![Page 1: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/1.jpg)
HUMIDITY AND BEST
PRACTICE IN NORTHWEST
PROJECTS
Presented by
Glen Tatam, M.AIRAH
Director of ACMV Design Consultants May 2016
![Page 2: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/2.jpg)
TOPICS TO BE COVERED Bad Practice
Building Construction
Design & Installation
Design Considerations
Location & Climate
Mould & Mildew
Building Construction
Building Leakage and Infiltration
Service and Maintenance
Design Parameters
Wet Season & Dry Season
Comfort Conditions
Dehumidification
Air Conditioning Design Considerations
Air Conditioning Plant Types & Limitations
Direct Expansion (DX)
VRV / VRF
Packaged Units
Heat Reclaim Units
Pre-conditioners
Devil in the Detail
![Page 3: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/3.jpg)
BAD PRACTICEBuilding Construction (Vapour Barrier)
![Page 4: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/4.jpg)
BAD PRACTICEDesign & Installation - The prime issue is condensation
![Page 5: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/5.jpg)
BAD PRACTICEThe prime issue is condensation
![Page 6: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/6.jpg)
BAD PRACTICEThe prime issue is condensation
![Page 7: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/7.jpg)
BAD PRACTICEThe prime issue is condensation
![Page 8: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/8.jpg)
BAD PRACTICEThe prime issue is condensation
![Page 9: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/9.jpg)
BAD PRACTICEThe prime issue is condensation
![Page 10: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/10.jpg)
BAD PRACTICEThe prime issue is condensation
![Page 11: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/11.jpg)
DESIGN CONSIDERATIONS – LOCATION & CLIMATE
![Page 12: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/12.jpg)
Onslow
Kununurra
BMW Design Guidelines
Meekatharra
WA Police Design Guidelines
Balgo
Pannawonica
WA Police
2015 Mould Outbreaks
Building Construction
Type of Air Conditioning
A/C Maintenance
Building Cleaning
A/C Installation
![Page 13: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/13.jpg)
MOULD & MILDEW
The growth of mould requires five ingredients:
Oxygen
Moisture
Food
Temperature
Spores
From the Australian Institute of Refrigeration, Air Conditioning and Heating (AIRAH) Design Manual DA 20 – “In a comfortable human environment the temperature is ideal for most fungi and it is virtually impossible to eliminate spores and food. Killing mould and mildew is generally effective only for limited periods. If food and water are available, fungus will grow back. Removing water necessary for fungal growth is often the most practical means of controlling mould and mildew, particularly when the problem spreads to walls, carpets and other parts of a building structure. Note that fungus can derive water from the air, not necessarily in pools (liquid). In practice, mould is controlled by limiting surface condensation and the moisture in materials by controlling the indoor relative humidity.”
![Page 14: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/14.jpg)
VAPOUR BARRIER - WALLS
![Page 15: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/15.jpg)
VAPOUR BARRIER - ROOFAustralian Building Codes Board
Information Handbook –Condensation in Buildings
![Page 16: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/16.jpg)
THERMAL BRIDGING (COLD TRACKING)
![Page 17: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/17.jpg)
BUILDING LEAKAGE & INFILTRATION Vapour Barrier
Door Seals
Air Locks
Positive Building Pressure**
ASHRAE Handbook identifies leakage rates as:
Leaky at 4 l/s/m2
Average at 2 l/s/m2
Tight at 0.7 l/s/m2
There are many other country standards, however Australia does not have a standard, although it does try to address infiltration under
the National Construction Code.
Building positive pressurization is a basic design principle that must be maintained at all times, particularly in hot humid regions.
![Page 18: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/18.jpg)
SERVICE & MAINTENANCE
Location of air conditioning plant
Plantrooms
Ceiling space
Exposed to weather
Type of air conditioning plant – can it be maintained by local service technicians
Ease of serviceability
Service access
Maintenance
Spare parts
Redundancy
Replacement
Economic Operating Life
![Page 19: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/19.jpg)
DESIGN PARAMETERSBMW Norther Regions Design Guidelines
States:
Areas with a winter ambient condition above 15 0C do not require provisions for heating unless either:
o The site is occupied 24 hours / day, or
o It is specifically requested by BMW or Department
Design indoor conditions stated as:
o 22.5 0C ± 1.5 0C, for cooling design of 24.0 0C,
o 50 % RH directly controlled by coil selection, 65% for high occupancy areas
Note - The cooling design conditions stated are only the dry season temperatures.
The new DA 20 – Air Conditioning, Cooling & Comfort in Hot Humid Tropical Climates, about to be released, makes limited reference to both DA 09 Australian weather data and ASHRAE formatted data
![Page 20: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/20.jpg)
Dry Season
37.4 0C DB / 28.5 0C WB,
Enth 91.64 kj/kg
Wet Season
30.0 0C DB / 29.0 0C WB,
Enth 94.5 kj/kg
Highest building heat gain
Highest air conditioning
cooling coil load
Broome WA
Room Condition
24.0 0C DB / 50 %RH
Dew Point
13.0 0C DB Which design condition would you use for an air cooled chiller / condenser ??
![Page 21: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/21.jpg)
Note that “Operative Temperature” is not the same as the space temperature as measured by a thermometer or temperature sensor. Operative temperature takes into account temperature, humidity, air speed, metabolic rate, and clothing insulation.
![Page 22: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/22.jpg)
AIR CONDITIONING SYSTEMS Main Design Requirements:
Designed to suit application
Positive building pressurization at all times
Maintain acceptable indoor air quality (temperature, humidity, air movement)
Cooling capacity and operation to suite wet and dry seasons
Relatively high airflow rates and air circulation
Continuous dehumidification, even at part load
Lower cooling coil air velocities (<=1.8 m/s)
Reasonable level of air filtration (primary / secondary filters)
Prevent cold tracking / condensation
Provide a level of redundancy
High level of energy efficiency
Reasonably smart control system
Extended economical operating life
Lower maintenance costs
![Page 23: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/23.jpg)
AIR CONDITIONING PLANT
DX Split Systems (“Off the Shelf”) - with staged compressors
Types typically include wall splits, cassettes, underslung and ducted
o Can only provide limited dehumidification due to coil depth
o Cannot provide continuous dehumidification (Pre-conditioner required)
o Limit on entering air temperature onto evaporator coil for high minimum outside applications
o No control over leaving air temperature
o Coil water carry-over at high fan speed
o Insufficient thermal insulation to prevent condensation
o Poor air distribution for wall, cassette and underslung units
o Proprietary control system
![Page 24: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/24.jpg)
VRV / VRF SYSTEMS
DX Split Inverter Systems (“Off the Shelf”)
Types typically include wall splits, cassettes, underslung and ducted
o Can only provide limited dehumidification
o Cannot provide continuous dehumidification (Pre-conditioner required)
o Limit on entering air temperature onto evaporator coil for high minimum outside applications
o No control over leaving air temperature
o Coil water carry-over at high fan speed at full cooling capacity
o Insufficient thermal insulation to prevent condensation
o Poor air distribution for wall, cassette and underslung units
o Proprietary control system
o Compliance issues with AS 1677 – short term exposure to refrigerants
![Page 25: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/25.jpg)
PACKAGED AIR CONDITIONING UNITS “ Off the Shelf” (Hitachi, Actron, Dunn Air)
![Page 26: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/26.jpg)
PACKAGED AIR CONDITIONING UNITS Commercial Grade (Specialized Engineering, Temperzone, Cosair)
![Page 27: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/27.jpg)
Rotary Heat Exchangers (Munters and others)
100% OUTSIDE AIR (DX) SYSTEMS
![Page 28: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/28.jpg)
HEAT RECLAIM - VENTILATION
![Page 29: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/29.jpg)
100% OUTSIDE AIR (DX) SYSTEMS
Pre-conditioner Ducted DX units with electronic expansion valve (Daikin & Others)
o Typically can only provide limited dehumidified airflow (300, 460 & 585 l/s)
o Nominal design ambient condition 33 0C DB / 28 0C WB / 68% RH
o Can operate upto 43 0C but cooling capacity drops substantially
o Supply air set point nominally set for 18 0C DB
![Page 30: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/30.jpg)
Pre-conditioner Air to Air Heat Exchangers (Air Change and others)
100% OUTSIDE AIR (DX) SYSTEMS
34.5/28.0
27.5/25.5
13.0/13.0
24.0/17.0
![Page 31: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/31.jpg)
$$$$
100% OUTSIDE AIR (DX) SYSTEMS Pre-conditioner Air
to Air Heat
Exchangers (Air
Change and others)
![Page 32: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/32.jpg)
100% OUTSIDE AIR – HEAT RECLAIMRun-around Coils with Chilled Water (Control of leaving air temperature)
Chilled Water
Cooling Coil
EDH
37.4 0C37.4 0C26.9 0C13.5 0C24.0 0C
KISS
![Page 33: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/33.jpg)
FAN COIL UNITS • Sandwich panel construction
• Minimum 50 mm thick insulation
• Incorporate anti-cold tracking (fan discharge, access doors, construction joints)
• Anti-vibration mounts / fans spring mounted
• Coiling and heating coils as required (for dehumidification or part run around coils)
• Cooling Coil Air Velocity <= 1.8 m/s
![Page 34: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/34.jpg)
CHILLED WATER
• Chiller – Air Cooled or Water Cooled
Water Cooled CentrifugalTurbo-core
Air & Water Water Cooled Screw
Water Cooled Scroll Air Cooled Scroll
• Water Quality
• Redundancy (Multiple chillers, dual circuits, multiple compressors)
• Maintenance
![Page 35: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/35.jpg)
DEVIL IN THE DETAIL• Location and selection of diffusers
• Diffuser and cushion head details
• Ductwork insulation
• Insulation of duct mounted dampers / fire dampers
• Flexible connections at AC unit
• Cold tracking of AC units
• Filter bank access (primary & secondary?)
• Drip trays & condensate drains
• Back draft dampers
• Insulation of exhaust ductwork
• Control system & logic
• Maintenance access
• Commissioning & tuning
![Page 36: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/36.jpg)
DEVIL IN THE DETAIL
![Page 37: Humidity and best practice in northwest projects · HUMIDITY AND BEST PRACTICE IN NORTHWEST PROJECTS Presented by Glen Tatam, M.AIRAH ... AIR CONDITIONING SYSTEMS Main Design Requirements:](https://reader033.vdocument.in/reader033/viewer/2022042009/5e7137d13ac93d218e03b6c0/html5/thumbnails/37.jpg)
THANK YOU
QUESTIONS ???