oo_

    .JUuJU

    . "11

    :W

    -0"0

    !B1RO'oo"

    :n:

    ,1ON

    'Jbo

    OE

    O"C9C

    :=0

    11a1g

    'Aam

    L

    O

    PO

    LOO

    "w_w

    =aT

    w

    - L"S0SAGME

    SECTIONC

    A Tooniooo

    JvAoon

    "doo"

    .pIn0Od"

    ohpoooo

    ""Ooro

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    33/36

    NOTICE OF PUBLIC HEARINGCITY OF MALIBUPLANNING COMMISSIONThe Malibu Planning Commission wil hold a public hearing on Tuesday, May 1 , 2007 , at6:30 p. , in the Council Chambers , Malibu City Hall , 23815 Stuart Ranch RoadMalibu , CA, for the project identified below.COASTAL DEVELOPMENT PERMIT NO. 07-015 and ADMINISTRATIVE PLAN REVIEWNO. 07-042 - An application for the conversion of non-habitable understructure intobasement area , the enclosure of a carport to a garage, and a 1,400 square foot first flooraddition to an existing single-family residence.

    APPLICATION NUMBER: Coastal Oevelopment Permit No. 07-015Administrative Plan Review No. 07-042February 8 , 2007Kirkor SuriPacific Home Oevelopers3510 Sweetwater Mesa Road , within the coastalzone4452-017-007Rural Residential-1 (RR-Stefanie Edmondson , 310-456-2489 , ext. 233

    APPLICATION FILING OATE:APPLICANT:OWNER:LOCATION:APN:ZONING:. CITY PLANNER:

    Pursuant to the authority and criteria contained in the California Environmental Quality Act("CEQA"), the Planning Oivision has analyzed the proposal as described above. ThePlanning Oivision has found that this project is listed among the classes of projects thathave been determined not to have a significant adverse effect on the environment and;therefore, are exempt from the provisions of CEQA. Accordingly, a CATEGORICALEXEMPTION (Class 1) wil be prepared and issued pursuant to CEQA Guidelines Section15301 (a) - Additions to ExistingFacilties. The Planning Commission further finds thatthere is no evidence in the record to suggest that any of the six exceptions to the use of acategorical exemption applies to this project (CEQA Guidelines Section 15300.2).A written staff report will be available at or before the hearing. Following an oral staff reportat the beginning of the hearing, the applicant may be given up to 15 minutes to make apresentation. Any amount of that time may be saved for rebuttal. . All other personswishing to address the Commission will be provided up to three minutes to address theCommission. These time limits may be changed at the discretion of the Commission. Atthe conclusion of the testimony, the Commission wil deliberate and its decision will bememorialized in a written resolution.Copies of all related documents re available for review at City Hall during regular businesshours. Written comments may be presented to the Planning Commission at any time priorto the close of the public hearing.LOCAL APPEAL - Pursuant to Local Coastal Program Local Implementation Plan (LIP)Section 13.20. 1 (Local Appeals), adecision of the Planning Commission may be appealedto the City Council by an aggrieved person by a written statement setting forth the groundsfor appeal. An appeal shall be filed with the City Clerk within 10 days of the PlanningCommission s decision and shall be accompanied by an appeal form and the filing fee of$655. , as specified by the City Council. Appeal forms may be found online at

    Attachment 4

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    34/36

    ww.ci.malibu.ca. in person at City Hall , or by calling 310-456-2489 , ext. 245 or ext.256.COASTAL COMMISSION APPEAL - An aggrieved person may appeal the PlanningCommission s decision to the Coastal Commission within 10 working days of the issuanceof the City Notice of Final , Action. Appeal forms may be found online atww.coastal.ca.gov or in person at the Coastal Commission South Central Coast Oistrictoffice located at 89 South California Street in Ventura , or by callng 805-585-1800. Suchan appeal must be filed with the Coastal Commission , not the City.IF YOU CHALLENGE THE CITY'S ACTION IN COURT, YOU MAY BE LIMITED TO RAISINGONLY THOSE ISSUES YOU OR SOMEONE ELSE RAISED AT THE PUBLIC HEARINGDESCRIBED IN THIS NOTICE , OR IN WRITTEN CORRESPONDENCE DELIVERED TO THECITY, AT OR PRIOR TO THE PUBLIC HEARING.If there are any questions regarding this notice , please contact Stefanie EdmondsonSenior#1 0-456- ext. 233.STACEY RICE , Ph. , AICPSenior PlannerPublish Oate: April 19 , 2007

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    35/36

    NcCn

    Awesaewbaaeaoboehh

    ing.Followinganoralsaeahbnnoh

    hnhacmbgvuo1mneo

    makeapeaoAamohmmb

    s

    oeaAohpswsnoaeh

    Cmsowbpoduoheminutestoad-

    dehCmsoT

    mmsmbc

    ahdseoohCmsoAhcuoo

    them

    hCmsowdbaeasd-

    sowbmmaznaweeuo

    Ceoaeaedmsaeaaeoeewa

    CyHdneabnhsWrecms

    mbpeeohPanCmsoaam

    poohcoohpchn

    L

    A

    -PursuanttoLocalCoastalPoamL

    Imemao(LPSo121(LocalAppeals),a

    dsoohPanCmsombaeo

    thCyC

    baaepobwesae

    m

    snohhgo

    oa

    Aa

    s

    bewhhCyCekwhn1dasba

    cmebaa

    omaneo$

    ,a

    s

    ebhCyC

    A

    ommbo

    onawcmbc.npsaCyHob

    cn342e2oe2

    C

    ACMSOAA-Anaggrievedperson

    ma

    hPanCmsodecisiontothe

    ConaCaCmsowhn1wkndo

    ths

    ohCyNcoFnAoA

    fommboonawcacgon

    psahCaCmsoShCaC

    Dscocoea8ShConaSenV

    tuaobcn851Saamb

    fewhhCaCmsonhCy

    IFYOC

    ETHCTSAOINC

    YMBLMTDTORSNOYTHIS

    S

    YOOSOOESRSATHP

    LCHANDCBDINTHSNCON

    WRTC

    O

    DV

    TOTH

    CTYAOPOTOTHPCH

    N

    Iheaeaqoednhsncpe

    caSeaeEmoSoPaat(310)

    42e2sm

    cmbc

    DeA12

    BCAmuACPanM

    C0c:.....

    (Js:

    r+

    ..c:

    .JQ)-.

    (D::c:

    oI\Q)

    0)::Q)

    01('::

    oCCQa.-

    .

    CyoMb

    2SuRR

    MbC9

    (342F347

    NOTICEOF

    PUBLICHEARING

    TMbPanCmsowhdapchn

    onTuesday,May1,2a63p,intheCouncil

    CmMalibuCityHall,2SuRR

    MbCohpoedebow

    COASTALDEVELOPMENTPMT(CN00

    AAMNSRVPAREWAN00

    Aapplicationfortheconversionofnon-hae

    usuuenobmaeheoeoacp

    toagaaa14seorsoaooa

    esnsneamilyresidence.

    ACONM

    ACOFLND

    AC

    OWN

    LOO

    CN00

    ARN00

    February8,2

    KrkSPcHmDo

    3SwweM

    Rwhnhca

    z 400

    .RuralResidential-1(R

    SeaeEm

    e

    2 smocmbcu

    AN ZON

    CTYPA

    Pursuanttotheahyaceacannh

    ConaEromaQ

    yACQhPan

    Dvsohayhpo

    adba

    T

    PanDvsohfohhspoesseam

    thcaopoeshhbdemnnoh

    sgcaseeoheoma

    theoe,areexemptfromtheprovisionsofCQ

    AdnyaCGCEMOCa1wb

    peeasps

    oCQGuidelinesSection

    15301(a)-AdditionstoEsnFeTPan

    Cmsouhnhhesnednh

    redos

    haohsxeoohuo

    categoricalexemptionappliestothispoeCQ

    GuidelinesSection15300.2

  • 8/8/2019 Http Www.ci.Malibu.ca.Us Download Index

    36/36

    : I

    1141'

    VI?

    o. -

    I,'I:

    10

    \ 6

    \c.II C. \

    ADDRESS: 3510 SWEETWATER MESA RD.MALIBU