At Wind Power Plants Hybrid Solar PV Power Plants Webinar on “Hybrid Renewable Power Plants: Opportunities and Challenges"

Upload: others

Post on 16-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

At 

Wind Power 

Plants

Hybrid Solar PV Power Plants

Webinar on “Hybrid Renewable Power Plants: Opportunities and Challenges"

Page 2: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

FFC ENERGY LTD – AT A GLANCE

Capacity 49.5 MW

Wind Turbine Model Nordex S77,1.5- HCV

Location Jhampir, District Thatta

Land Area 1,283 Acres

Total Wind Turbines 33

Benchmark Production 143.55 GWh per annum

Commercial Operations May 16, 2013

Page 3: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

JHAMPIR‐120 km from Karachi

PAKISTAN SINDH WIND CORRIDOR

Page 4: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

Wind Power Plants In Sindh Region

FFCELZORLU

TGF

FWEL – II

FWEL ‐ ISAPPHIRE

MASTER

YUNUSTAPAL

METRO

GUL AHMED

TENAGA

HYDRO CHINA

UNITED ENERGY

SACHALJHAMPIRHAWA TGS TGTTB 1

TB 2

TB 3

HARTFORD

ZAFAIR

Page 5: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

FFCEL Site

Unutilized Spaces Available within Wind Farm

Page 6: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

Growth Trend of Wind Plants - Pakistan

Commissioned  = 1240 MW

In Pipeline          = 600 MW800

Page 7: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

• Sindh wind corridor realizable capacity ‐ over ~10 GW• Tariff lowered to 6.7 – 7 $c/kWh – comparable to any technology

• Potential for Local industry growth– Tower manufacturing, – Blade and nacelle assembly – Services sector– Allied component supplies 

• However, Grid Evacuation Capacity is limiting factor• Grid enhancement projects underway  ‐ New Projects  expected as and when new allocations are available

Potential and Issue

Page 8: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

Opportunity

Grid Allocation50 MWAvailable for Solar

AEDB worked on concept in 2016‐17, found it workable

Page 9: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

50 MW

45 MW 5 MW35 MW 15 MW25 MW 25 MW50 MW 0 MW

Interconnected Power Control

Project Concept

Page 10: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

Resource Assessment

Page 11: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

Wind & Solar Potential

Page 12: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

Annual Average Daily Pattern

0

100

200

300

400

500

600

700

800

900

1000

6.2

6.4

6.6

6.8

7

7.2

7.4

7.6

7.8

8

8.2Solar

Irradiance

W/m2

Wind

Speed

m/s

Hour of the Day

Diurnal Pattern of Solar and Wind Resource at FFCEL Plantsite, Jhampir

Wind Speed Solar Global Irradiance

Value Creation Zone

Page 13: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Wind Farm Annual Production

Grid Capacity Utilization 33 %

Wind Farm Output – 144 GWh

Page 14: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

Combined Annual Production

Combined Output

Grid Capacity Utilization 48 %Combined Output – 207GWh

Page 15: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

Conclusion of Study

Page 16: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

• Pattern of wind & solar resources is conducive for hybrid

• Hybrid Solar assist in smoothing variations in Wind output

• 25 – 40 MW Solar Plant for 50 MW Wind Plant Possible

• ~ 600 MW Solar PV Plants can be installed by next year 

• Increased grid utilization factor – from 33% to 48%

• No additional grid infrastructure enhancement needed

• Reduction in overall per unit O&M cost of grid

• Addition of electricity at tariffs lower to overall basket price

• Addition of battery storage viability expected in 2 – 3 years

Results & Benefits

Page 17: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

M/s Hero Future Energies on April 13, 2018 inaugurated a 28.5 MW Solar PV Plant at its 50 MW Wind Power Plant in Karnataka, India under similar Grid Restriction Arrangement

Has any one done it?

Page 18: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site

• Concept has been approved in principle by AEDB and has issued LOIs to interested investors

• FFC has submitted its Feasibility study to AEDB which is under review for approval

• Suitable Upfront tariff for such hybrid Solar PV Projects shall provide stimuli for quick deployment as;

– No new grid planning / grid development needed

– Quick installation within 8 – 10 months possible

Progress & Way forward

Page 19: Hybrid Solar PV Power Plants At Wind Power PlantsTAPAL YUNUS METRO GUL AHMED TENAGA HYDRO CHINA UNITED ENERGY HAWA JHAMPIR SACHAL TGS TGT TB 1 TB 2 TB 3 HARTFORD ZAFAIR. FFCEL Site