hvac_duct_work_installation_mme.pdf
TRANSCRIPT
![Page 1: hvac_duct_work_installation_mMe.pdf](https://reader034.vdocument.in/reader034/viewer/2022051018/55cf9669550346d0338b50d3/html5/thumbnails/1.jpg)
H o m eH o m eH o m e DisclaimerDisclaimerDisclaimer Project HSE PlanProject HSE PlanProject HSE Plan Construction Method StatementsConstruction Method StatementsConstruction Method Statements
Method Statement TemplateMethod Statement TemplateMethod Statement Template Inspection ChecklistsInspection ChecklistsInspection Checklists Request A Method StatementRequest A Method StatementRequest A Method Statement
Project Execution PlanProject Execution PlanProject Execution Plan Customer SupportCustomer SupportCustomer Support Download Method StatementsDownload Method StatementsDownload Method Statements
Sheet Metal Ductinglangdonsheetmetal.com
Sure-Clamp Spiral Clamp Together Ductwork & Fittings
Method Statement Free DownloadMethod Statement Free DownloadMethod Statement Free DownloadRSS
You are here: Home » Method Statements » Construction Method Statements » HVAC Method Statements » Duct Works » Method Statements » Construction Method Statements » HVAC Method Statements » HVAC Duct Work Installation Method Statement
HVAC Duct Work Installation Method StatementHVAC Duct Work Installation Method StatementHVAC Duct Work Installation Method Statement
◾
◾ Tweet 2
◾
HVAC Duct Work & Accessories Installation Method Statement
1. PURPOSE
This method statement cover on site installation of
pre-fabricated duct-work systems manufactured from
hot dipped galvanized steel sheet to S.M.A.C.N.A.
2. SCOPE OF WORK
This method statement is to define the method to be
used to ensure that prefabricated ducting, bracketing, and in line equipment installation and final
connections and workmanship are correct and acceptable, and conforming to the contract
documents and General Specifications
Material to be submitted for review by the Client- see latest Revision of the Material Procurement
Schedule.
3. RESPONSIBLE PERSONNEL
◾ Construction Manager
◾ Mechanical Superintendent.
◾ Warehouse Controller
November 5, 2012 | webmaster
SPECIAL RECENT POSTSSPECIAL RECENT POSTS
Installation of Marble and Granite Tiles on floor, stairs, walls and countersApril 4th, 2014This method statement covers the detailed procedure to be followed for Supply & Installation of [...]
Method Of Statement For Installation of wires and cables - WiringMarch 29th, 2014Below is the list of equipment / Tools required for installation of wires and cables, which cab be u[...]
Method Statement For Installation & Testing of SMATV SystemMarch 21st, 2014Below are the steps or method statement for installation & testing of SMATV System in a project.[...]
Sanitary Ware Installation Method StatementMarch 20th, 2014Installation of sanitary ware can be done step wise as per mentioned procedure or method statement b[...]
Plastering Works Method StatementMarch 20th, 2014Below are the equipment involved in Plaster works that should be arranged before starting the plaste[...]
Method Statement for Internal Painting WorksMarch 20th, 2014Below is the procedure for doing the painting works for internal painting. This safe work method sta[...]
Chiller installation method statementMarch 17th, 2014Below is a standard operating procedure which can be used a a method statement for installation of c[...]
How To Do Installation of Suspended False CeilingsMarch 14th, 2014Equipment Required For Installation of Suspended Ceilings Leveling Instruments Line dory C[...]
3 Email Share
Page 1 of 4HVAC Duct Work Installation Method Statement
08/07/2014http://www.methodstatementhq.com/hvac-duct-work-installation-method-statement.ht...
![Page 2: hvac_duct_work_installation_mMe.pdf](https://reader034.vdocument.in/reader034/viewer/2022051018/55cf9669550346d0338b50d3/html5/thumbnails/2.jpg)
◾ Q.C. Engineer/Inspector
DOWNLOAD FULL METHOD STATEMENT IN WORD FORMAT
4. METHOD – PRE-INSTALLATION
◾ All materials drawings and other documentation relevant to a particular section of works will be
checked by the Construction Department prior to the commence of work ensuring that these are
of the correct type as reviewed by the Client.
◾ Before commencing any construction works, pre-inspections will be carried out on all materials
prior to them leaving the storage area
◾ Prior to the commencement of any construction works, areas and access will be inspected by the
Construction Team to ensure that they are in a suitable condition for construction works to
commence. The Client will be invited to attend this inspection at his discretion.
◾ A close co-ordination with other trades will be carried out on site prior to commence work.
◾ A safe and protective storage area will be allocated on site, in close co-ordination with the
employer.
5. METHOD OF INSTALLATION
1. Supervisor will instruct tradesmen regarding the execution of the works and will distribute all
necessary approved construction drawings of the latest revision.
2. The supervisor will also check that tools and equipment available are in compliance with the
contract requirements.
3. Ensure horizontal ductwork is adequately supported at equal distances in accordance with
Construction Drawings with all brackets fixed to the vertical face of ribbed beams of the structure.
4. Care will be taken during setting out, that ductwork runs between ceiling module lines so as to
maintain maximum flexibility for any future relocation of lighting fixtures or other services.
5. Ductwork supports unless otherwise indicated will be installed to provide a minimum space of
15mm between finished covering and adjacent work, and 100mm clearance from suspended
ceiling.
6. Supports or hangers will be placed within 300mm of any 45° – 90° bend.
7. Screwed drop rods will have thread adjustment in either direction available after leveling of
ductwork and associated plenum box’s.
8. Ducts will be supported within 300mm of mating flanges or joints.
9. As indicated on relevant approved construction drawings where more than one duct can be
supported on one hanger – the size of the hanger will be assessed on the sum of the maximum
widths.
10. Ductwork passing through non fire rated walls and floors will be adequately supported on either
side.
11. All locknuts are tightened correctly. At all open end’s check for debris then cover with suitable
material to prevent any ingress of debris vermin, or moisture.
12. Supervisor to ensure that there are no dents, distortion or buckling of ducting during installation
being aware that damaged sheet metal work will be rejected.
13. Supports are to be fixed at correct levels checking the bracket material is compatible with the
installation and the correct method used for thermal insulation.
14. Ducting to be installed allowing sufficient space for expansion/contraction and thermal insulation.
15. Fixing of flanges to ductwork will be by the approved details and in compliance with the
specification requirements: a) Clean both flange faces to be joined. b) Add gasket jointing
material to flanges to be mated. c) Using only undamaged rust free bolts nuts and washers join
mating flanges together and tighten bolts. d) Clean any excess jointing material from flanges.
16. Continuously check horizontal and vertical alignment of ductwork and compliance with
contractors drawings and specification requirements by using spirit level plumb or other suitable
instrument.
17. In line equipment is to be independently supported from main structure and not blockwork walls or
sub-structure.
18. Silencers, fire dampers, balancing dampers & other plant items will be installed as per contractors
drawings, and will be supported adequately.
Transformer testing & commissioning method statementMarch 14th, 2014Below is a standard method statement which can be used as learning purpose and to prepare further pr[...]
METHOD STATEMENT FOR INSTALLATION, TESTING AND COMMISSIONING OF UPSMarch 14th, 20141.0. PURPOSE: The purpose of this method statement defines the procedure to be followed for Insta[...]
CATEGORIESCATEGORIES
◾ BMS
◾ Cement & Clinker Testing
◾ Civil Engineering
◾ Civil Method Statements
◾ Concrete Testing
◾ Construction Method Statements
◾ Drainage Pipes Installation
◾ Duct Works
◾ Electrical
◾ Electrical Method Statements
◾ Fire Suppression System
◾ Health & Safety
◾ HVAC Checklists
◾ HVAC Maintenance
◾ HVAC Method Statements
◾ ISO 9001
◾ Method Statement Template
◾ Method Statements
◾ Piping Method Statements
◾ Piping Works
◾ Plumbing Method Statements
◾ Pressure Testing
◾ Project HSE Plan
◾ Pump Installation
◾ Quality Assurance
◾ Quality Management
◾ Risk
◾ Risk Assessment
◾ Risk Management
◾ Sample Forms & Formats
◾ Templates
◾ Testing & Commissioning
◾ Water Supply Piping
◾ Welding Risk
◾ What Is Hazard?
◾ What Is Risk?
◾ Working At Height
TAGSTAGS
& Access Control System Accessories AC Ducting Method Statement ac duct installation AC MaintenanceAcoustic Lining blank performa blank proformabms system BMS Testing Procedure Building Management System Building Management System BMS control measures Electrical Method Statement for hazard hvac HVAC
Page 2 of 4HVAC Duct Work Installation Method Statement
08/07/2014http://www.methodstatementhq.com/hvac-duct-work-installation-method-statement.ht...
![Page 3: hvac_duct_work_installation_mMe.pdf](https://reader034.vdocument.in/reader034/viewer/2022051018/55cf9669550346d0338b50d3/html5/thumbnails/3.jpg)
« Method Statement For GI Box And GI/PVC Conduit Installation In The WallMethod Statement For HVAC Ductwork Insulation And Acoustic Lining »
19. Supervisor to check before end of work day’s by recording in his diary (as necessary) that: a) The
correct type supports installed, b) Supports are adequately supporting the ductwork and
associated plant equipment.
20. Test holes to be provided and plugged ready for commissioning and control equipment.
21. Ensure terminal equipment is installed as specified.
22. Supervisor to ensure that all completed installations look neat and tidy, and that there is adequate
spacing between ductwork and in line equipment allowing access for operation and ease of
maintenance, to approved contractors drawings and manufacture’s recommendations.
23. The supervisor in charge and the QC officer shall continuously monitor the activities (by recording
the defects or snags into his House Process Inspection List) to ensure that all components indicated
on the approved contractors drawings have been installed and that the installation is in
accordance with the contract requirements.
DOWNLOAD FULL METHOD STATEMENT IN WORD FORMAT
6. SAFETY AND ENVIRONMENTAL CONSIDERATION
7. RECORDS
Ductwork check list.
8. REFERENCE DOCUMENTS
◾ Particular Technical Specification Vol 2. Mechanical
◾ S.M.A.C.N.A .Specification for Ductwork Construction and Installation 1985
◾ Painting & Identification See CONP-09-07
◾ For Second Fix Accessories, see separate Construction Quality Plan No. 07 ( i.e. For Grilles, Louvers
etc.)
◾ See Construction Quality Plan On Site Ductwork Manufacture
◾ Contractors Drawings
DOWNLOAD FULL METHOD STATEMENT IN WORD FORMAT
LIKE US ON FACEBOOK30 personnes aiment ça. Soyez le premier de vos amis.
J’aimeJ’aime PartagerPartager
Filed under Duct Works, HVAC Method Statements | Tags: AC Ducting Method Statement, for, HVAC Duct Work Installation Method Statement, HVAC System Procedure, statement
Air Handling Unitmarkclimate.com
Mark Climate Technologies Leader in Air Handling Units
Method Statements installationInstallation of GI Conduits & Accessories
methodMethod Of StatementMethod Statement method statement for Installation Method Statement Template MST MST For BMS of pipe flushing pressure pumps risk Risk Assessment safe work method sample check list sample checksheet Sample
Format Electrical statement swmstemplate test Testing & CommissioningTesting & Commissioning Method Statementwater
DOWNLOAD METHOD STATEMENTSDOWNLOAD METHOD STATEMENTS
◾ Download BMS Installation Method Statement
◾ Download Chilled Water Pipes Installation &
Testing Method Statement
◾ Download Method Statement For INSTALLATION
HYDRO TESTING & FLUSHING OF FIRE FIGHTING
PIPING SYSTEM INCLUDING SPRINKLERS
◾ Download Method Statement For CENTRAL
BATTERY SYSTEM INSTALLATION
◾ Download Method Statement For Fire Alarm
System
◾ Download Method Statement For Flushing Of
Chilled Water Piping
◾ Download Method Statement For Installation Of
Packaged Units
◾ Download Method Statement For Installation Of
Split Units & Risk Assessment
◾ Download Method Statement For Installation Of
Transformers
◾ Download Project HSE Plan With All Forms
◾ Home
◾ Privacy Policy
◾ Disclaimer
◾ Home
◾ Privacy Policy
◾ Disclaimer
Copyright © 2014 Method Statement Free Download | zBorder Theme powered by WordPress
Page 3 of 4HVAC Duct Work Installation Method Statement
08/07/2014http://www.methodstatementhq.com/hvac-duct-work-installation-method-statement.ht...
![Page 4: hvac_duct_work_installation_mMe.pdf](https://reader034.vdocument.in/reader034/viewer/2022051018/55cf9669550346d0338b50d3/html5/thumbnails/4.jpg)
Page 4 of 4HVAC Duct Work Installation Method Statement