huc technical exception (pos response - 19 oct 2011)_rev 1
TRANSCRIPT
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 1/37
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 2/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
and update to POS.
Item closed with no time and cost impact.
4.General SOW
14 Oct 2011 / POSAll special tool (for F&G system, Telecom, grating
gun, ect) for HUC shall be provided by PMC/VendorsBasis of Proposal No yes
17 Oct 2011 / PMC
and POS
PMC Nnoted, and further clarify with LSJOC.
6. 09-Nov-11 / Hien
LQ
Grating Gun shall be provided by POS (construction
tools).
7.General SOW
14 Oct 2011 / POS
To PMC Only:
̶ Bidder is only responsible for the load-out and
seafastening of HUC shiploose items to be
transported by HUC accommodation
barge/supply boat.
̶ For the HUC shiploose items that are located on
the topsides prior to load-out, POS shall providethe layout drawing only, other activities shall be
performed by PMC (with Bidder’s witness).
The heavy and bigsize shiploose shall
be put on topside
and following with
topside
installation.
No Yes
17 Oct 2011 / PMC
and POS
PMC Agreed and closed with no time and cost impact.
9. 09-Nov-11 / Hien
LQ
The proposal is not accepted. POS must make sure that
the said ship loose items are installed, secured and sea
fastened by POS. The layout drawings shall be
prepared by POS and sent to PTSC M&C/LSJOC for review/approval.
This is basis scope
of works.
10. General SOW
14 Oct 2011 / POS
To PMC only:
All costs incurred by Bidder to complete the onshore
carry over work shall be treated as Change Order
Basis of Proposal Yes Yes
17 Oct 2011 / PMC PMC Aagreed and closed with no time and cost impact.
Page 2 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 3/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
and POS
12. 09-Nov-11 / Hien
LQ
There is not any ONSHORE carry over works! If
offshore carry over works incurs solely by Bidder’s
fault, bidder shall complete such works at its cost.
13.General SOW
14 Oct 2011 / POS
To PMC Only:
Offshore modification due to incomplete works,incorrect fabrication and/or wrong location/ orientation
of Hook-up spools, supports and equipment,
discrepancies on drawings/ engineering documents/
vendor documents provided by PMC shall be treated as
Change Order.
Basis of Proposal Yes Yes
17 Oct 2011 / PMC
and POS
PMC Agreed and closed with no time and cost impact.
15. General SOW
14 Oct 2011 / POS
To PMC Only:
PMC shall perform all onshore pre-fabrication/construction work to the maximum extent
possible for subsequent offshore HUC.
Any offshore modification shall be performed by POS
in as Change Order basis
Basis of Proposal Yes Yes
17 Oct 2011 / PMCand POS
Parties understand that PMC shall pre-fabricateshiploose materials. However, flowlines tie-in spools
surveying, pre-fabrication/ tests are POS’s
responsibility.
Both Parties agreed that all onshore pre-fabrication/
construction work shall be performed by PMC tomaximum extent possible for minimum of offshore
HUC works.
For flow-lines tie-in, PMC shall perform onshore pre-
fabrication (shop welding, NDT, hydrotest, painting,
ect
) and POS shall perform onshore/offshore field
weld/fabrication after offshore survey.
Page 3 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 4/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
Any offshore modification shall be performed by POS
in as Change Order basis
Item closed with no time and cost impact.
17. 09-Nov-11 / Hien
LQ
Offshore modification like site run shall be POS scope
of works
18.General SOW
14 Oct 2011 / POS
To PMC Only:
Bidder shall prepare red-mark drawings. Based on thatPMC shall update/prepare as-built drawings.
Basis of Proposal No Yes
17 Oct 2011 / PMCand POS
PMC Agreed and closed with no time and cost impact.
20.General SOW
14 Oct 2011 / POS
To PMC Only:
̶ PMC shall perform qualification for all WPS,
including for offshore HUC.
̶Bidder shall perform only welder qualificationand apply WPS from PMC.
̶ Materials for welder qualification, however,
shall be free issued by PMC.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS
PMC Nnoted and further clarify with LSJOC for
special material such as Duplex pipe.
22. 09-Nov-11 / Hien
LQ
POS must prepare and qualify for all WPS including
materials.
POS may apply WPS from PMC if possible.
23.General SOW
14 Oct 2011 / POS
Bidder will only provide third party services (NDT,
PWHT) for offshore HUC and onshore NDT for welder qualification of HUC personnel.
Other services, if requested by PMC/client, shall be
performed by Bidder on reimbursable basis.
Basis of ProposalYes Yes
17 Oct 2011 / PMCand POS
PMC Nnoted and further clarify with LSJOC.
Page 4 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 5/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
25. 09-Nov-11 / Hien
LQ
POS shall arrange NDT sub-contractor
, PWHT to
satisfy HUC scope.
26.General SOW
14 Oct 2011 / POS
POS shall only perform function check
(commissioning); any errors, deficiencies, damage etc.
finding during pre-commissioning or commissioning
shall be cleared as much as possible; however, the item
that not able to clear or limited by Vendor warranteeshall be put into punch-list for their responsibility
parties/Vendors to fix.
Bidder shall support Vendors/Responsibility Parties to
repair their equipment and Bidder shall perform
function check again make sure system is worked
following project specification after its punchlist are
cleared. This support shall be treated as a Change
Order.
The punchlist may
be come from
wrong design,
fabrication,
manufacturing,equipment quality,
ect.
These punchlist
sometime need
specialist
(Vendors) or
responsibility
party to fix.
Yes Yes
17 Oct 2011 / PMC
and POS
Agreed with the 1
st
paragraph.For the 2nd paragraph, parties understand that
PMC/POS/Vendor shall be responsible for any error/
mistake contributed by itself.
In case that punchlistpunch list is not under POS
responsibility/scope but prevent POS from completion
of its scope
, PMC/LSJOC will still keep release all
relevant acceptance certificates and payment.
Item closed with no time and cost impact.
Page 5 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 6/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
28. General SOW
14 Oct 2011 / POS
For each platform Thang Long/Dong Do, Company to
clarify how many production wells and water injection
wells shall be tie-in during offshore HUC campaign? In
which how many shall be tie-in before first oil (without
interface with drilling activities, after first oil but
before arrival of drilling rig, and during drilling and production (SIMOB/SIPROD)?
To identify
productivities,
safety requirement
and HUC schedule
Yes Yes
17 Oct 2011 / PMC
and POS
Noted and further clarify with Client.PMC confirmed no flowline tie-in during main HUC
campaign; 3 wells to be HUC before first oil, and the
remains shall be performed after first oil.
30.General SOW
14 Oct 2011 / POS
To PMC Only:
PMC shall provide all project permanent materials for
HUC scopes including but not limited to: painting, thatinsulation/heat tracing materials, etc if any. All project
materials shall include the spares for site erection and
site modification
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS
PMC Aagreed and closed with no time and cost impact.
32. 09-Nov-11 / Hien
LQ
Painting materials shall be provided by POS for HUC
scope.
33.General SOW
All Pre-commissioning and Commissioning work completed by PMC onshore and accepted by LSJOC
will not be repeated offshore. All work offshore will be
limited to completion of hook-up scope and continually
of commissioning as per approved FTPs
Basis of Proposal May be Yes
17 Oct 2011 / PMC
and POS
PMC Noted. Need further clarify with Client and
confirm to POS.
Page 6 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 7/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
35.General SOW
14 Oct 2011 / POS
To PMC Only:
– Start up procedures shall be prepared by Operation,
Vendor or other;
– POS shall prepare and sign off only commissioning
procedures.
Basis of Proposal No yes
17 Oct 2011 / PMC
and POS
Agreed for the 1st statement.
POS agrees to withdraw the 2nd statement.
Agreed and closed with no cost and time impact.
37.General SOW
14 Oct 2011 / POS
– Bidder is only responsible for clean up the platform
with normal dirty that no need special chemical or tool/equipment to make it clean.
– If the platform is covered by cement or any special
material make by drilling or any company’scontractors that very hard to clean or need
scaffolding for working at height, this work shall be
treated as change order.
– After cleaning up, if it is dirty again which is not
attributable by Bidder’s fault then it shall not be
under Bidder’s responsibility.
Basis of Proposal May be yes
17 Oct 2011 / PMCand POS
Parties agree for the following wordings:
“POS shall be only responsible for overall cleaning-up
any dirty caused by POS’s HUC.scope.
, provided thatClient/PMC would manage Vendor to prevent making
stain/mark ”
Item closed with no cost and time impact.
Page 7 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 8/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
39.General SOW
14 Oct 2011 / POS
Bidder’s Proposal is based on the condition that Bidder
has free access 24/24 Hr to Facilities in order to
perform the works without the interruption caused by
PMC/LSJOC and its other Contractors. In case offshoreschedule is delayed or extended due to interfacing with
other PMC/LSJOC’s Contractors or any other reasonnot attributable to Bidder’s default, PMC/LSJOC will
reimburse any cost impact to Bidder based on the
proposed unit rates.
Bidder’s Proposal is based on the assumption that there
will be no drilling activities at the worksite during
HUC campaign.
Basis of Proposal Yes Yes
17 Oct 2011 / PMC
and POS
PMC Nnoted and further clarify with Client for the
following conditions:
- Free access to working area- Working shift (24/24).
- Number of people working on platform;
- Hotwork/cold work condition;
- Pressurized habitat requirement
41.General SOW
14 Oct 2011 / POS
Bidder’s Proposal is based on the schedule and work
sequences as proposed in Bidder’s Technical Proposal.
Should any request from PMC/Client to change the
sequences later on which lead to the increase in the
price shall be subject to Change Order
17 Oct 2011 / PMC
and POS
POS agrees to withdraw this exception.Item is closed with no cost and time impact.
PMC shall further clarify with LSJOC.
Page 8 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 9/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
43. General SOW
14 Oct 2011 / POS
Bidder’s Proposal is based on the assumption that
performance of HUC Thang Long Platform is before
and in continuity with HUC Dong Do Platform. Should
there be any additional mob/demob or stand-by time
between performance of HUC Thang Long Platform
and Dong Do Platform which is not attributable toBidder's fault then Bidder shall be reimbursed by
PMC/LSJOC for any time and cost incurred by Bidder
Basis of Proposal Yes Yes
17 Oct 2011 / PMC
and POS
POS agrees to withdraw this exception.
Item is closed with no cost and time impact.
Both parties agreed that this exception shall be
transmitted to Client (LSJOC) for further consideration
Page 9 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 10/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
45. General SOW Bidder’s Proposal is based on the assumption that the
tie-in of 10 flowlines of Thang Long Platform
(including 08 production wells and 02 water injection
wells) and 12 flowlines of Dong Do Platform
(including 10 production wells and 02 water injection
wells) are performed at the later stage after completion
of offshore HUC main campaign.
Therefore, Bidder assumed that the following services
free issued by PTSC MC/LSJOC:
- transportation of Bidder’s equipment & personnel from Bidder’s onshore base to
offshore worksite and vice versa, including
loading and offloading, any other infield
transportation if necessary,
- Catering and accommodation for Bidder’s
personnel during transportation & offshore
working duration.
Alternatively, Bidder could provide transportation and
accommodation as per the proposed vessel rates in
Section 4.3 – Schedule of Compensation.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS
Noted and further clarify with Client.
Both parties agreed to revised the above words as
follows:
“Bidder’s Proposal is based on the assumption that the
tie-in of 10 flowlines of Thang Long Platform
(including 08 production wells and 02 water injectionwells) and 12 flowlines of Dong Do Platform
(including 10 production wells and 02 water injection
wells) are performed based on well by well without
Page 10 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 11/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
utilization of pressurized habitat at the later stage after
completion of offshore HUC main campaign.
Therefore, Bidder assumed that the following services
free issued by PTSC MC/LSJOC:
- Transportation of Bidder’s equipment &
personnel from Bidder’s onshore base tooffshore worksite and vice versa, lifting
services such that loading cargo to vessel,
uploading to platform and to onshore, and
lifting for material, tools/equipment and ship-loose during working on platform, power
supply, and air supply.
- Catering and accommodation for Bidder’s
personnel during transportation & offshore
working duration.
- PMC/LSJOC will notice bidder any offshore
campaign at least two (02) weeks before
mobilization date.
Alternatively, Bidder could provide transportation and
accommodation as per the proposed vessel rates in
Section 4.3 – Schedule of Compensation”
47. 09-Nov-11 / Hien
LQ
All preparation related to offshore works shall be
performed by POS.
48. General SOW 14 Oct 2011 / POS To PMC Only:
Bidder’s Proposal excludes the following specialist
services which shall be free issued by PTSC MC: N2/He leak testing, Flange Management, Mechanical
Cleaning, Bolt Tensioning. Since PTSC MC may have
the contract with such specialist vendors to provide
onshore services. Alternative, POS can provide these
services to PMC/LSJOC based on reimbursable basis.
Basis of Proposal Yes Yes
Page 11 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 12/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
17 Oct 2011 / PMC
and POS
POS agrees to withdraw this exception and refer to
Item 10.
Item is closed with no cost and time impact.
50. 09-Nov-11 / Hien
LQPMC may be a sub-contractor for the said services.
51.General SOW
14 Oct 2011 / POS
Bidder’s Proposal is based on the assumption thatProvisional Acceptance Certificate shall be issued by
PMC/LSJOC separately for each milestone i.e
separately for completion of offshore HUC and each
flow-line tie-in.
Basis of Proposal
17 Oct 2011 / PMC
and POSPMC Nnoted and further clarify with Client.
53. General SOW
14 Oct 2011 / POS
Bidder’s HUC engineering is limited to the preparation
and development of HUC schedule, jobcards,workpacks for the offshore hook-up and
commissioning.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS
Parties agrees for the following wordings:
POS shall be responsible for offshore Hook up and
Commissioning engineering as specified in ITB, Part
4.1 - Scope of Work, Paragraph B1.5 – Offshore
hookup engineering. Except for clarification as Item 44 below.
tsupport SCOPE OF WORK for all facilities that meetsall the requirements as set forth in the contract. HUC
scope shall include as follow:
Preparation of activity task sheets that include full
bill of materials for each task;
Page 12 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 13/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
Preparation of a detailed schedule for offshore
work taking in to account all discipline activities;
List of equipment to be offshore installed;
Preparation of HUC bill of materials Details of
mechanical completion tasks to be performedoffshore;
Details of Pre-commissioning tasks to be
performed offshore;
Preparation of detailed schedule of vendor
representatives required offshore during HUC. POS
shall be responsible for coordination of vendor
representation offshore as required; and
Temporary power requirements calculation and
provision.
Ensuring all necessary drawings and documentsrequired to complete the activities have been
identified and are available to HUC crew;
Preparing nitrogen leak test procedure for offshore
testing;
Preparing hydrotest packs for offshore testing;
Preparing required tools list including hand and
mechanical/electrical tools.
Item is closed with no cost and time
impact.
Page 13 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 14/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
55.
General SOW
14 Oct 2011 / POS
Bidder’s proposal exclude any delay due to adverse
weather and/or bad sea condition and/or any other
standby which is not attributable to Bidder’s fault.
Bidder shall be reimbursed by PMC/LSJOC any cost
impact for these cases as per the proposed rates in
Section 4.3 – Schedule of Compensation.
Basis of Proposal Yes Yes
17 Oct 2011 / PMC
and POS
Both parties agreed that this exception shall be
transferred and discussed in T&Cs exception.
POS agrees to withdraw this item with no cost and time
impact.
57.General SOW
14 Oct 2011 / POS
Price of Marine Gas Oil for Work Barge Spread is
quoted to PMC/LSJOC based on 750 USD/MT. Any
increase/decrease in marine gas oil cost from USD 750 per Metre Tons shall result in an adjustment to the
Contract Price (increase or decrease) based on the net
actual documented cost of the marine fuel gas and
actual documented quantity usage basis
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS
This item shall be discussed in commercial section with
further clarifying.
58.
\
General SOW
14 Oct 2011 / POS
Bidder assumes that start-up assistance works (if require) shall be performed by Bidder during offshore
HUC main campaign and compensated by
PMC/LSJOC based on the proposed rates in Schedule
4.3 and approved timesheets. Otherwise, PMC/LSJOC
shall provide transportation, catering and
accommodation for Bidder’s personnel during offshoreworking.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS
PMC Nnoted and further clarify with Client.
Both parties agreed to integrate Item 45, 46 and
wording as below:
- Any scope related to startup and performance
Page 14 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 15/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
test assistance shall be treated as optional scope
and shall be reimbursed accordingly.
60.General SOW
14 Oct 2011 / POS
To PMC Only:
For onshore pre-commissioning & commissioning,
Bidder only provides its personnel to join with PMC’s
team to carry out onshore pre-com/comm. supports ,Bidder’ Proposal excludes the provision of any
materials, consumables & equipment for this scope, if
necessary.
Basis of Proposal
17 Oct 2011 / PMC
and POS
PMC confirmed that onshore pre-com and
commissioning is not under HUC scope so POS agrees
to withdraw this item with no time and cost impact.
62. General SOW
14 Oct 2011 / POS
Bidder’s proposal is based on the current ITB
documents and company supplied data provided by
Company. Any changes/revisions shall be subject to
mutual agreement. Any discrepancies betweendocument/ drawings and the actual conditions shall be
subject to Change Order.
Basis of Proposal May be Yes
17 Oct 2011 / PMCand POS
This item shall be worded in the contract provision
accordingly.Item is closed with no cost and time impact.
64.General SOW
14 Oct 2011 / POS
Company shall ensure that all the onshore pre-
fabricated items for offshore HUC works shall include
the extra length for the field run and installation.
Bidder qualified that 300mm over-length allowance for offshore fit-up and installation shall be provided by
Fabricator.
Basis of Proposal No No
17 Oct 2011 / PMC
and POSAgreed and closed with no cost and time impact.
Page 15 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 16/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
66.General SOW
14 Oct 2011 / POS
Bidder’s proposal is exclusive of preservation and
safety/security services for platform during onshore
and offshore prior to and after HUC phase.
Basis of
Proposal No Yes
17 Oct 2011 / PMC
and POS
This item is close with the understanding that POSwouldshall be only responsible for preservation for
facilities of HUC scope after during HUC’s campaign.Any other preservation shall not under POS scope.
No cost and time impact shall be applied.
68. 09-Nov-11 / Hien
LQ
Others preservation if required shall be performed by
POS/PMC and reimbursed by LSJOC.
69. General SOW
14 Oct 2011 / POS
– Vendor representatives shall be provided by
Company, if requested by Bidder during offshore
HUC schedule. Company shall provide the Vendor
equipment Data/Manuals and recommended
equipment testing and commissioning procedures
of Company supplied equipment whenever
available for Bidder’s technical reference.
– Bidder’s proposal is exclusive of all costs for
Vendor representatives (including but not limited to
salary and similar compensation cost,
BOSIET/HUET, medical check-up, boarding cards,
all the transportation even from onshore to offshore
and vice-versa, etc but include catering andaccommodation onboard Bidder’s HUC Marine
Spread, during HUC main campaign).
– Bidder shall advise Company when the Vendor Representatives need to be made available offshore
for planning and scheduling purposes in order to
optimize and to make effective use of Vendor
Representative's time.
Basis of Proposal Yes Yes
17 Oct 2011 / PMC - Item 1: Agreed and closed with no cost and time
Page 16 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 17/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
and POS
impact.
- Item 2: Agreed with exception the understanding thatPOS would pay for all cost in relation to requesting
Vendor representatives at site if due to POS’s fault /
mistake.
- Item 3: Agreed and closed provided that POS wouldwell manage its scope of works and coordinate with
PMC/Client for such kind of mobilized / demobilized
plan for an effective and workable plan.
Item is closed with no time and cost impact.
71.General SOW
14 Oct 2011 / POS
Bidder’s proposal is inclusive the catering and
accommodation cost for maximum of 25 Company’s
representatives and Vendor Representative, etc… Any
additional shall be subject to Change Order. All
communication cost for Company’s personnelincluding reps, vendor, etc are exclusive from Bidder’s
Proposal and shall be compensated to Bidder onreimbursable basis.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS
Agreed with POS’s proposal for accommodation
capacity at 25 pax for PMC, Client and Vendors.
Communication cost shall be reimbursed by
PMC/Client, provided that POS has reliable and
verifiable system documents to record any incurred cost
in relation such kind of services.Item is closed with no cost and time impact.
Page 17 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 18/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
73.General SOW
14 Oct 2011 / POS
A set of latest documents and drawings shall be madeavailable on platform before sail away of topside for
red-mark, checking to confirm readiness for
commissioning, ect including all vendor
documentations, onshore check-sheets and procedures,
project documents.
Basis of Proposal No No
17 Oct 2011 / PMC
and POSAgreed and closed with no cost and time impact.
75. 10-Nov-11 / Hien
LQ
POS must make sure that the said documents and
drawings are available for works performed. PMC shall
support as engineering scope.
76.General SOW
14 Oct 2011 / POS
Bidder’s proposal is subject to the offshore scheduled
proposal in Bidder proposal. Any addition cost arisen
from the delay of Project HUC schedule which is not
attributable to Bidder’s fault shall be subject to Change
Order.
Basis of Proposal Yes Yes
17 Oct 2011 / PMC
and POSAgreed and closed with no time and cost impact.
78.General SOW
14 Oct 2011 / POS
Leak test for the riser spools from Jacket to Topsides
will not required due to the fact that there is no closed
end of such spools at the performing time.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS Noted and further clarify with Client.
80. General SOW 14 Oct 2011 / POS Bidder’s proposal excludes all installation aids and
temporaries for offshore deck and jacket installation or
other by OIC such as lifting padeyes, trunions,
temporary supports, protection frames, scaffolding
platform which will be removed and painting touched
up by OIC prior to hand over to Bidder.
Basis of Proposal Yes Yes
Page 18 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 19/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
17 Oct 2011 / PMC
and POSAgreed and closed with no cost and time impact.
82.General SOW
14 Oct 2011 / POS
All last add-on conductors to be installed after
Topsides installation completion will be not under
HUC’s scope of work.Basis of Proposal No Yes
17 Oct 2011 / PMCand POS
Agreed and close with no cost and time impact.
84.General SOW
14 Oct 2011 / POS
– In case, any flow-line is not ready for tie-in works
during the offshore HUC campaign then Bidder
will perform the tie-in works in several campaigns
upon receipt the Company’s instruction.
– Company will provide under its own cost all
transportation, catering and accommodation for
Bidder’s construction crew, tools and equipment,
etc required for each well tie-in works.
– Any standby of personnel and tool and equipment
due to adverse weather or other reasons that shall
be reimbursed by Company to Bidder as per the proposed rates.
Basis of Proposal Yes Yes
17 Oct 2011 / PMC
and POSAgreed and closed with no time and cost impact.
86. General SOW 14 Oct 2011 / POS To PMC Only:
– PMC shall prepare and provide Bidder with all sub-system/system boundary drawings during pre-
commioning phase;
– PMC will provide Bidder with all applicable
drawings markup all HUC scope prior to HUC
preparation phase.
Main contractor/
detailed
engineering to boundary scope of
work betweenHUC, drilling,
OIC, etc
contractors
No Yes
Page 19 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 20/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
17 Oct 2011 / PMCand POS
Agreed and closed with no time and cost impact.
88. 10-Nov-11 / Hien
LQ
PMC shall provide all drawings. POS to develop
boundary drawings for his cope and submit to PTSC
MC/LSJOC for approval.
89.General SOW
14 Oct 2011 / POS
To PMC Only:
– Bidder is responsible for prepare packing list,
shiploose list following jobcards or wells/slot and
disciplines for ease of handling during offshore
HUC;
– PMC is responsible for tagging and packing ship-
loose items into boxes following the packing list
submitted by Bidder
– Bidder is responsible Provisions of suitablecontainers, long baskets, lifting gears and the like.
Packing material into containers and the like.
Preparations of packing lists/ manifests;
– PMC shall prepare permit to pass the gate security
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POSAgreed and closed with no cost and time impact.
91. 10-Nov-11 / Hien
LQ
Bidder is responsible for tagging and packing ship-
loose items into boxes. The packing list to be submitted
to PTSC M&C for information.
Page 20 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 21/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
92.General SOW
14 Oct 2011 / POS
To PMC Only:
Battery limit of HUC:
– Pipelines are above the flanges of risers at top of
jacket;
– For umbilical if any (no drawing provided to
identify this) is from junction box on sub-cellar
deck (or cellar deck) to local e-house;
– For structure is above of jacket legs where
connection between jacket and topside.
Reflect to its scope No Yes
17 Oct 2011 / PMC
and POS
Agreed and closed with no cost and time impact,
provided, however that POS shall be responsible for its
scope of works in accordance with the contract
provisions.
Both parties agreed to integrate Item 54 as below: – Bidder’s Proposal excludes any Hook up &
Commissioning for Umbilical from FPSO that
should be under FPSO contractor scope.
94.General SOW
14 Oct 2011 / POS
To PMC Only:
PMC/Company will be responsible for bunkering the
fuel/liquid for all tanks i.e. crane pedestal, process
vessels, tanks, etc prior to the offshore HUC
commencement.
Basis of Proposal No Yes
18 Oct 2011 / PMC POS agrees to withdraw this item.
96. 10-Nov-11 / Hien
LQPOS scope of works
Page 21 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 22/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
97.
4.2 – Work packs/
B.1.5 Hook-Up
Engineering
The SOW drawing should
include items that may beinstalled and completed
onshore but are required to
be removed during
transportation of the deck.
14 Oct 2011 / POS
Bidder’s proposal excludes any removed items during
transportation which may be re-installed during
offshore HUC campaign.
Since Bidder is
unable to know the
exactly items that
may be requested
to be removed by
Company during
transportation of the deck.
No Yes
17 Oct 2011 / PMC
and POS
PMC noted.
Parties agrees that, POS shall consider to back charge
PMC/Client for any requirements on the re-installation
of major components only.
Item closed with no cost and time impact.
99. 10-Nov-11 / Hien
LQ
T&C scope of works. POS shall perform the works as
required and cost shall be back charged to T&Iaccount.
100.
Section 4.2 – Work packs /
B.1.5 Hook-Up
Engineering/
Alignment and tuning of
all systems between
wellhead platforms and
FPSO
14 Oct 2011 / POSBidder is assuming that this work shall be performedduring offshore HUC main campaign. Otherwise, it is
subject to Change Order.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS Noted and further clarify with Client.
Page 22 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 23/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
102.
B.1.7 Start-up and
Performance Testing
Engineering
Start-up operations will
commence in accordance
with procedures jointlydeveloped by
CONTRACTOR and
COMPANY. These
procedures will beexecuted jointly by
COMPANY operations
personnel and the offshore
commissioning and start-
up teams.
14 Oct 2011 / POS
Bidder’s Proposal is limited by provision of personnel
for Startup assistance period and Bidder shall not joinwith Company for preparation of procedures.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS
POS agrees to withdraw this item and integrate into
Item 26.
104.
B.1.7 Start-up and
Performance TestingEngineeringCONTRACTOR shall
assist COMPANY in the
preparation of a
Performance Testing
Strategy Procedure to
ensure the satisfactory
completion of performance
tests
14 Oct 2011 / POS
Bidder’s proposal is limited by provision of personnel
for Startup assistance period and Bidder shall not joinwith Company for preparation of Performance TestingStrategy Procedure.
Basis of Proposal No Yes
18 Oct 2011 / PMCPOS agrees to withdraw this item and integrate into
Item 26.
Page 23 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 24/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
106.
B.6.1 General
All Thang Long WHP and
Dong Do WHP Topsides
installations, hookup and
commissioning work may
be conducted under
SIMOPS conditions.CONTRACTOR shall
allow for continuous
installation and hookup
and commissioning programs.
14 Oct 2011 / POS
Bidder’s Proposal is based on the assumption that
Bidder shall free access to Installation Site for
performance of HUC works without the interruption
caused by Company and its other Bidders. Otherwise, it
is subject to Change Order
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS
POS agrees to withdraw this item and discussed in item
17.
108.
B.7.4 -Instrumentation,
Automation and
Related Equipment
Completion of all drawing
’as built’ as required.
14 Oct 2011 / POSBidder’s Proposal is based on to complete Red-line
Mark-up for HUC Scope only.Basis of Proposal No Yes
17 Oct 2011 / PMC
and POSAgreed and closed with no cost and time impact.
110.10-Nov-11 / Hien
LQ
Bidder shall responsible to complete all “as-built”
drawings related to his scope (HUC, Commissioning,…)
111.
B.7.6 Offshore
Mechanical
Completion, Pre-Commissioning,
and
Commissioning
CONTRACTOR shall
14 Oct 2011 / POS
Bidder’s Proposal excludes provision of a portablecabin. Because, Bidder shall provide Work Barge
Spread for accommodation during offshore HUC
campaign
Basis of Proposal No Yes
Page 24 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 25/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
provide a port-a-
cabin or officesuitably rated for
offshore hazardous
area for use by
offshore MCtechnicians as a
work area for
compiling dossiers,
etc.
17 Oct 2011 / PMC
and POS Noted and further clarify with Client.
113.10-Nov-11 / Hien
LQ
Bidder shall responsible to provide “suitable office” to
carry the works at offshore.
114.
B.7.6 OffshoreMechanical
Completion, Pre-
Commissioning,and
Commissioning
CONTRACTOR shall
conduct offshore leak tests
of all platform process
piping, vessels and
equipment at pressures
10% above operating pressures, with a 99%
nitrogen/1% helium
mixture.
14 Oct 2011 / POS
Bidder’s proposal is based on the performance of leak
test for hook-up spools only not for all platform process piping.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS Noted and further clarify with Client.
Page 25 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 26/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
116.10-Nov-11 / Hien
LQClarify with Item 29.
117.
B.7.1 Piping and Relatedequipment:
Prefabricate
(onshore) and
hydrotest pipespools prior to
being shipped
offshore to
minimize the
offshore
component of work
14 Oct 2011 / POS
Bidder’s Proposal is based on the assumption thatOnshore fabrication and hydro testing for pipe spools
prior to offshore HUC campaign will be carried out by
Fabrication contractor.
Basis of Proposal No Yes
18 Oct 2011 / PMC
Item is closed with the agreement that POS shall carry
out fabricating, testing for flow lines tie-in spool in
accordance with POS’s offshore survey’s results.
This Item is included in the Item 7 and to be closed.
No cost and time impact would be applied.
119.
B.7.1 Perform
hydrotesting of
completed
modifications inaccordance with
approved the
hydrotesting
procedure.
Perform final nitrogen leak test on pipework in
accordance with
COMPANY
specifications
14 Oct 2011 / POS
1. Bidder assumes that risers will be performedhydrotesting which have been installed by Bidder.
2. Bidder assumes that connections between riser spool
to jacket riser flange and topside piping are by flange
connection (with flange management) or by golden
weld and no leak test required.
3. Bidder assumes that Bidder only performs nitrogen
leak test for spools installed by Bidder.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS Noted and further clarify with Client.
Page 26 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 27/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
121.10-Nov-11 / Hien
LQ Nitrogen/Helium leak test shall be discussed at item 29.
122.
B.7.2 Top-up lube oil,
hydraulic oil,
refrigerant, etc. if
required, to themanufacturer
recommended
levels
14 Oct 2011 / POS
Bidder’s Proposal excludes Top-up lube oil, hydraulic
oil, refrigerant, etc. if required, to the manufacturer
recommended levels for pre-commissioning,
commissioning, start-up and performance test.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS Noted and further clarify with Client.
124.10-Nov-11 / Hien
LQ
Bidder responsible for 1st fill before commissioning
and start-up. This needs to be clarified with LSJOC.
125. B.7.3 Re-instate Fiber
Optic Cables
14 Oct 2011 / POS
Bidder’s Proposal excludes any Hook up &Commissioning for Fiber Optic and Umbilical from
FPSO to each Junction Box at DD WHP and from DD
WHP to each Junction Box at TL WHP
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS
POS agrees with withdraw this item, however
integrated into Item 41.
127.
B.7.5 Completion of all
tasks detailed in the
step by step
activity scope of
work for telecommunication
s, including any
tasks carried over
14 Oct 2011 / POS
Bidder’s Proposal excludes to install the carried over
works and completion of onshore punchlist include“A” puch-list and “B” punch-list items. Alternatively,
Bidder can perform such works which is subject to
Change Order.
Basis of Proposal No Yes
Page 27 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 28/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
from onshore
fabrication yard
Completion of all ‘A’ punch-list items and as
many ‘B’ items as
feasible;
17 Oct 2011 / PMC
and POS
POS agrees with withdraw this item and integrated into
Item 5.
129.
B.7.6 CONTRACTOR’s
scope also includes
removal of
temporary power
generation facilities
following
introduction of
hydrocarbons tothe platform.
14 Oct 2011 / POSBidder qualifies that this scope is under start-up and
performance test scope not under HUC scope.Reflect to its scope No Yes
17 Oct 2011 / PMC
and POS Noted and further clarify with Client.
131.10-Nov-11 / Hien
LQ
It is required for Commissioning and taken over by
LSJOC
132.
B.7.6 CONTRACTOR
shall promptly
clear all refuge,
surplus, scrap,
temporary
equipment and
materials,
containers and thelike from the
platforms at the
appropriate time
14 Oct 2011 / POS
Bidder will clear all refuge, surplus, crap, temporary
equipment and materials, container and the like used
for HUC campaign only.
Reflect to its scope No Yes
18 Oct 2011 / PMC Agreed and closed with no cost and time impact.
134.10-Nov-11 / Hien
LQ
Others campaigns are also required to clear as it needs
to complete the remaining HUC and offshore
commissioning activities.
Page 28 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 29/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
135.
B.7.6 Notwithstanding the
foregoing,CONTRACTOR
shall be responsible
for completing all
remaining Work including
installation, hook
up, mechanical
completion, pre-
commissioning,
and commissioning
of
process/productionand utilities
pipework and
equipment notcompleted in
construction yard.
This shall include
completing all ‘A’
and ‘B’ punchlist
items and
carryover work
from construction
yard.
14 Oct 2011 / POS
Bidder assumes that Carryover works and onshore
punchlist must be provided to Bidder at least 02
months prior to commencement of offshore HUC for further preparation. These works are subjected to
Change Order.
Reflect to its scope Yes Yes
17 Oct 2011 / PMC
and POS
PMC/Client shall provide the mentioned document at
least 01 week in advancebefore load-out date.
Item is closed with no time and cost impact.
Page 29 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 30/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
137.
B.7.6 CONTRACTOR
shall provide all
tools, consumables,
equipment,
personnel and anyother resources
required to
mechanically
complete, pre-
commission and
commission the
CONTRACT
Objects
14 Oct 2011 / POS
1. Bidder’s proposal excludes supply of any special
tool for pre-commissioning and commissioning that
must be provided by Vendor or EPCI contractor.
2. Bidder proposal excludes supply of first fill (oil,
lubricant etc.) for all reservoir, vessel or tank for pre-
commissioning, commissioning or operation.
3. Bidder qualifies that during offshore HUC, if any
system that is found leakage due to not good
fabrication, or not good manufacturing by supplier,then supply of additional fill or replacement (oil,
lubricant etc.) shall not be under Bidder’s
responsibility.
Basis of Proposal Yes Yes
17 Oct 2011 / PMC
and POSPOS agrees with withdraw this item.
139.
B.7.2 Mechanical andRelated Equipment
Hookup and reinstate any
piping to the
mechanicalequipment that has
been removed for
transportation
14 Oct 2011 / POS
Bidder’s Proposal only includes to hook up and
reinstate all piping and mechanical equipment related
to HUC scope which may be removed during
transportation. Otherwise, it is subject to Change
Order.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS
POS agrees with withdraw this item and transferred to
Item 43.
141.
B.7.3 Electrical and
Related Equipment
CONTRACTOR shall
14 Oct 2011 / POS
Bidder’s Proposal only includes reinstatement of all
equipment and cables related to HUC scope which may
be removed during transportation. Otherwise, it is
subject to Change Order.
Basis of Proposal No Yes
Page 30 of 20
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 31/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
reinstate all
equipment andcables removed for
platform
installation.
17 Oct 2011 / PMC
and POS
POS agrees with withdraw this item and transferred to
Item 43..
143.
B.7.5 CONTRACTOR
shall be responsible
completing
offshore Hook up
and
Commissioning
work) for the
telecommunication
system that provides for fully
functionaltelecommunication
s system that will
satisfactorily meet
the handover
requirements from
project to
operations with
minimal punch list
work HUC scope
shall include
14 Oct 2011 / POS
Bidder’s Proposal excludes hook up and
commissioning for umbilical from FPSO to Umbilical
Splitter Junction Box and from Splitter Junction Box toF/O junction box, Power cable Junction box, and
control cable Junction box.
Basis of Proposal No Yes
17 Oct 2011 / PMC
and POS
POS agrees with withdraw this item and integrated into
Item 41.
145. HUC Riser 14 Oct 2011 / POS
1) Bidder assumed that connections between riser spool to jacket riser flange and topside piping are by
flange connection (with flange management) or by
golden weld and no leak test required.
Basis of Proposal No Yes
Page 31 of 20
C S h d l C
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 32/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
2) All riser spools shall be hung off with temporary
supports on topside or drilling deck before loadoutand shall be transported together to offshore.
3) Bidder proposal only included hydrotest for riser
spools that will be welded offshore.17 Oct 2011 / PMC
and POS Note and further clarify with POS.
147.10-Nov-11 / Hien
LQ
1) Clarify with LSJOC
2) Transportation these materials to offshore shall
be Bidder responsible. However, PMC/LSJOC
shall consider to allow Bidder as the above
suggestion if possible.
148.
B.3 – TL WHP Topside
And DD WHP TopsideMechanical, Pre-
Commissioning And
Commissioning
14 Oct 2011 / POS
To PMC Only:
̶ Bidder’s scope shall be limited to provision of
personnel to support for the work.
̶ Bidder assumes that all tool/equipment and
consumable for this scope shall be provided by
PMC.
̶ Bidder’s personnel are only joint testing for ITR-
B (pre-commissioning) but not for ITR-A
(mechanical completion).
Basis of Proposal Yes Yes
17 Oct 2011 /
PMC and POS POS agrees with withdraw this item.150. General scope of work 19 Oct/ POS Due to lake of drawing/documents in ITB to
indentify interface scope of work for hookup
between helideck and topside, POS proposal is based
on assumsion that are as below:
1. Structure Hook-up: install 02 handrails from
May be May be
Page 32 of 20
C S h d l C t
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 33/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
weather deck to helideck.
2. Piping: Install 04 open drain line from helideck to
topside.
3. Electrical: Install 24 lightings and 4 floodlights at
helideck.
4. Fire and Gas: Install status light DAL500102,
DAL500103 at helideck. Install open path IR gas detector transmitters at helideck
Any additional scope not mentioned above shall be
consider as additional scope.
151. Contract mile stone date 19 Oct/ POS
PMC/LSJOC to confirm what is the date that drilling
complete their set up and allow HUC barge to be along
side platform for HUC work
Yes Yes
152.10-Nov-11 /
Hien LQPMC to clarify with LSJOC
SECTION 4.3 – SCHEDULE OF COMPENSATION
153. 1.0 GENERALPREAMBLE
1.6 All rates, pricesand sum contained hereinin this Section 4.3 shall bethe full inclusive rates, prices and sums todesign, engineer, procure, pre-fabricate, construct,transport, install, hookup
and commission apply protective treatment,
14 Oct 2011 /POS
1.6 All rates, prices and sum contained herein inthis Section 4.3 shall be the full inclusive rates, prices and sums to design, engineer, procure, pre-fabricate, construct, transport, install, hookup andcommission apply protective treatment, inspect,onshore test & pre-commission, pack, loadout andseafasten, hook-up and commissioning, completionand start up assistance and other activities to completethe WORKS.
Reflect to its scope No No
Page 33 of 20
C S h d l C t
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 34/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)inspect, onshore test & pre-commission, pack,loadout and seafasten,hook-up andcommissioning,completion and start upassistance and other
activities to complete theWORKS.
17 Oct 2011 /PMC and POS
Further clarify in commercial section.
155.
1.10 All fabricationrates shall include for temporary works,fabrication aids,fabricating and erectingtemporary supports andeffectively staying andsupporting all itemsdeemed necessary duringfabrication and erection,and subsequentlydismantling and clearingall necessary temporaryworks and temporarysupports
14 Oct 2011 /POS
1.10 All fabrication rates shall include for temporary works, fabrication aids, fabricating anderecting temporary supports and effectively stayingand supporting all items deemed necessary duringfabrication and erection, and subsequentlydismantling and clearing all necessary temporary
works and temporary supports
Reflect to its scope No No
17 Oct 2011 /PMC and POS
Further clarify in commercial section.
157.
1.14 CONTRACTOR shall provide all serviceswith regard to co-ordination, including butnot limited to material,
weight, and quality and progress control.
14 Oct 2011 /POS
1.14 CONTRACTOR shall provide all services withregard to co-ordination, including but not limited tomaterial, weight, and quality and progress control.
Reflect to its scope No No
17 Oct 2011 /PMC and POS
Page 34 of 20
Compan Sched le Cost
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 35/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
159.
1.16 The costs for CONTRACTOR suppliedmaterials and equipmentshall cover procurement,source inspection,expediting, FAT,transportation and
handling, customclearance and duties, tax.CONTRACTOR shallalso allow for provision of third party inspection,original certificate,expediting and vendor representative for all theCONTRACTOR suppliedequipment as necessary.
14 Oct 2011 / POS
1.16 The costs for CONTRACTOR suppliedmaterials and equipment shall cover procurement,source inspection, expediting, FAT, transportation andhandling, custom clearance and duties, tax.CONTRACTOR shall also allow for provision of third party inspection, original certificate, expediting andvendor representative for all the CONTRACTOR supplied equipment as necessary.
Reflect to its scope No No
17 Oct 2011 /PMC and POS
Further clarify in commercial section.
161.
Schedule FPayment schedule of hook-
up and commissioning
3. Time Rate Basis For
Standby Of Contractor's
Spreads/
4.1 – Weather Standby
CONTRACTOR shall
propose a Weather
Limiting Criteria for all
activities of offshore
WORKS including, but
14 Oct 2011 / POS
4.1 – Weather Standby
CONTRACTOR shall propose a Weather Limiting
Criteria for all activities of offshore WORKS
including, but not limited to:
Heavy Lifting (more than 5MT but less than20MT)
Heavy Lifting (more than 20MT)
Pipelaying Operations
Topsides
Saturation Diving Operations
Surface Diving Operations
ROV Operations
Reflect to its scope No No
Page 35 of 20
Company Schedule Cost
7/27/2019 HUC Technical Exception (POS Response - 19 Oct 2011)_rev 1
http://slidepdf.com/reader/full/huc-technical-exception-pos-response-19-oct-2011rev-1 36/37
S/N
Company
Specs/Article/ Clause
Number
Dated / Parties Contractor Proposed ExceptionsReason(s) for
Exceptions
Schedule
Impact
(+/-)
Cost
Impact
(Yes/No)
not limited to:Heavy Lifting (more
than 5MT but less than
20MT)
Heavy Lifting (more
than 20MT)
Pipelaying OperationsTopsides
Saturation Diving
Operations
Surface Diving
OperationsROV Operations
17 Oct 2011 /
PMC and POS Further clarify in commercial section.
Section 4.4 to Section 4.11
163.
14 Oct 2011 / POS
To PMC Only:
POS shall comply for all requirements relevant to HUCscope. Other requirement which is not relevant shall be
revised/ changed to suit with Subcontract agreement.
17 Oct 2011 / PMC
and POS Noted.
165.10-Nov-11 / Hien
LQ
HUC and Commissioning Scope (includes onshore and
offshore)
Page 36 of 20