ENVIRONMENTAL CLERANCE FOR MINOR MINERAL (STONE QUARRY) PROJECT FOR M/S INFRA TRANSMISSION PVT. LTD. Survey no. 51/2 Village: KUNDEWAHAL, Taluka: PANVEL District: RAIGAD, State: MAHARASHTRA. Area: 1.4000 Hectare CONSULTANT: Hubert Enviro care systems Pvt. Ltd. Accredited by QCI – NABET: - Sectors 1 & 38 Lab Recognized by MoEF, Govt. of India NABL Accredited Certificate ISO 17025:2005 Certified by ISO 9001:2008 Certified by BS OHSAS 18001:2007 Approved Environmental Monitoring Laboratory Head Office: # 18, 92 nd Street, 18 th Avenue, Ashok Nagar, Chennai – 600083 Goa Office: Consultant - Vivek P. Navare Sankalpana, opposite Syndicate bank, Dhavlimal Ponda Goa Telephone no.: 0832 314491, 9422442756 Email: [email protected] AUGUST 2015

Upload: lamthuy

Post on 18-Mar-2018

253 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

ENVIRONMENTAL CLERANCE FOR MINOR MINERAL

(STONE QUARRY) PROJECT

FOR

M/S INFRA TRANSMISSION PVT. LTD.

Survey no. 51/2

Village: KUNDEWAHAL,

Taluka: PANVEL

District: RAIGAD, State: MAHARASHTRA.

Area: 1.4000 Hectare

CONSULTANT:

Hubert Enviro care systems Pvt. Ltd.

Accredited by QCI – NABET: - Sectors 1 & 38

Lab Recognized by MoEF, Govt. of India

NABL Accredited Certificate ISO 17025:2005

Certified by ISO 9001:2008

Certified by BS OHSAS 18001:2007

Approved Environmental Monitoring Laboratory

Head Office: # 18, 92nd Street, 18th Avenue, Ashok Nagar, Chennai – 600083

Goa Office: Consultant - Vivek P. Navare

Sankalpana, opposite Syndicate bank, Dhavlimal Ponda Goa

Telephone no.: 0832 314491, 9422442756

Email: [email protected]

AUGUST 2015

Page 2: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt. Ltd. Page 1

CONSOLIDATED STATEMENT ON VARIOUS ENVIRONEMNTAL ASPECTS FOR

INDUSTRIAL PROJECTS:

Important Note before filling the form:

1. Fill the form in the same format (i.e. Font: Times New Roman and font size: 12)

2. Do not edit / delete the columns if it’s not applicable

3. Send soft copy to the [email protected] and [email protected] in the

Word format (doc file).

Sr.

No. Particulars Commitment On

1 Name of the project M/s Infra Transmission Pvt. Ltd.

2 Name , address, e-mail & contact

number of proponent

M/s Infra Transmission Pvt. Ltd.

C/o Shri Mohd Mannan Akhtar Shaikh

Plot no 71, sector 1

Navi Mumbai

Koper Khairne, S. O.

District- Thane

State - Maharashtra

Pin code: 400709

3 Name , address, e-mail & contact

number of Consultant

Vivek P. Navare

Hubert Enviro care systems Pvt. Ltd.

# 18, 92nd Street, 18th Avenue,

Ashok Nagar, Chennai – 600083

Telephone no.: 044 – 42985511/55, 09884390811

Email: [email protected]/ ,

[email protected]/,

[email protected]

Website: www.hecs.in

4 Accreditation of Consultant (NABET

accreditation)

NABET Accreditation.

Accreditation for sectors 1A

5 New Project/Expansion in existing

project /Diversification in existing

project

New project

6

If expansion/ Diversification, whether

environmental clearance has been

obtained for existing project (If yes,

enclose a copy with compliance table)

Not Applicable

7 Activity schedule in the EIA

notification

Category 1 (a), B

8 Area Details

Total plot Area : 1.4000 Ha

Page 3: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt. Ltd. Page 2

12 Location details of the project Latitude 18°56'57.24"N Longitude 73°03'31.85"E

Location Kundewahal

Elevation above Mean Sea

Level (meters) 58m

13 Distance from protected area/

critically polluted area/ Eco

sensitive area/ Inter state

boundary

No t Appl i cable

14 Raw materials (including process

chemicals, catalysts & additives). List

of

raw

mater

ials

to be

used

Physical

and

chemical

nature of

raw

material

Quanti

ty

(tones

/

month

) full

produc

tion

capacit

y

Source

of

material

s

Means of

transportati

on (Source

to storage

site) with

justification

No raw material is

required. Stone (Minor

mineral) will be extracted

from the strata

Stone

will be

extracte

d from

the

strata.

There will

be network

of road in

the

quarry.

Quarry

will be

connected

to the

public

road by

existing

un-

asphalted

9 Name of Notified Industrial area/ MIDC Not Applicable

10

TOR given by SEAC?

No.

11

Estimated cost of the project :

(Including cost for land, building,

plant and machinery separately) 50.0 lacks

Page 4: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt. Ltd. Page 3

road

(having a

distance of

about 0.11

Kms).

15 Production profile (tones / year): Name of Products,

By products and

Intermediate

Products

Existing Propos

ed

activit

y

(new)

Total

Main Products

Stone

Metal

(5000

Brass/

Annu

m)

-

Stone

Metal

(5000

Brass/A

nnum)

-

By- Products

Intermediate

Products

Crushe

d

Powde

r

(about

of the

total

produc

t)-

Crushed

Powder

(about

of the

total

product)

--

16 Process Details/Manufacturing

Details

Process details are given in Pre-feasibility report.

17 Rain Water Harvesting

(RWH)

In monsoon the rain water will get collected in quarry

pit.

Level of the Ground water table (it is at least 10m

below the lowest level of the pit)

• Size and no of RWH tank(s) & Quantity- 5mx 5mx

3m. There will be at least two such tanks.

• Location of the RWH tank(s)

• Size, nos of recharge pits and Quantity. There will

be drains on the higher side of the pit to increase the

catchment area.

18

Total Water Requirement

Total water requirement:

Fresh water (CMD):2.5 & Source:Borewell

Recycled water (CMD):0 CMD

Use of the water:

Process (CMD): Cooling water (CMD):0

CMD

DM Water (CMD):0 CMD

Page 5: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt. Ltd. Page 4

Dust Suppression (CMD): 1.5

Drinking (CMD):0.5

Green belt (CMD):0.5

Fire service (CMD):0 CMD

Others (CMD):0 CMD

19

Strom water drainage

Natural water drainage pattern

quantity of storm water

Size of SWD

Not Applicable

20 Sewage generation and Treatment

Amount of Sewage generation: 0.300 CMD

Proposed treatment for sewage: Septic tank

provided.

21

Characters of effluent

Parameters

(pH,BOD,COD, etc)

Inlet

effluent

Character

istic

Outlet

effluent

Character

istic

Effluent

Dischar

ge

Standar

ds

(CPCB/

MPCB)

pH

Not Applicable.

S.S

B.O.D

C.O.D

O & G

22 ETP Details

Amount of effluent generation (CMD)

Capacity of the ETP (CMD)

Amount of treated effluent recycled (CMD):

Amount of water send to the CETP (CMD):

Membership of the CETP (If require): If yes

then attach the letter submit the letter

Not Applicable

23 Note on ETP technology to be used Not Applicable

24 Disposal of the ETP sludge (if Not Applicable

Page 6: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt. Ltd. Page 5

28 Emission Standard: Sr. NO Pollutan

t

Source of

Emission

Emission

rate

(kg/hr)

Concentr

ation in

flue gas

(g/m3)

1 SPM Process,

product

transportat

ion,

blasting

(if done)

Monitoring will be

done 2 SO2

3 NOX

4 CO

applicable)

25 Solid Waste Management

Sr.

No

.

Source Qty

(TPM)

Form (Sludge /

Dry / slurry

etc.)

Composition

1 Raw Water Treatment Plant ---- ---- ----

2 ETP --

--

--

3 Process -- --

--

4 Spent Carbon ---- ---- ----

5 Oily Sludge ---- ---- ----

6 (Others like Battery waste etc)

Spent Oil -- -- --

(There will not be any waste generation from the quarry. Basalt stone will be extracted from the

strata).

Method of disposal of solid waste: Not Applicable

26 Atmospheric Emissions:

Flue gas characteristics (SPM,

SO2, NOX, CO) Pollutant

Source of

Emission

Emissio

n Rate

(Kg/hr)

Concentratio

n in flue gas

(g/m3)

SPM Process,

product

transportation

, blasting (if

done)

Only SPM and RSPM

will be generated

RPM

SO2

NOX

CO

27 Stack emission Details:

Not Applicable.

Plant

sectio

n &

Unit

Sta

ck

No.

Height

ground

level (m)

Internal

Diamete

r (Top)

(m )

Emissi

on rate

Temp.

of

Exhaus

t Gases.

Page 7: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt. Ltd. Page 6

29

Ambient Air Quality Data

Copies of Analysis reports attached with the EIA report

30 Details of fuel to be used :- Not Applicable

Sr. No. Fuel Daily Consumption

(TPD/KLD) % Ash % Sulphur

1 Gas -- -- -- --

2 Naphtha -- -- -- --

3 HSD 150 liter -- -- --

4 LDO -- -- -- --

5 F.O -- -- -- --

6 Coal -- -- -- --

7 Lignite -- -- -- --

8 Other (pl.

Specify) -- -- -- --

Source of fuel : Diesel for D. G Set if Available

Mode of transportation of fuel to site: By Road

31 Energy

Power supply:

Existing power requirement:107 H.P

Number and capacity DG sets to be used (existing

and proposed)- One DG sets:125 KVA will be

installed at the site which will serve the purpose.

Details of the non-conventional renewable energy

proposed to be used : NA

Page 8: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt. Ltd. Page 7

32

Green Belt Development

(in Sq. mtr.)

Existing nos. of trees, Proposed nos.

of trees with plant species

Number trees being cut/ replanted or

compensated.

Green Belt area: 0.3014 hectare. (3014 sqm)

Number and species of trees to be planted

• Number, size, age and species of trees to be cut,

trees to be

Transplanted Ashoka, Guava, Coconut, Lemon,

Casurina,

Mango,Neem, Hibiscus, Decorative trees, Sal,

Nilgiri, Palm

Also plant species like Bamboo, ficus, aloe vera,

spider plant, and elephant ear philodendron, Banana

trees etc shall be planted in the premises.

33 Details of Pollution Control

System:

Sr.

No

Existing Proposed

1 Air . Water Sprinklers,

Dust Collection

Bag, Covered

Product Storage.

2 Water No adverse impact ---

3 Noise Enclosure for noise

generating

equipments,

Vibration pads for

the specific

Instrument.

4 Solid

Waste

----

Disposed to

authorized Vendor

by MPCB

34 Environmental Management plan

Budgetary Allocation

Capital cost (With break up):6,00,000

• O&M cost (With break up): 40,000

Page 9: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt. Ltd. Page 8

35

EIA Submitted (if

yes then submit

the salient

Features)

Sr.

No.

Recurri

ng Cost

per

annum

(Rs.)

Capital

Cost (Rs.)

1 Air Pollution Control 5,000 2,25,000

2 Water Pollution Control ----- -----

3 Noise Pollution Control 5,000 1,75,000

4

Environment

Monitoring and

Management

15,000 50,000

5 Reclamation borrow /

mined area ----- -----

6 Occupational Health 5,000 25,000

7 Green Belt 5,000 75,000

8 Solid Waste

Management 5,000/- 50,000/-

9 Others (Pl. Specify) ----- -----

Total 40,000/- 6,00,000/-

Period of data collected

Details of the primary data collection (i.e. location of the

sample collection, number of visit, etc)

Details of the secondary data collection (i.e. Source and

year of data)

Potential hazard and mitigation measures

Conclusion of the Cumulative Impact study

EIA report is submitted along with the consolidated

statement (Refer Cumulative Impact Study)

36 Public hearing

Report

Date of the public hearing

Name of the news paper in which the advertisement

appeared

(Please attach the copy)

Location of the public hearing

Number of people attended the hearing

Objection(s) / Suggestion(s) if any

Not Applicable

Page 10: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt. Ltd. Page 9

37

Air Pollution

waste water issue

in the project area,

if any

No there is no issue on air & water pollution in the

respective project area.

Page 11: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt. Ltd. Page 10

Declaration

I hereby declare that no work has been initiated for the said project.

Date:

Place:

Name & Signature Name & Signature

Of the project proponent of the consultant

M/s Infra Transmission Pvt. Ltd.

C/o Shri Mohd Mannan Akhtar Shaikh Vivek P. Navare

Plot no 71, sector 1 EIA co-ordinator

Navi Mumbai

Koper Khairne, S. O.

District- Thane

State – Maharashtra, 400709

Mobile No: 9867122749

Page 12: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 1

FORM-I

(I) Basic Information

Sr.

No.

Item Details

1. Name of the Project Proposal for Quarrying of Minor mineral

Stone Quarry Survey no. 51/2, Kundewahal

Village, Taluka Panvel, District Raigad, State

Maharashtra.

2. S. No. in the Schedule 1 (a)

3. Proposed

capacity/area/length/tonnage to be

handled/command area/lease area/

number of wells to be drilled

Lease area :1.4000ha, Yearly 5000 Brass

4. New/Expansion/Modernization New

5. Existing Capacity/ Area etc. NA

6. Category of Project i.e., `A`or `B` Category B

7. Does it attract general condition? If yes,

please specify.

It does not attract any general condition

8. Does it attract specific condition? If Yes,

please specify.

It does not attract any Specific condition

9. Location

Plot/Survey/Khasara No.

Village

Tehsil

District

State

survey No. 51/2

Kundewahal

Panvel

Raigad

Maharashtra

10. Nearest Railway Station/ Airport along

with distance in kms.

Jasai railway station~4.02Km

11. Nearest Town, City, District

Headquarters along with distance in kms.

Padeghar approx 1.72 Kms from the site

12. Village Panchayats, Zilla Parishad,

Municipal Corporation, Local

body(complete postal addresses with

telephone nos. to be given)

Grampanchayat Kundewahal Taluka: Panvel

District :Raigad, Maharashtra

13. Name of Applicant M/s Infra Transmission Pvt. Ltd.

14. Registered Address C/o Shri Mohd Mannan Akhtar Shaikh

Plot no 71, sector 1

Navi Mumbai

Koper Khairne, S. O.

District- Thane

State – Maharashtra 400709

Page 13: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 2

Mobile No: 9867122749

15. Address for correspondence: C/o Shri Mohd Mannan Akhtar Shaikh

Plot no 71, sector 1

Navi Mumbai

Koper Khairne, S. O.

District- Thane

State - Maharashtra

Mobile No: 9867122749

Name M/s Infra Transmission Pvt. Ltd.

Designation (Owner/Partner/CEO) Proprietor.

Address C/o Shri Mohd Mannan Akhtar Shaikh

Plot no 71, sector 1

Navi Mumbai

Koper Khairne, S. O.

District- Thane

State – Maharashtra 400709

Mobile No: 9867122749

Pin Code 400709

E-mail --

Telephone No. 9867122749

Fax. No. --

16. Details of Alternate Sites examined, if

any.

Location of there sites should be shown

on a topo sheet

Quarrying is a site specific activity. It is

carried out where it is available. No

alternative site is required to be examined.

(second part of the question is NA)

17. Interlinked Projects Crushing of the basalt stone produced from

the quarry will be carried out at or near the

site.

18. Whether separate application of

interlinked project has been submitted?

No separate application is submitted, as it is

not required

19. If yes, date of submission No information as per column 18

20. If no, reason Not applicable.

21 Whether the proposal involves

Approval / clearance under: if yes, details

of the same and their status to be given.

(a) The Forest (Conservation)

Act, 1980?

(b) The Wildlife (Protection)

Act 1972?

(c) The C.R.Z. Notification, 1991?

Proposal does not require approval/clearance

under any of the act, Notification stated

therein, as it is a revenue area.

22. Whether there is any Government

Order/Policy relevant/relating to the site?

There is no specific policy of govt. relating to

site.

23. Forest Land involved (hectares) Nil

24. Whether there is any litigation pending

against the products and/or land in which

No.

Page 14: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 3

the project is propose to set up?

(a) Name of the Court

(b) Case. No.

(c) Orders/Directions of the court,

If any and its relevance with the

proposed project.

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which

will cause physical changes in the locality (topography, land use, changes in water

bodies, etc.)

Sr.

No.

Information/Checklist

Confirmation

Yes/No Details thereof (with approximate quantities/

rates, wherever possible) with source of

information data

1.1 Permanent or temporary

change in land use, land

cover or topography

including increase in

intensity of land use (with

respect to local land use

plan).

Yes Changes in the land use may take place due to

excavating the pit, backfilling the part of the

exhausted portion, afforestation etc. The details are

given below:

Pit/Backfilled 0.8272 ha

Roads 0.0425 ha

Plantation 0.3014 ha

Unutilized 0.2289 ha

1.2 Clearance of existing land,

vegetation and building?

No No uprooting of trees or demolition of building is

required.

1.3 Creation of new land uses. No There is no creation of new land uses.

1.4 Pre-construction

investigation e.g. bore

house, soil testing?

No NA

1.5 Construction works? No No construction will be involved and for the mining

of Minor Minerals, Stone. There will be only

temporary structures for office, rest shelter etc.

1.6 Demolition Works? No Not required as it does not exist in core zone.

1.7 Temporary sites used for

construction works or

housing of construction

workers?

No No housing or construction works presently

involved and the laborers deployed by nearby

villages.

1.8 Above ground building,

structures or earthworks

including linear structures,

cut and fill or excavations.

No No Housing or Construction works presently

involved.

1.9 Underground works

including mining or

tunneling?

No Nothing will be demolished.

Page 15: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 4

1.10 Reclamation works? Yes No reclamation of worked out site will be required

as it elevated ground.

Sr.

No.

Information/Checklist

Confirmation

Yes/No Details thereof (with approximate quantities rate,

wherever possible) with source of information

data

1.11 Dredging? No It is not involved.

1.12 Offshore structure? No Not involved.

1.13 Production and

manufacturing process?

No There is no manufacturing process. There will be

extraction of stone from the strata.

1.14 Facilities for storage of

goods or materials?

No Transportation of stone will be on daily basis. only

in absence of transportation vehicle the excavated

material will be stored on the site (This is only a

temporary feature).

1.15 Facilities for treatment or

disposal of solid waste or

liquid effluents?

No Not required.

1.16 Facilities for long term

housing of operational

workers?

No No housing for operational workers either for short

or long term is required. The operational worker will

be from nearby villages for which no housing, at the

site is required.

1.17 New road, rail or sea traffic

during construction of

operation?

No Not required.

1.18 New road, rail, air

waterborne or other

transport infrastructure

including new or altered

routes and station, ports,

airports etc.?

No Not required.

1.19 Closure or diversion of

existing transport routes or

infrastructure leading to

changes in traffic

movements?

No No closure or diversion of existing transport routs or

infrastructure is necessitated

1.20 New or diverted

transmission lines or

pipelines?

No Not required.

1.21 Impoundment, damming,

culverting, realignment or

other changes to the

No Not required

Page 16: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 5

Sr.

No.

Information/Checklist

Confirmation

Yes/No Details thereof (with approximate quantities

rate, wherever possible) with source of

information data

Hydrology of watercourses

or aquifers?

1.22 Stream crossing? No

Not required.

1.23 Abstraction or transfers of

water from ground or surface

waters?

No No abstraction or transfer of water from ground or

surface waters is required to carry out mining

operations

1.24 Changes in water bodies or

the land surface affecting

drainage or run-off.

No There is no water body in the applied area. The

natural drainage in the applied area will get

affected. But it is purely local one and will not

affect at all the overall network of streams in the

area. Water bodies (static or dynamic) in the

buffer zone will not get affected at all.

1.25 Transport of personnel or

materials for construction,

operation or

decommissioning

No Workers will come to the site of their own. There

is no need to supply them the transport. No

construction work may be required for the mining

purpose and there is no need to transport any

material for the purpose.

1.26 Long-term dismantling or

decommissioning or

restoration works?

No No dismantling or restoration will be involved as

no structure will come up

1.27 Ongoing activity during

decommissioning which

could have an impact on the

environment?

No There is no decommissioning activity impacting

environment.

1.28 Influx of people to an area in

either temporarily or

permanently?

No There will be no influx of people to an area either

temporarily or permanently as no satellite project

will come up.

1.29 Introduction of alien species? No

None.

1.30 Loss of native species or

genetic diversity?

No No loss of native species or genetic diversity will

occur

1.31 Any other actions? No

None.

Page 17: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 6

2. Use of natural resources for construction or operation of project (such as land, water,

materials or energy, especially any resources which are non-renewable or in short

supply).

Sr.

No.

Information/Checklist

Confirmation

Yes/No Details thereof (with approximate quantities

rate, wherever possible) with source of

information data

2.1 Land specially undeveloped

or agricultural (ha)

No Applied area is not specifically used for any

purpose. It is rocky area and not used for

agriculture. Vegetation in the area is very poor.

There is hardly any bush or shrubs.

2.2 Water (expected source &

competing users) unit KLD

No Total water requirement for the project is 5000

L/D sourced from nearby bore well or through

water tankers. Breakup of the same is given here:

Sr. no purpose Requirement

(LD)

1 Drinking

and other

50lt/Day

2 Dust

Suppressio

n

4500lt

3 Plantation 450 lit

Total 5000 lit

2.3 Minerals (MT) No No mineral is required. (Rock will be excavated

from the starta).

2.4 Construction material-stone,

aggregates, and /soil

(expected source-MT)

No There will not be any permanent construction. No

construction material will be required at the site.

(The yearly expected production will be 5000

brass)

2.5 Forests and timber (source-

MT)

No Not required.

2.6 Energy including electricity

and fuels (source, competing

users) unit: fuel (MT),

energy (MW)

Yes Diesel is required by tippers. About 50 to 100 lit

may be required.

(Electricity is required for crushing and screening

plant. Total power is 135 H.P.)

2.7 Any other natural resources

(use appropriate standard

units)

No None

Page 18: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 7

3.0 Use storage, transport, handling or production of substances or materials, which could

be harmful to human health or the environment or raise concern about actual or

perceived risk to human health

Sr.

No.

Information/Checklist

Confirmation

Yes/No Details there of (with approximate quantities

rate, wherever possible) with source of

information data

3.1 Use of substances or

materials, which are

hazardous (as per MSIHC

rules) to human health or the

environment (flora, fauna,

and water supplies)

No Not required.

3.2 Changes in occurrence of

disease or affect disease

vectors (e.g. insect or water

borne disease)

No All the environmental parameters will be within

control. We do not expect occurrence of disease.

3.3 Affect the welfare or people

e.g. by changing living

conditions?

No Direct employment will improve the living

condition of nearby villagers. Welfare facilities

will be made available to workers (and to certain

extent for local villagers).

3.4 Vulnerable groups of people

who could be affected by the

project e.g. hospital patients,

children the elderly etc.

No None of the vulnerable groups of people will be

affected due to mining operation.

3.5 Any other causes No None

4.0 Production of solid wastes during construction or operation or decommissioning

(MT/month)

Sr.

No.

Information/Checklist

Confirmation

Yes/No Details thereof (with approximate quantities

rate, wherever possible) with source of

information data

4.1 Spoil, overburden or mine

wastes

Yes There is no top soil cover in the applied area.

Basalt rock is exposed from the surface. There is

no over burden or mine waste. There will be only

production from any excavation at the site.

4.2 Municipal waste (domestic

and or commercial wastes)

No (The will not be any habitation in the applied

area).

4.3 Hazardous wastes (as per

hazardous waste

management rules)

No There will be no production of hazardous waste.

Page 19: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 8

4.4 Other industrial process

wastes

No Mining activity will not produce any industrial

process waste.

4.5 Surplus product No There will not be any surplus production or bye

product.

4.6 Sewage sludge or other

sludge from effluent

treatment

No There will be no production of sludge.

4.7 Construction or demolition

wastes

No No waste due to construction or demolition will

be produced.

4.8 Redundant machinery or

equipment

No No redundant machineries will be stored at site if

it can’t be repaired will be sailed to scrapers.

4.9 Contaminated soils or other

materials

No No contaminated soils or other materials will be

generated.

4.10 Agricultural wastes No No Agricultural wastes will be produced.

4.11 Other solid wastes No None

5.0 Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)

Sr.

No.

Information/Checklist

Confirmation

Yes/No Details thereof (with approximate quantities

rate, wherever possible) with source of

information data

5.1 Emissions from combustion

of fossil fuels from stationary

or mobile sources.

Yes Main source of emission is due to burning of

diesel for operating mining equipments. There will

be emission of gases from combustion of fuel used

in the vehicles (dumpers etc.) used for transporting

mineral out of zone. However, emission will be of

low magnitude.

5.2 Emission from production

processes

Yes Dust emission from open cast mining activity.

However, this will be suppressed with adequate

sprinkling system.

5.3 Emissions from materials

handling including storage or

transport

Yes Dust emission from material handling during

storage or transport and gas emission through

combustion of fuel used in the vehicles

5.4 Emissions from construction

activities including plant and

equipment

No There will no construction activity i.e. of plant or

engagement. Hence, there will be no generation of

emission.

5.5 Dust or odours from

handling materials including

construction materials,

sewage and waste.

Yes Dust will be generated mainly during material

handling; transportation etc. No odors will be

developed during mining activity.

5.6 Emissions from incineration

of waste.

No No incineration of waste will be carried.

5.7 Emissions from burning of

waste in open air (e.g. slash

No There will no burning of waste in open air. Hence

no emission.

Page 20: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 9

material, construction debris)

5.8 Emissions from any other

sources

No None

6.0 Generation of Noise and vibration, and emissions of Light and heat

Sr.

No.

Information/Checklist

Confirmation

Yes/No Details thereof (with approximate quantities

rate, wherever possible) with source of

information data

6.1 From operation of equipment

e.g. engines, ventilation

plant, crushers

Yes

During transport of material and at crushing and

screening Plant.

6.2 From industrial or similar

processes

No No process which generates noise will be engaged.

6.3 From construction or

demolition

No No equipment for construction or demolition will

be engaged

6.4 From blasting or piling Yes Blasting will be carried at the site. Noise and

vibration will be generated but at low magnitude.

6.5 From construction or

operational traffic

Yes Boulders and crushed metal will be transported by

the trucks. Noise will be generated during the

transport activity.

6.6 From lighting or cooling

systems

No There will be no lighting or cooling system.

6.7 From any other sources No None.

7.0 Risks of contamination of land or water from release of pollutants into the ground or

into sewers, surface waters, groundwater, coastal wasters or the sea

Sr.

No.

Information/Checklist

Confirmation

Yes/No Details thereof (with approximate quantities

rate, wherever possible) with source of

information data

7.1 From handling, storage, use

or spillage of hazardous

materials

No NA

7.2 From discharge of sewage or

other effluents to water or

the land (expected mode and

place of discharge)

No There is no discharge of effluents or waste water.

Surface run off may carry contaminants to the

nearby water course.

7.3 By deposition of pollutants

emitted to air into the land or

into water

Yes There will be generation of gases pollutants as

mining machinery will be used. In buffer zone,

transport vehicles emission may contaminate air

but pollutant level in air will be within permissible

level.

7.4 From any other sources No None.

7.5 Is there a risk of long term No Minor mining will generate dust but will be within

Page 21: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 10

build up of pollutant in the

environment from these

sources?

control.

8.0 Risk of accidents during construction or operation of the project, which could affect

human or the environment

Sr.

No.

Information/Checklist

Confirmation

Yes/No Details thereof (with approximate quantities

rate, wherever possible) with source of

information data

8.1 From explosion, spillages,

fires etc from storage,

handling, use or production

of hazardous substances

Yes. There are chances of fire due to improper use of

explosives. (Blasting will be carried out by expert

contractors with at most precaution during

handling of explosives )

8.2 From any other causes No. Diesel will be used by trucks. Fire may take places

due to unsafe storage, handling and use of diesel.

8.3 Could the project be affected

by natural disasters causing

environmental damage (e.g.

floods, earthquakes,

landslides, could burst etc)?

No. The location of site is such that it will not be

affected by earthquake (zone III), floods (much

above HFL, landslides (being on top of plateau)

Cloud Bursts (not prone due to history of climate).

Thus site is free from all the natural disasters.

9.0 Factor which should be considered (such as consequential development) which could

lead to environmental effects or the potential for cumulative impact with other existing

or planned activities in the locality.

Sr.

No.

Information/Checklist

Confirmation

Yes/N

o

Details thereof (with approximate quantities

rate, wherever possible) with source of

information data

9.1 Lead to development of

supporting utilities, ancillary

development or development

stimulated by the project

which could have impact on

the environment e.g.:

Supporting infrastructure

(roads, power supply, waste or

waste water treatment, etc)

Housing development

Extractive industries

Supply industries Other

Yes.

The stone mining will leads to positive

development of supporting facilities and will

improve socioeconomic aspect of the area

9.2 Lead to after use of the site,

which could have an impact on

the environment

No. There will be only change in the land profile of

the area. An attempt will be made to restore the

land to much better use and better aesthetic value.

Page 22: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 11

Sr.

No.

Information/Checklist

Confirmation

Yes/No Details thereof (with approximate quantities

rate, wherever possible) with source of

information data

9.3 Set a precedent for later

developments

No.

The excavation will be made in the stratum till the

rocks are extracted keeping safe parameters of the

pit. Once it is over it will be restored to best

possible way. The area will not set any precedence

for any future development.

9.4 Have cumulative effects due

to proximity to other existing

or planned project with

similar effects

No.

There is no other project in the proximity nor is

planned in the near future. .

(III) Environmental sensitivity

Sr.

No.

Areas Name/

Identity

Aerial distance (with 15-km) proposed project

location boundary

1 Areas protected under

international conventions,

national or local legislation

for their ecological,

landscape, cultural or other

related value

No. There are no such protected areas or project

within15 km distance

2 Areas which are important or

sensitive of ecological

reasons- wetlands, water

courses or other water

bodies, coastal zone,

biospheres,mountains,forests

No. None

3 Areas used by protected,

important or sensitive

species of flora or fauna for

No. None

4 Inland, coastal, marine or

underground waters

Yes. None

5 State, national boundaries No. Not applicable

6 Routes or facilities used by

the public for access to

recreation or other tourist,

pilgrim areas

No Not applicable

7 Defense installations No. None

8 Densely populated or built-

up area

Given. Chirle village is approx 3.87 Kms away from the

core zone.

Page 23: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 12

9 Areas occupied by sensitive

man Made land uses

(hospitals, schools, places of

worship, community

facilities)

Yes

There are few village dispensaries. Hospitals and

Schools envisaged within 05 km radius of the

mine sit but not in core zone.

10 Areas containing important,

high quality or scarce

resources (ground water

resources, surface resources,

forestry, agriculture,

fisheries, tourism, minerals)

No. None

11 Areas already subjected to

pollution or environmental

damage.(those where

existing legal environmental

standards are exceeded)

No. None.

12 Areas susceptible to natural

hazard which could cause the

project to present

environmental problems

(earthquakes, subsidence,

landslides, erosion, flooding

or extreme or adverse

climatic conditions)

No. No such area exists nearby.

“I hereby given undertaking that the data and information given in the application and enclosures

are true to the best of my knowledge and belief and I am a aware that if any of the data and

information submitted is found to be false or misleading at any stage, the project will be rejected

and clearance give, if any to the project will be revoked at our risk and cost.

Date:

Place:

M/s Infra Transmission Pvt. Ltd., C/o Shri Mohd Mannan Akhtar Shaikh

Plot no 71, sector 1

Navi Mumbai

Koper Khairne, S. O.

District- Thane

State – Maharashtra 400709

Mobile No: 9867122749

(Project Proponent/ Authorized Signatory)

Page 24: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 1

PPRREEFFEEAASSIIBBIILLIITTYY SSTTUUDDYY

FFOORR

MM//SS IINNFFRRAA TTRRAANNSSMMIISSSSIIOONN

PPVVTT.. LLTTDD..

Page 25: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 2

Executive summary

M/s Infra Transmission Pvt. Ltd. has been granted a quarrying lease over an area 1.4000 Ha. In the Survey no. 51/2 and the lease period is for 5 years i.e. from 2015-2016 to 2019-2020 with quarrying capacity of 5000 brass per year according to the consent by MPCB. M/s Infra Transmission Pvt. Ltd. has been awarded with the consent to operate for mining of stone crushing in Kundewahal, Panvel, and District Raigad for the period of 5 years. The major highlights of the project are:

The project comes under non agriculture land.

Ideally located at a distance of 1.63km from National highway no 4B for proper road

accessibility.

No National park or wildlife sanctuary lies within the buffer zone or nearby this region.

No displacements of settlement are required.

No sensitive places of notified archaeological, historical or tourist importance within or

nearby the buffer zone.

Project Description Location: The site is located at Survey no. 51/2 Kundewahal, Panvel, District Raigad, and Maharashtra. The site is accessible from highway (National highway no 4B) at a distance of 1.63 Kms. Land: The land provided comes under mining area approved by the government of Maharashtra. Therefore no need of human displacement is needed in the project area. The land provided for stone mining is 1.4000 hectare to the project proponent. Co-ordinate: The coordinates of the plant site are latitude 18°56'57.24"N and longitude 73°03'31.85"E (Boundary pillar no. 1). Water: Water requirement of the project will be met through the water tanker and bore well which is existing in the human settlement area. Company does not exploit any other water resources or ground water; therefore no adverse impact is anticipated on water environment. The water requirement is estimated to be maximum of 2250 lit/day.

Page 26: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 3

Electric Supply: The estimated power requirement for the project will be 107 HP. Power supply to the project will be sourced from Maharashtra State Electricity Distribution Co. Ltd. The unit has also Diesel generator for power back up of 125 KVA capacities. Project Cost: The total cost of the project including all facilities is estimated to be INR 50.00 Lacks. Topography: The project site falls under the district of Raigad. Raigad district is one of the four coastal district situated along the western coast of the State and is located between north latitude 17°51’00” and 19°08’00” and east longitudes 72°50’00” and 73°40’00”. The geographical area of the district is 7152 sq. km. It is bounded by Thane district and Mumbai Suburban in the north, Ratnagiri district in the south, Pune district in the east and Arabian Sea forms the western boundary having a length of about 250 km. Soil Quality: The soils in the district are formed from the Deccan Trap which is predominating rock formation with small out crops of Laterite at a few places in the Poladpur taluka and Matheran hill. The soils are grouped as Forest, Varkas, Rice, Khar or Saline, Coastal Alluvium and Laterite as per the location and topographical situation. Major crops grown in the district area Rice, pulses, mangoes, oil seeds etc. Meteorology: The average annual rainfall within the district is heavy and is about 2200 mm to 5000 mm in Raigad district. The average maximum temperature in summer is 31.8°C and average minimum temperature in winter is 17.7°C. Relative humidity ranges from 65% to 75%in all seasons. Water: Water needed for operation requirement shall be drawn from water tankers and bore well which is present in the human settlement area and not in the lease area. Ecology: No extra land will be acquired during the operation of the project there will be no adverse impact on some of the environmental aspect. In the area of the project proponent clustered green belt is found in the vicinity, hence there will not be any kind of deforestation. No rare or endangered species of flora and fauna are present in the immediate vicinity as well as the study area. Thus, there will not be any adverse impact on flora and fauna. Socio-economic: The project will provide positive impact on the economic development of the region in terms of employment opportunities. Moreover the above unit will be operating in an authorized mining land declared by the Govt. of India. Therefore no population will be displaced.

Page 27: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 4

Risk assessment plan Risks likely to pose threat to man, environment or property associated with various activities are addressed in this report. Such activities include transport, storage; handling and usage of fuels. Surrounding population shall be made aware of safety precautions to be taken in case of any mishap in project site. Conclusion The minor mineral project of stone crushing will not have any adverse impact on the environment. Altogether the project will have a positive impact on social environment by providing employment opportunity for the skilled and unskilled labors living in the surrounding villages. Also the infrastructure around the site will be improved due to the project.

Prefeasibility Report 1. INTRODUCTION OF THE PROJECT 1.1 Identification of the project proponent M/s Infra Transmission Pvt. Ltd. has been granted a quarrying lease over an area 1.4000 Ha. In the Survey no. 51/2 and the lease period is for 5 years i.e. from 2015-16to 2019-20 with quarrying capacity of 5000 brass per year according to the consent by MPCB. M/s Infra Transmission Pvt. Ltd. has been awarded with the consent to operate for mining of stone crushing in Kundewahal, Panvel, and District Raigad for the period of 5 years. M/s Infra Transmission Pvt. Ltd. has appointed Hubert Enviro Care Systems Pvt Ltd to carry out Prefeasibility and EMP report for the existing project of their Minor Mineral Activity of the order 5000 brass/annum according to the consent obtained by MPCB. The major highlights of the project are:

The project comes under non agriculture land.

Ideally located at a distance of 1.63km from National highway no 4B for proper road

accessibility.

No National park or wildlife sanctuary lies within the buffer zone or nearby this region.

No displacements of settlement are required.

No sensitive places of notified archaeological, historical or tourist importance within or

nearby the buffer zone.

Page 28: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 5

Crushing Activity Crushing activities will be carried out at crushing plant near lease area. 1.2 Description of Nature of the Project Over the last 10 years, the Construction sector has been registering strong growth rates in the range of 7-8%. Housing and construction is one of the major drivers of growth in more Than 40 allied industries including STONE CRUSHING. In addition, for the building of Roads, flyovers and bypasses, there is a mass and consistent need of crushed stone across the country. Several projects are in progress and are being commenced shortly which will have high demand of crushed stone all over the country. In order to make up the backlog and meet the projected requirements for the next 20 years, overall housing construction has to raise 500,000 housing units per annum. This process leads to construction of roads, bridges, new houses; markets, etc resultantly gear up construction activities and more use of crushed stones. The aforementioned facts and statistics provide enough evidences, assuring a steep and continuous growth vis a vis investment opportunity in the STONE CRUSHING business. 1.3 Need of the Project The project proponent has existing Stone Crushing activity in the mining lease as explorations have shown that these deposits occur in the subject lease area. The mining production is covered under the Ministry of Environment & Forests Notification 2006. This report of Prefeasibility & Environmental Management Plan is given here as a part of the information to be furnished to the SEAC, Govt. of Maharashtra for obtaining Environmental Clearance as per

office Memorandum No. L-11000/47/2011/IA-II (M) dated 18.05.2012 .To meet the ever-increasing local demand for Crushed stone by the building industry and construction company the project proponent intends to produce the following quantities of crushed stones by Manual method of quarry activity. The year wise production and development details for the five years plan period are summarized in the table below.

Table No. 1 Production Plan for Five years

Year Crushed Stone

I (2015-16) 5000 Brass

II (2016-17) 5000 Brass

III (2017-18) 5000 Brass

IV (2018-19) 5000 Brass

V (2019-20) 5000 Brass Total 25000 Brass

Page 29: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 6

1.4 Demand Supply Gap Since it is an applied industry of the construction sector, growth in construction sector may be considered as proxy for the growth in stone crushing sector, i.e. around 7-8%. Crushed stone has a very minor share among the exports of non-metallic mineral products of India. It is observed that total export volume of the crushed stone has been very low, whereas, Marble has the highest share and remained at the top. The market scope for crushed stone is found to be encouraging in local market with the increased demand from building industry & construction fields. There is also a sufficient demand from Govt. Contractors for laying of roads and construction of industries etc. The entry in the target market is easy and there is a narrow gap in the supply and demand, which is expected to grow in the coming years. The business opportunity to fill the demand and supply gap would be quite profitable.

1.5 Employment Generation

The establishment of this project will improve the socio-economic status of the surrounding area by way of direct & indirect employment. The Employment opportunity will be created for skilled and mainly unskilled people. 2. PROJECT DESCRIPTION 2.1 Location:

The project is located on a plot of land measuring 1.4000 hectare at Village Kundewahal, Taluka Panvel, District Raigad, and Maharashtra. Project involve stone quarry of the capacity 5000 brass/year.

Table No.2 SALIENT FEATURES OF LOCATION

Project Site Survey no. 51/2, Kundewahal Village, Taluka Panvel, District Raigad, State Maharashtra

Co-ordinates latitude 18°56'57.24"N and longitude 73°03'31.85"E

Nearest Highway National highway no 4B from the site is 1.63 km.

Nearest City Padeghar approx 1.72 Kms from the site

Nearest Railway station Jasai Railway station: Approx.4.02km

Water bodies -

Average rainfall 2200-5000 mm

Average temperature Average maximum temperature in summer is 31.8°C and average minimum

Page 30: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 7

temperature in winter is 17.7°C.

Average humidity 65-75%

Archaeological monument Not present in the 10 km radius of the site.

Human settlement No human settlement is observed in 1 km around the lease area.

Shed Provided Shed will be provided for the workers

Crusher Location Crusher location will be 90 meter away from quarry area.

Fig 1: Project Location -latitude 18°56'57.24"N and longitude 73°03'31.85"E (Google Earth Image of the project site) 2.2 Land Distribution around Site The project site will be having quarry area, crushing area, office area and shelter provided for the workers.

Page 31: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 8

2.3 Size and Magnitude of Operation The estimated cost of the project is going to be INR 50.00 Lacks, including a capital expenditure of INR 6 lacks on environmental matters. It is expected that the recurring costs on environmental matters would be INR 0.40 lacks. The project capacity is 5000 Brass/Annum. 2.4 Proposed Crushing Unit Process Details The mined stones are transported to the crusher sites by road through tractor trolleys or pay-

loaders. The pay-loaders unload the mined stones into storage hoppers located at elevated

levels of the crusher sites. These stones are crushed in a primary crusher. The primary crusher

uses 74 KW of power and the process is around 15-20 min duration. And then sent to a

vibratory screen. Enclosures are provided to crusher & sprinkling arrangement to control the

dust emission.

The oversized stones from the screen are sent for further size reductions in secondary and

tertiary crushers. The power required by the secondary and tertiary crusher is 37 KW and 14.8

KW respectively also the time taken will be half an hour by secondary crusher and 1 hour for

tertiary crusher. From the secondary and/or tertiary crushers, the crushed stones are sent for

screening. In the screen, products of various sizes get separated which are stored in heaps. The

movement of stones from the crusher to the screen and then to the product piles is done

through conveyor belts. The products are generally stored in open areas. The final product is

having various sizes like 10mm, 20mm and 30mm along the stone dust. All the materials are

used in the construction and building purposes.

Page 32: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 9

Process Flow Diagram of Typical Stone Crusher Unit

2.5 mining technology Four technologies namely bucket wheel system, Dragline system, shovel dumper system and surface mine with pay loader system are well known for quarrying plan. Due to multi seam, abrasive sandstone, hard carb shale and many faults bucket wheel system has not been considered. Dragline system has also not been considered due to many faults. Shovel dumper system is very flexible and offer convenient mining. The project proponent is using Shovel dumper system and manual method for the quarrying of stones. Surface miner system can be considered when overburden generated can be backfilled. Surface miner system is costly; this can be the reason for its less use.

Mined stones

Sent to crusher site

Primary crusher

Primary vibratory screen

Tertiary crusher Secondary crusher

Secondary vibratory screen

Product to stockpile

Products to

stockpile

Up-loading of mined stones

Page 33: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 10

2.6 Water Sources Water is required in the project site for various purposes like spraying to control the dust generation. Water is also used during the drilling process. The water requirement will be around 2.5 CMD. The source of the water will be bore well.

Table 3 Water Use Table

Sr. No Activities Demand (CMD)

1 Domestic Purpose 0.5 CMD

2 Mine a. Drilling b. Dust Suppression c. Equipment/Vehicle washing

1.5 CMD

3 Green Belt 0.5CMD

Total 2.5 CMD

2.7 Power Sources The power requirement of the project will be around 107 H.P. it is also connected to the D.G set of 125 KVA.

Table 4 D.G set Details

Sr. No Fuel Used For Fuel Monthly Consumption

1 D.G Set 125 kva HSD 100 Lit/day

2.8 Waste Generated The possible waste generated by the mining process will be some rejection which can be used for leveling of the land. No solid or liquid waste will be generated from the mining process. The spent oil from the D.G set will be discarded by selling it to the authorized dealer.

Page 34: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 11

Table No. 5

Type, Quantity and Mode of Disposal of Hazardous Waste

Sr. No

Cat. No.

Name of waste Qty. T/A Mode of Disposal as given in

Authorization

1. 5.1 Used/Spent Oil 60 liter/Annum

Sent to CPCB authorized recycler

2.9 Explosive Storage Project proponent conducts explosion at site to the help of licensed practitioner. Hence there is no storage of explosives on the quarry site. 2. 10 Manpower The total manpower is 10 people at the project site. Both the skilled and the unskilled labors are included.

Table 7 Organization Table

Sr. No Category Operative Phase

1 Administrative 2

2 Supervisory 1

3 Skilled Worker 3

4 Unskilled Worker 2

5 Security 2

Conclusion Based on the foregoing study as summarized above, it is observed that there will be marginal increase in the dust pollution, which will be controlled by sprinkling of water and transportation of stone metal in closed/tarpaulin covered trucks. There will be no major impact on the ambient environment & ecology due to the mining activities moreover the mining operation will lead to direct and indirect employment generation in the area. Kundewahal, Raigad District will have a positive impact on the Socio Economics of the area and lead to sustainable development of the region. The applicant will ensure the implementation of the environmental protective measures within the mine area & surroundings and will comply with the terms & conditions to be laid down by the Ministry of Environment & Forests as required under the Environmental Protection Act-1986 and its amendments.

Page 35: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 1

EENNVVIIRROONNMMEENNTTAALL

MMAANNAAGGEEMMEENNTT PPLLAANN

FFOORR

MM//SS IINNFFRRAA

TTRRAANNSSMMIISSSSIIOONN PPVVTT.. LLTTDD..

Page 36: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 2

Impact on Environment and Mitigation Management Plan

A) Introduction:

This section will discuss the management plans for mitigation/abatement of adverse environmental impacts and enhancement of beneficial impacts due to mining. The Environmental management plan has been designed within the framework of various Indian legislatives and regulatory requirements on environmental and socio-economic aspects.

The objective is to protect the environmental values of the mine land are:

To provide a stable, non-polluting land-form Land disturbed by mining activities will be made stable (geo-technically and

erosion) to ensure that the post mine landform are not compromised by instability.

To provide a beneficial post mining land use. The post-mine land uses for areas disturbed by mining will be a mosaic of

self-sustaining vegetation communities and grazing land, using appropriate native tree, shrub and grass species, and improved pasture species as appropriate.

To control the introduction and spread of declared plants. To minimize the disturbance of remnant vegetation.

B) Anticipated Impact and Mitigation Measures

1. Air Environment

Air Quality Management measures suggested for air pollution control based on the sources are as follows: Sources of Air pollution The main sources of air pollution are identified as-

Mining activities inside the Quarry area like Drilling, Blasting, transport and dumping of the stone.

Crushing of stones Transport of stone from quarry area to crushing area. Stone handling activities at the respective site. Stone transportation from crushing area to storage area.

Page 37: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 3

Mitigation Measures for Air pollution The mitigation measures to be provided in the quarry area for air pollution are:

Dust suppression system (water spraying or sprinklers) to be adopted at site while loading and use of sharp teeth for shovel

Dust extraction system to be used in drill machines Use of sharp drill bits for drilling holes and drills with water flushing system

(wet drilling), to reduce dust generation. Near the stock piles (temporary storage of the products) mist spray will be

provided at appropriate places for preventing dust pollution during handling of the product.

The mitigation measures to be provided in the crushing area for air environment are:

Crusher to be to be provided with Bag filter to arrest any dust emission. The dust emission level will be kept under prescribed standard limit.

Water sprinkling system for crushing operation to be provided to check any fugitive emission from the crushing operation.

Close conduit type conveyer belt for transportation of stones from one crushing site to another.

The belt and idlers to be maintained in a proper condition so as to avoid spillage of material, also prevent any fugitive emissions.

The mitigation measures to be provided in the transport and handling area for air pollution is:

Regular water spraying on the roads connected with quarry and crushing area during transportation of stones.

Storage area is to be provided with appropriate shed for controlling dust generations.

Dumping of stones from the heavy vehicles will be done from an appropriate height for less dust generation.

The heavy vehicles are the main sources for release of carbon monoxide and nitric oxide, so to avoid the increase of pollutant in the site the vehicles will be maintained properly and regularly.

Vehicles with valid PUC will be used for transportation.

Page 38: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 4

Table 1: Details of D.G Set

Stack

No

Stack

Identification

Stack

Height

(m)

Stack top

inside dia.

(m)

Stack

gas exit

temp

(OC)

Volumetric

flow rate;

(m3/h) NTP

Type of

Fuel

1. DG (125 KVA) 3 meter

above

the roof

0.300 125-160 300-500 H.S.D

Observation The Air quality is likely to remain within the limits prescribed by MPCB. There will also be negligible increase in the levels of the pollutants in the site area. The Necessary mitigation measures to be considered by the project proponent, mining activity is not likely to have any adverse effect on the existing environment.

2. Noise Environment

Noise Quality Management measures suggested for noise pollution is based on the baseline data for noise quality. Sources of Noise pollution The main sources of noise pollution are identified as-

Mining activities inside the Quarry area like Drilling, Blasting and transport. Crushing area and belt conveyer

Mitigation Measures for Noise pollution The mitigation measures to be provided for the quarry and crushing area for noise pollution are:

Proper designing of plant & machinery by providing in-built mechanisms like silencers, mufflers and enclosures for noise generating parts and shock absorbing pads at the foundation of vibrating equipment.

Routine maintenance of equipment.

Page 39: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 5

Enclosures for crusher house, etc. Rational deployment of noise generating plant and machinery. Greenbelts around the quarry and infrastructure sites HEMMs with sound proof cabins. Personal protective devices to all the persons working in high noise areas.

Observation The ambient noise level monitoring carried out in and around the project site shows that the ambient noise level are well within the stipulated limits of MPCB. The necessary mitigation measures were already considered by the project proponent.

3. Water Environment

Since the mining activity is related to stones the water contamination is not a major issue.

4. Ground Vibration and Blasting

Blasting is an occasional and impulsive event, which needs to be carried out in an isolated manner. The ground vibration peak particle velocity from blasting operations carried out in or on the quarry area must not exceed 2 mm/s for more than 5% of the total number of blasts carried out in or on the quarry during each reporting period; and must not exceed 7 mm/s at any time, at any residence or other noise sensitive receiver nearby. Mitigation for Vibration activity due to blasting Time of blasting

Blasting operations on the quarry area may only take place when there is a need to meet the daily requirement of production. If at all necessary the timing will be between 1.00pm and 3.00pm. Relevant guidelines and standards applicable to the management of blasting for the project are listed below:

Guideline for the Use of Explosives as per Explosive Rule 2008. Noise pollution

(Regulation and control) rules 2000 under MPCB.

Page 40: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 6

Fly-rock Management

The Drill and Blast Engineer is to ensure that no fly-rock is emitted beyond the zone of exclusion. The zone of exclusion is assumed to be 500 meters.

All blasts are designed in such a manner as to ensure that no fly rock is ejected

from the site or on to any infrastructure established on site. In the event of fly rock extending beyond the pit, a thorough assessment is to be carried out in conjunction with the mine expert to determine the likely cause and to ensure that future preventive measures are in place to prevent a recurrence of a similar incident.

No workforce shall be allowed during blasting time so that the workers are not exposed to impulsive noise level. The noise generating points during blasting will be enclosed to minimize the propagation of high noise intensity. Before blasting is done, warning sound is given so that people can move to safe places. Observation Since blasting is an occasional event to meet the requirement of daily production capacity, no adverse impact can be observed. Also the vibration measured created due to blasting activity in the quarry area was within limit.

5. Occupational health and safety measures

Air Pollution For the safety of workers at site, engaged at the strategic location/dust generation points like, drilling, loading and unloading points, crushing etc. dusk mask will be to be provided. Dust mask would prevent the inhalation of RPM thereby reducing the risk of lung disease and other respiratory disorders. Along with that safety goggles, safety shoes and helmet will be to be provided to the workers.

Page 41: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 7

Noise Pollution To protect the workers from high sound level during activity like blasting and drilling following measures to be adopted.

Provision of protective device like ear muffs/ear plugs to the worker who cannot be isolated from the source of high intensity noise, e.g. blasting.

Confining the noise by isolating the source of noise.

Reducing the exposure time of workers to higher noise levels by shifts

management.

6. Impact on Socio Economic Status

The project is likely to give a boost to the economy of the area and providing secondary and tertiary employment to local people. For the well-being of the workers employed in the quarry site, they are to be provided with temporary shelter and all the facility for good living by the owner of the quarry. C) Simple Checklist for Identification of Impact

Table 1: Simple Checklist

Components No

Significant Impact

Significant Impact

Negative Positive

High Moderate Low High Medium Low

Air Quality * Water Quality *

Noise Quality * Ground Vibration

*

Page 42: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 8

Land Contamination

*

Ecology *

Occupational health

*

Socio Economy *

7. Afforestation Plan

The plants grown in the area should be dust tolerant and fast growing so that permanently green belt is created. The main aim of the plantation around the area of the project is to stabilize the area to protect it from rain and wind erosion. The working area i.e. quarries and crushing area shall contain fine particles resulting in erosion of land when these get airborne. Stabilization against wind is therefore a must.

Table 2: Plants which can be used for green belt development

Sr. No Botanical Name Common Name

1 Aeglemarmelos Bel

2 Alstonia scholars Saptaparni

3 Alangiumsalvifolium Ankol

4 Aquilariaagallocha Agar

5 Buteamonosperma Palash

6 Cassia fistula Indian laburnum

7 Dalbergia Shisham

8 Lagerstroemia speciosa Jarul

9 Pongamiapinnata Karanj

10 Saracaasoca Sita Ashok

11 Sterculiaurens Gum Karaya

12 Syzygiumcumini Jamun

13 Terminaliaarjuna Arjun

14 Ficuselastica Indian rubber tree

15 Ficuscarica Fig

16 Ficusbenghalensis Banyan , Vad

Page 43: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 9

Table No. 3: Environmental monitoring program:

Sr. no. Activity schedule

Air Pollution Monitoring

1 Air monitoring for PM 2.5 PM 10, SO2 and NO x at the factory boundary.

Once every three month.

Water Pollution Monitoring

1

Monitoring of one sample of ground water at nearby location. For essential parameters as per IS: 10500:1991.

Once every season

Solid Waste Generation Monitoring / Record Keeping

1 Records of generation of used drums, bags and records of their dispatch to vendors for refilling

Daily

2 Inspection of each used drums/containers for any leakage or spillage problem

Once in a week.

3 Records of generation of waste oils and their treatment

As and when generated.

4 Scrap drums/containers etc. to be sent to scrap vender.

Once in month

Soil Sample

1 Soil Analysis around the site Once in a year Noise Monitoring

1 Noise due to Quarry work and Crushing etc. Once every three month.

17 Ficusreligiosa Peepal

18 Ficusracemosa Udumbara

Page 44: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 10

ENVIRONMENTAL MANAGEMENT CELL

OWNER

SITE MANAGER

ADMINISTRATIVE

SKILLED WORKERS

UNSKILLED WORKERS

SECURITY

Page 45: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 11

Table 4: Environmental Budget

Sr. No. Recurring Cost

per annum (Rs.)

Capital Cost (Rs.)

1 Air Pollution Control 5,000 2,25,000

2 Water Pollution Control ----- -----

3 Noise Pollution Control 5,000 1,75,000

4 Environment Monitoring and

Management 15,000 50,000

5 Reclamation borrow / mined area ----- -----

6 Occupational Health 5,000 25,000

7 Green Belt 5,000 75,000

8 Solid Waste Management 5,000/- 50,000/-

9 Others (Pl. Specify) ----- -----

Total 40,000/- 6,00,000/-

Page 46: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 12

Table 5: ENVIRONMENTAL MANAGEMENT PLAN

Sr. No.

Activity Environmental

Issue Management Action to be Taken

Operation of Plant Facilities for manufacture of various products

1 Minor Mineral Mining

(Crushed Stone)

Air

Land

Water

Strictly follow the appropriate spill control procedures.

Ensure proper usage of PPE's to the workers.

Reactors in plant will be equipped with requisite pollution control devices such as dust and fume extraction system to arrest the fumes generated during charging of raw materials.

A copy of the MSDS of explosive chemicals to be easily accessible to employees

Operation of Utility Facilities

1 DG Set(s)

(125 KVA)

Air

Land

Noise

Ensure proper preventive maintenance of fuel firing system, use of ultra-low sulphur diesel.

Ensure proper maintenance of machinery to reduce noise level

Ensure adequate height of stacks.

Ensure re-processing of lube-oil and maintain records of the same.

Storage, Handling & Transportation of Raw materials and Products

Page 47: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt. Ltd. Page 13

1 Storage of all

the

final products

Air

Water

Land

Explore possibilities for reducing dust generation during storage.

Ensure safe disposal of used bags for sale/reuse.

2 Transportation of all the finished products & hazardous wastes.

Air

Water

Land

Ensure proper training to drivers for transportation of final product and emergency actions

Ensure availability of MSDS of all the explosive materials stored in the site area. Off-site Emergency plan, whenever required.

Ensure provision of PPE’s to truck drivers during transportation

Other Facilities

1 Development & Maintenance of green belt

Air

Land

Green belt to be developed & maintained as proposed within the premises.

Some pollution indicator trees should also be planted within the premises.

E) Conclusion Regular monitoring will be carried out to check pollution level in the site. So that mitigation measures can we adopted. The project proponent is very well aware of environmental issues which can be affected due to improper functioning.

Page 48: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 1

PPRROOJJEECCTT

BBEENNEEFFIITTSS

FFOORR

MM//SS IINNFFRRAA

TTRRAANNSSMMIISSSSIIOONN PPVVTT.. LLTTDD..

Page 49: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/s Infra Transmission Pvt. Ltd.

Hubert Enviro Care Systems Pvt Ltd Page 2

M/s Infra Transmission Pvt. Ltd. has got the stone quarrying plan on

lease, in Kundewahal, Raigad District for a period of 05 years. The mining

area covered is 1.4000 Hectare. The project benefits are explained below,

Improvement in Physical Infrastructure

Improvement in Social Infrastructure

Increase in Employment Potential

Prevention of Illegal Mining

Creating Green belt

Overall it can be said that the proposed project will not cause any adverse

environmental impact if at all it will have some positive socio-economic

impacts.

Page 50: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt Ltd Page 1

CCOONNCCLLUUSSIIOONN

Page 51: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission

M/S INFRA TRANSMISSION PVT. LTD.

Hubert Enviro Care Systems Pvt Ltd Page 2

1. Conclusion

Based on the foregoing study as summarized above, it is observed that there will be

marginal increase in the dust pollution, which will be controlled by sprinkling of water

and transportation of stone metal in closed/tarpaulin covered trucks. There will be no

major impact on the ambient environment & ecology due to the mining activities

moreover the mining operation will lead to direct and indirect employment generation

in the area. Kundewahal, Raigad District will have a positive impact on the Socio

Economics of the area and lead to sustainable development of the region. The applicant

will ensure the implementation of the environmental protective measures within the

mine area & surroundings and will comply with the terms & conditions to be laid down

by Ministry of Environment & Forests as required under the Environmental Protection

Act-1986 and its amendments.

Page 52: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission
Page 53: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission
Page 54: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission
Page 55: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission
Page 56: Hubert Enviro care systems Pvt. Ltd.environmentclearance.nic.in/writereaddata/FormB/EC/Additional... · INDUSTRIAL PROJECTS: ... e-mail & contact number of proponent M/s Infra Transmission