  • 7/31/2019 Hydraulics en Online

    1/14

    www.trimetrica.com.pt

    HYDRAULIC AND MARINE STRUCTURES

  • 7/31/2019 Hydraulics en Online

    2/14

  • 7/31/2019 Hydraulics en Online

    3/14

    1. INTRODUCTION

    TRIMETRICA provides engineering consultancy services, the company has a highly skilled team of engineering

    experts with a significant experience in hydraulic and marine structures.

    Including:

    reservoirs

    sewage treatment stations

    tunnels

    dams

    Associate Member:

    CMM - The Portuguese Steelwork

    Association

    SPES Portuguese society of

    earthquake engineering

    GECORPA Portuguese Association of Companies dealing with

    Conservation of Architectural Heritage

  • 7/31/2019 Hydraulics en Online

    4/14

  • 7/31/2019 Hydraulics en Online

    5/14

    COVA DO VIRIATO DAMSTRENGTHENING AND REHABILITATION DESIGN

    DeveloperCovilh City CouncilSTAP, S.A.

    Project PlanningFernando Domingues

    Project FeaturesDam Strengthening and rehabilitation design

    DescriptionStrengthening with application of anchors,projected concrete. Hydraulic and structuralcalculus and design of the Conduits.

    Year2004

    Site LocationCovilh Portugal

  • 7/31/2019 Hydraulics en Online

    6/14

  • 7/31/2019 Hydraulics en Online

    7/14

    QUINTA DO CONDE SEWAGE TREATMENT PLANTSTRUCTURAL DESIGN & PLANNING

    DeveloperHidrocontrato, Seth, Construtora do Lena

    Project PlanningFernando Domingues and Jos Oliveira

    Project FeaturesSewage treatment station project open to publictender

    DescriptionStructure design with respect to all hydrauliccomponents of the treatment station

    Year2006

    Site LocationLisbon Portugal

  • 7/31/2019 Hydraulics en Online

    8/14

    CAMBEDO DAMREINFORCED CONCRETE STRUCTURAL DESIGN & PLANNING

    DeveloperDireco Regional de Agricultura de (Trs-os-

    Montes Regional Directorate of Agriculture)

    Project PlanningHidroprojecto, S.A. and

    Fernando Domingues

    Project FeaturesConsulting services to project planners on the

    construction of the Cambedo Dam

    DescriptionConstruction of a reinforced concrete dam

    structure in the Vale de Chaves system

    Year1992

    Site Location

    Trs-os-Montes - Portugal

  • 7/31/2019 Hydraulics en Online

    9/14

    REDIRECTING OF WATER-PIPE- SOLVAYPIPE DESIGN & PLANNING

    DeveloperConstrutora do TmegaMatias & vilas

    Project PlanningFernando Domingues and Jos Oliveira

    Project FeaturesHydraulic project planning

    DescriptionRedirecting of an effluent conduit of the Solvaychemical plant Site Locationd on the EN248national road

    Year2006

    Site LocationEN 248 Portugal

  • 7/31/2019 Hydraulics en Online

    10/14

    MITRENA YARD - LISNAVEINSPECTION OF STRUCTURE

    OwnerLISNAVE, S.A.

    ProjectFernando Domingues

    ActivityStructural analysis of a metallic structure

    DescriptionUnderwaterinspection of diverse elements in theentrance of the Hydrolift, in which the earrings ofthe floodgate had been enclosed.

    Year2010

    SiteSesimbra Portugal

  • 7/31/2019 Hydraulics en Online

    11/14

    METALLIC PLATFORMSTRUCTURAL ANALYSIS OF METALLIC STRUCTURE

    OwnerLINDLEY, Lda.

    ProjectFernando Domingues

    ActivityStructural analysis of metallic strcture.

    Description

    Structural analysis of a platform located at afloating wharf next to the pier front of the Hotel doMar in Sesimbra.

    Year2010

    SiteSesimbra Portugal

  • 7/31/2019 Hydraulics en Online

    12/14

    DOCK BERTH OFVIANA DO CASTELOSTRUCTURAL ANALYSIS OF PILES

    OwnerLINDLEY, Lda.

    ProjectJos Oliveira, Ins Rodrigues

    ActivityStructural Analysis of laterally loaded pile group

    DescriptionStructural Analysis of laterally loaded pile group toperform included in the scope of works of theparking structure for the fleet of Viana de CAstelo'sHarbour

    Year

    2011

    SiteViana do Castelo Portugal

  • 7/31/2019 Hydraulics en Online

    13/14

    DOCK BERTH OFPEDROUOSSTRUCTURAL ANALYSIS OF PILES

    OwnerLINDLEY, Lda.

    ProjectJos Oliveira, Ins Rodrigues

    ActivityStructural Analysis of laterally loaded pile group

    DescriptionStructural Analysis of laterally loaded pile group toperform included in the scope of works of thereahabilitation of the dock berth of Pedrouos.

    Year

    2011

    SiteLisboa Portugal

  • 7/31/2019 Hydraulics en Online

    14/14