Step Testing Module
Ranhill Water Services Sdn. Bhd.
Step TestingStep Testing
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Objective of the Course
• To help delegates gain an understanding of the purpose of step testing, and its place within a leakage or NRW strategy
• To provide information on the methods used to carry out a test
• To provide sufficient information to enable candidates to take the combined TW/CABWI assessment
![Page 2: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/2.jpg)
2
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Topics to be Covered
1. Meaning and purpose of step testing
2. Equipment required
3. Planning the test
4. Method of operation
5. Interpreting results
Step Testing Module
Ranhill Water Services Sdn. Bhd.
What is a Step Test?
A step test is a method of narrowing down the search for suspected leakage within a discrete area, by successively shutting parts of that area, and noting the effect on the supply.
The integrity of the area must be established, all boundary valves shut, and the status of all other valves known.
Supply should preferably be from a single source and metered.
![Page 3: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/3.jpg)
3
Step Testing Module
Ranhill Water Services Sdn. Bhd.
District MeteringDistrict Metering
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Typical 24hr Flow ProfileTypical 24hr Flow Profile
Flo
w l
/s
Minimum Night Flow
![Page 4: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/4.jpg)
4
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Step TestingStep Testing
11 22
3344
Flow InFlow In
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Step Test ResultsStep Test Results
Flo
w l
/s
![Page 5: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/5.jpg)
5
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Valve Functions Within the Area
1. Boundary valves – permanently shut
2. Circulating valves – normally open but shut for the test
3. Step valves – normally open but shut progressively
4. Redundant sluice valves – permanently open
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Valve Functions Within the Area
1. Boundary Valves
– valves isolating the area in question, whether a
DMA or not, from adjacent areas. They must be
sound, not let by, and will remain shut throughout
the test. If they are DMA boundary valves they will
be permanently shut.
![Page 6: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/6.jpg)
6
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Valve Functions Within the Area
2. Circulating Valves
– valves which are shut before the test starts to allow
division of the area into separate parts. After
shutting, and before the test starts, water will
circulate around these valves, and the pressure will
be the same either side.
BV
BV BVCV
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Valve Functions Within the Area
3. Step Valves
– valves which are shut in turn to reduce the area being
metred in a series of ‘steps’.
BV
BV BVCVSV1
SV2 SV3
![Page 7: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/7.jpg)
7
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Valve Functions Within the Area
4. Redundant Valves
– valves which remain open throughout the test and are
not used as part of the test.
- The example shown could be used as a step valve if
required
BV
BV BVCVSV1
SV2 SV3
Redundant valve
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Plan of Step Test Area
1
2
3
4
5
6
7
8
9SV
BV
BV
BVBV
CV
CV
CV
SV
SVSV
SVSV
SV
SV
SV
![Page 8: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/8.jpg)
8
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Topics to be Covered
1. Meaning and purpose of step testing
2. Equipment required
3. Planning the test
4. Method of operation
5. Interpreting results
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Equipment Required for Proving
• Meter (check function)
• Valve key and bar
• Hydrant key and bar
• Swan neck
• Hose
• Lifting keys
• Crow bar?
![Page 9: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/9.jpg)
9
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Equipment Required for Step Test
• Meter
• Flow logger
• Pulse unit
• Valve key and bar
• Lifting keys
• Crow bar?
• Software programme
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Topics to be Covered
1. Meaning and purpose of step testing
2. Equipment required
3. Planning the test
4. Method of operation
5. Interpreting results
![Page 10: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/10.jpg)
10
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Planning the Test
• Obtain map of test area
• Identify boundary valves
• Number all valves on the map
• Plan sequence of steps
• Identify circulating valves and step
valves on the map
• Prove the test area
Step Testing Module
Ranhill Water Services Sdn. Bhd.
1- BV
2 - BV
3
4
5
7 – BV
8 – BV
10
11
12 - BV13
14
15
16
18
17
19
20
21
22 - BV
23
6
Obtain Map of Test Areanumber all valves and identify boundary valves
9 - BV
![Page 11: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/11.jpg)
11
Step Testing Module
Ranhill Water Services Sdn. Bhd.
1- BV
2 - BV
3
4 - RV
5 - CV
7 – BV
8 – BV
10 - CV
11
12 - BV13 - RV
14
15 - CV
16
18
17
19
20
21
22 - BV
23
6 - RV
Plan Sequence of Stepswork from the furthest section towards the meter
Step 1
Step 2
9 - BVStep 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step Testing Module
Ranhill Water Services Sdn. Bhd.
1- BV
2 - BV
3 - SV
4 - RD
5 - CV
7 – BV8 – BV
10 - CV
11 - SV
12 - BV13 - RD
14 - SV
15 - CV
16 -SV6
18 - SV
17 - SV
19 - SV
2 - SV0
21 - SV
22 - BV
23
6 - RV
Identify All Valves on the MapBVs, CVs, SVs, and RVs
9 - BV
![Page 12: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/12.jpg)
12
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Prove Test Area• Operate and record status of boundary valves, count
number of turns, and shut all except last
• Check that circulating valves and step valves operate, record status and number of turns
• Carry out local proving if required
• Check that any redundant valves are open
• Open hydrant near final valve
• Shut final BV to check dry shut
• Return all valves to original status
• Report any unexpected results
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Record Valve Status
No. Type Status Turns CC or AC Comments
1 B V S 9 CC m etal gate – double click
2 CV O 8 .5 C C probably soft faced
DMA No……………… Date………………….
![Page 13: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/13.jpg)
13
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Topics to be Covered
1. Meaning and purpose of step testing
2. Equipment required
3. Planning the test
4. Method of operation
5. Interpreting results
Step Testing Module
Ranhill Water Services Sdn. Bhd.
1. Decide area to be worked – DMA ‘league table’
2. Use VIS for quick wins
3. Break area down into smaller parts by:- step testing- sound survey
- noise logging
4. Correlate to give approximate noise location
5. Pinpoint and report
6. Repair
7. Return and re-log etc until clear
Step Testing as part of a Leakage Strategy
![Page 14: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/14.jpg)
14
Step Testing Module
Ranhill Water Services Sdn. Bhd.
1 – Decide area to be worked
• Monitor DMAs – monthly readings
• Arrange ‘league table’ of worst areas to
give priorities
• Monitor burst frequency
• Monitor customer complaints
• Use local knowledge
Step Testing as part of a Leakage Strategy
Step Testing Module
Ranhill Water Services Sdn. Bhd.
2 – VISVisual Inspection Survey
• Tour the area - best on foot
• Any obvious leaks – water above ground?
• Look for quick wins
Step Testing as part of a Leakage Strategy
![Page 15: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/15.jpg)
15
Step Testing Module
Ranhill Water Services Sdn. Bhd.
3 - Break Area Down into Smaller Parts
1. Step testing
2. Sound survey
3. Noise logging
3 possible methods:
Step Testing as part of a Leakage Strategy
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Plan of Step Test Area
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step 91 - SV
2 - BV
7 - BV
11 - BV14 - BV
6 - CV
9 - CV
5 - CV
10 - SV
14 - SV13 - SV
12 - SV13 - SV
15 - SV
16 - SV
4 - SV
3
![Page 16: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/16.jpg)
16
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Record of Step Valve Operations
Valve No. Type Turns Time Open Time Shut Comments
DMA……………………………………………………………….. Date…………………………………………………………….
7 CV 13 none none already open
12 CV 12.5 00.14 none found throttled – left open
17 SV 12.5 00.27 05.15
12 SV 13 00.39 05.04
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Disadvantages of Step Testing
• Relatively crude method – works best with large leaks
• Potential water quality problems
• Interrupts customers supply
• Usually requires night work
• Labour intensive
![Page 17: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/17.jpg)
17
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Topics to be Covered
1. Meaning and purpose of step testing
2. Equipment required
3. Planning the test
4. Method of operation
5. Interpreting results
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Plan of Step Test Area
1
2
3
4
5
6
7
8
9SV
BV
BV
BVBV
CV
CV
CV
SV
SVSV
SVSV
SV
SV
SV
![Page 18: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/18.jpg)
18
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Flow Graph During Step Test
Valve nos. 1 2 3 4 5 6 7 8 9 9 8 7 6 5 4 3 2 1
T i m e
F l o w
Step Valve Step Valve
Opening Closure
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Plan of Step Test Area
1
2
3
4
5
6
7
8
9SV
BV
BV
BVBV
CV
CV
CV
SV
SVSV
SVSV
SV
SV
SV
![Page 19: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/19.jpg)
19
Step Testing Module
Ranhill Water Services Sdn. Bhd.
1- BV
2 - BV
3
4 - RV
5 - CV
7 – BV
8 – BV
10 - CV
11
12 - BV13 - RV
14
15 - CV
16
18
17
19
20
21
22 - BV
23
6 - RV
Plan Sequence of Stepswork from the furthest section towards the meter
Step 1
Step 2
9 - BVStep 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Graph of Flow Logger Results
Flow
Time
Large step indicates leak location
Step 1 2 3 4 5 6 7 8
![Page 20: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/20.jpg)
20
Step Testing Module
Ranhill Water Services Sdn. Bhd.
1- BV
2 - BV
3
4 - RV
5 - CV
7 – BV
8 – BV
10 - CV
11
12 - BV13 - RV
14
15 - CV
16
18
17
19
20
21
22 - BV
23
6 - RV
Plan Sequence of Stepswork from the furthest section towards the meter
Step 1
Step 2
9 - BVStep 3
Step 4
Step 5
Step 6
Step 7
Step 8
Step Testing Module
Ranhill Water Services Sdn. Bhd.
Time
Flow
Open & Close Sequence
Step Valve
Closure
Step Valve
Opening
![Page 21: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/21.jpg)
21
Step Testing Module
Ranhill Water Services Sdn. Bhd.
DMA 01 05/09/00 to 07/09/00
Minimum Night Flow = 28.13 Litres / second
Step Testing Module
Ranhill Water Services Sdn. Bhd.
![Page 22: 20Step%20Testing%20Guidelines](https://reader033.vdocument.in/reader033/viewer/2022042901/568c34ed1a28ab0235924eac/html5/thumbnails/22.jpg)
22
Step Testing Module
Ranhill Water Services Sdn. Bhd.
DMA 01 08/10/00 to 10/10/00
Minimum Night Flow = 18.75 Litres / Second
MNF Reduced by 9.38 Litres / Second
Step Testing Module
Ranhill Water Services Sdn. Bhd.
THANK YOUTHANK YOUTHANK YOUTHANK YOUTHANK YOUTHANK YOUTHANK YOUTHANK YOU