hwt spike bi aix upg brod move v1.3

36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3 http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 1/36 Maintenance : Description Change # Change Description HWT – Spike BI upg and Move Brod move Executive Transformation Summary Before Shift Kick-off technical change Yes, at the end of the call, Nicolas Bacquié asked for the same volume than production 3x300GB. Until we have the confirmation from SOD team regarding LUN size, we should host origlog in vgTI1ci and mirrlog on vgTImisc; thus, we have to add these 2 LUNs removal in the change after you perform the logical volume change.

Upload: ramya-sri

Post on 14-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 1/36

Maintenance :

Description Change #

Change Description HWT – Spike BI upg and Move Brod move

Executive Transformation Summary Before

Shift

Kick-off technical change

Yes, at the end of the call, Nicolas Bacquié asked for the same volume

than production 3x300GB.

Until we have the confirmation from SOD team regarding LUN size, we

should host origlog in vgTI1ci and mirrlog on vgTImisc; thus, we have

to add these 2 LUNs removal in the change after you perform the

logical volume change.

Page 2: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 2/36

Hello Lionel ,

For the sapdata size i understood that should be same on PI1 , so I

would prefer same as planned for 4201prd - 3x300Gb .

Sapdata was splited because of restore tests, I will remove sapdata2

until the migration day and restore the good configuration .

@Helene, is it possible to open the change to change the rootvg Tier1

to Tier2 ?

 According to my documentation should be :

9 UX1_ampsv04202ppr 0 89 vdisk89

600507680180857A5800000000000059 50 T1

Page 3: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 3/36

Schedule date End date

After Impact / Comments Status

Wait

Page 4: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 4/36

Page 5: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 5/36

Reference: HWT Spike BI AIX upg Brod Move

GLOBAL PROJECT STATUS

ID Task name Resp

1 Project preparation tasks

Validate servers list IBM

Go from customer Saint-Gobain

Elaborate Roadmap IBM

Kickoff meeting SG/IBM

Resources IBM

AIX pre-requisite document build IBM

Request new IP adress for Galaxy Vlan IBM

Zone Alternate boot disk IBM

Run Upgrade preparation IBM

Call customer before stoping SAP and OS IBM

Run upgrade IBM

Stop application IBM

Activate AIX6.1 + system and SAP check IBM

SystemValidation Saint-Gobain

Go for production migration Saint-Gobain

unZone Alternate boot disk IBM

configure trunck IP adress for Galaxy IBM

check latest backup succesful IBM

force archivelogs ( SAP, DB, …) IBM

check no running actions IBM

disable scheduler TSM IBM

 Add NPIV Connection for Galaxy IBM

Zone Lpar on SAN Galaxy IBM

Storage Agent upgrade IBM

TSM migration on Galaxy IBM

update new conf file IBM

Test / Sauvegrade IBM

Validation des tests de sauvegrades Saint-Gobain

Unzone Lpar partition on SG Brod IBM

BROD Move ampsv04203pjt

Spike BI ampsv04204prd

Spike BI ampsv04203pjt

Page 6: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 6/36

Go/ No GO meeting SG/IBM

Request new IP adress for Galaxy Vlan IBM

Zone Alternate boot disk IBM

Run Upgrade preparation IBM

Call customer before stoping SAP and OS IBM

Run upgrade IBM

Stop application IBM

Activate AIX6.1 + system and SAP check IBM

SystemValidation Saint-Gobain

Go for production migration Saint-Gobain

unZone Alternate boot disk IBM

configure trunck IP adress for Galaxy IBM

check latest backup succesful IBM

force archivelogs ( SAP, DB, …) IBMcheck no running actions IBM

disable scheduler TSM IBM

 Add NPIV Connection for Galaxy IBM

Zone Lpar on SAN Galaxy IBM

Storage Agent upgrade IBM

TSM migration on Galaxy IBM

update new conf file IBM

Test / Sauvegrade IBM

Validation des tests de sauvegrades Saint-Gobain

Check GBRSUnzone Lpar partition on SG Brod IBM

Move Spike BI backup history

from dedicated SG BROD infrastructure to Galaxy oneIBM

BROD Move ampsv04204prd

Page 7: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 7/36

Date

Start End Start End  

Owner ( Status Duration Date Date Time Time change

itect/PM Done 6/9 6/9 9:00 18:00

SG PM Done 5/9 5/9 9:00 18:00

PM Done 7/9 10/9 9:00 18:00

Team Done 12/9 12/9 13:00 18:00

PM Open 7/9 12/9 9:00 9:00

Unix team Open 10/9 10/9 14:00 18:00 CH12165479

PM Done 10/9 10/9 10:00 12:00 CH12165246

D/Unix te Done 12/9 12/9 14:00 18:00 CH12165485

Unix team Open 1:30 18/9 18/9 8:00 12:00 CH12165495

PM Open 0:05 18/9 18/9 12:00 12:00 CH12165498

Unix team Open 3:25 18/9 18/9 12:00 19:00 CH12165498

SAP Open 0:10 18/9 18/9 14:30 18:00 CH12165498

nix Team Open 4:30 18/9 18/9 14:30 19:00 CH12165498

chnical te Open 1:00 19/9 19/9 18:00 19:00 CH12165498

chnical te Open 0:10 19/9 19/9 19:00 19:30 CH12165498

D/Unix te Open 20/9 20/9 8:00 12:00 CH12165520

Unix team Open 20/9 20/9 8:00 12:00 CH12165787

BROD Open 0:10 20/9 20/9 12:00 18:00 CH12165787

SAP Open 0:30 20/9 20/9 12:00 18:00 CH12165787

BROD Open 0:10 20/9 20/9 12:00 18:00 CH12165787

BROD Open 0:05 20/9 20/9 12:00 18:00 CH12165787

Unix Open 0:15 20/9 20/9 12:00 18:00 CH12165787

SANSOD Open 0:15 20/9 20/9 12:00 18:00 CH12165787

ROD Tea Open 1:00 20/9 20/9 12:00 18:00 CH12165787

ROD Tea Open 3:00 20/9 20/9 12:00 18:00 CH12165787

BROD Open 1:30 20/9 20/9 12:00 18:00 CH12165787

NIX/BRO Open 0:30 20/9 20/9 18:00 18:00 CH12165787

Open 20/9 20/9 18:00 18:00 CH12165787

SANSOD Open 0:15 TBD TBD 10:00 18:00

Comments

Page 8: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 8/36

Page 9: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 9/36

Strategic Outsourcing

 Additional Information

To be confirm with PM and entity

Pospone to 13/09.

Tasks details in step 1 into Unix_roadmap

Tasks details in step 1 into Unix_roadmap

Tasks details in step 2 into Unix_roadmap

Tasks details in step 3.3 and 3.4

Tasks details in step 3.5 into Unix_Roadmap

Tasks details in step 3.6, 3.7 and 4 & 5 into Unix_Roadmap

Tasks details in step 6 into Unix_Roadmap

Tasks details in step 6 into Unix_Roadmap

Take screen shot

Send log including the proof that lan Free is used

Validate with test result and using GBRS report

Page 10: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 10/36

To be planed

Tasks details in step 1 into Unix_roadmap

Tasks details in step 1 into Unix_roadmap

Tasks details in step 2 into Unix_roadmap

Tasks details in step 3.3 and 3.4

Tasks details in step 3.5 into Unix_Roadmap

Tasks details in step 3.6, 3.7 and 4 & 5 into Unix_Roadmap

Tasks details in step 6 into Unix_Roadmap

Tasks details in step 6 into Unix_Roadmap

Validate with test result and using GBRS report

Page 11: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 11/36

Step Activity

1 Prerequisites

1.1  Additional LUN for alt_disk_install (Via requeted change)

2 Preparation

2.1 Register client on NIM server (If not register)

2.2 Perform backup of client system

2.3 Back up ssh configuration and client key files in case they get overwritten

2.4 Preparation of SPOT and LPP_Source

2.5 Preparation of rsh commands on client from NIM

2.6 Check for necessary network ports & space on server and LV naming

2.7 Check for TCB

3 Migration

3.3 Migrate Server to requested level from NIM

3.4 Check/Change the bootlist

3.5 Stop Applications

3.6 Reboot Server/Check Server 

3.7 Update SDDPCM and MPIO

4 Post checks after migration

4.1 Verify that ODM and fileset base is consistent

4.2 Verify if the system is in desired oslevel

4.3 If the server is hosting DBs make sure you enable AIO

4.4 Update latest TL/SP & Reboot4.5 LDAP Check/VASTOOL

4.6 Upgrade TSM client 6.2.4.1

4.7 Upgrade Tape driver atape

4.8 Configure Galaxie IP adress

4.9 Final reboot

5 Starting Application

5.1 Update Disp+Work kernel version 

5.11 Check and set Oracle Parameters 

5.2 Start SAP application (Check Users are locked / Start DB + SAP)

Milestone 3

Milestone 4

Milestone 1

Milestone 2

Page 12: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 12/36

Page 13: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 13/36

Status Service Status Owner Begin Date End dateDuration

[hours]

Online

Done Online SAN 12/9/12 14:00 12/9/12 18:00 1:00

Online 1:20

Open Online UNIX 18/9/12 8:00 18/9/12 8:15 0:15Open Online UNIX 18/9/12 8:15 18/9/12 8:45 0:30Open Online UNIX 18/9/12 8:45 18/9/12 8:50 0:05Open Online UNIX 18/9/12 8:50 18/9/12 9:20 0:30Open Online UNIX 18/9/12 9:20 18/9/12 9:35 0:15Open Online UNIX 18/9/12 9:35 18/9/12 9:45 0:10Open Online UNIX 18/9/12 9:45 18/9/12 9:55 0:10

Online 3:45

Open Online PM 18/9/12 9:55 18/9/12 10:00 0:05Open Online UNIX 18/9/12 10:00 18/9/12 12:30 2:30Open Online UNIX 18/9/12 12:30 18/9/12 12:35 0:05Open Online PM 18/9/12 12:35 18/9/12 12:40 0:05

Open Offline SAP 18/9/12 12:35 18/9/12 13:20 0:45

Open Offline UNIX 18/9/12 13:20 18/9/12 13:30 0:10Open Offline UNIX 18/9/12 13:30 18/9/12 13:40 0:10

Offline 1:55

Open Offline UNIX 18/9/12 13:40 18/9/12 13:45 0:05Open Offline UNIX 18/9/12 13:45 18/9/12 13:50 0:05Open Offline UNIX 18/9/12 13:50 18/9/12 13:55 0:05

Open Offline UNIX 18/9/12 13:55 18/9/12 14:25 0:30Open Offline UNIX 18/9/12 14:25 18/9/12 14:35 0:10Open Offline USBS 18/9/12 14:35 18/9/12 15:05 0:30Open Offline Unix 18/9/12 15:05 18/9/12 15:10 0:05

N/A Offline Unix 18/9/12 15:10 18/9/12 15:25 0:15Open Offline Unix 18/9/12 15:25 18/9/12 15:35 0:10Open Online PM 18/9/12 15:35 18/9/12 15:40 0:05

Offline  App Team 0:45

Open

Offline SAP 18/9/12 15:40 18/9/12 16:40 1:00

Open

Offline SAP 18/9/12 16:40 18/9/12 16:50 0:10

Open Offline SAP 18/9/12 16:40 18/9/12 17:40 1:00

Open Online PM 18/9/12 17:40 18/9/12 17:45 0:05

Spike BI AIX UPGRADE

Page 14: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 14/36

Page 15: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 15/36

Page 16: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 16/36

Page 17: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 17/36

Step Activity

1 Prerequisites

1.1  Additional LUN for alt_disk_install (Via requeted change)

2 Preparation

2.1 Register client on NIM server (If not register)

2.2 Perform backup of client system

2.3 Back up ssh configuration and client key files in case they get overwritten

2.4 Preparation of SPOT and LPP_Source

2.5 Preparation of rsh commands on client from NIM

2.6 Check for necessary network ports & space on server and LV naming

2.7 Check for TCB

3 Migration

3.3 Migrate Server to requested level from NIM

3.4 Check/Change the bootlist

3.5 Stop Applications

3.6 Reboot Server/Check Server 

3.7 Update SDDPCM and MPIO

4 Post checks after migration

4.1 Verify that ODM and fileset base is consistent

4.2 Verify if the system is in desired oslevel

4.3 If the server is hosting DBs make sure you enable AIO

4.4 Update latest TL/SP & Reboot

4.5 LDAP Check/VASTOOL

4.6 Upgrade TSM client 6.2.4.1

4.7 Upgrade Tape driver atape

4.8 Configure Galaxie IP adress

4.9 Final reboot

5 Starting Application

5.1 Update Disp+Work kernel version 

5.11 Check and set Oracle Parameters 

5.2 Start SAP application (Check Users are locked / Start DB + SAP)

5.3 Run Oracle statistic

Milestone 3

Milestone 4

Milestone 1

Milestone 2

Page 18: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 18/36

Page 19: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 19/36

Page 20: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 20/36

Page 21: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 21/36

Page 22: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 22/36

Page 23: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 23/36

Area

System Performance

Hardware Capacity

Database Performance

Database Performance System Performance Database Performance

Comments

Values was done just after closing activities.

0

0.2

0.4

0.6

0.8

1

1.2

0

0.2

0.4

0.6

0.8

1

1.2

System performance

0

0.2

0.4

0.6

0.8

1

1.2

1/1/1900 1/2/1900 1/3/1900

Database

Av

Ta

Av

Ta

Av

Page 24: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 24/36

Page 25: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 25/36

Page 26: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 26/36

Page 27: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 27/36

Page 28: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 28/36

Page 29: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 29/36

Page 30: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 30/36

Status

Open

Done

OpenDone

Open

Open

Open

Open

Open

Open

Open

Open

Open

Open

Open

Open

Open

Open

Open

Open

Open

Page 31: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 31/36

Company Role First name Last name Site

SG Global Solution Architect Stephane Saretta SG

SG Global Solution Architect Jean-Claude Férien SG

SG Maxime Couderc SG

SG Project Manager Vanvassa Chounlamountry SG

Solucom Project Manager Sarah Beauzor  SG Pam Zorge SG

SG ROI Arnaud Epinette SG

SG Jose-Luis Girardot SG

SG Ranjith Jacob SG

SG Sivaraman Packrisamy INDIA

IBM Project Manager   Hélène Scavazzin LGE

IBM Project Manager   Jeyakaran Jayaraj

IBM APM Roberto Indrigo JUP

IBM Project Executive Sophie Thibault

IBM DPE Yannick Penfrat

IBM SAP / Oracle

IBM Unix

IBM USBS Bekkam Kumar India

IBM Architect Nicola Rossi MTGIBM TPM Helene Scavazzin LGE

IBM LAN Architect Rene-Jean Girault JUP

IBM CTL Balamuralikrishn Srinivasan India

IBM SDM Senthil Kumar J India

Page 32: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 32/36

Page 33: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 33/36

Page 34: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 34/36

Page 35: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 35/36

Page 36: HWT Spike BI AIX Upg Brod Move v1.3

7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3

http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 36/36