Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0 KEPCO & KHNP Non-Proprietary Human Factors Verification and Validation Scenarios Revision 0 Non-Proprietary December 2014 Copyright 2014 Korea Electric Power Corporation & Korea Hydro & Nuclear Power Co., Ltd All Rights Reserved

Upload: others

Post on 04-Feb-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP

Non-Proprietary

Human Factors Verification and Validation Scenarios

Revision 0

Non-Proprietary

December 2014

Copyright ⓒ 2014

Korea Electric Power Corporation &

Korea Hydro & Nuclear Power Co., Ltd

All Rights Reserved

Page 2: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP ii

Non-Proprietary

REVISION HISTORY

Revision Date Page Description

0 December

2014 All First Issue

This document was prepared for the design certification

application to the U.S. Nuclear Regulatory Commission and

contains technological information that constitutes intellectual

property.

Copying, using, or distributing the information in this

document in whole or in part is permitted only by the U.S.

Nuclear Regulatory Commission and its contractors for the

purpose of reviewing design certification application

materials. Other uses are strictly prohibited without the

written permission of Korea Electric Power Corporation and

Korea Hydro & Nuclear Power Co., Ltd.

Page 3: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP iii

Non-Proprietary

ABSTRACT

The purpose of this technical report, Human Factors Verification and Validation Scenarios, is to identify the operational conditions and scenarios that are used in the human-system interface (HSI) task support verification, design verification, and integrated system validation and to provide detailed scenarios suitable for use on a full-scope simulator.

The scenarios that are described in this technical report contain a sampling of operational conditions and a summary of the Advanced Power Reactor 1400 probabilistic risk assessment.

Page 4: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP iv

Non-Proprietary

TABLE OF CONTENTS

1. PURPOSE............................................................................................................. 1

2. SCOPE ................................................................................................................. 2

2.1. Applicable Documents .................................................................................................................... 2

3. SAMPLING OF OPERATIONAL CONDITIONS FOR THE INTEGRATED SYSTEM VERIFICATION ..................................................................................................... 3

3.1. Plant Conditions .............................................................................................................................. 3

3.2. Types of Personnel Tasks ............................................................................................................... 5

3.3. Situational Factors or Error-Forcing Contexts ................................................................................ 7

4. SUMMARY OF THE APR1400 PROBABILISTIC RISK ASSESSMENT ................... 8

4.1. Major Operator Errors ..................................................................................................................... 8

4.2. Total Core Damage Frequency of Initial Events ............................................................................. 8

4.3. Analysis of Significances ................................................................................................................ 8

5. APR1400 HUMAN FACTORS VERIFICATION AND VALIDATION SCENARIOS ..... 9

5.1. Small Break Loss-of-Coolant Accident with Computer-Based Procedure and Human-System Interface Display Failure ............................................................................................................... 10

5.2. Anticipated Transient without Trip with Ovation Distributed Control System Failure ................... 12

5.3. Excessive Steam Demand Event with Alarm Server Failure ........................................................ 13

5.4. Loss of All Feedwater ................................................................................................................... 14

5.5. Station Blackout ............................................................................................................................ 15

5.6. Steam Generator Tube Rupture ................................................................................................... 16

5.7. Main Control Room FIRE ............................................................................................................. 17

Appendix A Small Break Loss-of-Coolant Accident with Computer-Based Procedure and Human-System Interface Display Failure (ISV-1) .............................................. A1

Appendix B Anticipated Transient without Trip with Ovation Distributed Control System Failures (ISV-2)............................................................................................................... B1

Appendix C Excessive Steam Demand Event with Alarm Server Failure (ISV3) ................... C1

Appendix D Loss of All Feedwater (ISV4) ............................................................................... D1

Appendix E Station Blackout (ISV5) ....................................................................................... E1

Appendix F Steam Generator Tube Rupture (ISV6) ............................................................... F1

Appendix G Main Control Room Fire (ISV7) ........................................................................... G1

Page 5: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP v

Non-Proprietary

ACRONYMS AND ABBREVIATIONS

AAC alternate alternating current

ACU air cleaning unit

AOP abnormal operating procedure

AFWP auxiliary feedwater pump

ATWT anticipated transient without trip

BOL beginning of life

BTP Branch Technical Position

CBP computer-based procedure

CCW component cooling water

CCWP component cooling water pump

CHG charging

CMF common mode failure

CRS control room supervisor

CVCS chemical and volume control system

DBA design basis accident

DCS distributed control system

DG diesel generator

EDG emergency diesel generator

EO electrical operator

EOP emergency operating procedure

ESWP essential service water pump

FW feedwater

GOP general operating procedure

HA human action

HSB hot standby

HSI human system interface

Hx heat exchanger

I&C instrumentation and control

IC initial condition

ISV integrated system validation

L/D letdown

LDP large display panel

Page 6: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP vi

Non-Proprietary

LOAF loss of all feedwater

LOCA loss-of-coolant accident

LOOP loss of offsite power

LPMS loose part monitoring system

MCR main control room

MD motor driven

MF mitigating function

MFWP main feedwater pump

NRC U.S. Nuclear Regulatory Commission

OER operating experience review

PM preventive maintenance

PME predictive maintenance engineer

POP plant operating procedure

PRA probabilistic risk assessment

PZR pressurizer

RCS reactor coolant system

RO reactor operator

RPCS reactor power cutback system

RSR remote shutdown room

RTP return to power

SBO station black out

SBLOCA small break loss-of-coolant accident

SG steam generator

SGTR steam generator tube rupture

SI safety injection

SIAS safety injection actuation signal

SM shift manager

SRO senior reactor operator

STA shift technical advisor

SUFWP start-up feedwater pump

Tavg average temperature

TD turbine driven

TO turbine operator

TS trade secret

Page 7: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP vii

Non-Proprietary

VCT volume control tank

V&V verification and validation

Page 8: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP viii

Non-Proprietary

Page intestinally blank

Page 9: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 1

Non-Proprietary

1. PURPOSE

The purpose of this technical report, Human Factors Verification and Validation Scenarios, is to identify the operational conditions and scenarios that are used in the human-system interface (HSI) task support verification, design verification, and integrated system validation (ISV). The verification and validation (V&V) scenarios are detailed scenarios that are suitable for use on a full-scope simulator.

Page 10: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 2

Non-Proprietary

2. SCOPE

The V&V scenarios, which are described in Section 5 of this report, include the following information to reasonably assure that the important dimensions of performance are addressed and to allow the scenarios to be accurately and consistently presented in repeated trials:

Description of the scenario and any pertinent prior history necessary for personnel to understand the state of the plant at the startup of the scenario

Initial conditions: Precise definition of the plant’s functions, processes, systems, component conditions, and performance parameters (e.g., similar to the initial conditions at shift turnover)

Events (e.g., failures) that occur during the scenario and their initiating conditions (e.g., based on time, parameter value)

Precise definition of workplace factors (e.g., environmental conditions, such as low levels of illumination)

Needs for task support (e.g., procedures, technical specifications)

Staffing level

Details of communication content between control room personnel and remote personnel (e.g., load dispatcher via telephone)

Scripted responses for test personnel who act as plant personnel in the scenarios

Applicable Documents 2.1.

NUREG-0711, “Human Factors Engineering Program Review Model," Rev. 3, U.S. Nuclear 1.Regulatory Commission, 2012.

NUREG-0800, "Standard Review Plan," Rev. 2, U.S. Nuclear Regulatory Commission, 2007. 2.

NUREG-0700, “Human-System Interface Design Review Guidelines,” Rev. 2, U.S. Nuclear 3.Regulatory Commission, 2002.

NUREG/CR-6393, “Integrated System Validation: Methodology and Review Criteria,” U.S. Nuclear 4.Regulatory Commission, 1997.

APR1400-E-I-NR-14008-P, “Human Factors Verification and Validation Implementation Plan,” KHNP, 5.December 2014.

BTP 7-19, “Guidance for Evaluation of Diversity and Defense-in-Depth in Digital Computer-Based 6.Instrumentation and Control Systems,” Rev. 6, U.S. Nuclear Regulatory Commission, July 2012.

Page 11: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 3

Non-Proprietary

3. SAMPLING of OPERATIONAL CONDITIONS for THE INTEGRATED SYSTEM VERIFICATION

Plant Conditions 3.1.

TS

TS

Page 12: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 4

Non-Proprietary

TS

Page 13: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 5

Non-Proprietary

Types of Personnel Tasks 3.2. TS

Page 14: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 6

Non-Proprietary

TS

Page 15: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 7

Non-Proprietary

Situational Factors or Error-Forcing Contexts 3.3.

TS

Page 16: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 8

Non-Proprietary

4. SUMMARY OF THE APR1400 PROBABILISTIC RISK ASSESSMENT

Major Operator Errors 4.1.

Total Core Damage Frequency of Initial Events 4.2.

Analysis of Significances 4.3.

TS

TS

TS

Page 17: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 9

Non-Proprietary

5. APR1400 HUMAN FACTORS VERIFICATION AND VALIDATION SCENARIOS

TS

Page 18: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 10

Non-Proprietary

Small Break Loss-of-Coolant Accident with Computer-Based Procedure and Human-System 5.1.Interface Display Failure

TS

Page 19: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 11

Non-Proprietary

TS

Page 20: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 12

Non-Proprietary

Anticipated Transient without Trip with Ovation Distributed Control System Failure 5.2.

TS

Page 21: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 13

Non-Proprietary

Excessive Steam Demand Event with Alarm Server Failure 5.3.

TS

Page 22: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 14

Non-Proprietary

Loss of All Feedwater 5.4.

TS

Page 23: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 15

Non-Proprietary

Station Blackout 5.5.

TS

Page 24: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 16

Non-Proprietary

Steam Generator Tube Rupture 5.6.

TS

Page 25: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev. 0

KEPCO & KHNP 17

Non-Proprietary

Main Control Room FIRE 5.7.

TS

Page 26: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A1

Non-Proprietary

APPENDIX A

Small Break Loss-of-Coolant Accident with Computer-Based Procedure Failure and Human-System Interface Display Failure

ISV-1

Page 27: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A2

Non-Proprietary

TABLE OF CONTENTS

1. OVERVIEW ........................................................................................................ A3

1.1. Human Factors Verification and Validation Objectives ................................................................ A3

1.2. Scenario Overview ........................................................................................................................ A4

1.3. Performance Measures ................................................................................................................ A5

1.3.1. Important Human Actions (IHA) .................................................................................................... A5

1.3.2. Primary Tasks ............................................................................................................................... A5

1.4. Other Performance Measures ...................................................................................................... A9

1.5. List of Important Human Actions ................................................................................................ A10

1.6 Applicable Operational Condition Sampling ............................................................................... A10

2. FACILITATORS INFORMATION ....................................................................... A12

2.1. Scenario Timeline ....................................................................................................................... A12

2.2. Procedure Flowpath.................................................................................................................... A14

2.3. Emergency Plan ......................................................................................................................... A14

2.4. Technical Specifications ............................................................................................................. A14

2.5. Scenario Termination Criteria ..................................................................................................... A14

2.6. Anticipated Scenario Length ....................................................................................................... A14

3. SIMULATOR EXERCISE EVALUATION ............................................................ A15

3.1. Evaluation Preparation ............................................................................................................... A15

3.2. Evaluation ................................................................................................................................... A16

3.2.1. Event-1 Run ESW Pump 02A ..................................................................................................... A16

3.2.2. Event-2 SG1 Downcomer Radiation Monitor Malfunction .......................................................... A17

3.2.3. Event-3 SBLOCA + SIAS Automatic Actuation Failure .............................................................. A18

3.2.4. Event 4 Computer Based Procedure System (CBP) Failure ...................................................... A33

3.2.5. Event-5 Loss of all Operator Console Displays and LDP with resulting RCS Cooldown at the Safety Console ........................................................................................................................... A33

3.3. Debrief ........................................................................................................................................ A46

3.3.1. Post Exercise Evaluation ............................................................................................................ A46

3.3.2. Data Acquisition .......................................................................................................................... A46

ISV-1 ATTACHMENT 1 - TRENDING PARAMETERS .................................................... A47

ISV-1 ATTACHMENT 2 - SBLOCA MALFUNCTIONS .................................................... A50

ISV-1 ATTACHMENT 3 - SHIFT TURNOVER SHEET.................................................... A51

ISV-1 ATTACHMENT 4 - ANTICIPATED DIALOG ......................................................... A52

Page 28: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A3

Non-Proprietary

OVERVIEW 1.

Human Factors Verification and Validation Objectives 1.1.

TS

Page 29: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A4

Non-Proprietary

Scenario Overview 1.2.

TS

Page 30: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A5

Non-Proprietary

Performance Measures 1.3.

1.3.1. Important Human Actions (IHA)

1.3.2. Primary Tasks

TS

TS

Page 31: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A6

Non-Proprietary

TS

Page 32: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A7

Non-Proprietary

TS

Page 33: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A8

Non-Proprietary

TS

Page 34: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A9

Non-Proprietary

Other Performance Measures 1.4.

TS

Page 35: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A10

Non-Proprietary

List of Important Human Actions 1.5.

Applicable Operational Condition Sampling 1.6.

TS

TS

Page 36: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A11

Non-Proprietary

TS

Page 37: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A12

Non-Proprietary

FACILITATORS INFORMATION 2.

Scenario Timeline 2.1.

TS

Page 38: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A13

Non-Proprietary

TS

Page 39: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A14

Non-Proprietary

Procedure Flow path 2.2.

Emergency Plan 2.3.

Technical Specifications 2.4.

Scenario Termination Criteria 2.5.

Anticipated Scenario Length 2.6.

TS

TS

TS

TS

TS

Page 40: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A15

Non-Proprietary

SIMULATOR EXERCISE EVALUATION 3.

Evaluation Preparation 3.1.

TS

Page 41: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A16

Non-Proprietary

Evaluation 3.2.

3.2.1. Event-1 Run ESW Pump 02A

TS

Page 42: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A17

Non-Proprietary

3.2.2. Event-2 SG1 Downcomer Radiation Monitor Malfunction

TS

Page 43: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A18

Non-Proprietary

3.2.3. Event-3 SBLOCA + SIAS Automatic Actuation Failure

TS

TS

Page 44: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A19

Non-Proprietary

TS

Page 45: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A20

Non-Proprietary

TS

Page 46: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A21

Non-Proprietary

TS

Page 47: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A22

Non-Proprietary

TS

Page 48: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A23

Non-Proprietary

TS

Page 49: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A24

Non-Proprietary

TS

Page 50: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A25

Non-Proprietary

TS

Page 51: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A26

Non-Proprietary

TS

Page 52: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A27

Non-Proprietary

TS

Page 53: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A28

Non-Proprietary

TS

Page 54: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A29

Non-Proprietary

TS

Page 55: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A30

Non-Proprietary

TS

Page 56: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A31

Non-Proprietary

.

TS

Page 57: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A32

Non-Proprietary

TS

Page 58: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A33

Non-Proprietary

3.2.4. Event 4 Computer Based Procedure System (CBP) Failure TS

Page 59: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A34

Non-Proprietary

TS

Page 60: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A35

Non-Proprietary

TS

Page 61: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A36

Non-Proprietary

TS

Page 62: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A37

Non-Proprietary

TS

Page 63: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A38

Non-Proprietary

TS

Page 64: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A39

Non-Proprietary

TS

Page 65: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A40

Non-Proprietary

TS

Page 66: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A41

Non-Proprietary

TS

Page 67: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A42

Non-Proprietary

3.2.5. Event-5 Loss of all Operator Console Displays and LDP with resulting RCS Cooldown at the Safety Console

TS

Page 68: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A43

Non-Proprietary

TS

Page 69: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A44

Non-Proprietary

TS

Page 70: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A45

Non-Proprietary

TS

Page 71: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A46

Non-Proprietary

Debrief 3.3.

3.3.1. Post Exercise Evaluation

3.3.2. Data Acquisition

TS

TS

TS

Page 72: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A47

Non-Proprietary

ISV-1 Attachment 1 - Trending Parameters

TS

Page 73: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A48

Non-Proprietary

TS

Page 74: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A49

Non-Proprietary

TS

Page 75: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A50

Non-Proprietary

ISV-1 Attachment 2 - SBLOCA Malfunctions

TS

Page 76: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A51

Non-Proprietary

ISV-1 Attachment 3 - Shift Turnover Sheet

TS

Page 77: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP A52

Non-Proprietary

ISV-1 Attachment 4 - Anticipated Dialog

TS

Page 78: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B1

Non-Proprietary

APPENDIX B

Anticipated Transient without Trip with Distributed Control System Failures

ISV-2

Page 79: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B2

Non-Proprietary

TABLE OF CONTENTS

OVERVIEW ............................................................................................. B3 1.

Human Factors Verification and Validation Objectives ................................................................ B3 1.1.

Scenario Overview ........................................................................................................................ B4 1.2.

Performance Measures ................................................................................................................ B5 1.3.

Other Performance Measures ...................................................................................................... B9 1.4.

List of Important Human Actions ................................................................................................ B10 1.5.

Applicable Operational Condition Sampling ............................................................................... B10 1.6.

FACILITATORS INFORMATION ............................................................... B11 2.

Scenario Timeline ....................................................................................................................... B11 2.1.

Procedure Flowpath.................................................................................................................... B12 2.2.

Emergency Plan ......................................................................................................................... B12 2.3.

Technical Specifications ............................................................................................................. B12 2.4.

Scenario Termination Criteria ..................................................................................................... B12 2.5.

Anticipated Scenario Length ....................................................................................................... B12 2.6.

SIMULATOR EXERCISE EVALUATION ..................................................... B13 3.

Evaluation Preparation ............................................................................................................... B13 3.1.

Evaluation ................................................................................................................................... B13 3.2.

3.2.1. Event 1 Enter Mode 2 and achieve criticality ............................................................................. B13

3.2.2. Event-2 Charging Control Valve (CV-212P) Fails Close ............................................................ B14

3.2.3. Event-3 Start a Turbine Driven Main Feedwater Pump (TDMFWP) and stop the Start-up Feedwater Pump (SUFWP) ........................................................................................................ B15

3.2.4. EVENT-4 Pressurizer Spray Valve Fails Open With ATWT ....................................................... B16

3.2.5. EVENT-5 ATWT ......................................................................................................................... B17

3.2.6. EVENT-6 RCS Ovation DCS Failures (common mode failures) ................................................ B24

Debrief ........................................................................................................................................ B25 3.3.

ISV-2 ATTACHMENT 1 - TRENDING PARAMETERS .............................................. B26

ISV-2 ATTACHMENT 2 – MALFUNCTION LIST ..................................................... B29

ISV-2 ATTACHMENT 3 - SHIFT TURNOVER SHEET ............................................. B30

ISV-2 ATTACHMENT 4 - ANTICIPATED DIALOG .................................................. B31

Page 80: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B3

Non-Proprietary

OVERVIEW 1.

Human Factors Verification and Validation Objectives 1.1.

TS

Page 81: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B4

Non-Proprietary

Scenario Overview 1.2.

TS

Page 82: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B5

Non-Proprietary

Performance Measures 1.3.

TS

Page 83: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B6

Non-Proprietary

TS

Page 84: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B7

Non-Proprietary

TS

Page 85: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B8

Non-Proprietary

TS

Page 86: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B9

Non-Proprietary

Other Performance Measures 1.4.

TS

Page 87: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B10

Non-Proprietary

List of Important Human Actions 1.5.

[IHAs exercised in this scenario]

Applicable Operational Condition Sampling 1.6.

TS

TS

Page 88: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B11

Non-Proprietary

FACILITATORS INFORMATION 2.

Scenario Timeline 2.1.

TS

Page 89: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B12

Non-Proprietary

Procedure Flowpath 2.2.

Emergency Plan 2.3.

Technical Specifications 2.4.

Scenario Termination Criteria 2.5.

Anticipated Scenario Length 2.6.

TS

TS

TS

TS

TS

Page 90: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B13

Non-Proprietary

SIMULATOR EXERCISE EVALUATION 3.

Evaluation Preparation 3.1.

Evaluation 3.2.

3.2.1. Event 1 Enter Mode 2 and achieve criticality

TS

TS

Page 91: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B14

Non-Proprietary

3.2.2. Event-2 Charging Control Valve (CV-212P) Fails Close

TS

TS TS

Page 92: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B15

Non-Proprietary

TS

Page 93: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B16

Non-Proprietary

3.2.3. Event-3 Start a Turbine Driven Main Feedwater Pump (TDMFWP) and stop the Start-up Feedwater Pump (SUFWP)

3.2.4. EVENT-4 Pressurizer Spray Valve Fails Open With ATWT

TS

TS

Page 94: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B17

Non-Proprietary

3.2.5. EVENT-5 ATWT

TS

TS

Page 95: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B18

Non-Proprietary

TS

Page 96: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B19

Non-Proprietary

TS

Page 97: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B20

Non-Proprietary

TS

Page 98: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B21

Non-Proprietary

TS

Page 99: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B22

Non-Proprietary

TS

Page 100: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B23

Non-Proprietary

TS

Page 101: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B24

Non-Proprietary

3.2.6. EVENT-6 RCS Ovation DCS Failures (common mode failures)

TS

TS

Page 102: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B25

Non-Proprietary

Debrief 3.3.

3.3.1 Post Exercise Evaluation

3.3.2 Data Acquisition

TS

TS

TS

Page 103: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B26

Non-Proprietary

ISV-2 ATTACHMENT 1 - TRENDING PARAMETERS

TS

Page 104: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B27

Non-Proprietary

TS

Page 105: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B28

Non-Proprietary

TS

Page 106: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B29

Non-Proprietary

ISV-2 ATTACHMENT 2 – MALFUNCTION LIST

TS

Page 107: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B30

Non-Proprietary

ISV-2 ATTACHMENT 3 - SHIFT TURNOVER SHEET

TS

Page 108: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B31

Non-Proprietary

ISV-2 ATTACHMENT 4 - ANTICIPATED DIALOG

TS

Page 109: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP B32

Non-Proprietary

TS

Page 110: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C1

Non-Proprietary

APPENDIX C

Excessive Steam Demand Event with Alarm Server Failures

ISV-3

Page 111: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C2

Non-Proprietary

TABLE OF CONTENTS

OVERVIEW......................................................................................................... C3 1.

Human Factors Verification and Validation Objectives ................................................................ C3 1.1

Scenario Overview ....................................................................................................................... C4 1.2

Performance Measures ............................................................................................................... C5 1.3

Other Performance Measures ..................................................................................................... C9 1.4

List of Important Human Actions ................................................................................................ C10 1.5

Applicable Operational Condition Sampling .............................................................................. C10 1.6

FACILITATORS INFORMATION ........................................................................ C12 2.

Scenario Timeline ...................................................................................................................... C12 2.1

Procedure Flowpath................................................................................................................... C13 2.2

Emergency Plan ........................................................................................................................ C13 2.3

Technical Specifications ............................................................................................................ C13 2.4

Scenario Termination Criteria .................................................................................................... C13 2.5

Anticipated Scenario Length ...................................................................................................... C13 2.6

SIMULATOR EXERCISE EVALUATION ............................................................. C14 3.

Evaluation Preparation .............................................................................................................. C14 3.1

Evaluation .................................................................................................................................. C14 3.2

Event 1 Control rod partial movement surveillance test ............................................................ C14 3.2.1

Event-2 CVCS letdown Heat Exchanger tube leak ................................................................... C15 3.2.2

Event-3 Rapid power decrease in response to LPMS alarms ................................................... C16 3.2.3

Event-4 Two MFWPs Trip with Automatic Initiation Failure of RPCS ........................................ C17 3.2.4

Event-5 Alarm Server A and B Failures ..................................................................................... C18 3.2.5

Event-6 Main Steam Line 2B Break IRC ................................................................................... C20 3.2.6

Debrief ....................................................................................................................................... C30 3.3

Post Exercise Evaluation ........................................................................................................... C30 3.3.1

Data Acquisition ......................................................................................................................... C30 3.3.2

ISV-3 ATTACHMENT 1 - TRENDING PARAMETERS ..................................................... C31

ISV-3 ATTACHMENT 2 - MALFUNCTION LIST ............................................................. C34

ISV-3 ATTACHMENT 3 - SHIFT TURNOVER SHEET .................................................... C35

ISV-3 ATTACHMENT 4 - ANTICIPATED DIALOG .......................................................... C36

Page 112: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C3

Non-Proprietary

OVERVIEW 1.

Human Factors Verification and Validation Objectives 1.1

TS

Page 113: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C4

Non-Proprietary

Scenario Overview 1.2

TS

Page 114: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C5

Non-Proprietary

Performance Measures 1.3

TS

Page 115: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C6

Non-Proprietary

TS

Page 116: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C7

Non-Proprietary

TS

Page 117: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C8

Non-Proprietary

TS

Page 118: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C9

Non-Proprietary

Other Performance Measures 1.4

TS

Page 119: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C10

Non-Proprietary

List of Important Human Actions 1.5

Applicable Operational Condition Sampling 1.6

TS

TS

Page 120: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C11

Non-Proprietary

TS

Page 121: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C12

Non-Proprietary

FACILITATORS INFORMATION 2.

Scenario Timeline 2.1

Page 122: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C13

Non-Proprietary

Procedure Flowpath 2.2

Emergency Plan 2.3

Technical Specifications 2.4

Scenario Termination Criteria 2.5

Anticipated Scenario Length 2.6

TS

TS

TS

TS

TS

TS

Page 123: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C14

Non-Proprietary

SIMULATOR EXERCISE EVALUATION 3.

Evaluation Preparation 3.1

Evaluation 3.2

Event 1 Control rod partial movement surveillance test 3.2.1

TS

TS

Page 124: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C15

Non-Proprietary

Event-2 CVCS letdown Heat Exchanger tube leak 3.2.2

TS

TS

Page 125: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C16

Non-Proprietary

Event-3 Rapid power decrease in response to LPMS alarms 3.2.3

TS

TS

Page 126: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C17

Non-Proprietary

Event-4 Two MFWPs Trip with Automatic Initiation Failure of RPCS 3.2.4

TS

TS

Page 127: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C18

Non-Proprietary

Event-5 Alarm Server A and B Failures 3.2.5

TS

TS

Page 128: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C19

Non-Proprietary

TS

Page 129: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C20

Non-Proprietary

Event-6 Main Steam Line 2B Break IRC 3.2.6

TS

TS

Page 130: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C21

Non-Proprietary

TS

Page 131: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C22

Non-Proprietary

TS

Page 132: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C23

Non-Proprietary

TS

Page 133: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C24

Non-Proprietary

TS

Page 134: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C25

Non-Proprietary

TS

Page 135: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C26

Non-Proprietary

TS

Page 136: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C27

Non-Proprietary

TS

Page 137: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C28

Non-Proprietary

TS

Page 138: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C29

Non-Proprietary

TS

Page 139: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C30

Non-Proprietary

Debrief 3.3

Post Exercise Evaluation 3.3.1

Data Acquisition 3.3.2

TS

TS

Page 140: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C31

Non-Proprietary

ISV-3 ATTACHMENT 1 - TRENDING PARAMETERS

TS

Page 141: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C32

Non-Proprietary

TS

Page 142: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C33

Non-Proprietary

TS

Page 143: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C34

Non-Proprietary

ISV-3 ATTACHMENT 2 - MALFUNCTION LIST

TS

Page 144: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C35

Non-Proprietary

ISV-3 ATTACHMENT 3 - SHIFT TURNOVER SHEET

TS

Page 145: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C36

Non-Proprietary

ISV-3 ATTACHMENT 4 - ANTICIPATED DIALOG

TS

Page 146: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP C37

Non-Proprietary

TS

Page 147: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D1

Non-Proprietary

APPENDIX D

Loss of All Feedwater

ISV-4

Page 148: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D2

Non-Proprietary

TABLE OF CONTENTS 1. OVERVIEW......................................................................................................... D3

Human Factors Verification and Validation Objectives ................................................................ D3 1.1

Scenario Overview ....................................................................................................................... D4 1.2

Performance Measures ............................................................................................................... D5 1.3

Other Performance Measures ..................................................................................................... D8 1.4

List of Important Human Actions .................................................................................................. D9 1.5

Applicable Operational Condition Sampling ................................................................................ D9 1.6

2. FACILITATORS INFORMATION ........................................................................ D10

Scenario Timeline ...................................................................................................................... D10 2.1

Procedure Flowpath.................................................................................................................... D11 2.2

Emergency Plan ........................................................................................................................ D12 2.3

Technical Specifications ............................................................................................................ D12 2.4

Scenario Termination Criteria .................................................................................................... D12 2.5

Anticipated Scenario Length ...................................................................................................... D12 2.6

3. SIMULATOR EXERCISE EVALUATION ............................................................. D13

Evaluation Preparation .............................................................................................................. D13 3.1

Evaluation .................................................................................................................................. D14 3.2

Event 1 CVCS Letdown Line Leak Upstream Control Valve CV-201P/Q .................................. D14 3.2.1

Event 2 13.8kV SW-02M, SW-02N BUS FAULT ....................................................................... D16 3.2.2

Event 3 MD AFWP 2A and 2B Trip, Loss Of All Feedwater (LOAF) .......................................... D23 3.2.3

Debrief ....................................................................................................................................... D33 3.3

Post Exercise Evaluation ........................................................................................................... D33 3.3.1

Data Acquisition ......................................................................................................................... D33 3.3.2

ISV-4 ATTACHMENT 1 - TRENDING PARAMETERS ..................................................... D34

ISV-4 ATTACHMENT 2 - MALFUNCTION LIST ............................................................. D37

ISV-4 ATTACHMENT 3 - SHIFT TURNOVER SHEET .................................................... D38

ISV-4 ATTACHMENT 4 - ANTICIPATED DIALOG .......................................................... D39

Page 149: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D3

Non-Proprietary

1. OVERVIEW

Human Factors Verification and Validation Objectives 1.1

TS

Page 150: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D4

Non-Proprietary

Scenario Overview 1.2

TS

Page 151: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D5

Non-Proprietary

Performance Measures 1.3

TS

Page 152: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D6

Non-Proprietary

TS

Page 153: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D7

Non-Proprietary

TS

Page 154: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D8

Non-Proprietary

Other Performance Measures 1.4

TS

Page 155: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D9

Non-Proprietary

List of Important Human Actions 1.5

Applicable Operational Condition Sampling 1.6

TS

TS

Page 156: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D10

Non-Proprietary

2. FACILITATORS INFORMATION

Scenario Timeline 2.1

TS

Page 157: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D11

Non-Proprietary

Procedure Flowpath 2.2

ST-3542 TD AFWP IB Surveillance Test

⇒ AOP-3451-04 CVCS ⇒ POP-01 Standard Post Trip Action (SPTA) ⇒ EOP-01 Reactor Trip Recovery

TS

TS

Page 158: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D12

Non-Proprietary

⇒ POP-02 Diagnostic Actions (DA) ⇒ EOP-05 Loss of All Feedwater ⇒ FRP-06 Core and RCS Heat Removal

Emergency Plan 2.3

Emergency Classification is SAE based on

Technical Specifications 2.4

LCO 3.7.5 Auxiliary Feed Water System

Scenario Termination Criteria 2.5

The scenario is terminated upon restoration of MDAFWP 2B and subsequent transition to step 59

Success Path HR-2 “SG with SIS in operation”.

Anticipated Scenario Length 2.6

2 to 2.5 Hours

TS

TS

TS

TS

TS

Page 159: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D13

Non-Proprietary

3. SIMULATOR EXERCISE EVALUATION

Evaluation Preparation 3.1

TS

Page 160: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D14

Non-Proprietary

Evaluation 3.2

Event 1 CVCS Letdown Line Leak Upstream Control Valve CV-201P/Q 3.2.1

TS

Page 161: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D15

Non-Proprietary

TS

Page 162: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D16

Non-Proprietary

Event 2 13.8kV SW-02M, SW-02N BUS FAULT 3.2.2

TS

Page 163: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D17

Non-Proprietary

TS

Page 164: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D18

Non-Proprietary

TS

Page 165: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D19

Non-Proprietary

TS

Page 166: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D20

Non-Proprietary

TS

Page 167: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D21

Non-Proprietary

TS

Page 168: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D22

Non-Proprietary

TS

Page 169: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D23

Non-Proprietary

Event 3 MD AFWP 2A and 2B Trip, Loss Of All Feedwater (LOAF) 3.2.3

TS

Page 170: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D24

Non-Proprietary

TS TS TS TS TS

Page 171: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D25

Non-Proprietary

TS

Page 172: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D26

Non-Proprietary

TS

Page 173: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D27

Non-Proprietary

TS

Page 174: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D28

Non-Proprietary

TS

Page 175: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D29

Non-Proprietary

TS

Page 176: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D30

Non-Proprietary

TS

Page 177: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D31

Non-Proprietary

TS

Page 178: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D32

Non-Proprietary

TS TS

Page 179: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D33

Non-Proprietary

Debrief 3.3

Post Exercise Evaluation 3.3.1

• Questionnaire for Situation Awareness and BARS

• De-briefing

• Discussion and evaluation of exercise results

Data Acquisition 3.3.2

• Parameter Trends: Operation expert

• Questionnaire: HFE Lead

• Evaluation results: ISV conductor

• Retrieve Audio/Video Files: ISV conductor

TS

TS

Page 180: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D34

Non-Proprietary

ISV-4 ATTACHMENT 1 - TRENDING PARAMETERS

TS

Page 181: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D35

Non-Proprietary

TS

Page 182: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D36

Non-Proprietary

TS

Page 183: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D37

Non-Proprietary

ISV-4 ATTACHMENT 2 - MALFUNCTION LIST

TS

Page 184: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D38

Non-Proprietary

ISV-4 ATTACHMENT 3 - SHIFT TURNOVER SHEET

TS

Page 185: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP D39

Non-Proprietary

ISV-4 ATTACHMENT 4 - ANTICIPATED DIALOG

TS

Page 186: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E1

Non-Proprietary

APPENDIX E

Station Black Out

ISV-5

Page 187: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E2

Non-Proprietary

TABLE OF CONTENTS

OVERVIEW......................................................................................................... E3 1.

Human Factors Verification and Validation Objectives ................................................................. E3 1.1

Scenario Overview ........................................................................................................................ E4 1.2

Performance Measures ................................................................................................................ E5 1.3

Other Performance Measures ...................................................................................................... E8 1.4

List of Important Human Actions ................................................................................................... E9 1.5

Applicable Operational Condition Sampling ................................................................................. E9 1.6

FACILITATORS INFORMATION ........................................................................ E11 2.

Scenario Timeline ....................................................................................................................... E11 2.1

Procedure Flowpath.................................................................................................................... E12 2.2

Emergency Plan ......................................................................................................................... E12 2.3

Technical Specifications ............................................................................................................. E12 2.4

Scenario Termination Criteria ..................................................................................................... E12 2.5

Anticipated Scenario Length ....................................................................................................... E12 2.6

SIMULATOR EXERCISE EVALUATION ............................................................. E13 3.

Evaluation Preparation ............................................................................................................... E13 3.1

Evaluation ................................................................................................................................... E14 3.2

Event 1 Equipment Rotation -- Charging Pump from 1A to 1B .................................................. E14 3.2.1

Event-2 CVCS VCT LT-227 Fails Low ........................................................................................ E14 3.2.2

Event-3 Deaerator Level Controller LIK-0318NO1 Fails Low .................................................... E15 3.2.3

EVENT-4 100% to 75% Power Operation and Severe Weather (Tornado Warning) ................. E16 3.2.4

Event-5 Loss of Offsite Power .................................................................................................... E17 3.2.5

EVENT-6 Station Black Out ........................................................................................................ E26 3.2.6

Debrief ........................................................................................................................................ E31 3.3

Post Exercise Evaluation ............................................................................................................ E31 3.3.1

Data Acquisition .......................................................................................................................... E31 3.3.2

ISV-5 ATTACHMENT 1 - TRENDING PARAMETERS ..................................................... E32

ISV-5 ATTACHMENT 2 - MALFUNCTION LIST ............................................................. E35

ISV-5 ATTACHMENT 3 - SHIFT TURNOVER SHEET .................................................... E36

ISV-5 ATTACHMENT 4 - ANTICIPATED DIALOG .......................................................... E37

Page 188: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E3

Non-Proprietary

OVERVIEW 1.

Human Factors Verification and Validation Objectives 1.1

TS

Page 189: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E4

Non-Proprietary

Scenario Overview 1.2

TS

Page 190: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E5

Non-Proprietary

Performance Measures 1.3

TS

Page 191: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E6

Non-Proprietary

TS

Page 192: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E7

Non-Proprietary

TS

Page 193: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E8

Non-Proprietary

Other Performance Measures 1.4

TS

Page 194: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E9

Non-Proprietary

List of Important Human Actions 1.5

Applicable Operational Condition Sampling 1.6

TS

TS

Page 195: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E10

Non-Proprietary

TS

Page 196: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E11

Non-Proprietary

FACILITATORS INFORMATION 2.

Scenario Timeline 2.1

TS

Page 197: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E12

Non-Proprietary

Procedure Flowpath 2.2

SOP-3451 Chemical & Volume Control System (CVCS) ⇒ AOP-3451-01 Reactor Makeup System Abnormal Operation ⇒ AOP-3531-01 Condensate System Abnormal Operation ⇒ GOP-3003-02 100% to 75% Power Operation ⇒ POP-01 Standard Post Trip Action (SPTA) ⇒ POP-02 Diagnostic Actions (DA) ⇒ EOP-06 Loss of Offsite Power (LOOP) ⇒ POP-02 Diagnostic Actions (DA) ⇒ EOP-07 Station Black Out (SBO)

Emergency Plan 2.3

Emergency Classification is an Alert and upgrades to a SAE 15 minutes after the initial event when power is not restored

Technical Specifications 2.4

LCO 3.8 Electric Power System

Scenario Termination Criteria 2.5

When the minimum required vital equipment is restored per EOP-07 step 21.

Anticipated Scenario Length 2.6

2.0 to 2.5 Hours

TS

TS

TS

TS

TS

TS

Page 198: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E13

Non-Proprietary

SIMULATOR EXERCISE EVALUATION 3.

Evaluation Preparation 3.1

TS

Page 199: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E14

Non-Proprietary

Evaluation 3.2

Event 1 Equipment Rotation -- Charging Pump from 1A to 1B 3.2.1

Event-2 CVCS VCT LT-227 Fails Low 3.2.2

TS

TS

Page 200: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E15

Non-Proprietary

Event-3 Deaerator Level Controller LIK-0318NO1 Fails Low 3.2.3

TS

TS

Page 201: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E16

Non-Proprietary

EVENT-4 100% to 75% Power Operation and Severe Weather (Tornado Warning) 3.2.4

TS

TS

Page 202: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E17

Non-Proprietary

Event-5 Loss of Offsite Power 3.2.5

TS

TS

Page 203: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E18

Non-Proprietary

TS

TS

Page 204: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E19

Non-Proprietary

TS

Page 205: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E20

Non-Proprietary

TS

Page 206: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E21

Non-Proprietary

TS

Page 207: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E22

Non-Proprietary

TS

Page 208: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E23

Non-Proprietary

TS

Page 209: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E24

Non-Proprietary

TS

Page 210: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E25

Non-Proprietary

TS

Page 211: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E26

Non-Proprietary

EVENT-6 Station Black Out 3.2.6

TS

Page 212: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E27

Non-Proprietary

TS

Page 213: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E28

Non-Proprietary

TS

Page 214: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E29

Non-Proprietary

TS

Page 215: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E30

Non-Proprietary

TS

Page 216: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E31

Non-Proprietary

Debrief 3.3

Post Exercise Evaluation 3.3.1

Questionnaire for Situation Awareness and BARS

De-briefing

Discussion and evaluation of exercise results

Data Acquisition 3.3.2

Parameter Trends: Operation expert

Questionnaire: HFE Lead

Evaluation results: ISV conductor

Retrieve Audio/Video Files: ISV conductor

TS

TS

TS

Page 217: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E32

Non-Proprietary

ISV-5 ATTACHMENT 1 - TRENDING PARAMETERS

TS

Page 218: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E33

Non-Proprietary

TS

Page 219: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E34

Non-Proprietary

TS

Page 220: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E35

Non-Proprietary

ISV-5 ATTACHMENT 2 - MALFUNCTION LIST

TS

Page 221: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E36

Non-Proprietary

ISV-5 ATTACHMENT 3 - SHIFT TURNOVER SHEET

TS

Page 222: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E37

Non-Proprietary

ISV-5 ATTACHMENT 4 - ANTICIPATED DIALOG

TS

Page 223: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP E38

Non-Proprietary

TS

Page 224: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F1

Non-Proprietary

APPENDIX F

Station Black Out

ISV-6

Page 225: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F2

Non-Proprietary

TABLE OF CONTENTS

1. OVERVIEW......................................................................................................... F3

1.1 Human Factors Verification and Validation Objectives ................................................................. F3

1.2 Scenario Overview ........................................................................................................................ F4

1.3 Performance Measures ................................................................................................................ F5

1.4 Other Performance Measures ...................................................................................................... F9

1.5 List of Important Human Actions ................................................................................................. F10

1.6 Applicable Operational Condition Sampling ............................................................................... F10

2. FACILITATORS INFORMATION ........................................................................ F11

2.1 Scenario Timeline ....................................................................................................................... F11

2.2 Procedure Flowpath.................................................................................................................... F12

2.3 Emergency Plan ......................................................................................................................... F12

2.4 Technical Specifications ............................................................................................................. F12

2.5 Scenario Termination Criteria ..................................................................................................... F12

2.6 Anticipated Scenario Length ....................................................................................................... F12

3. SIMULATOR EXERCISE EVALUATION ............................................................. F13

3.1 Evaluation Preparation ............................................................................................................... F13

3.2 Evaluation ................................................................................................................................... F14

3.2.1 Event 1 Equipment Rotation -- CCWP from 1A & 1B to 2A & 2B ............................................... F14

3.2.2 Event-2 Condenser A Left Hotwell Tube Leak ............................................................................ F15

3.2.3 Event-3 100% to 75% Power Operation ..................................................................................... F16

3.2.4 EVENT-4 RRS Tavg Fail Low ..................................................................................................... F17

3.2.5 Event-5 Steam Generator Tube Leak with Secondary Radiation Monitor Failures .................... F18

3.2.6 Event 6 Steam Generator Tube Rupture (SGTR) ...................................................................... F20

3.3 Debrief ........................................................................................................................................ F38

3.3.1 Post Exercise Evaluation ............................................................................................................ F38

3.3.2 Data Acquisition .......................................................................................................................... F39

ISV-6 ATTACHMENT 1 - TRENDING PARAMETERS ..................................................... F40

ISV-6 ATTACHMENT 2 - MALFUNCTION LIST ............................................................. F43

ISV-6 ATTACHMENT 3 - SHIFT TURNOVER SHEET .................................................... F44

ISV-6 ATTACHMENT 4 - ANTICIPATED DIALOG .......................................................... F45

Page 226: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F3

Non-Proprietary

1. OVERVIEW

1.1 Human Factors Verification and Validation Objectives

TS

Page 227: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F4

Non-Proprietary

1.2 Scenario Overview

TS

Page 228: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F5

Non-Proprietary

1.3 Performance Measures

TS

Page 229: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F6

Non-Proprietary

TS

Page 230: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F7

Non-Proprietary

TS

Page 231: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F8

Non-Proprietary

TS

Page 232: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F9

Non-Proprietary

1.4 Other Performance Measures

TS

Page 233: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F10

Non-Proprietary

1.5 List of Important Human Actions

1.6 Applicable Operational Condition Sampling

TS

TS

Page 234: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F11

Non-Proprietary

2. FACILITATORS INFORMATION

2.1 Scenario Timeline

TS

Page 235: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F12

Non-Proprietary

2.2 Procedure Flowpath

SOP-3461 Component Cooling Water System • AOP-3530-01 Condenser Tube Leak • GOP-3003-02 100% to 75% Power Operation • AOP-3711-01 Reactor Regulating System Abnormal • AOP-3431-03 Steam Generator Tube Leak (SGTL) • POP-01 Standard Post Trip Actions (SPTA) • POP-02 Diagnostic Actions (DA) • EOP-03 Steam Generator Tube Rupture (SGTR)

2.3 Emergency Plan

Emergency Classification is an Alert

2.4 Technical Specifications

LCO 3.4.12 RCS Leakage

2.5 Scenario Termination Criteria

When SDC conditions are established

2.6 Anticipated Scenario Length

2.0 to 2.5 Hours

TS

TS

TS

TS

TS

TS

Page 236: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F13

Non-Proprietary

3. SIMULATOR EXERCISE EVALUATION

3.1 Evaluation Preparation

TS

Page 237: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F14

Non-Proprietary

3.2 Evaluation

3.2.1 Event 1 Equipment Rotation -- CCWP from 1A & 1B to 2A & 2B

TS

Page 238: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F15

Non-Proprietary

3.2.2 Event-2 Condenser A Left Hotwell Tube Leak

TS

Page 239: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F16

Non-Proprietary

3.2.3 Event-3 100% to 75% Power Operation

TS

TS

Page 240: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F17

Non-Proprietary

3.2.4 EVENT-4 RRS Tavg Fail Low

TS

Page 241: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F18

Non-Proprietary

3.2.5 Event-5 Steam Generator Tube Leak with Secondary Radiation Monitor Failures

TS

TS

Page 242: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F19

Non-Proprietary

TS

Page 243: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F20

Non-Proprietary

3.2.6 Event 6 Steam Generator Tube Rupture (SGTR)

TS

Page 244: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F21

Non-Proprietary

TS

Page 245: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F22

Non-Proprietary

TS

Page 246: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F23

Non-Proprietary

TS

Page 247: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F24

Non-Proprietary

TS

Page 248: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F25

Non-Proprietary

TS

Page 249: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F26

Non-Proprietary

TS

Page 250: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F27

Non-Proprietary

TS

Page 251: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F28

Non-Proprietary

TS

Page 252: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F29

Non-Proprietary

TS

Page 253: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F30

Non-Proprietary

TS

Page 254: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F31

Non-Proprietary

TS

Page 255: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F32

Non-Proprietary

TS

TS

TS

Page 256: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F33

Non-Proprietary

TS

TS

Page 257: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F34

Non-Proprietary

TS

Page 258: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F35

Non-Proprietary

TS

Page 259: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F36

Non-Proprietary

TS

Page 260: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F37

Non-Proprietary

TS

Page 261: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F38

Non-Proprietary

3.3 Debrief

3.3.1 Post Exercise Evaluation

TS

TS

Page 262: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F39

Non-Proprietary

3.3.2 Data Acquisition

TS

Page 263: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F40

Non-Proprietary

ISV-6 ATTACHMENT 1 - TRENDING PARAMETERS

TS

Page 264: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F41

Non-Proprietary

TS

Page 265: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F42

Non-Proprietary

TS TS

Page 266: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F43

Non-Proprietary

ISV-6 ATTACHMENT 2 - MALFUNCTION LIST

TS

Page 267: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F44

Non-Proprietary

ISV-6 ATTACHMENT 3 - SHIFT TURNOVER SHEET

TS

Page 268: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F45

Non-Proprietary

ISV-6 ATTACHMENT 4 - ANTICIPATED DIALOG

TS

Page 269: Human Factors Verification and Validation Scenarios

Human Factors Verification and Validation Scenarios APR1400-E-I-NR-14010-NP, Rev.0

KEPCO & KHNP F46

Non-Proprietary

TS

Page 270: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G1

Non-Proprietary

APPENDIX G

Main Control Room Fire

ISV-7

Page 271: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G2

Non-Proprietary

TABLE OF CONTENTS

1. OVERVIEW......................................................................................................... G3

1.1 Human Factors Verification and Validation Objectives ................................................................ G3

1.2 Scenario Overview ....................................................................................................................... G4

1.3 Performance Measures ............................................................................................................... G5

1.4 Other Performance Measures ..................................................................................................... G9

1.5 List of Important Human Actions ................................................................................................ G10

1.6 Applicable Operational Condition Sampling .............................................................................. G10

2. FACILITATORS INFORMATION ........................................................................ G11

2.1 Scenario Timeline .......................................................................................................................G11

2.2 Procedure Flowpath................................................................................................................... G12

2.3 Emergency Plan ........................................................................................................................ G12

2.4 Technical Specifications ............................................................................................................ G12

2.5 Scenario Termination Criteria .................................................................................................... G12

2.6 Anticipated Scenario Length ...................................................................................................... G13

3. SIMULATOR EXERCISE EVALUATION ............................................................. G14

3.1 Evaluation Preparation .............................................................................................................. G14

3.2 Evaluation .................................................................................................................................. G15

3.2.1 Event 1 MFWP B Vibration High and associated 100% to 75% Power Operation ................... G15

3.2.2 Event 2 Charging line leak on the Regenerative Hx Outlet IRC, with containment radiation monitors failed low ..................................................................................................................... G16

3.2.3 Event-3 Downpower from 75% to Hot Standby followed by a cooldown to Mode 4 ................. G17

3.2.4 Event-4 Steam Generator 2 FW Master controller fails low ...................................................... G18

3.2.5 Event 5 Fire in the MCR with Required RCS Cooldown from the RSR .................................... G19

3.3 Debrief ....................................................................................................................................... G21

3.3.1 Post Exercise Evaluation ........................................................................................................... G21

3.3.2 Data Acquisition ......................................................................................................................... G21

ISV-7 ATTACHMENT 1 - TRENDING PARAMETERS ..................................................... G22

ISV-7 ATTACHMENT 2 - MALFUNCTION LIST ............................................................. G25

ISV-7 ATTACHMENT 3 - SHIFT TURNOVER SHEET .................................................... G26

ISV-7 ATTACHMENT 4 - ANTICIPATED DIALOG .......................................................... G27

Page 272: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G3

Non-Proprietary

1. OVERVIEW

1.1 Human Factors Verification and Validation Objectives

TS

Page 273: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G4

Non-Proprietary

1.2 Scenario Overview

TS

Page 274: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G5

Non-Proprietary

1.3 Performance Measures

TS

Page 275: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G6

Non-Proprietary

TS

Page 276: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G7

Non-Proprietary

TS

Page 277: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G8

Non-Proprietary

TS

Page 278: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G9

Non-Proprietary

1.4 Other Performance Measures

TS

Page 279: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G10

Non-Proprietary

1.5 List of Important Human Actions

1.6 Applicable Operational Condition Sampling

TS

TS

Page 280: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G11

Non-Proprietary

2. FACILITATORS INFORMATION

2.1 Scenario Timeline

TS

Page 281: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G12

Non-Proprietary

2.2 Procedure Flowpath

2.3 Emergency Plan

2.4 Technical Specifications

2.5 Scenario Termination Criteria

TS

TS

TS

TS

TS

Page 282: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G13

Non-Proprietary

2.6 Anticipated Scenario Length

TS

Page 283: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G14

Non-Proprietary

3. SIMULATOR EXERCISE EVALUATION

3.1 Evaluation Preparation

TS

Page 284: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G15

Non-Proprietary

3.2 Evaluation

3.2.1 Event 1 MFWP B Vibration High and associated 100% to 75% Power Operation

TS

Page 285: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G16

Non-Proprietary

3.2.2 Event 2 Charging line leak on the Regenerative Hx Outlet IRC, with containment radiation monitors failed low

TS

TS

Page 286: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G17

Non-Proprietary

3.2.3 Event-3 Downpower from 75% to Hot Standby followed by a cooldown to Mode 4

TS

TS

Page 287: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G18

Non-Proprietary

3.2.4 Event-4 Steam Generator 2 FW Master controller fails low

TS

Page 288: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G19

Non-Proprietary

3.2.5 Event 5 Fire in the MCR with Required RCS Cooldown from the RSR

TS

TS

Page 289: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G20

Non-Proprietary

TS

Page 290: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G21

Non-Proprietary

3.3 Debrief

3.3.1 Post Exercise Evaluation

3.3.2 Data Acquisition

TS

TS

TS

Page 291: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G22

Non-Proprietary

ISV-7 ATTACHMENT 1 - TRENDING PARAMETERS

TS

Page 292: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G23

Non-Proprietary

TS

Page 293: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G24

Non-Proprietary

TS

Page 294: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G25

Non-Proprietary

ISV-7 ATTACHMENT 2 - MALFUNCTION LIST

TS

Page 295: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G26

Non-Proprietary

ISV-7 ATTACHMENT 3 - SHIFT TURNOVER SHEET

TS

Page 296: Human Factors Verification and Validation Scenarios

HF V&V Scenarios APR1400-E-I-NR-14010-NP Rev.0

KEPCO & KHNP G27

Non-Proprietary

ISV-7 ATTACHMENT 4 - ANTICIPATED DIALOG

TS