Page 1: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

Markus BohlinSICS

Hump Yard Track Allocation with Temporary Car StorageRailRome 2011

Holger FlierJens MaueMatus MihalakETH

Funded by Swedish Transport Administration and Swiss National Science Foundation

Page 2: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

2 M. Bohlin

Problem definition

Complexity

The mixing problem

Experiments

Outline

Page 3: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

3 M. Bohlin

PROBLEM DEFINITION

Page 4: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

4 M. Bohlin

Hump Yard Track allocation

… …

qi CC

Roll-in Roll-out

Dep. train

formation

Page 5: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

5 M. Bohlin

Temporary car storage (”Mixing”)

Tracks reserved for ”mixed” use

Pull-outImmediateroll-in

Page 6: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

6 M. Bohlin

• Planning by hand• Default: roll-in order = arrival

order • Pull-backs are planned in advance

• Partial pull-backs

• Train formation on multiple tracks• Multiple trains on one track

Current Practice

Page 7: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

7 M. Bohlin

Solution Approach

Arrival & Departure yards•Track allocations•Schedule roll-ins s.t. pull-outs

•Determine roll-outs

•Minimizes ”freight-time” on class. tracks

Classification bowl•Track allocation•Mixed tracks

•Gives feasible plan•Minimizes car roll-ins

Step 1:

Heuristic A

Heuristic Impr.

Heuristic B

MIP Model

MIP Mode

l

Step 2:

Page 8: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

8 M. Bohlin

Temporal constraints

Arrival Roll-in Roll-out Departure

• Roll-in can start after the arrival inspection and preparations:

• Brake test can begin when all cars have arrived:

rollrollarrarr STT ii

outoutrollroll:),( STTCji ji

Brake test

Page 9: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

9 M. Bohlin

• Sorting of freight carsSiddiqee, 1972Dahlhaus, Horák, Miller and Ryan, 2000Dahlhaus, Manne, Miller and Ryan, 2000Gatto, Maue, Mihalak and Widmayer, 2009Jacob, Marton, Maue and Nunkesser, 2010

• Train parkingBlasum, Bussieck, Hochstättler, Moll, Scheel and Winter, 1999Di Stefano and Koci, 2004Winter and Zimmermann, 2000

• Freight yard dispatchingHe, Song, and Chaudhry, 2003

• Track assignmentCornelsen and Di Stefano, 2007

Related Work

Page 10: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

10 M. Bohlin

COMPLEXITY

Page 11: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

11 M. Bohlin

Given a mixing plan, the ”uncut” track allocation is the remaining part after mixing.

Mixing and Cutting

”local cut-off” = number of mixed cars

Page 12: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

12 M. Bohlin

Cutting only allowed until the last pull-out or until departure preparations begin

Mixing and Cutting

Page 13: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

13 M. Bohlin

Unlimited mixed capacity: -coloring of interval graphs.

Theorem 1. Finding a feasible track allocation for the mixing-problem is NP-complete even for instances where 1) the mixed capacity is zero, or 2) the mixed capacity is unlimited, and all intervals may have arbitrary uncutted parts.

Problem reduces to interval graph coloring if all trains fit on all tracks.

Complexity Results (1)

Page 14: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

14 M. Bohlin

Theorem 2. In case of uniform and sufficient track lengths, the problem of finding a feasible track allocation that minimizes the number of cars sent to the mixed tracks over all time periods is solvable in polynomial time.

Complexity Results (2)

Page 15: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

15 M. Bohlin

1

2

n

q1

q2

qk

1

2

n

q1

q2

qk

Arc cost = number of mixed carsArcs between trains in roll-

out order

Departingtrains

Classificationtracks

Arcs to all trains (zero

cost)

Arcs from all trains (zero

cost)

Solved as assignment problem in O(n3)

Between tracks (no allocation,

zero cost)

Page 16: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

16 M. Bohlin

THE MIXING PROBLEM

Page 17: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

Three tracks available (horizontal lines). Dark areas cannot be cut off. Pulltimes: vertical lines. Greedy coloring, by start time.

Heuristic A: Interval coloring

Page 18: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

Schedule needs 2 extra tracks. Find first infeasible clique. Intersection of clique members is grey.

Heuristic A: Interval coloring

Page 19: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

Cut off 2 intervals with least cost (here no choice)

Heuristic A: Interval coloring

Page 20: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

Again, greedy coloring by start time, with intervals that have been cut off.

Heuristic A: Interval coloring

Page 21: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

Second infeasible clique, one extra track needed.

Heuristic A: Interval coloring

Page 22: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

Cut off cheaper interval (let’s say it’s the violet one)

Heuristic A: Interval coloring

Page 23: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

Finally, a feasible schedule. This always works if a greedy coloring of the dark areas (minimal parts of the intervals) happens to be feasible.

Heuristic A: Interval coloring

Page 24: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

25 M. Bohlin

• Assign trains in roll-out order• Choose best track w.r.t. resulting

local cut-off• Best-fit w.r.t. length as tie-break

Heuristic B: Greedy

Page 25: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

Train Sizes Track Sizes

A look at the data...

Page 26: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

Train Sizes Track Sizes

Every train on the left fits on each track in bucket on right

A look at the data...

Page 27: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

Train Sizes Track Sizes

All tracks on right are longer than many trains on the left

A look at the data...

Page 28: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

Heuristic I: Improvement• Bucket: Set of tracks and trains s.t. each train

fits on each track within that bucket

• Idea: build buckets from feasible schedule (length-wise)

• Solve each bucket independently to optimality (total mixing usage / roll-ins)

– in order of reverse length, pick tracks until some allocated train doesn’t fit on a track

– selected tracks and trains bucket (removed)

Page 29: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

EXPERIMENTS

Page 30: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

31 M. Bohlin

Hallsberg Hump Yard (Sweden)

Page 31: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

32 M. Bohlin

• One week of traffic (spring 2010)– Timetabled arrivals and departures– Car allocation given

• Planning for Thursday – Sunday• Two mixing tracks (necessary)• Train length up to 613 m• 80% of arrivals between 12:00 and 23:59.

Step 1: 20 minutesMIP feasibility: 30 minutesMIP min mix: 30 minutes

Experimental Setup

Page 32: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

33 M. Bohlin

MIP Heur. A

Heur. A+I

Heur. B

Heur. B+I

1200130014001500160017001800190020002100

Results, 2 days (mixed usage)Meters

Page 33: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

34 M. Bohlin

MIP Heur. A

Heur. A+I

Heur. B

Heur. B+I

0

50

100

150

200

250

300

350

Results, 2 days (extra roll-ins)Extra car-roll-ins

Page 34: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

35 M. Bohlin

Page 35: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

36 M. Bohlin

Gantt chart, 2 days

Page 36: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011

37 M. Bohlin

• Pull-back planning• Scheduling mixed tracks

• Integrated approach

Open issues

Page 37: Hump Yard Track Allocation with Temporary Car Storage RailRome  2011