Maintenance :
Description Change #
Change Description HWT – Spike BI upg and Move Brod move
◄
Executive Transformation Summary Before
Shift
Kick-off technical change
Yes, at the end of the call, Nicolas Bacquié asked for the same volume
than production 3x300GB.
Until we have the confirmation from SOD team regarding LUN size, we
should host origlog in vgTI1ci and mirrlog on vgTImisc; thus, we have
to add these 2 LUNs removal in the change after you perform the
logical volume change.
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 2/36
Hello Lionel ,
For the sapdata size i understood that should be same on PI1 , so I
would prefer same as planned for 4201prd - 3x300Gb .
Sapdata was splited because of restore tests, I will remove sapdata2
until the migration day and restore the good configuration .
@Helene, is it possible to open the change to change the rootvg Tier1
to Tier2 ?
According to my documentation should be :
9 UX1_ampsv04202ppr 0 89 vdisk89
600507680180857A5800000000000059 50 T1
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 3/36
Schedule date End date
After Impact / Comments Status
Wait
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 4/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 5/36
Reference: HWT Spike BI AIX upg Brod Move
GLOBAL PROJECT STATUS
ID Task name Resp
1 Project preparation tasks
Validate servers list IBM
Go from customer Saint-Gobain
Elaborate Roadmap IBM
Kickoff meeting SG/IBM
Resources IBM
AIX pre-requisite document build IBM
Request new IP adress for Galaxy Vlan IBM
Zone Alternate boot disk IBM
Run Upgrade preparation IBM
Call customer before stoping SAP and OS IBM
Run upgrade IBM
Stop application IBM
Activate AIX6.1 + system and SAP check IBM
SystemValidation Saint-Gobain
Go for production migration Saint-Gobain
unZone Alternate boot disk IBM
configure trunck IP adress for Galaxy IBM
check latest backup succesful IBM
force archivelogs ( SAP, DB, …) IBM
check no running actions IBM
disable scheduler TSM IBM
Add NPIV Connection for Galaxy IBM
Zone Lpar on SAN Galaxy IBM
Storage Agent upgrade IBM
TSM migration on Galaxy IBM
update new conf file IBM
Test / Sauvegrade IBM
Validation des tests de sauvegrades Saint-Gobain
Unzone Lpar partition on SG Brod IBM
BROD Move ampsv04203pjt
Spike BI ampsv04204prd
Spike BI ampsv04203pjt
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 6/36
Go/ No GO meeting SG/IBM
Request new IP adress for Galaxy Vlan IBM
Zone Alternate boot disk IBM
Run Upgrade preparation IBM
Call customer before stoping SAP and OS IBM
Run upgrade IBM
Stop application IBM
Activate AIX6.1 + system and SAP check IBM
SystemValidation Saint-Gobain
Go for production migration Saint-Gobain
unZone Alternate boot disk IBM
configure trunck IP adress for Galaxy IBM
check latest backup succesful IBM
force archivelogs ( SAP, DB, …) IBMcheck no running actions IBM
disable scheduler TSM IBM
Add NPIV Connection for Galaxy IBM
Zone Lpar on SAN Galaxy IBM
Storage Agent upgrade IBM
TSM migration on Galaxy IBM
update new conf file IBM
Test / Sauvegrade IBM
Validation des tests de sauvegrades Saint-Gobain
Check GBRSUnzone Lpar partition on SG Brod IBM
Move Spike BI backup history
from dedicated SG BROD infrastructure to Galaxy oneIBM
BROD Move ampsv04204prd
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 7/36
Date
Start End Start End
Owner ( Status Duration Date Date Time Time change
itect/PM Done 6/9 6/9 9:00 18:00
SG PM Done 5/9 5/9 9:00 18:00
PM Done 7/9 10/9 9:00 18:00
Team Done 12/9 12/9 13:00 18:00
PM Open 7/9 12/9 9:00 9:00
Unix team Open 10/9 10/9 14:00 18:00 CH12165479
PM Done 10/9 10/9 10:00 12:00 CH12165246
D/Unix te Done 12/9 12/9 14:00 18:00 CH12165485
Unix team Open 1:30 18/9 18/9 8:00 12:00 CH12165495
PM Open 0:05 18/9 18/9 12:00 12:00 CH12165498
Unix team Open 3:25 18/9 18/9 12:00 19:00 CH12165498
SAP Open 0:10 18/9 18/9 14:30 18:00 CH12165498
nix Team Open 4:30 18/9 18/9 14:30 19:00 CH12165498
chnical te Open 1:00 19/9 19/9 18:00 19:00 CH12165498
chnical te Open 0:10 19/9 19/9 19:00 19:30 CH12165498
D/Unix te Open 20/9 20/9 8:00 12:00 CH12165520
Unix team Open 20/9 20/9 8:00 12:00 CH12165787
BROD Open 0:10 20/9 20/9 12:00 18:00 CH12165787
SAP Open 0:30 20/9 20/9 12:00 18:00 CH12165787
BROD Open 0:10 20/9 20/9 12:00 18:00 CH12165787
BROD Open 0:05 20/9 20/9 12:00 18:00 CH12165787
Unix Open 0:15 20/9 20/9 12:00 18:00 CH12165787
SANSOD Open 0:15 20/9 20/9 12:00 18:00 CH12165787
ROD Tea Open 1:00 20/9 20/9 12:00 18:00 CH12165787
ROD Tea Open 3:00 20/9 20/9 12:00 18:00 CH12165787
BROD Open 1:30 20/9 20/9 12:00 18:00 CH12165787
NIX/BRO Open 0:30 20/9 20/9 18:00 18:00 CH12165787
Open 20/9 20/9 18:00 18:00 CH12165787
SANSOD Open 0:15 TBD TBD 10:00 18:00
Comments
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 8/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 9/36
Strategic Outsourcing
Additional Information
To be confirm with PM and entity
Pospone to 13/09.
Tasks details in step 1 into Unix_roadmap
Tasks details in step 1 into Unix_roadmap
Tasks details in step 2 into Unix_roadmap
Tasks details in step 3.3 and 3.4
Tasks details in step 3.5 into Unix_Roadmap
Tasks details in step 3.6, 3.7 and 4 & 5 into Unix_Roadmap
Tasks details in step 6 into Unix_Roadmap
Tasks details in step 6 into Unix_Roadmap
Take screen shot
Send log including the proof that lan Free is used
Validate with test result and using GBRS report
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 10/36
To be planed
Tasks details in step 1 into Unix_roadmap
Tasks details in step 1 into Unix_roadmap
Tasks details in step 2 into Unix_roadmap
Tasks details in step 3.3 and 3.4
Tasks details in step 3.5 into Unix_Roadmap
Tasks details in step 3.6, 3.7 and 4 & 5 into Unix_Roadmap
Tasks details in step 6 into Unix_Roadmap
Tasks details in step 6 into Unix_Roadmap
Validate with test result and using GBRS report
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 11/36
Step Activity
1 Prerequisites
1.1 Additional LUN for alt_disk_install (Via requeted change)
2 Preparation
2.1 Register client on NIM server (If not register)
2.2 Perform backup of client system
2.3 Back up ssh configuration and client key files in case they get overwritten
2.4 Preparation of SPOT and LPP_Source
2.5 Preparation of rsh commands on client from NIM
2.6 Check for necessary network ports & space on server and LV naming
2.7 Check for TCB
3 Migration
3.3 Migrate Server to requested level from NIM
3.4 Check/Change the bootlist
3.5 Stop Applications
3.6 Reboot Server/Check Server
3.7 Update SDDPCM and MPIO
4 Post checks after migration
4.1 Verify that ODM and fileset base is consistent
4.2 Verify if the system is in desired oslevel
4.3 If the server is hosting DBs make sure you enable AIO
4.4 Update latest TL/SP & Reboot4.5 LDAP Check/VASTOOL
4.6 Upgrade TSM client 6.2.4.1
4.7 Upgrade Tape driver atape
4.8 Configure Galaxie IP adress
4.9 Final reboot
5 Starting Application
5.1 Update Disp+Work kernel version
5.11 Check and set Oracle Parameters
5.2 Start SAP application (Check Users are locked / Start DB + SAP)
Milestone 3
Milestone 4
Milestone 1
Milestone 2
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 12/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 13/36
Status Service Status Owner Begin Date End dateDuration
[hours]
Online
Done Online SAN 12/9/12 14:00 12/9/12 18:00 1:00
Online 1:20
Open Online UNIX 18/9/12 8:00 18/9/12 8:15 0:15Open Online UNIX 18/9/12 8:15 18/9/12 8:45 0:30Open Online UNIX 18/9/12 8:45 18/9/12 8:50 0:05Open Online UNIX 18/9/12 8:50 18/9/12 9:20 0:30Open Online UNIX 18/9/12 9:20 18/9/12 9:35 0:15Open Online UNIX 18/9/12 9:35 18/9/12 9:45 0:10Open Online UNIX 18/9/12 9:45 18/9/12 9:55 0:10
Online 3:45
Open Online PM 18/9/12 9:55 18/9/12 10:00 0:05Open Online UNIX 18/9/12 10:00 18/9/12 12:30 2:30Open Online UNIX 18/9/12 12:30 18/9/12 12:35 0:05Open Online PM 18/9/12 12:35 18/9/12 12:40 0:05
Open Offline SAP 18/9/12 12:35 18/9/12 13:20 0:45
Open Offline UNIX 18/9/12 13:20 18/9/12 13:30 0:10Open Offline UNIX 18/9/12 13:30 18/9/12 13:40 0:10
Offline 1:55
Open Offline UNIX 18/9/12 13:40 18/9/12 13:45 0:05Open Offline UNIX 18/9/12 13:45 18/9/12 13:50 0:05Open Offline UNIX 18/9/12 13:50 18/9/12 13:55 0:05
Open Offline UNIX 18/9/12 13:55 18/9/12 14:25 0:30Open Offline UNIX 18/9/12 14:25 18/9/12 14:35 0:10Open Offline USBS 18/9/12 14:35 18/9/12 15:05 0:30Open Offline Unix 18/9/12 15:05 18/9/12 15:10 0:05
N/A Offline Unix 18/9/12 15:10 18/9/12 15:25 0:15Open Offline Unix 18/9/12 15:25 18/9/12 15:35 0:10Open Online PM 18/9/12 15:35 18/9/12 15:40 0:05
Offline App Team 0:45
Open
Offline SAP 18/9/12 15:40 18/9/12 16:40 1:00
Open
Offline SAP 18/9/12 16:40 18/9/12 16:50 0:10
Open Offline SAP 18/9/12 16:40 18/9/12 17:40 1:00
Open Online PM 18/9/12 17:40 18/9/12 17:45 0:05
Spike BI AIX UPGRADE
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 14/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 15/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 16/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 17/36
Step Activity
1 Prerequisites
1.1 Additional LUN for alt_disk_install (Via requeted change)
2 Preparation
2.1 Register client on NIM server (If not register)
2.2 Perform backup of client system
2.3 Back up ssh configuration and client key files in case they get overwritten
2.4 Preparation of SPOT and LPP_Source
2.5 Preparation of rsh commands on client from NIM
2.6 Check for necessary network ports & space on server and LV naming
2.7 Check for TCB
3 Migration
3.3 Migrate Server to requested level from NIM
3.4 Check/Change the bootlist
3.5 Stop Applications
3.6 Reboot Server/Check Server
3.7 Update SDDPCM and MPIO
4 Post checks after migration
4.1 Verify that ODM and fileset base is consistent
4.2 Verify if the system is in desired oslevel
4.3 If the server is hosting DBs make sure you enable AIO
4.4 Update latest TL/SP & Reboot
4.5 LDAP Check/VASTOOL
4.6 Upgrade TSM client 6.2.4.1
4.7 Upgrade Tape driver atape
4.8 Configure Galaxie IP adress
4.9 Final reboot
5 Starting Application
5.1 Update Disp+Work kernel version
5.11 Check and set Oracle Parameters
5.2 Start SAP application (Check Users are locked / Start DB + SAP)
5.3 Run Oracle statistic
Milestone 3
Milestone 4
Milestone 1
Milestone 2
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 18/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 19/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 20/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 21/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 22/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 23/36
Area
System Performance
Hardware Capacity
Database Performance
Database Performance System Performance Database Performance
Comments
Values was done just after closing activities.
0
0.2
0.4
0.6
0.8
1
1.2
0
0.2
0.4
0.6
0.8
1
1.2
System performance
0
0.2
0.4
0.6
0.8
1
1.2
1/1/1900 1/2/1900 1/3/1900
Database
Av
Ta
Av
Ta
Av
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 24/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 25/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 26/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 27/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 28/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 29/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 30/36
Status
Open
Done
OpenDone
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
Open
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 31/36
Company Role First name Last name Site
SG Global Solution Architect Stephane Saretta SG
SG Global Solution Architect Jean-Claude Férien SG
SG Maxime Couderc SG
SG Project Manager Vanvassa Chounlamountry SG
Solucom Project Manager Sarah Beauzor SG Pam Zorge SG
SG ROI Arnaud Epinette SG
SG Jose-Luis Girardot SG
SG Ranjith Jacob SG
SG Sivaraman Packrisamy INDIA
IBM Project Manager Hélène Scavazzin LGE
IBM Project Manager Jeyakaran Jayaraj
IBM APM Roberto Indrigo JUP
IBM Project Executive Sophie Thibault
IBM DPE Yannick Penfrat
IBM SAP / Oracle
IBM Unix
IBM USBS Bekkam Kumar India
IBM Architect Nicola Rossi MTGIBM TPM Helene Scavazzin LGE
IBM LAN Architect Rene-Jean Girault JUP
IBM CTL Balamuralikrishn Srinivasan India
IBM SDM Senthil Kumar J India
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 32/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 33/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 34/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 35/36
7/29/2019 HWT Spike BI AIX Upg Brod Move v1.3
http://slidepdf.com/reader/full/hwt-spike-bi-aix-upg-brod-move-v13 36/36