This document provides a comprehensive overview of all necessary installation tasks for the HYBRIFLEX™ SiteExpress solution HYBRIFLEX™ SiteExpress solution Installation Instructions

Upload: lykhue

Post on 05-Feb-2017

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HYBRIFLEX™SiteExpress solution InstallationInstructions

This document provides a comprehensive overview of all necessary

installation tasks for the HYBRIFLEX™ SiteExpress solution

HYBRIFLEX™ SiteExpress solution Installation Instructions

Page 2: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 2 of 36

Installation Instructions 10000010334-01

About this document

This document provides a comprehensive overview of all necessary installation tasks for the SiteExpress Tower Top Assembly (TTA) Solution. It includes a step-by-step-guide that explains how to handle and assemble all necessary TTA piece parts. It is applicable for the Model:

A typical HYBRIFLEX solution per site (max. configuration) contains:

· 3 TTA

· 3 HYBRIFLEX riser cable

· 1 Cabinet

o 1 patch panel

o 1 BBU

o 1 PSU

Contents 1. Description 4

2. Inspection 5

3. Specification 5

4. Assembly of TTA 6

5. Installation of TTA 7

6. TTA Azimuth Adjustment 10

7. Mounting a HYBRIFLEX riser

cable in the box 13

8. Hoisting and mounting the

riser cable 17

9. Grounding of riser cable 18

10. Over length management 19

11. Mounting the patch panel in a

19 inch rack 20

12. Changing jumper cables in

the field 21

13. Ultra high sites scenarios 22

Page 3: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 3 of 36

Note:

These instructions are written for

qualified and experienced

installation personnel.

Please read this document

carefully before starting any work.

Any liability or responsibility for

the results of improper or unsafe

installation is disclaimed.

Please respect valid

environmental regulations for

assembly and waste disposal.

Always use appropriate personal

protection and observe all work

safety and security precautions in

accordance with local regulations

during installation.

Refer to Appendix A for advice on

safe work practices.

DISCLAIMER:

RFS is not responsible and liable

for installation if not performed

by RFS.

Tools required for cable

installation

· Philips (cross) screwdriver

· Flat head screwdriver

· 13 mm open-ended spanner

· 19 mm open-ended spanner

· 5 mm Allen key

· Standard pipe cutter

· Rip Tool HTRT-1-000

· JSTRIP-78-2

Tools required for TTA hoisting

· Winches

o Main Winch: Ingersoo Rand Force 5 or similar

Following is available from Nobles

o Hand winch - Rig-Mate creeper or Tirfor

o Head Block – Snatch block self-locking 2.5 t breaking load (minimum WLL 800kg) with shackle

o Heel Block –Snatch block 2.5 t breaking load (minimum WLL 800kg) with shackle

· Ropes / Lines

o Running Line - 16 mm diameter synthetic rope (common brand: PLASMA)

o Tail Line - 16 mm diameter synthetic rope (common brand: PLASMA)

o Winch Line - 8 mm wire rope with fibre core 6x19 (12/6/1).Minimum breaking strength 2.5 t

Page 4: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 4 of 36

1. Description

The TTA antenna system for wireless radio application is designed for side mounting to a customer supplied support structure (tower leg). Stays are supplied for stability.

The system comprises triple band antenna (Version A with one panel or Version B with two panels), remote radio heads for the required frequencies and a cable network assembled to a purpose designed frame.

Single Panel Assembly (Version A) Top View

Two Panel Assembly (Version B) Top View

These systems are supplied assembled for installation. Eyelets and side sway stays are to be fitted at site, before the antenna systems can be lifted and installed.

The antenna system operates in an unpressurised condition.

Page 5: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 5 of 36

2. Inspection

Immediately on receipt unpack the equipment, inspect for any obvious damage and discrepancies (refer Items List). Advise both the carrier and RFS of any damage/discrepancy which may have occurred.

Antenna (typical two panel assembly)

ITEMS LIST

Item Description

1

2

3

4

5

Antenna Assembly

Stays (2)

Installation Consumable Kit

Tower Interface Clamps

Lifting Eyelets (2 for single panel assembly, 3 for 2 panel assembly)

3. Specification

Design Wind Speed 225 km/hr to TIA-222-G

Weight

one panel assembly

two panel assembly

220 kg

260 kg

Page 6: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 6 of 36

4. Assembly of TTA

1. Overview

Elevation View Typical Antenna Assembly

(Two Panel Version)

2. Fit three x 12 mm shackles to the top

flanges of the tower mounting pipe.

Picture2 shows 2 eyelets for a single panel assembly

3. Assemble the tower interface clamps to the tower mounting pipe. Torque settings are 60Nm for M12 stainless steel bolts.

Page 7: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 7 of 36

5. Installation of TTA

1. Transport crate containing antenna assembly to an area below the final installation position. Where possible the top of assembly should be directly below the support structure.

2. Remove top and sides of the transport crate.

3. Prepare appropriate site and rigging equipment for the height of the support structure using preferred engineering practice. Two lifting arrangements are shown in APPENDIX B and APPENDIX C.

4. Refer to accompanying table for typical installation Rope lengths. Ensure the appropriate length is on hand for each site. Rope Datasheet see APPENDIX D

5. Locate the hand winch (e.g. Rig-Mate (Datasheet in APPENDIX E) creeper or Tirfor hand winch) for the 16 mm running line away from the tower, and where the operator has clear view of the full height of the tower, the antenna load, and all personnel involved in lifting the antenna load. A distance measure-ment cannot be specified exactly – safety of people and equipment determines this location and the guides above are an estimate only. Fix the winch in place using a dead weight (heavy vehicle) or ground anchor. Install the Tirfor handle and the Tirfor wire rope in the Tirfor. Position the eye end on the load side of the Tirfor, the tapered end feeds through the Tirfor and should be tethered to the ground anchor or dead weight. Install the running line at the tower top (about 1-2 metres above the top of the final antenna position). Run the loose end through the eye on the Tirfor. When the line is tight, the load is guided up to the tower top. Let the slack off gradually to bring the load into the correct position on the tower.

Page 8: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 8 of 36

6. Locate the head block (self-locking snatch block with eye) on the tower (block capacity minimum 800 kg WLL).

7. Locate the heel block (self-locking snatch block with eye) at the foot of the tower.

8. Install the main winch (Ingersoll Rand or similar drum style winch with minimum 800kg WLL) in position. Secure it with ground anchors or a dead weight.

9. Fit the eyebolts to the top flanges of the

antenna as required for each arrangement.

10. Attach winch line to uppermost eye bolts or eyebolt (using sling/rope and shackle combination or other preferred fixing method).

11. Lay the wire rope into the head block and the heel block at the top and bottom of the support tower. The eye end of the rope will attach to the eye bolts on the antenna. The free end will be wound around the drum of the winch.

12. Attach mounting hardware to the antenna assembly prior to lifting.

13. To allow removal of the transport crate securing hardware, take the weight of the assembly with the winch. Keep the assembly steady.

14. Remove the hardware (bolts, screws etc.) securing the antenna to the packing. Keep the assembly steady.

Page 9: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 9 of 36

15. Raise the top of the assembly to a vertical position. Steady the assembly to avoid damage. The base flanges slide along the crate as the assembly goes vertical.

16. With the assembly base resting on the transport crate and steadied to avoid damage, attach extra sling/rope and shackles, lifting hook to remaining top flange eye bolt.

DO NOT RELEASE THE

EXISTING SLINGS FROM

THE LIFTING HOOK.

Some adjustment may be necessary so that the antenna assembly hangs vertical from the winch line and the load is shared by all lifting eyes. It will be an advantage to use slings all of the same length (refer to accompanying picture).

17. Attach tag lines to the base of the assembly as shown on the appropriate rigging arrangement diagram.

18. Slowly lift assembly to installation position using the tag line to avoid contact between antenna assembly and the mounting pole.

19. Once antenna assembly is in final position (this can be managed with the tag lines), attach the mounting brackets and tighten securely.

20. Remove lifting hardware from the eye bolts. (lifting eye bolts can remain as part of the assembly). Mount the antenna with the radome facing the direction of desired radiation. Mounting clamps are supplied.

Page 10: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 10 of 36

6. TTA Azimuth Adjustment

DO NOT loosen any

fastening nuts clamped

with tower pipe during

azimuth adjustment!

1. Unscrew hoisting hook from top flange.

Page 11: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 11 of 36

2. Loosen 4 x M12 fastening nuts from each clamp (opposite side of tower pipe)

- In total 12 nut from 3 clamps (top, middle,

bottom)

DO NOT remove these

nuts completely. Just

loosen slightly to allow

settling of TTA

3. The whole frame will slip down due to weight and will be stopped by the flange at the bolted clamp.

Page 12: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 12 of 36

4. Rotate RFS TTA system to desired azimuth manually (-60° to +60°)

5. Re-tighten the 12 pcs M12 nuts by sequence (torque: 60 Nm)

Page 13: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 13 of 36

7. Mounting of a riser cable in the box

Use a standard cable clamp to temporarily attach the riser to the infrastructure. This will simplify the assembly process.

Open the riser grounding bar by loosening the corresponding screws.

Tools required: Phillips (cross) screwdriver

Feed fiber optic cable from the riser cable through the cable gland and the grounding bar. Start with the bottom left gland (grounding bar marked in green).

Caution: Do not remove the

protective bubble wrap foil

because it will make the

insertion process easier.

To minimize the risk of

increased fiber attenuation,

do not kink or bend the

cable too sharply.

To minimize the risk of

increased fiber attenuation,

do not kink or bend the

cable too sharply.

Temporarily attach the fiber optic cable to the over length holder.

Feed the DC cable and armor of the jumper through the cable gland and the grounding bar.

Attach the grounding bar to the armor and tighten to mechanical stop.

Tools required: Phillips (cross) screwdriver

Page 14: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 14 of 36

In case only three jumpers are connected (3 sector scenario) the fourth fiber pair of the riser cable should be terminated with a “loop back connector”

Connect the DC cables to the screw terminal. Match each cable to its corresponding color-coded terminal.

Tools required: Flat head screwdriver

Lay the fiber optic cables counter-clockwise into the over length holders and terminate each cable at the fiber optic adapters.

Make sure that the fiber optic connectors with a red boot are connected to the bottom adapter (marked red), and that the connectors with a blue boot are connected to the top adapters (marked blue).

Secure cable where necessary with provided cable clips.

Caution: Clean the fiber optic

connectors before

connecting them.

Use only approved

fiber optic connector

cleaning kits.

Sample

Page 15: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 15 of 36

During this process observe the following color codes for NSN applications:

Interconnect two DC screw terminals each with the provided DC bridges

During this process

Page 16: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 16 of 36

observe the following color codes for Huawei, E/// and ZTE applications:

Interconnect two DC screw terminals each with the provided DC bridges.

Tighten the glands to seal the cables – hand tight only (Gland P 3,5 – 5Nm / Gland Q 9 -11 Nm).

Close the box door and tighten the locking screws hand tight to achieve proper sealing.

Tools required: Phillips (cross) screwdriver

m)

Page 17: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 17 of 36

8. Hoisting & Mounting the riser

cable

Check materials to make sure all parts

are available. The following are required

to mount and adjust the riser cable:

· Pre-connectorized HYBRIFLEX Riser Cable assembly

· GKSPEED Earthing Kits (if applicable)

· Clamps (if applicable)

· Rip tool (HTRT-1-000), electrical screwdriver, pipe cutter

Unpack the HYBRIFLEX cable and

prepare it for hoisting:

· Unroll the ring on the ground. The outer part of the ring is intended to be the TOP end.

· Attach the hoisting grip to the armored part of the HYBRIFLEX TOP end.

· Attach individual DC and fiber optic cables to the hoisting rope (this can be done with insulation tape).

· Ensure that the fiber optic connectors distribution parts of the riser cable should not be unpacked before connecting it to the Distribution Box (DB) or Baseband Unit (BBU).

Hoist the HYBRIFLEX cable:

· Based on cable length and site conditions, this can be accomplished manually or by means of a winch. The maximum pulling length per hoisting grip should not exceed 50m. If a second hoisting grip is needed, make sure the cable between the hoisting grips hangs with a bit of slack.

· Extend the required cable length up to the entrance of the distribution box. Then attach the main part of the cable temporarily as near as possible to the box.

· Before removing the hoisting grip, install a minimum of three cable clamps to the top of the horizontal run to prevent the cable from slipping.

Page 18: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 18 of 36

· Use MBHS78-1-F (single layer) or MBHS78-3-F (triple layer) cable clamps.

· Complete all the connection work described in Section 3.

Clamping

· Install the remaining clamps, starting at the top and moving down along the structure.

· Pre-install the clamps to the structure.

· Clamp the cable into the clamps.

· Remove the hoisting grip when the clamping process is completed.

Tools required: 13 mm open-ended spanner

9. Grounding of riser cable

For this project three grounding points are foreseen:

On the top near to the distribution box

Before transition from vertical to horizontal cable run

Before entering the building / outdoor cabinet for BBU

Clean the jacket at the desired grounding point and cut out a strip of 20mm (0.8 in) with the stripping tool JSTRIP-78-2 (do not damage the outer conductor!)

Remove covering paper from Butyl carefully in direction of the arrow and pre-bend the grounding body. Align the grounding kit body to the slot (grounding wire on the bottom side) and wrap it around the cable. Make sure wire mesh keeps in place in the body and is placed in the dismantled area. Do not turn or move the body after wrapping around the cable, otherwise butyl sealing could be damaged.

Page 19: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 19 of 36

Tighten the two screws alternating (6-10 Nm)

Straighten the grounding wire in the direction to the grounding point (shortest way possible). The fixation of the wire is recommended. Note the standard & local rules.

Tools required: JSTRIP-78-2, Flat head screw driver, 5mm Allen key

10. Over length management

Typically, an excess length of the main cable is not stored. If installation results in an over length of HYBRIFLEX cable, the excess cable can be cut easily by removing the armor and the jacket from the excess length.

Start by determining the new break point and cut the armor and jacket using a standard pipe cutter.

The HYBRIFLEX cable is constructed with a built-in Kevlar rip cord, which allows cutting longitudinally through the armor and jacket. To simplify the cutting process, use the RFS rip tool (HTRT-1-000) with an electric screwdriver.

Remove the armor and jacket.

Tools required: Standard pipe cutter Rip Tool HTRT-1-000

Caution: Wear protective gloves

during this process!

Remove the protective foil from the inner core.

Note that DC cables can be cut to the desired length, while pre-connectorized fiber optic cables can be coiled to a handy ring that can be stored in the 19” patch panel.

Page 20: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 20 of 36

11. Mounting the patch panel in a 19”

inch rack

Typically, the fiber optic distribution and patch panel is mounted using a cage nut.

Hold the patch panel in position…

… and mount it using rack-screws with plastic washers. Note that these screws are not part of the patch panel package. They should be part of the 19” rack.

Tools required: Phillips (cross) screwdriver

The drawer can be opened by raising the front panel.

Page 21: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 21 of 36

Feed the fiber optic cables through one of the four cable entries in the back of the drawer. The single excess cables can be secured in multiple positions using cable ties.

Caution: To minimize the risk of

increased fiber attenuation,

do not kink or bend the

cable too sharply.

Connect the fiber optic connectors to the adapters.

The dust caps on the connectors and adapters can be stored in the drawer for later use. But dust caps should be stored in dust protective packaging before storage.

Caution: Clean the fiber optic

connectors before

connecting them.

Use only approved

fiber optic connector

cleaning kits.

12. Changing jumper cables in the

field

Remove the old jumper:

· Disconnect the fiber optic connectors from the adapters and unwind the fiber optic cable from the over length holder. Disconnect the DC cables from the screw terminal.

· Open the jumper grounding bar and loosen the compression nut on the cable gland.

· Carefully pull out the jumper.

Re-attach the new jumper:

Sample

Page 22: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 22 of 36

13. Ultra High Site Scenarios

Due to the DC power cable cross section the use of HYBRIFEX™ 10mm² without any additional measures is limited to a cable length 120m.

Scenario 1, HYBRIFEX™ 10mm² without any additional measures:

· The HYBRIFLEX cabling system is connected in accordance to chapter 3 of this document.

· The riser cable is grounded in accordance to chapter 4. The grounding wire of the earthing kit is connected to a grounding point of the infrastructure.

Distribution Box

Earthing Kit

Earthing Kit

Shelter

HYBRIFLEX™

4mm² 5 … 45 m

6mm² 50 … 75 m

10mm² 80 … 120 m

-48V

0V

GND

SCENARIO 1

5 … 120m

-48V

0V

GND

Page 23: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 23 of 36

A

A

A

B

B

B/C

C

D

C

D

E

E

Scenario 2, HYBRIFEX™ 10mm² with additional use of the HYBRIFLEX ™ armor:

· The HYBRIFLEX cabling system is connected in accordance to chapter 3 of this document.

· To incorporate additionally the armor as usable DC cross section the riser cable is equipped with an earthing kit . The grounding wire of this earthing kit is connected to the outer grounding stud of the distribution box by means of a 12mm cable lug . Internally the grounding stud has to be connected to the 0V terminals by a 16mm² wire bridge .Use the uppermost screw terminal to connect the bridge, while 2 DC output cables have to share the second screw terminal .

Distribution Box

Earthing Kit

Earthing Kit

Shelter

HYBRIFLEX™

10mm²

-48V

0V

GND

SCENARIO 2

125 … 140m

-48V

0V

GND

D

Page 24: HYBRIFLEX™SiteExpress solution InstallationInstructions

HYBRIFLEX™ SiteExpress solution

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 24 of 36

A

A

B

B/C

C

D

E

A

Scenario 3, HYBRIFEX™ 10mm² with additional use of the HYBRIFLEX ™ armor and

the outer conductor of an existing “out of service” coaxial cable:

· The HYBRIFLEX cabling system is connected in accordance to chapter 3 of this document.

· To incorporate additionally the armor as usable DC cross section the riser cable is equipped with an earthing kit . The grounding wire of this earthing kit is connected to the outer grounding stud of the distribution box by means of a 12mm cable lug . Internally the grounding stud has to be connected to the 0V terminals by a 16mm² wire bridge . Use the uppermost srew terminal to connect the bridge, while 2 DC output cables have to share the second screw terminal .

· To incorporate additionally the outer conductor of an “out of use” 1 5/8” coaxial cable, this cable is equipped with an earthing kit. The grounding wire of this earthing kit is also connected to the outer grounding stud of the distribution box by means of a 12mm cable lug.

Shelter

HYBRIFLEX™

10mm²

-48V

0V

GND

SCENARIO 3

145 … 170m

With RF 1 5/8“

-48V

0V

GND

Existing

RF 1 5/8“

Earthing Kit

Earthing Kit

D

Page 25: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 25 of 36

GENERAL INSTRUCTION

Set up winch and tower rigging Site induction Install antenna on a tower using a winch Risk Assessment Matrix

1. Prior to any works commencing perform site induction.

2. Comply with any site directive given by site owner.

3. Comply with the OHS Policy and Site Rules for this Project.

4. Report all incidents and hazards to the Site Supervisor no matter how small the issue.

5. Conduct works in a safe and responsible manner with consideration to legislative requirements as well as the safety and wellbeing of other workers.

6. Maintain required OHS documentation including but not limited to:

· registers,

· log books,

· daily plant inspection,

· tool box meetings,

· work method statement, etc. 7. Operate machinery, equipment or plant in a

safe and responsible manner. 8. Maintain work and amenity areas in a clean and

tidy condition. 9. At all times wear the mandatory Personal

Protective Equipment (PPE) for this project. 10. Wear additional PPE as required according to:

· any work method statement,

· risk assessment, or

· at the directive of the site owner. 11. Comply with local authority requirements for the

use of electrical equipment. Before work commences conduct a task specific risk assessment. Record hazards identified on the attached sheets. Daily, maintain attendance list of all personnel on site.

APPENDIX A (1/7)

Page 26: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 26 of 36

CHECK LISTS

1. PERSONNEL

Project/Site name/Other Signature

Name of Site Supervisor

Names of personnel on site

Qualifications and experience required to perform this task

Dogging certificate

Rigging Certificate

Senior First Aid

Training required to complete task in safe manner

Working at heights

Tower Rescue

EME awareness, obtain site maps and store for reference

Defensive Driving/4WD training

Planned outage approval obtained

Yes/No

APPENDIX A (2/7)

Page 27: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 27 of 36

2. TOOLS AND EQUIPMENT

Strike out those not used

Equipment used on project* see notes

www.nobles.com.au

Hand Winch – Tirfor or Nobles Rig-mate Creeper WLL 800 kg

Drum winch - Ingersoll Rand Force 5 or similar with WLL 800 kg

Snatch block with self locking side plates and bow shackle x 2 – Nobles WLL 800 kg

Wire rope with fibre core – eg PLASMA 8 mm

Synthetic Rope 16 mm polyester low stretch – eg Nobles Superfilm pp control ropes

Sledge hammer – eg Fiskars heavy duty

Ground anchors – eg steel ultrapost fence posts hot dipped galvanised x 1.65 m quantity 4 or dead weight for each winch

Synthetic flat webbing slings x 2 eg Nobles

Wire rope sling eye/eye 500 mm eg Nobles p64

Bow Shackles 16 mm x 2 eg Nobles

Compass, eg Silva

Spirit level, eg Stabila 600 mm

Laser distance meter eg Sokkia, or Leica D510

Digital camera

Grounding meter eg Fluke 1630

Hand held two-way radio communications system eg Motorola DP3400 for UHF band (make selection based on locally available frequencies)

The following standard tools are recommended:

http://www.bunnings.com.au

Torque wrench eg Norbar SLO with 16 mm and 12 mm attachments Socket set (selection of sockets 10-30 mm Sidchrome or similar quality brand) including ratchet handle Claw hammer 680 g, eg Estwing Metal files: 1 x flat and 1x rod, eg Nicholson or Trojan Plier set: to contain multi-grip, bull nose with side cutter and needle nose pliers eg Irwin, Stanley or Trojan. Hacksaw, eg Stanley 305 mm blade Suitable solvent, eg isopropyl alcohol Cleaning cloth eg lint free cotton rags

Personal Protective Equipment

http://www.honeywellsafety.com

Karabiners, eg Nobles R-105-S, or Soll snap/screw gate Harness, Miller Revolution Harness M1020056 Lanyards, eg Miller LD18SEC2.0 Twin tail lanyards, Tower rescue kit eg Miller by Sperian

APPENDIX A (3/7)

Page 28: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 28 of 36

3. NOTES

Ropes/Lines

1. Running Line

· 16 mm diameter synthetic rope (common brand: PLASMA, purple in colour)

· It is lighter (approximately 1/10th of wire rope)

· It floats

· Has no sharp burrs

· It is very flexible

· Can be repaired in the field.

2. Tail Line

· 16 mm diameter synthetic rope (common brand: PLASMA, purple in colour)

3. Winch Line

· 8 mm witre tope with fibre core 6 x 19 (12/6/1). Minimum breaking strength 2.5 T (Normally available 3.3T)

Installation/Mast height, m

Wire/Rope Length Required

Running Line Winching Line Tail Line

20 35 80 40

30 50 115 60

40 65 150 80

50 80 185 100

Note: Installation height at bottom of the antenna

4. EQUIPMENT RECORD

Maintenance records of plant and equipment

Log book and maintenance records for winch

Prestart inspection of winch

Prestart inspection of lifting equipment

Prestart inspection of climbing equipment

APPENDIX A (4/7)

Page 29: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 29 of 36

5. VEHICLES

Loading of vehicles Loading tools and equipment

Loads over: 20kg for a single person, 45kg for two people or 75kg for three people should be handled with appropriate mechanical handling equipment; such as hand trucks and trolleys, pallet jacks, forklifts, cranes and pulleys.

The following practices must be adhered to when handling objects:

• Do not lift with a bent back. • Bend your knees when lifting to reduce the strain on

your back. • Keep the load as close as possible to your body. • Keep your back straight at all times. • Avoid twisting your body while lifting loads, turn with

your whole body. • Avoid lifting items above shoulder height. • Avoid forward reaching of more than 30cm away from

the body.

Driving to site

· Accidents while driving

· Wildlife

· Other Vehicle

· Road subsidence

· Loose Cargo

· Vehicle is maintained as per manufacturer’s handbook

· Vehicle condition is inspected and recorded at least every 3 months.

· Driving in off road conditions to be performed by a trained 4WD driver.

· Notify line manager of itinerary and estimated arrival time.

· Driver is to drive according to the road and weather conditions.

· Driver to avoid travelling at dawn and dusk when possible.

· Defensive driver training for the driver.

· Drivers to be licensed for the type of vehicle

· Crews trained in first aid response.

· Vehicles fitted with EPIRB or satellite phone for emergency communication in remote areas

· All materials/tools to be transported behind cargo barrier.

· All cargo to be secured in trailer/tray.

· Check the load frequently during long trips

APPENDIX A (5/7)

Page 30: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 30 of 36

6. ARRIVING AT SITE

Site Access

Arrange access

Inform site owner on arrival

· Check for

· Wildlife

· EME

· RF

· Damaged structures

· Changed conditions

· Wear suitable protective personal equipment

Unload and set up · Check for

· Obstacles

· Uneven ground

· Wildlife

· Weather

APPENDIX A (6/7)

Page 31: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 31 of 36

7. INDUCTION

Site Induction for all Staff · All staff to sign

Emergency

· Prepare for emergency

· Fire –evacuation

· Structure collapse

· Spill

· Exposure to EMF or RF

· Medical

· Flood

· Severe Storm

· Cyclone

· Location of assembly area and exits explained.

· Location of telephone and fire extinguishers identified.

· Emergency contact numbers known.

· All staff to be inducted to emergency plan.

· Correct communication equipment on site Satellite phone or Next G Phone with coverage

· All staff to be trained in Basic Life Support/CPR at least every 3 years.

· Fully stocked First Aid kit to be on site at all times.

· First Aid kit to be inspected at least every 3 months

· If site is remote, inform local rescue services i.e. Rangers Office of location and intended stay

· Confirmation of rescue plan for workers working at height.

Working on Site in proximity to live antenna

· Work must be conducted during a scheduled outage

· Lock out circuit breakers and aerial switch frames so that equipment cannot be turned on while work is occurring.

· A personal EME monitor will be used to check that the area is below safe levels.

· Refer to site hazard folder for EME maps

· Outage plan will be submitted to ensure EME levels comply with in country regulations.

Set up for winch

· All rigging performed by advanced riggers.

· All lifting equipment tested and visually inspected before use for damage.

· A tagline is attached to control movement of the load.

· Radio contact between dogmen, riggers and winch operator.

· Inspect wire winch rope before use

· Hook up the load to the winch ensuring it is balanced and positioned to assist the climbers (in a suitable position to install). Counterweight.

Check for

· Obstacles

· Overhead wires – guy or electrical

· Uneven ground

· Wildlife

· Weather

APPENDIX A (7/7)

Page 32: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 32 of 36

Prepare the tower · Climbers must be 100% attached to the structure at all times.

· Climbers must have completed the working at heights course and tower rescue course and be approved to be a tower climber.

· Climbers to take regular breaks when climbing for extended periods or feeling fatigued.

· Barricade tower to prevent unauthorised access

Climb to height

Check for:

· Falling

· Falling objects

· Radiation exposure

· RF voltage

· Staff trained and ticketed to perform task.

· Radiation hazard monitors to be worn by climbers.

· PPE to be worn

· Twin lanyard to be used

· Attached to the tower at all times.

· Ensure all staff and contractors are aware of the height works and are isolated from its fall path.

· Use portable barricades and signs to warn pedestrians.

· Tool bags to be used to carry “V” bolts and tools

· All tools to be attached to lanyards while working on tower

Perform installation ·

De-rig site · Inspect winch and cables

· Remove equipment from site

Page 33: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 33 of 36

Typical Rigging Arrangement (tower height greater than 15 m)

This schematic illustrates a method that gives best control over the load.

APPENDIX B

RUNNING LINE, NORMALLY Ø16mm

SYNTHETIC ROPE UNDER TENSION

RUNNING BLOCK

HAND

WINCH

ANCHOR

SHORT ( 500mm )

WIRE STROP

WINCH

( RATED 2000kg MINM )

SHACKLE

16mm x 2

HEEL

BLOCK

SINGLE

TAIL LINE

LOAD

HEAD

BLOCK

TOWER

Page 34: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 34 of 36

Typical Rigging Arrangement (tower height less than 15 m)

Attach slings or wire rope to the shackles. Raise the antenna off the ground.

APPENDIX C

ANCHOR

WINCH

( RATED 2000kg MINM )

SHACKLE

16mm x 2

HEEL

BLOCK

TAIL LINE

LOAD

HEAD

BLOCK

TOWER

TAIL LINE

~45°

~45°

Page 35: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 35 of 36

APPENDIX D

Page 36: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 36 of 36

APPENDIX E

Page 37: HYBRIFLEX™SiteExpress solution InstallationInstructions

© RADIO FREQUENCY SYSTEMS 2012. ALL RIGHTS RESERVED

10000010334-01 Page 37 of 36

Radio Frequency Systems

United States +1-800-321-4700 • Germany +49-511-676-2000

Australia +61-3-9751-8400 • Brazil +55-11-4785-2433 • China + 86-21-3773-8888

www.rfsworld.com