Hydraulic Climbing Formwork HKS
5.03 1
The scaffolding and formwork pre-sented in this chapter are complex systems and as such are only offered as project-related systems.
If you have such complex construc-tion projects, please contact our sales department.
On the following pages we present you our systems using the examples of a few projects which have already been implemented
Status: January 2010
Tower Scaffolding
Hydraulic Climbing Formwork HKS
5.03 2
Info:
Hydraulically moved climbing formwork.
Two climbing discs, connected by working platforms and
assemblies, form a climbing unit. This can support both
conventional and moveable formwork. The climbing unit is
suspended on climbing rails connected to the building. The
hydraulic climbing installation is integrated into the climbing
unit. The hydraulic installation of several climbing units is
mounted in a ring or a line. Climbing shoes with locking
pawls hold the climbing unit on the climbing rails. The sys-
tem climbs from one floor to the next in climbing steps of
approximately 30 cm, geared to the height of the respective
floor.
2,703
Up
to a
ppro
x. 3
,900
mm
var.
Status: January 2010
Moveable Scaffolding AKF
Hydraulic Climbing Formwork HKS
5.03 3
Info:
Two climbing supports AKF, connected by a working plat-
form and assemblies, form a climbing unit. This can sup-
port both conventional * and also moveable formwork. The
moveable formwork can be moved mechanically and hy-
draulically. Attachment rings screwed onto the building pro-
vide support for the climbing units, which are mounted by
crane.