BorWin 1 The Worlds First 400 MW HVDC Light® connection for wind power BWEA 31 21 October 2009
Peter Jones Head of Technology ABB [email protected]
© ABB Group September 08 Slide 2
The Project
© ABB Group September 08 | Slide 3
75 km land cable
125 km sea cable
400 MW Offshore converter
400 MW converter
First HVDC Wind Power Connector
Contract Sep 2007 Completion Nov 2009
BorWin 1, 400 MW HVDC Light
© ABB Group September 08 | Slide 4
BorWin 1 Project
Customer transpower offshore gmbh (former E.ON Netz Offshore GmbH, Germany)
Scope 400 MW HVDC Light® system off-shore
station on platform with sub-sea structure Onshore station at E.ON substation Diele Telecommunication Control and protection
Cables DC cable submarine (2x125km) DC cable on land (2x75km) Fibre optic cable (200 km)
© ABB Group September 08 Slide 5
The Platform
© ABB Group September 08 | Slide 6
Jacket Piles
Crane
Transformers
Helipad
J-Tubes
Topside
BorWin 1 Overview of platform layout
© ABB Group September 08 | Slide 7
BorWin 1
Topside weight approx 3200 t
Size approx 50 x 33,5 x 22 m
Jacket weight 1700 t
Height 62 m
Sea level to topside 20 m
© ABB Group September 08 | Slide 8
BorWin 1
Topside and jacket verified, witnessed and approved by Germanische Lloyd according to the German rules & regulations
Permits for the platform has to be obtained from BSH before start of installation & operation
© ABB Group September 08 | Slide 9
BorWin 1 – Fabrication at Heerema, Vlissingen, Deck elevation east February 2009
© ABB Group September 08 | Slide 10
BorWin 1 – Fabrication at Heerema, Vlissingen, Jacket structure roll-up April 2009
© ABB Group September 08 | Slide 11
BorWin 1 – Fabrication at Heerema, Vlissingen, Topside roll out May 4, 2009
© ABB Group September 08 | Slide 12
BorWin 1, 400 MW HVDC Light
© ABB Group September 08 | Slide 13
BorWin 1 Jacket in place
© ABB Group September 08 | Slide 14
BorWin 1 Jacket installation
© ABB Group September 08 | Slide 15
BorWin 1 Various weather at BorWin Alpha site
© ABB Group September 08 | Slide 16
BorWin 1 Platform in Place
© ABB Group September 08 | Slide 17
BorWin 1 Top deck from helicopter August 2009
© ABB Group September 08 | Slide 18
BorWin 1 Installation of additional cables September 2009
© ABB Group September 08 Slide 19
The Onshore HVDC Converter
© ABB Group September 08 | Slide 20
Diele - Onshore site Diele – Onshore HVDC Light station
Cooling Units
Reactors Valves
Chopper
AC Filter Yard
DC Filter Yard
Power Transformer
© ABB Group September 08 | Slide 21
Diele - Onshore site Earth work early September 2008
© ABB Group September 08 | Slide 22
Diele - Onshore site Converter building January 2009
© ABB Group September 08 | Slide 23
Diele - Onshore site Installation of valve and control enclosures April 2009
© ABB Group September 08 | Slide 24
Diele - Onshore site Transformer transport
© ABB Group September 08 | Slide 25
Diele - Onshore site Chopper resistors
© ABB Group September 08 | Slide 26
Diele - Onshore site Overview of substation
© ABB Group September 08 Slide 27
Onshore and Offshore Cable
© ABB Group September 08 | Slide 28
BorWin 1 HVDC Light cable
121 km sea cable (1200 mm2 Cu)
8,4 km Wadden Sea, Norderney and Ems (1600 mm2 Cu)
73,6 km land cable (2300 mm2 Al)
© ABB Group September 08 | Slide 29
BorWin 1 Cable – 125km Offshore route
© ABB Group September 08 | Slide 30
BorWin 1 Cable – Part of submarine cable Waiting for installation March 2009
© ABB Group September 08 | Slide 31
BorWin 1 Cable – Team Oman – installation vessel for submarine cables
© ABB Group September 08 | Slide 32
BorWin 1 Waiting for the Weather
© ABB Group September 08 | Slide 33
BorWin 1 Cable – Onshore route
The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.
© ABB Group September 08 | Slide 34
Cable pieces Approx. 750 m cable
per drum Approx. weight 10 t
per drum Standard
150
cm
Cable - protection
BorWin 1 Cable – Installation of land cable
© ABB Group September 08 | Slide 35
BorWin 1
Cable – Installation LK Aurich Excavating trenches: summer 2008
© ABB Group September 08 | Slide 36
BorWin 1 Cable – Installation LK Aurich Installation of land cable: summer 2008
© ABB Group September 08 | Slide 37
BorWin 1
Cable – Installation LK Aurich Cable jointing cubicle: summer 2008
© ABB Group September 08 | Slide 38
BorWin 1 Cable – Installation LK Aurich Cable jointing: summer 2008
© ABB Group September 08 | Slide 39
BorWin 1
Cable – Installation Drilling rig for river Ems crossing: autumn 2008
© ABB Group September 08 | Slide 40
BorWin 1
Cable – Installation Welded steel pipes for river Ems Crossing: autumn 2008
© ABB Group September 08 | Slide 41
BorWin 1 Cable – Trenching equipment Excalibur
© ABB Group September 08 | Slide 42
BorWin 1 Cable – Installation at Wadden Sea
© ABB Group September 08 | Slide 43
BorWin 1 Cable – Installation at Wadden Sea
© ABB Group September 08 | Slide 44
BorWin 1 Cable – Installation at Wadden Sea
© ABB Group September 08 | Slide 45
BorWin 1 Cable – Installation at Wadden Sea
© ABB Group September 08 | Slide 46
BorWin 1 Cable – Installation at Wadden Sea
© ABB Group September 08 | Slide 47