hydro-turbine applications product manual · marine, offshore, pump, hydro-turbine and other many...

44
Hydro-Turbine Applications Product Manual HT2009.2 T H O R D O N B E A R I N G S I N C.

Upload: others

Post on 10-Mar-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Hydro-TurbineApplications

Product Manual

HT2009.2

T H O R D O N B E A R I N G S I N C.

Table of Contents

A. Company Profile . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1

B. Thordon Hydro-Turbine Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2 a) Product and Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2b) Thordon Grades . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3c) Typical Bearing Abrasive Wear Rates . . . . . . . . . . . . . . . . . . . . . . . . .5d) General Material Selection Guide . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6e) Typical Bearing Wear Rate vs. Abrasive Content . . . . . . . . . . . . . . . .8f) Design and Installation Considerations . . . . . . . . . . . . . . . . . . . . . . .8g) Technical Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9h) Thordon Bearing Sizing Calculation Program . . . . . . . . . . . . . . . . . .9

C. Applications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11a) Main Guide Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11b) Segmented Shaft Seals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .11c) Wicket Gate and Operating Mechanism Bearings . . . . . . . . . . . . . . .12d) Wicket Gate Thrust Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12e) Servo-Motor and Servo-Link Bearings . . . . . . . . . . . . . . . . . . . . . . . .13f) Operating Ring Wear Pads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13g) Pump Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .13h) Control Gate Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14i) Butterfly Valve Trunnion Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . .14j) Screen Bearings and Wear Pads . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14k) Butterfly Valve Seals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14l) Servo-Motor and Other Hydraulic/Pneumatic Sealing Applications .15m) Seals for Wicket Gate, Operating Mechanism and Other Limited

Motion Bearings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15n) Kaplan Runner Hub Seals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .15

D. Reference Stories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

E. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

F. Typical Designs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36

Note: The information contained in this document is offered as part ofour service to customers. Thordon Bearings reserves the right to revise any information or specifications included in this document without priornotice.

1

COMPANY PROFILE

Thordon Bearings Inc., a member of the Thomson-Gordon Group of Burlington,Ontario, Canada, designs and manufactures a complete range of high performance,environmentally-friendly bearings and bearing systems. Recognized internationally forsuperior performance, Thordon solutions and products are specified extensively inmarine, offshore, pump, hydro-turbine and other many other industrial applications inover 70 countries throughout the world.

Utilizing proprietary polymers developed and manufactured by Thordon as the bearingsurface, Thordon bearing solutions deliver high reliability and long wear life, particularlyin tough, abrasive operating conditions. This high level of product performance resultsin decreased life cycle costs and increased mean time between failures for Thordon'scustomers. A team of experienced, in-house application design engineers providesinnovative bearing system designs to meet or exceed each customer's technicalrequirements. Thordon products and services are available worldwide through localdistributors whose factory-trained specialists consult with customers from theestablishment of bearing system specifications to ensuring the product is correctlyinstalled and commissioned in the field.

Since the turn of the century, Thordon Bearings' parent company, the Thomson-GordonGroup, a fourth generation family-owned business, has recognized the importance ofproviding industry with superior products, precision manufacturing and solid applicationengineering support. Thordon Bearings' own engineering and quality focus has earnedworldwide recognition from its many customers. Quality procedures are certified to ISO9001:2000 Quality System requirements.

Thordon bearings, and bearing systems, are the proven, cost-effective,environmentally-friendly, solution for rigorous and demanding journal bearingapplications.

SECTION B

PRODUCT AND CONFIGURATIONS

Thordon has developed two types of polymer bearings and several grades that allowselection of the optimal bearing for your unique application.

Elastomeric BearingsThordon Bearings introduced a proprietary, elastomeric, synthetic polymer alloy morethan 30 years ago originally for use as a sleeve bearing for vertical pump applications.The unique polymer structure yields basic properties more in line with those you couldexpect from a very high performance rubber if one existed. However, Thordon isharder - yet elastomeric, tough and resilient in nature, self-lubricating with a muchlower coefficient of friction and able to accommodate much higher specific pressuresthan rubber.

Thordon elastomeric bearing grades are not reinforced with layers of woven fabric,rather, it is a fully homogenous product with all properties consistent throughout theentire wall thickness of the bearing. Compared to other non-metallics such as phenoliclaminates, Thordon is somewhat softer and more compliant. As a result, under slightmisalignment conditions where edge loading is created, Thordon is able to deformslightly, allowing the load to be distributed over a larger area. The localized pressureon the bearing edge is significantly reduced. Due to its elastomeric nature, Thordon isalso able to withstand higher degrees of vibration and shock loading without incurringpermanent deformation or damage. Thordon offers three elastomeric grades and twoconfigurations

Continuous research over the years has resulted in development of four differentbearing-grade elastomer products - XL, SXL, HPSXL and GM2401. This allowsselection of an optimum solution based on matching product characteristics to thespecific application requirements.

ThorPlas® Thermoplastic BearingsThorPlas® is a new, proprietary, engineered thermoplastic bearing product recentlyintroduced by Thordon Bearings. While the Thordon range of high performanceelastomeric bearing products clearly offers superior performance in the applications inwhich they can be specified, there are technical limits, such as maximum temperaturesand pressures beyond which they cannot be used.

To address this issue, Thordon Bearings has introduced ThorPlas®, which significantlyexpands the range of applications where Thordon bearings can be specified, while stillmaintaining many of the recognized Thordon performance advantages.

2

3

PRODUCT AND CONFIGURATIONS (cont’d.)

When compared to the Thordon elastomer-based products, ThorPlas® offers:

• increased strength and rigidity allowing maximum dynamic working pressures up to 31 MPa (4500 psi) in a full-form tubular configuration

• improved ability to operate at elevated temperatures up to 80°C (176°F) in water• improved chemical resistance in all major chemical categories• enhanced wear life in non-abrasive environments

In recent Powertech tests, ThorPlas® demonstrated exceptional wearperformance particularly in the dry tests. According to Powertech, there waslittle evidence of stress on the bearing material and no indication of damage tothe journal surfaces.

THORDON GRADES

ThorPlas® (Blue)

• thermoplastic material developed by Thordon specifically as a homogeneous high pressure bearing

• maximum dynamic working pressure to 31.0 MPa (4500 psi)• very low wear in non-abrasive environments • reasonable abrasion resistance - less than Thordon

elastomeric grades, but better than bronze, epoxy phenolics and many other non-metallic bearing materials

Thordon SXL (Off White)

• maximum dynamic working pressure to 10.0 MPa (1450 psi)in limited motion

• lower coefficient of friction (typically 0.10-0.20) than XL• higher dry PV (Pressure Velocity) rating than XL• higher resistance to abrasion than XL in wet applications;

good abrasion resistance operating dry• dry start-up capability as a vertical pump bearing• high resistance to shock loading and vibration

4

THORDON GRADES (cont’d.)

Thordon HPSXL (Grey)

• designed for higher pressure applications, as the bearing component in HPSXL TRAXL bearings (HPSXL bonded in a metallic shell)

• maximum dynamic working pressure to 15.0 MPa (2175 psi) in limited motion

• HPSXL TRAXL has maximum dynamic working pressure to 55.0 MPa (8000 psi) in limited motion

• lowest coefficient of friction (typically 0.06 - 0.12)• moderately abrasion resistant (lower abrasion resistance

than XL or SXL)• high resistance to shock loading and vibration

Thordon XL (Black)

• maximum dynamic working pressure to 5.5 MPa (800 psi) in limited motion

• low coefficient of friction (typically 0.20-0.25)• high resistance to abrasion in dry applications• high resistance to shock loading and vibration

Thordon GM2401/Composite (Yellow Shell, Black Wear Surface is GM2401)

• bearing formulated specifically for use in very abrasive environments

• used in rotating applications in abrasive water conditions such as pump and dredge bearings

• outstanding abrasion resistance - two or more times that of rubber

• significantly lower coefficient of friction than rubber • higher resilience and stiffness than rubber

THORDON GRADES (cont’d.)

Thorseal

• high performance elastomer hydraulic lip (cup) seal• highly abrasion resistant - use as a seal to exclude abrasives from limited motion bearings

• suitable for pressures from 0 to 100.0 MPa (0 - 15,000 psi)• recommended for reciprocating linear or limited motion rotary applications

• very tough - cut and tear resistant• low friction - self-lubricating• available in single lip or stacked ThorPak ("chevron" style)

5

TYPICAL BEARING ABRASIVE WEAR RATES

6

Recommended Thordon GradesLubrication /

Operating Pressure

Dry (sealed or minimal abrasives)

0-10 MPa (0-1450 psi) SXL ThorPlas

10-15 MPa (1450-2175 psi) HPSXL ThorPlas

15-31 MPa (2175-4500 psi) HPSXL TRAXL ThorPlas

31-55 MPa (4500-8000 psi) HPSXL TRAXL

Dry (abrasives present)

0-5.5 MPa (0-800 psi) XL SXL ThorPlas

5.5-10 MPa (800-1450 psi) SXL ThorPlas

10-15 MPa (1450-2175 psi) HPSXL ThorPlas

15-31 MPa (2175-4500 psi) ThorPlas

Wet (sealed or minimal abrasives)

0-10 MPa (0-1450 psi) SXL ThorPlas

10-15 MPa (1450-2175 psi) HPSXL ThorPlas10-15 MPa (1450-2175 psi) HPSXL ThorPlas

15-31 MPa (2175-4500 psi) HPSXL TRAXL ThorPlas

31-55 MPa (4500-8000 psi) HPSXL TRAXL

Wet (abrasives present)

0-3 MPa (0-500 psi) GM2401 SXL ThorPlas

3-10 MPa (500-1450 psi) SXL ThorPlas

10-15 MPa (1450-2175 psi) HPSXL ThorPlas

15-31 MPa (2175-4500 psi) ThorPlas

Note: The maximum pressures given for the various products are based on maximum dynamic

working pressures for intermittent, limited motion. For applications involving continuous

rotary motion, PV limits of the materials will significantly reduce the maximum

allowable pressures stated above.

This is a general guide for technical reference only. Critical applications that are close to

pressure or temperature limits, or subjected to non-standard environments should be

reviewed and approved by Thordon Engineering.

GENERAL MATERIAL SELECTION GUIDE FOR VARIOUSAPPLICATION PARAMETERS

7

MATERIAL SELECTION GUIDE FOR PUMPBEARING APPLICATIONS

Thordon Grades

Parameter Thordon XL Thordon SXL

Thordon

Composite

(GM2401)

ThorPlas

Description Elastomeric

Polymer Alloy

Elastomeric

Polymer Alloy

Elastomeric

Polymer Alloy

Engineered

Thermoplastic

Temperature Limit 60°C (140°F) 60°C (140°F) 60°C (140°F) 80°C (176°F)

Suitable for Dry Start Up NO YES** NO YES**

Resistance to Acids Limited Limited Limited Fair to Good

Resistance to Alkalies Limited Limited Limited Fair to Good

Suitable for Hydrocarbons YES YES YES YES

Abrasion Resistance Good Better Best Acceptable

Shaft Sleeve Material Bronze,

Stainless Steel

Bronze,

Stainless Steel

Ni-Cr-B

Recommended

Bronze,

Stainless Steel

Lubrication Water, Seawater,

Most Fluids (pH 5 10)

Water, Seawater,

Most Fluids (pH 5 10)

Water, Seawater,

Most Fluids (pH 5 10)

Water, Most Fluids

(pH 3 11) exceptMost Fluids (pH 5-10) Most Fluids (pH 5-10) Most Fluids (pH 5-10) (pH 3-11) except

Chlorinated Solvents

and Strong Acids

and Bases

Remarks Good balance

between abrasion

resistance and low

friction

Lowest friction;

Suitable for dry start-

up; Good abrasion

resistance

For use in highly

abrasive operating

environments

Good choice for low

abrasion applications

and for use at

temperatures and in

chemical solutions

unsuitable for Thordon

elastomers

** For dry start up times longer than 30 seconds, please contact Thordon Engineering for grade selection

Note: For Nuclear use, Quality Control certificates including certified test reports can be supplied. Thordon Bearings Inc.

operates under the provision of 10 CFR21.

This is a general guide for technical reference only. Critical applications that are close to

pressure or temperature limits, or subjected to non-standard environments should be

reviewed and approved by Thordon Engineering.

8

Increasing Abrasive Content

Clean Water Abrasive Water

Incr

easi

ng W

ear

XLSXLCOMPOSITERUBBER

TYPICAL BEARING WEAR RATE VS. WATER ABRASIVE CONTENT

DESIGN AND INSTALLATION CONSIDERATIONSBefore choosing a Thordon grade for an application, the following criteria must beconsidered:• speeds (rpm) • process temperature (pumps)• type of lubrication • pH levels (pumps)• pressures • Thordon has produced a Bearing Sizing• amount of abrasives • Calculation computer program to assist • degree of impact loading designers in the calculations required to• ambient temperatures (maximum/minimum) correctly size Thordon bearings• special ambient conditions (e.g. intermittent (see sample output above)

exposure to high temperature steam cleaning) • Thordon engineers can help in designing• media temperature (pumps) bearing solutions and drawings can be

provided

9

TECHNICAL SUPPORT

Thordon Bearings recognizes the importance of superior products, precision manufacturingand application engineering support. Thordon Bearings in-house engineers work closelywith customers to provide innovative bearing system designs that meet or exceed thetechnical requirements of the application. Full engineering drawings are generated asnecessary. Thordon has many years of experience with numerous industrial applications invirtually all industries and offers technical support during machining and installation.

Geared to provide quick response to customer needs, Thordon Bearings understands theimportance of quick delivery and reduced downtime. Standard size bearings are stocked atthe factory and by Thordon distributors around the world. Special sizes or designs can bemachined to the exact requirements of the customer and delivered quickly throughout theworld.

THORDON BEARING SIZING PROGRAM

The Thordon Bearing Sizing Calculation Program is provided to assist designers in thecalculations required to correctly size Thordon bearings. The program input parametersinclude shaft RPM, interference or bond fit, type of lubrication, type of service, load onbearing, etc. Output parameters include machined bearing sizes and tolerances,amount of interference, bore closure amount, min. installed clearance, runningclearance, etc. An example of the Thordon Bearing Sizing Calculation Program outputis attached.

Designed to operate on a PC (personal computer), the software operates in the Windows operating system. The program is in a color, menu-based format so thatentries can be made with a minimum of effort. Outputs can be printed and inputs canbe saved to a file. Contact Thordon or your distributor to obtain a copy of the programor visit our website at http://www.thordonbearings.com.

SAMPLE OUTPUT

10

11

APPLICATIONS

Application: Main Guide BearingsRecommended Grades: SXL and GM2401

Thordon Bearings recommends two bearinggrades for use in water-lubricated turbine mainguide bearings. Thordon SXL offers the lowestcoefficient of friction, superior adhesive wearperformance and good resistance to wearresulting from third particle abrasion. GM2401is specially formulated to provide optimal wearresistance in abrasive-laden water conditions,routinely outwearing rubber bearings by a factorof two or more, yet still exhibiting a significantlylower coefficient of friction compared to rubber.

Thordon can be specified as an upgrade forrubber or other non-metallic bearings in existing water-lubricated bearing systems oras a complete conversion from sealed oil or grease lubricated systems to pollution-freewater lubrication. Although elastomeric in nature, Thordon bearings, particularily SXLare stiffer than rubber and capable of supporting higher loading. A high degree ofresilience, however, is still maintained and running clearances similar to rubber arepossible.

Thordon main guide bearings are usually supplied factory-bonded into split bearinghousings, or on larger diameter shafts, onto multiple segment blocks. Thordonbearings can also be supplied in stave configuration if required.

Application: Segmented Shaft SealsRecommended Grade: SXL

Thordon SXL radial and axial segmentedshaft seals provide extended wear lifecompared to carbon graphite-based seals,particularily when abrasives are present.There is absolutely no risk of damaging atough SXL seal during installation and overalllife cycle costs are significantly reduced.Thordon segmented shaft seals are suppliedmolded to size to suit the shaft diameter.

12

Application: Wicket Gate and Operating Mechanism BearingsRecommended Grades: HPSXL, HPSXL TRAXL and ThorPlas®

Thordon HPSXL TRAXL, or on some smallermachines HPSXL full form bearings are suitablefor the lower pressures encountered, arerecommended for use in wicket gate and linkagebearing systems. HPSXL, an enhanced elastomerproduct introduced by Thordon more than fiveyears ago, offers even better friction and wearperformance operating either wet or dry than SXLTRAXL. HPSXL TRAXL achieved a top leveloverall rating in the Powertech simulation tests forwicket gate and operating linkage bearings.

Thordon ThorPlas® is also well suited for wicketgate and linkage bearing applications. Anengineered thermoplastic, ThorPlas® can beinstalled as a full-form product and does notrequire a bronze shell that HPSXL requires tomeet the specific pressure requirements of thisapplication. Also successfully tested byPowertech, ThorPlas® demonstrated very lowwear and acceptable friction levels. Where thereis a preference for a full form bearing, ThorPlas®

is the clear choice for performance and value.

Both HPSXL and ThorPlas® are easily machined and can be supplied either finished tofinal sizes provided by the customer, or with overbuild to facilitate line boring afterinstallation to correct the misalignment and dimensional consistencies oftenencountered during turbine rehabilitation.

Application: Wicket Gate Thrust BearingsRecommended Grade: HPSXL

Thordon HPSXL gate thrust collar bearings eliminate theneed for grease required by conventional designs.Elastomeric HPSXL's inherent resilience and lowcoefficient of friction ensures smooth gate operation withno stick slip. Thordon's designs typically incorporate thethrust bearing into the upper head cover bearing bypolymerizing HPSXL onto a flange on the upper bearing,however separate thrust bearings can also be supplied.

13

Application: Servo-Motor and Servo-Link BearingsRecommended Grades: HPSXL TRAXL and ThorPlas®

HPSXL TRAXL bearings are recommended for theservo-motor and servo-link bearing positions.Elastomeric HPSXL is able to accommodate the minormisalignment that often occurs at these bearinglocations and grease lubrication can be eliminated.

ThorPlas® is also a good bearing choice for thesebearing positions. Self-lubricating and capable of beinginstalled as a full form tube, ThorPlas® also performs wellunder the edge loading that can occur due to minormisalignment.

Application: Operating Ring Wear PadsRecommended Grades: SXL and HPSXL

Thordon SXL and HPSXL vertical and horizontal operatingring wear pads offer smooth, grease-free operation andhigh abrasion resistance. Usually supplied molded to sizecomplete with stainless steel inserts for mechanicalfastening, Thordon wear pads can also be bonded inposition using a Thordon-approved adhesive.

Application: Pump BearingsRecommended Grades: SXL, XL, GM2401 and ThorPlas®

Non-polluting Thordon water-lubricated pump bearings offerdry-start capabilities, long wear life, low friction and superiorresistance to abrasive wear. Available in four grades, Thordonpump bearings can be selected to optimize specificperformance requirements. From Thordon Composite for highlyabrasion resistant bottom bowl bearings to Thordon SXL fordry-start upper bearings to ThorPlas® for higher temperatureapplications, Thordon pump bearings outperform rubberbearings by a factor of two or more in abrasive conditions. Notlimited by shelf life or a range of standard production sizes,Thordon pump bearings facilitate quick turn-around andreduced maintenance inventories. Costly sleeve or shaftreplacement can often be avoided by machining a pre-groovedThordon tube to the exact non-standard dimensions required.A separate Pump Bearing Product Manual is available.

14

Application: Control Gate BearingsRecommended Grade: HPSXL

Supplied in ball and socket, or bushing and padconfigurations to suit all types of control gateapplications, Thordon HPSXL bearings with theirlow coefficient of friction operate smoothly andeasily without grease lubrication. Abrasion resistantand resilient, Thordon bearings provide long wearlife and are not damaged by the impact loadingresulting from frequent operation.

Application: Butterfly Valve Trunnion BearingsRecommended Grades: HPSXL TRAXL and ThorPlas®

Thordon HPSXL TRAXL valve trunnionbearings operate smoothly and easily withoutgrease lubrication. ThorPlas® bearings alsooperate well when specified in this application.

Application: Screen Bearings and Wear PadsRecommended Grades: SXL, HPSXL and ThorPlas®

Resilient, and highly resistant to abrasion, ThordonSXL is the obvious choice for the shaft bearings andwear pads used in travelling and stationary screens.Non-corroding Thordon bearings offer extended wearlife while eliminating the maintenance and pollutionconcerns associated with grease lubrication. In somedesigns and locations where pressures may exceedthe limit for SXL, HPSXL or, if necessary, ThorPlas®

are the recommended options due to their higherpressure capabilities.

Application: Butterfly Valve SealsRecommended Grade: Thorseal

Highly abrasive resistant, tough, and compliant,Thorseal butterfly valve seals offer extended wearlife and are resistant to damage resulting from debrisbecoming lodged in the valve during operation.

15

Application: Servo-Motor and Other Hydraulic/Pneumatic Sealing ApplicationsRecommended Grade: Thorseal

In servo-motor and other hydraulic/pneumatic sealingapplications, high performance, tough, Thorseal lip self-lubricating polymer lip seals offer positive sealing up to 100MPa (15,000 psi). Thorseals provide long wear life with noneed for periodic adjustments; resist tearing and extrusion;and as a result of their internal lubricants, operate with lessdrag and reduced cylinder wear. Thorseals are not onlyavailable in a wide range of standard sizes but can also bequickly machined to custom size requirements up to 1.5m(60") in diameter.

Application: Seals for Wicket Gate, Operating Mechanism and other Limited Motion Bearings

Recommended Grade: Thorseal

To prevent contamination of wicket gate, or other hard-to-reach, bearings by abrasive laden waters; or operatingmechanism bearings by corrosion residue or othercontaminants, seals are recommended. High qualityThorseal lip seals are formulated from a tough, high-strength polymer impregnated with internal lubricants andare supplied as an integral part of the bearing design.

Application: Kaplan Runner Hub SealsRecommended Grade: Thorseal

Taking advantage of tough, long-wearing Thorsealpolymer lip seals, an enhanced sealing design has beendeveloped for Kaplan runner blade hubs. Essentially, twospecially designed Thorseal single ring U-cup seals arelocked together to function as a monolithic double-actingseal and fitted back to back in the blade shaft stuffingbox. The outer seal lip prevents ingress of water into thehub contaminating the lubricating oil and the inner sealprevents oil from leaking out of the hub into theenvironment. This design is easy to install, resists distortion during blade re-positioningand the modified lip design insures positive sealing under conditions of significantlymore blade droop than conventional packing. Shaft wear is reduced due to the frictionand wear reducing additives in the polymer and the seals can be supplied split for easyin-situ replacement.

REFERENCE STORIES

MORE POLYMER SHAFT SEALS ORDEREDB Y C H I N E S E T U R B I N E I N D U S T R Y

Dongfang Electrical Machinery Co.,Ltd (part of Dongfang Electric Corp.)and Harbin Electric Machinery Co.,Ltd. have recently placed additionalorders for Thordon SXL elastomericpolymer segmented turbine shaftseals bringing the total on order oralready installed in 2005, to six sets.The shaft seals sold by ProcoInternational Co. Ltd., Thordon'sexclusive Distributor in China,are/will be installed at the Kangyang,Sanbanxi, Xiafu, Baishan and Nalanpower plants in China and the TekezeHydropower Plant in Ethiopia. Sealing large hydro turbine shafts

from 400mm up to 2000+mm (16 upto 80 in.) diameter can be amaintenance challenge for powerplant operators. Typically, turbineseals consist of two or three sets ofstacked segmented carbon rings thatcan be difficult to install withoutbreakage and can be subject torelatively short life if misaligned orsubjected to abrasives.

Since its first shaft seal installation in1982 at the Manapouri Power Station

in New Zealand, Thordon Bearingshas compiled a history of segmentedshaft seal installations. In 2003,Thordon embarked on a program tofurther optimize it's segmented shaftseal design utilizing its proprietarySXL material. SXL is formulatedusing a tough elastomeric syntheticpolymer alloy offering ease ofinstallation, high natural abrasionresistance and good sealingperformance.

SXL Segmented Shaft Seal

Customer Power Plant/Dam CountrySeal Type

Turbine/ Pump RPM

Shaft Diameter

(mm)

Shaft Diameter (inches)

Install Date

Itaipu Binacional Itaipu Brazil Axial 3770 mm 148.43 Oct. 2005Dongfang Electric Machinery Co., Ltd Nalan China Axial Francis 892mm 35.12 Oct. 2005Harbin Electric Machinery Co., Ltd. Baishan China Radial Pump Turbine 200 1015 mm 39.96 Aug. 2005Harbin Electric Machinery Co., Ltd. Xiafu China Radial Francis 107 1170 mm 46.06 Apr. 2005Harbin Electric Machinery Co., Ltd. Sanbanxi China Axial Francis 166 1532 mm 60.31 Mar. 2005Dongfang Electrical Machinery Co. Ltd. Tekeze Hydropow er Plant Ethopia Radial 1160 mm 45.67 Mar. 2005Dongfang Electrical Machinery Co. Ltd. Tekeze Hydropow er Plant Ethopia Radial Francis 300 1160 mm 45.67 Mar. 2005Harbin Electric Machinery Co., Ltd. Kangyang China Axial Horizontal 125 970 mm 38.19 Mar. 2005Meridian Energy Manapouri Pow er Station New Zealand Radial 910 mm 35.83 Jan. 2005Infraserv Hochst Germany 2060 mm 81.10 Oct. 2004Harbin Electric Machinery Co., Ltd. Nirji China Radial Francis 107 1170mm 46.06 Jun. 2004Harbin Electric Machinery Co., Ltd. Etan China Radial Kaplan 22.5 2380 mm 93.70 Nov. 2003Dongfang Electrical Machinery Co. Ltd. Fenshuijiang China Radial Horizontal 166 720 mm 28.35 Jul. 2003Harbin Electric Machinery Co., Ltd. Gongboxia Pow er Station China Axial Francis 1820 mm 71.65 Mar. 2003California Department of Water Resources San Luis Dam U.S.A. Radial 940 mm 37.01 Mar. 2003China Pow er Complete Equipment Co., Ltd Gongboxia Pow er Station China Axial Francis 1820 mm 71.65 Feb. 2003Harbin Electric Machinery Co., Ltd. Huilong Pow er Plant China Radial Pump Turbine 750 620 mm 24.41 Feb. 2003US Bureau of Reclamation U.S.A. Radial Toshiba Turbine 792 mm 31.18 Jan. 2003Harbin Electric Machinery Co., Ltd. Banglang China Axial Francis 892mm 35.12 May. 2002Harbin Electric Machinery Co., Ltd. Kalun II China Axial Francis 1526mm 60.08 Jan. 2001Mighty River Pow er Maraetai Pow er Station New Zealand Radial 635 mm 25.00 Jul. 1999Snohomish Co. P.U.D., Washington Henry M. Jackson Project U.S.A. Axial Francis Turbine Nov. 1998Northern Wasco Co. P.U.D., Oregon McNary Dam U.S.A. Radial 650 mm 25.59 Aug. 1998LA Dept. of Water Pow er (LADWP) U.S.A. Radial 499 mm 19.65 Sep. 1997Genesis Pow er Rangipo Pow er Station New Zealand Radial 644 mm 25.35 Dec. 1996Seattle City Light, Washington Centralia City Light Pow er Plant U.S.A. Radial 400 337 mm 13.27 May. 1996Central Arizona Water Conservation Distri Havasu, Colorado River U.S.A. Radial Hitachi pump 514 1067 mm 42.01 Jul. 1995Mighty River Pow er Aratiatia Pow er Station New Zealand Radial 755 mm 29.72 Jan. 1992Hydro Quebec Beauharnois Generating Station Canada Radial 1022 mm 40.24 Aug. 1988US Bureau of Reclamation Grand Coulee Dam U.S.A. Radial Toshiba Turbine 792 mm 31.18 Mar. 1988Meridian Energy Manapouri Pow er Station New Zealand Radial 910 mm 35.83 Jan. 1982

SXL Segmented Shaft Seal References

REFERENCE STORIES

GREASE FREE THORPLAS® FOR KAPLANRUNNER BLADE BUSHINGS

it provides a smooth, quiet, stableoperation in demanding applications suchas wicket gate trunnion bearings.”

The material has good thermal stability(minimal to no changes due totemperature) and low water absorption(minimal to no changes due to exposure towater), which allow for tighter installedclearances, Muschta says. Furthermore, shesays it is easy and safe to machine becauseit produces no hazardous dust and releasesno dangerous byproducts.

Alabama Electric's Thomasson says thefact that the bearing is self-lubricating wasthe most important characteristic in itsselection. “The runner location is not easilyaccessed,” he says. “You have to stop theunit, put down headgates or stoplogs,dewater the pit, and climb in there. Andeven then it's still not easy to get to thebearings. It was not designed to belubricated.

He also appreciates the environmentallyfriendly nature of ThorPlas®. “If you usedone with grease and the seal failed, youcould contaminate the stream,” he says.

Thomasson cited ease of installation asanother key factor in choosing the Thordonproduct. According to Muschta, theproduct is installed using a “freeze fit” or“shrink fit” method. “Due to its coefficientof thermal expansion, ThorPlas® willcontract or shrink somewhat when cooled,”she says. “You can then place the bearinginto the housing by slipping it or lightlypressing it in.”

Thomasson reports no problems so far.“The bushings are easy to work with,” hesays. “And in the year they have been inuse at the plant, they have been troublefree.”

"From Hydro Review, June 2006, Copyright HCI Publications,

www.hcipub.com, Excerpted with permission."

NW

Alabama Electric installed ThorPlas® runnerblade trunnion bushings for their Kaplanturbine

In April 2005, operators at AlabamaElectric Cooperative's 3-MW Gantthydroelectric plant on the ConecuhRiver in Alabama, U.S.A., decided toreplace the four runner blade trunnionbushings in the vertical Kaplan turbineof Unit 4. The bushings reduce frictionwhen the runner blade pitch variesaccording to head and flow.

The powerhouse originally containedthree vertical Francis turbines. In 1984,Alabama Electric replaced Units 1 and 2with a single 2-MW vertical Kaplan unit(Unit 4). Unit 3 remains in service.

For Unit 4, Alabama Electric selected abushing manufactured by ThordonBearings. The bushing is the company'snew ThorPlas®, a grease and oil-freeengineered (i.e., non-elastomer)thermoplastic bearing.

“We chose the Thordon bushing becausewe have been using a Thordon turbinemain guide bearing without anyproblems since 1984,” says WesThomasson, a mechanical engineer inthe central generation section ofAlabama Electric.

ThorPlas® is a crystalline, premiumgrade, homogeneous, engineeredthermoplastic bushing that is self-lubricating and can accept operationpressures up to 31 MPa (4,500 psi)without the need for metal backing, saysIngrid A. Muschta, P.Eng., ProductManager for Thordon.

“ThorPlas® has demonstratedexceptional wear and abrasion resistanceand has one of the lowest wear ratesamong nearly all rigid polymers, “saysMuschta. “Due to its ratio of static todynamic co-efficient of friction, it doesnot exhibit any stick slip effect. Instead,

REFERENCE STORIES

MAINTENANCE AT INCO GENERATING PLANT NOLONGER FRAZZLED BY DOWNTIME CONCERNS

Frazzle ice is created when long periods ofextremely cold weather, typically in the -35°Crange, turn river water into a giant Slushie®.This isn't uncommon on The Spanish River inNorthern Ontario, Canada, home of three IncoHydropower Generating Stations. Frazzle ice isa regular occurrence almost every spring,pounding into the intakes and causing pumpsthat provide water to the turbines to ice up andshut down.

"When this occurs," says Claude Mailloux,Planner/Supervisor for Inco, "there is a risk thatthe turbine may run dry." As a result, the mainguide bearings may overheat and need to beremoved, inspected and reinstalled again.

Easier said than done. Until, that is, Inco beganto use Thordon SXL.

Powering A Century Of GrowthThe Spanish Riverways has an important dualrole in Northern Ontario. It is one of the mostbreathtaking recreational waterways in theProvince, attracting tourists worldwide. It isalso the source of hydroelectric power that fuelsthe region's vast pulp and paper and nickelmining industries. Inco taps this tributary withgenerating plants located in Big Eddy, HighFalls and Nairn Falls.

For most of the operational history of theseplants, wood called lignum vitae was used as themain guide bearing. But as the rare source ofthis hard and oily timber - the guayacum tree -became even rarer, Inco was forced to look foralternatives.

"They originally switched over to phenolicbearings," said Lorne Thornton, President ofPioneer Power Industries, a long-time

Thordon Bearings distributor, "But these camewith maintenance headaches and otherconcerns."

The problem was, the river water contains ahigh level of particulates, making it abrasive. Asa result, the phenolic bearings would wearrapidly and need to be changed approximatelyevery two to three years. This was not a quickprocess. In fact, because of the hands-on leadchinking that was involved, the turnaround timeto remove and install the bearings was up tofour months.

"To make matters worse," says Thornton, "thephenolic bearings would constantly needadjusting to maintain performance, which onlyadded to the workload and expense."Clearly, Inco needed a better solution. And theyfound it, in Thordon SXL.

A Track Record That Speaks For ItselfProven in demanding hydroelectric applicationsaround the globe, Thordon SXL has become theindustry standard. An elastomeric polymer, thebearing features grease-free operation,remarkably low wear and exceptionalperformance in dirty water conditions. It's thebearing of choice for water lubricated mainshafts and pumps in both rehabilitation and newturbine projects.

"Inco not only wanted to lower maintenancecosts, but they also wanted to eliminate leadchinking. Thordon SXL was the answer to bothof these issues," says Thornton.

To reduce downtime in the future, Thornton andthe engineers at Thordon Bearingsrecommended a stave configuration. Thishelped reduce the time it would take to remove,

service and reinstall the bearings from thecurrent standard of three to four months to justa few days!

The new bearings were installed in Unit #3 (oneof three turbines in total) at the Nairn Falls plantin 1999. After excellent performance over thenext 24 months, SXL was installed in the othertwo units.

"So far, Thordon has lasted twice as long as theprevious phenolic bearing," says Mailloux."And the longer lifespan has kept labour andmaterials costs down while expanding uptime."Bearing performance is monitored continuouslyand has being running within acceptableparameters for more than five years. "This isremarkable considering the rough operatingconditions and the fact that the turbines arenearly one hundred years old!"

Getting Frazzled Once AgainThen mother nature struck. In January 2004,frazzle ice once again formed on The SpanishRiver. During this inclimate period, Unit #2started and stopped five times, each timerunning dry. The fear was that the bearingwould be burnt and require immediatechangeout, something that would be expectedfrom a phenolic material. It wasn't. In fact, afterinspection, Thordon SXL was only mildlyscuffed.

"And the good news is," says Thornton, "Inco'smaintenance staff was able to clean theexfoliated material from the water grooves andreinstall the bearing in the same day."

This allowed Inco to keep this unit on line forthe upcoming spring run-off period and have aplanned outage in the summer for the changeoutof the bearing during the low water flow period.

Reliability was an important factor in the

Star Lake Hydro Partnership’s decision

to replace the Star Lake Generating

Station’s turbine guide bearing. The 18-

MW facility — owned by a partnership

of Abitibi-Consolidated Inc. (51 percent)

and Enel North America, Inc. (49

percent) — runs about 98 percent of the

time, shutting down for scheduled

maintenance for only six to seven days a

year.

As manager of the Star Lake Generating

Station in southwestern

Newfoundland, Canada, Robert

Conlon wanted to replace a water-

lubricated, hydrostatic turbine guide

bearing in a vertical Francis unit that

required a complex high pressure

filtered water supply. This filtration

system was very costly to maintain

and a previous hydrostatic bearing

failure during initial startup had

required the replacement of both the

turbine shaft and the bearing, which

meant a month-long and costly

outage.

“The second water-lubricated, metal

turbine guide bearing has performed

fine for four years,” says Conlon.

“However, we were concerned of the

consequences if this bearing failed at full

load. The result could be an unexpected

failure destroying the bearing, damaging

the shaft and possibly damaging the

generator.”

Those fears were eliminated, however,

when the hydrostatic metal bearing was

replaced with a water-lubricated,

Thordon SXL turbine guide bearing

operating in hydrodynamic conditions.

For water lubricated metal bearings such

as the one at Star Lake, the fluid film

must be consistent between the shaft and

the bearing. If abrasives are present in

the lubricating water, the fluid film may

be disrupted and the bearing will fail.

The water supplied to water lubricated

metal bearings has to be extremely clean

(contaminants removed to 25-30

microns).

Thordon SXL bearings allow a larger

diametrical clearance between the shaft

and the bearing surface and require more

water than the metal bearing. The water

flow requirements to the SXL bearing

surface for cooling purposes are 0.15

litres/minute per mm (1 U.S.

gallon/minute per inch) of shaft diameter

at standard clearances. However, the

water filtering requirements are not as

stringent for SXL bearings, because

wear life is not seriously effected with

water contaminants up to 150 to 200

microns.

Thordon SXL is an elastomeric polymer

bearing material with a 25-year history

of long-life performance in water

lubricated main shaft guide bearings. “It

was certainly the right choice for us,”

says Conlon. “Even if the Thordon SXL

bearing were to fail, it would not fail

suddenly and unexpectedly. The most

that would happen is that the Thordon

material would wear a little bit.”

Before making the commitment to

purchase the Thordon SXL bearing, the

Star Lake Hydro Partnership researched

the product extensively. This included

checking references in North America

and Europe. “Satisfied with the

experience of others,” says Conlon, “the

order was eventually placed for two

bearings (one plus a spare) in July

2003”.

Rapid installation reducesdowntime

Normally, the turbine shaft has to be

dismantled to install a solid journal

bearing. Disassembly and re-

assembly is an arduous process. In

addition, the whole unit has to be

realigned as a part of the process.

Working with Thordon’s engineers,

however, the decision was made to

design and fabricate the bearing in

two halves. “We simply took the two

halves and bolted them together

around the shaft,” says Conlon.

“Once the Thordon bearing was in

place, it was positioned with a

constant annulus around the shaft.”

Before removing the old bearing, the

turbine runner had been wedged in

position so that the turbine shaft was

centered on the old bearing. As a result,

no time-consuming realignment was

necessary.

The Thordon bearing was so simple to

install, in fact, that the outage lasted just

six days, which Conlon observed, “was a

large saving in time and money.”

Confident that the Thordon SXL bearing

will not fail unexpectedly, the Star Lake

Hydro Partnership is comfortable that

they have made a major improvement in

Station reliability. The Thordon SXL

bearing is performing as anticipated.NW

THORDON SXL GUIDE BEARING ELIMINATESRISK AT THE STAR LAKE GENERATING STATION

Thordon SXL Main Guide Bearing ready for installation at Star Lake

REFERENCE STORIES

REFERENCE STORIES

21

REFERENCE STORIES

22

REFERENCE STORIES

Th

ord

on

Hyd

ro T

urb

ine

Be

arin

g -

Ma

in G

uid

e B

ea

rin

gs

Sh

aft

Dia

me

ter

Initia

l

Insta

llatio

n

Da

te

Th

ord

on

Gra

de

Po

we

r/D

am

Sta

tio

n

Co

un

try o

f

Insta

llatio

n

Ma

x.

He

ad

(M

)

Typ

e o

f

Tu

rbin

eR

PM

Co

mp

an

yD

ire

ctio

n(m

m)

Ju

n -

20

01

SX

LK

rasn

oja

rsk

Ru

ssia

LM

ZV

ert

ica

l2

39

0

Ja

n -

20

02

SX

LK

rasn

oya

rsk

Ru

ssia

LM

ZV

ert

ica

l2

39

0

Ma

y -

20

03

SX

LK

rasn

oya

rsk

Ru

ssia

LM

ZV

ert

ica

l2

39

0

Ja

n -

20

01

SX

LS

aya

no

-Sh

ush

en

ska

ya

Ru

ssia

LM

ZV

ert

ica

l1

97

0

Mar

-2004

SX

LV

olg

aR

ussia

LM

ZV

ert

ica

l1

52

0

Ju

l -2

00

0G

M2401

Na

rva

Hyd

ro P

ow

er

Sta

tio

nR

ussia

18

70

1L

MZ

Ve

rtic

al

95

5

Ju

n -

20

01

GM

2401

Na

rva

Hyd

ro P

ow

er

Sta

tio

nR

ussia

18

70

1L

MZ

Ve

rtic

al

95

5

Feb -

2002

GM

2401

Na

rva

Hyd

ro P

ow

er

Sta

tio

nR

ussia

18

70

1L

MZ

Ve

rtic

al

95

5

Ja

n -

20

04

GM

2401

Na

rva

Hyd

ro P

ow

er

Sta

tio

nR

ussia

LM

ZV

ert

ica

l9

55

Se

p -

19

99

SX

LB

ukh

torm

a H

yd

roR

ussia

12

51

LM

ZV

ert

ica

l9

20

Ju

l -1

99

2S

XL

Stillw

ate

r 1

U.S

.A.

La

qu

ad

ara

In

c.

Ho

rizo

nta

l8

74

Ju

l -1

99

6S

XL

Gle

n P

ark

, N

YU

.S.A

.N

ort

hb

roo

k E

ne

rgy,

Inc.

Ve

rtic

al

86

4

Feb -

2004

SX

LG

len

Pa

rk H

yd

roU

.S.A

.N

ort

hb

roo

k E

ne

rgy

Ho

rizo

nta

l8

64

Ju

ne

23

, 2

00

8P

ag

e 1

of

21

Th

ord

on

Hyd

ro T

urb

ine

Be

arin

g -

Ma

in G

uid

e B

ea

rin

gs

Sh

aft

Dia

me

ter

Initia

l

Insta

llatio

n

Da

te

Th

ord

on

Gra

de

Po

we

r/D

am

Sta

tio

n

Co

un

try o

f

Insta

llatio

n

Ma

x.

He

ad

(M

)

Typ

e o

f

Tu

rbin

eR

PM

Co

mp

an

yD

ire

ctio

n(m

m)

Mar

-1996

GM

24

01

U.S

.A.

Me

rce

r M

an

ag

em

en

tV

ert

ica

l8

64

Apr

-2001

GM

24

01

U.S

.A.

Co

ttre

ll P

ap

er

Mill

Ve

rtic

al

85

1

Ma

y -

20

04

SX

LH

. N

ee

ly H

en

ry H

yd

roe

lectr

ic

Ge

ne

rating

Pla

nt

U.S

.A.

Fra

ncis

Ala

ba

ma

Po

we

rV

ert

ica

l8

38

Ju

l -1

99

6S

XL

Ne

ely

He

nry

U.S

.A.

Am

erica

n H

yd

roV

ert

ica

l8

38

Ju

l -1

99

6S

XL

Ne

ely

He

nry

U.S

.A.

Am

erica

n H

yd

roV

ert

ica

l8

38

Ju

l -1

99

7S

XL

Ne

ely

He

nry

U.S

.A.

Am

erica

n H

yd

roV

ert

ica

l8

38

Ju

l -1

99

7S

XL

Ne

ely

He

nry

U.S

.A.

Am

erica

n H

yd

roV

ert

ica

l8

38

Ja

n -

20

04

SX

LN

IVA

-3R

ussia

LM

ZV

ert

ica

l8

00

Ju

l -1

99

5S

XL

Ka

rap

iro

Sta

tio

nN

ew

Ze

ala

nd

67

Ele

ctr

icity C

orp

. o

f N

ew

Z

ea

lan

dV

ert

ica

l7

61

SX

LN

ort

h C

an

al, M

AU

.S.A

.C

on

so

lida

ted

Hyd

ro,

Inc.

Ho

rizo

nta

l7

52

Ja

n -

19

98

SX

LB

uch

tarm

inska

ya

Ru

ssia

LM

ZV

ert

ica

l7

20

Ja

n -

19

99

SX

LB

uch

tarm

inska

ya

Ru

ssia

LM

ZV

ert

ica

l7

20

Ju

n -

20

00

SX

LB

uch

tarm

inska

ya

Ru

ssia

LM

ZV

ert

ica

l7

20

Ju

ne

23

, 2

00

8P

ag

e 2

of

21

Th

ord

on

Hyd

ro T

urb

ine

Be

arin

g -

Ma

in G

uid

e B

ea

rin

gs

Sh

aft

Dia

me

ter

Initia

l

Insta

llatio

n

Da

te

Th

ord

on

Gra

de

Po

we

r/D

am

Sta

tio

n

Co

un

try o

f

Insta

llatio

n

Ma

x.

He

ad

(M

)

Typ

e o

f

Tu

rbin

eR

PM

Co

mp

an

yD

ire

ctio

n(m

m)

Feb -

2001

SX

LB

uch

tarm

inska

ya

Ru

ssia

LM

ZV

ert

ica

l7

20

Ja

n -

20

02

SX

LB

uch

tarm

inska

ya

Ru

ssia

LM

ZV

ert

ica

l7

20

Ju

l -1

99

0S

XL

Bo

ise

Ca

sca

de

, U

SA

U.S

.A.

Am

erica

n H

yd

roH

ori

zo

nta

l6

35

Ju

l -1

99

3S

XL

Wa

sh

ing

ton

Wa

ter

Po

we

rU

.S.A

.A

me

rica

n H

yd

roH

ori

zo

nta

l6

28

Ju

l -1

99

4S

XL

Sta

tio

n 5

Un

it #

3U

.S.A

.R

och

este

r G

as &

Ele

ctr

icV

ert

ica

l6

22

Ju

l -1

99

7S

XL

Sta

tio

n 5

Un

it #

4U

.S.A

.R

och

este

r G

as &

Ele

ctr

icV

ert

ica

l6

22

Ja

n -

20

00

SX

LM

am

aka

nska

ya

Ru

ssia

LM

ZV

ert

ica

l6

15

Ja

n -

19

99

SX

LM

am

aka

nska

ya

Ru

ssia

LM

ZV

ert

ica

l6

15

Ju

l -1

98

7S

XL

Me

rrill

#3

U.S

.A.

Wis

co

nsin

Po

we

r S

tatio

nH

ori

zo

nta

l6

10

Ju

l -1

99

2S

XL

Ya

dkin

Na

rro

ws

U.S

.A.

65

Am

erica

n H

yd

roV

ert

ica

l5

84

Ju

l -1

99

8S

XL

Ro

tne

nS

we

de

nW

ap

lan

s M

ek.

Ve

rksta

d

AB

Ve

rtic

al

57

0

Ju

l -1

99

8S

XL

Ro

tne

n (

Re

se

rvla

ge

r)S

we

de

nW

ap

lan

s M

ek.

Ve

rksta

d

AB

Ve

rtic

al

57

0

Oct

-20

03

SX

LS

tar

La

ke

, N

ew

fou

nd

lan

dC

an

ad

a1

35

Fra

ncis

51

4E

ne

l N

ort

h A

me

rica

Ve

rtic

al

55

0

Ju

ne

23

, 2

00

8P

ag

e 3

of

21

Th

ord

on

Hyd

ro T

urb

ine

Be

arin

g -

Ma

in G

uid

e B

ea

rin

gs

Sh

aft

Dia

me

ter

Initia

l

Insta

llatio

n

Da

te

Th

ord

on

Gra

de

Po

we

r/D

am

Sta

tio

n

Co

un

try o

f

Insta

llatio

n

Ma

x.

He

ad

(M

)

Typ

e o

f

Tu

rbin

eR

PM

Co

mp

an

yD

ire

ctio

n(m

m)

Ja

n -

20

03

SX

LG

len

n F

alls

, U

nit G

2U

.S.A

.A

lgo

nq

uin

Po

we

rV

ert

ica

l4

94

Ju

l -1

99

0S

XL

We

st

Bu

xto

nU

.S.A

.C

en

tra

l M

ain

e P

ow

er

Ve

rtic

al

47

6

Ju

l -1

99

8S

XL

Bjo

rna

2 (

1+

4 la

ge

r)S

we

de

nG

ran

ing

eve

rke

nV

ert

ica

l4

60

Ju

l -1

99

8S

XL

Gid

bo

le 2

(1

+4

la

ge

r)S

we

de

nG

ran

ing

eve

rke

nV

ert

ica

l4

60

Ju

l -1

99

7S

XL

Gid

ea

2 (

1+

6 la

ge

r)S

we

de

nG

ran

ing

eve

rke

nV

ert

ica

l4

60

Ma

y -

20

02

SX

LC

edar

Cre

ek

U.S

.A.

Du

ke

En

erg

yV

ert

ica

l4

57

Se

p -

20

02

SX

LW

ee

ks F

alls

U.S

.A.

CH

I E

ne

rgy

Ve

rtic

al

45

7

Ju

l -1

99

1S

XL

Sa

n F

ran

cis

cito

Po

we

rpla

nt

U.S

.A.

L.A

. D

ep

t. o

f W

ate

r &

P

ow

er

Ve

rtic

al

44

5

Ju

l -1

99

6S

XL

Sh

erm

an

Sta

tio

nU

.S.A

.O

rio

n P

ow

er-

Gle

ns F

alls

Ve

rtic

al

44

5

Ju

l -1

99

5S

XL

Mill

ino

cke

t U

nit #

1U

.S.A

.D

uke

Po

we

r, M

EH

ori

zo

nta

l4

38

Ja

n -

20

01

SX

LK

ara

sen,

G2

Sw

ed

en

Mo

ller

Un

de

na

s T

urb

in

AB

Ve

rtic

al

43

0

Ju

l -1

99

3S

XL

Wa

sh

ing

ton

Wa

ter

Po

we

rU

.S.A

.A

me

rica

n H

yd

roH

ori

zo

nta

l4

25

Ju

l -1

99

6S

XL

Be

ar

Sw

am

p,

MA

U.S

.A.

No

rth

ea

st

Ge

ne

ratin

gV

ert

ica

l4

09

Ju

ne

23

, 2

00

8P

ag

e 4

of

21

Th

ord

on

Hyd

ro T

urb

ine

Be

arin

g -

Ma

in G

uid

e B

ea

rin

gs

Sh

aft

Dia

me

ter

Initia

l

Insta

llatio

n

Da

te

Th

ord

on

Gra

de

Po

we

r/D

am

Sta

tio

n

Co

un

try o

f

Insta

llatio

n

Ma

x.

He

ad

(M

)

Typ

e o

f

Tu

rbin

eR

PM

Co

mp

an

yD

ire

ctio

n(m

m)

Ju

l -1

99

6S

XL

Mill

ino

cke

t L

ake

Da

mU

.S.A

.B

ow

ate

r P

ap

er

Ve

rtic

al

40

6

Ju

l -1

99

5S

XL

Ga

ntt

Hyd

ro U

nit #

3U

.S.A

.K

ap

lan

Ala

ba

ma

Ele

ctr

icV

ert

ica

l4

03

Ju

l -1

99

5S

XL

Ga

ntt

Hyd

ro U

nit #

4U

.S.A

.A

lab

am

a E

lectr

icV

ert

ica

l4

03

Feb -

2007

CO

MP

AC

GC

PA

Ru

sse

ll S

mith

Po

we

r S

tatio

n

U.S

.A.

16

Ka

pla

nG

rand C

oule

e P

ow

er

Au

tho

rity

Ho

rizo

nta

l4

00

Feb -

2007

Wate

r Q

ua

GC

PA

Ru

sse

ll S

mith

Po

we

r S

tatio

n

U.S

.A.

16

Ka

pla

nG

rand C

oule

e P

ow

er

Au

tho

rity

Ho

rizo

nta

l4

00

Ju

l -1

99

4S

XL

Big

Cre

ek

U.S

.A.

So

uth

ern

Ca

lifo

rnia

E

dis

on

Ve

rtic

al

39

3

Oct

-20

05

SX

LB

ratf

ors

en

Sw

ed

en

Fo

rsvik

Byg

g &

Tu

rbin

e

Se

rvic

eH

ori

zo

nta

l3

90

Ju

l -1

99

1S

XL

Ra

ce

St.

U.S

.A.

Nia

ga

ra M

oh

aw

k P

ow

er

Ve

rtic

al

38

1

Ju

l -1

99

5S

XL

Sh

erm

an

Sta

tio

nU

.S.A

.O

rio

n P

ow

er-

Gle

ns F

alls

Ve

rtic

al

36

9

Ju

l -1

99

7S

XL

Fa

llin

g W

ate

rU

.S.A

.A

lleg

he

ny P

ow

er

Ve

rtic

al

36

9

Ja

n -

20

01

SX

LU

.S.A

.B

urr

ow

s P

ap

er

Co

rp.

Ve

rtic

al

36

8

No

v -

20

01

SX

LU

.S.A

.O

rio

n P

ow

er

Ve

rtic

al

36

8

Ju

l -1

99

6S

XL

Lyo

ns F

alls

Pa

pe

r, N

YU

.S.A

.N

ort

hb

roo

k E

ne

rgy,

Inc.

Ve

rtic

al

36

7

Ju

ne

23

, 2

00

8P

ag

e 5

of

21

Th

ord

on

Hyd

ro T

urb

ine

Be

arin

g -

Ma

in G

uid

e B

ea

rin

gs

Sh

aft

Dia

me

ter

Initia

l

Insta

llatio

n

Da

te

Th

ord

on

Gra

de

Po

we

r/D

am

Sta

tio

n

Co

un

try o

f

Insta

llatio

n

Ma

x.

He

ad

(M

)

Typ

e o

f

Tu

rbin

eR

PM

Co

mp

an

yD

ire

ctio

n(m

m)

Ju

l -1

99

8S

XL

Gid

ea

1 (

1+

6 la

ge

r)S

we

de

nG

ran

ing

eve

rke

nV

ert

ica

l3

60

Ju

l -1

99

7S

XL

Gid

bo

le 1

(1

+4

la

ge

r)S

we

de

nG

ran

ing

eve

rke

nV

ert

ica

l3

60

Ju

l -1

99

2S

XL

Ca

tara

ct

U.S

.A.

Ce

ntr

al M

ain

e P

ow

er

Ve

rtic

al

35

9

Ju

l -1

99

0S

XL

E.

Mill

ino

cke

tU

.S.A

.G

reat N

ort

hern

Ho

rizo

nta

l3

56

Ju

l -1

99

1S

XL

Sch

oo

l S

tre

et

U.S

.A.

Nia

ga

ra M

oh

aw

k P

ow

er

Ve

rtic

al

35

6

Ju

l -1

99

4S

XL

Bry

ng

eS

we

de

nW

ap

lan

s M

ek.

Ve

rksta

d/G

ran

ing

eve

rke

Ve

rtic

al

35

5

SX

LF

oxo

Po

we

r S

tatio

nS

pa

inIb

erd

rola

Ho

rizo

nta

l3

50

Feb -

2002

SX

LA

IT M

essa

ou

dM

oro

cco

34

Als

tom

Po

we

rV

ert

ica

l3

50

SX

LP

lastico

s F

err

o P

ow

er

Sta

tio

nS

pa

inIb

erd

rola

Ve

rtic

al

34

9

Ju

l -1

99

2S

XL

Su

pe

rio

rU

.S.A

.C

ity o

f A

nn

Arb

ou

r, M

IV

ert

ica

l3

43

Ju

l -1

98

5S

XL

Wa

usa

u #

2U

.S.A

.W

isco

nsin

Po

we

r S

tatio

nH

ori

zo

nta

l3

43

Mar

-2001

SX

LP

SE

G P

ow

er-

Ke

arn

ey

U.S

.A.

Am

erica

n H

yd

roV

ert

ica

l3

43

Ju

l -1

98

9S

XL

Hira

mU

.S.A

.C

en

tra

l M

ain

e P

ow

er

Ve

rtic

al

33

3

Ju

ne

23

, 2

00

8P

ag

e 6

of

21

Th

ord

on

Hyd

ro T

urb

ine

Be

arin

g -

Ma

in G

uid

e B

ea

rin

gs

Sh

aft

Dia

me

ter

Initia

l

Insta

llatio

n

Da

te

Th

ord

on

Gra

de

Po

we

r/D

am

Sta

tio

n

Co

un

try o

f

Insta

llatio

n

Ma

x.

He

ad

(M

)

Typ

e o

f

Tu

rbin

eR

PM

Co

mp

an

yD

ire

ctio

n(m

m)

De

c -

19

96

SX

LS

alt R

ive

r P

roje

ct

U.S

.A.

Ho

rizo

nta

l3

31

Ju

l -1

98

6S

XL

Bu

ckin

gh

am

, Q

CC

an

ad

aM

cL

are

n P

ow

er

Ve

rtic

al

33

0

Ju

l -2

00

2G

M2

40

1U

.S.A

.C

en

tra

l M

ain

e P

ow

er

Ho

rizo

nta

l3

25

SX

LL

a P

ard

ina

Po

we

r S

tatio

nS

pa

inIb

erd

rola

Ho

rizo

nta

l3

20

SX

LS

arr

ia P

ow

er

Sta

tio

nS

pa

inIb

erd

rola

Ho

rizo

nta

l3

20

Ju

l -1

98

6S

XL

Ale

xa

nd

er

U.S

.A.

Wis

co

nsin

Po

we

r S

tatio

nH

ori

zo

nta

l3

18

Ja

n -

20

01

SX

LG

lava

Sw

ed

en

Wa

pla

ns M

ek

Ve

rksta

d/B

irka

Ve

rtic

al

31

0

SX

LL

a C

alz

a d

e S

aya

Po

we

r S

tatio

n

Sp

ain

Ibe

rdro

laH

ori

zo

nta

l3

10

Ju

n -

20

05

SX

LT

an

ne

fors

Re

se

rvS

we

de

nT

UR

AB

Ho

rizo

nta

l3

05

Ju

l -1

98

5S

XL

Mu

sq

ua

sh

Ca

na

da

Ne

w B

run

sw

ick P

ow

er

Ve

rtic

al

30

5

Ju

l -1

98

7S

XL

Mu

sq

ua

sh

U.S

.A.

Ne

w B

run

sw

ick P

ow

er

Ve

rtic

al

30

5

Ju

l -1

98

6S

XL

Ph

ilad

elp

hia

Fa

llsU

.S.A

.H

ori

zo

nta

l3

00

SX

LS

art

ag

ud

a P

ow

er

Sta

tio

nS

pa

inIb

erd

rola

Ho

rizo

nta

l3

00

Ju

ne

23

, 2

00

8P

ag

e 7

of

21

Th

ord

on

Hyd

ro T

urb

ine

Be

arin

g -

Ma

in G

uid

e B

ea

rin

gs

Sh

aft

Dia

me

ter

Initia

l

Insta

llatio

n

Da

te

Th

ord

on

Gra

de

Po

we

r/D

am

Sta

tio

n

Co

un

try o

f

Insta

llatio

n

Ma

x.

He

ad

(M

)

Typ

e o

f

Tu

rbin

eR

PM

Co

mp

an

yD

ire

ctio

n(m

m)

SX

LS

an

taca

na

Po

we

r S

tatio

nS

pa

inIb

erd

rola

Ho

rizo

nta

l3

00

Ju

l -1

98

4S

XL

Hu

tte

nm

uh

leIn

tern

atio

na

lV

ert

ica

l3

00

Ju

l -1

98

5S

XL

Kl. M

un

ch

en

Inte

rna

tio

na

lH

ori

zo

nta

l3

00

Ju

l -1

98

6S

XL

Str

ato

sIn

tern

atio

na

lH

ori

zo

nta

l3

00

Ju

l -1

98

7S

XL

No

rth

Ca

na

l, M

AU

.S.A

.C

on

so

lida

ted

Hyd

ro,

Inc.

Ho

rizo

nta

l3

00

Ju

l -1

99

5S

XL

Ed

wa

rds M

fg.

Co

.U

.S.A

.A

me

rica

n H

yd

roV

ert

ica

l3

00

Ju

l -1

99

3S

XL

Pa

cific

Po

we

r A

sh

ton

Un

it #

31

U.S

.A.

Am

erica

n H

yd

roV

ert

ica

l2

98

Ju

l -1

99

1S

XL

Pa

cific

Po

we

r U

tah

Po

we

rU

.S.A

.A

me

rica

n H

yd

roV

ert

ica

l2

98

Ju

l -1

99

6S

XL

Stillw

ate

rU

.S.A

.M

erc

er

Ma

na

ge

me

nt

Ve

rtic

al

29

7

Ju

l -1

99

5S

XL

Fin

ch

Pru

yn

& C

o., G

len

Fa

llsU

.S.A

.A

me

rica

n H

yd

roH

ori

zo

nta

l2

92

SX

LE

l C

ab

ildo

Po

we

r S

tatio

nS

pa

inIb

erd

rola

Ho

rizo

nta

l2

90

SX

LM

on

teq

uie

ro P

ow

er

Sta

tio

nS

pa

inIb

erd

rola

Ho

rizo

nta

l2

90

SX

LB

erb

eg

al P

ow

er

Sta

tio

nS

pa

inIb

erd

rola

Ho

rizo

nta

l2

90

Ju

ne

23

, 2

00

8P

ag

e 8

of

21

Th

ord

on

Hyd

ro T

urb

ine

Be

arin

g -

Ma

in G

uid

e B

ea

rin

gs

Sh

aft

Dia

me

ter

Initia

l

Insta

llatio

n

Da

te

Th

ord

on

Gra

de

Po

we

r/D

am

Sta

tio

n

Co

un

try o

f

Insta

llatio

n

Ma

x.

He

ad

(M

)

Typ

e o

f

Tu

rbin

eR

PM

Co

mp

an

yD

ire

ctio

n(m

m)

SX

LB

ub

un

aw

an

Po

we

r S

tatio

nS

pa

inIb

erd

rola

Ho

rizo

nta

l2

90

Ju

l -1

99

5S

XL

He

dn

as

Sw

ed

en

Wa

pla

ns M

ek.

Ve

rksta

d/S

ke

lleft

ea

Kra

ftV

ert

ica

l2

90

Ju

l -1

99

5S

XL

Sch

ag

htico

ke

Hyd

roU

.S.A

.F

ran

cis

Nia

ga

ra M

oh

aw

k P

ow

er

Ve

rtic

al

28

0

SX

LS

an

Mig

ue

l D

el P

ino

Po

we

r S

tatio

n

Sp

ain

Ibe

rdro

laH

ori

zo

nta

l2

80

Ju

l -1

99

5S

XL

Du

ke

Po

we

r G

asto

n S

ho

als

U.S

.A.

Fra

ncis

Am

erica

n H

yd

roH

ori

zo

nta

l2

79

Ju

l -1

99

2S

XL

Du

ke

Po

we

r G

asto

n S

ho

als

U.S

.A.

Fra

ncis

Am

erica

n H

yd

roH

ori

zo

nta

l2

79

Ma

y -

20

02

SX

LS

we

de

nW

ap

lan

s M

ek.

Ve

rksta

dV

ert

ica

l2

75

Ja

n -

20

05

SX

LG

rau

s P

ow

er

Pla

nt

Sp

ain

13

30

0C

om

em

asa

Ve

rtic

al

27

0

Ja

n -

20

05

Wate

r Q

ua

Gra

us P

ow

er

Pla

nt

Sp

ain

13

30

0C

om

em

asa

Ve

rtic

al

27

0

SX

LC

ald

as P

ow

er

Sta

tio

nS

pa

inE

nd

esa

Ve

rtic

al

27

0

SX

LM

ore

s P

ow

er

Sta

tio

nS

pa

inIb

erd

rola

Ho

rizo

nta

l2

70

SX

LH

ue

rme

da

Po

we

r S

tatio

nS

pa

inIb

erd

rola

Ve

rtic

al

27

0

Ju

l -1

99

1S

XL

Ap

pa

lach

ian

Po

we

r C

o.

U.S

.A.

Am

erica

n H

yd

roV

ert

ica

l2

67

Ju

ne

23

, 2

00

8P

ag

e 9

of

21

Th

ord

on

Hyd

ro T

urb

ine

Be

arin

gs -

Wic

ke

t G

ate

an

d

Op

era

tin

g M

ech

an

ism

Re

fere

nce

s

Sh

aft

Dia

me

ter

Initia

l

Insta

llatio

n

Da

te

Th

ord

on

Gra

de

Po

we

r/D

am

Sta

tio

n

Ma

x.

He

ad

(M

)T

yp

e o

f

Tu

rbin

eR

PM

Co

mp

an

yD

ire

ctio

n(m

m)

SX

LC

ed

illo

Po

we

r S

tatio

nIb

erd

rola

33

0

Ju

l -2

00

1H

PS

XL

Ta

llere

s A

ram

bu

ru3

20

Ju

n -

20

00

HP

SX

L T

RA

XL

Bo

un

da

ry D

am

City o

f S

ea

ttle

29

8

Se

p -

20

04

Th

orP

las

Ga

ntt

Hyd

ro,

No

. 4

Ka

pla

nA

lab

am

a E

lectr

ic2

82

Ja

n -

20

03

HP

SX

L T

RA

XL

Am

erica

n H

yd

ro2

72

No

v -

20

01

HP

SX

L T

RA

XL

Fo

lso

m D

am

#1

, #

2,

#3

10

4U

.S.

Bu

rea

u o

f R

ecla

ma

tio

n2

66

Ja

n -

20

03

HP

SX

L T

RA

XL

Un

it #

5 &

6A

me

rica

n H

yd

ro2

64

Feb -

2004

HP

SX

L T

RA

XL

Un

it #

7 &

8A

me

rica

n H

yd

ro2

64

Ju

l -2

00

5T

ho

rPla

sB

ais

ha

nF

ran

cis

20

0H

arb

in E

lectr

ic M

ach

ine

ry C

o.

Ltd

.2

60

Mar

-2006

Th

orP

las

Exe

l E

ne

rgy

22

9

Mar

-2008

Th

orP

las

Ma

luta

ng

II3

80

Fra

ncis

Ha

rbin

Ele

ctr

ic M

ach

ine

ry C

o.

Ltd

.1

60

No

v -

20

02

HP

SX

L T

RA

XL

Ha

rbin

Po

we

r E

qu

ipm

en

t1

50

Oct

-20

07

Th

orP

las

Pu

bu

go

u1

50

Fra

ncis

Do

ng

fan

g E

lectr

ica

l M

ach

ine

ry1

45

Ju

ne

23

, 2

00

8P

ag

e 1

of

7

Th

ord

on

Ra

dia

l a

nd

Axia

l S

eg

me

nte

d S

ha

ft S

ea

ls Sh

aft

Dia

me

ter

Cu

sto

me

rC

ou

ntr

y

No

. o

f

Tu

rbin

es

with

Se

als

Po

we

r P

lan

t /

Da

mT

urb

ine

/

Pu

mp

No

. o

f

Rin

gs /

Tu

rbin

e

Initia

l

Insta

llatio

n

Da

teT

yp

e o

f

Se

al

(mm

)

Ita

ipu

Bin

acio

na

lB

razil

Ita

ipu

Hyd

roe

lectr

ic P

ow

er

Pla

nt

Oct

-20

05

Axia

l3

77

0

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a3

Eta

n P

ow

er

Sta

tio

nK

ap

lan

2 N

ov -

20

04

Ra

dia

l2

38

0

Infr

ase

rv H

oe

ch

st

Ge

rma

ny

Filt

er

Oct

-20

04

Axia

l2

06

0

IMP

SA

Hyd

roA

rge

ntin

a M

ar

-2001

Axia

l2

04

4

IMP

SA

Hyd

roA

rge

ntin

a M

ar

-2001

Axia

l1

92

5

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a3

Go

ng

bo

xia

Po

we

r S

tatio

nF

ran

cis

3 F

eb -

2003

Axia

l1

82

0

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a4

Sa

nb

an

xi P

ow

er

Pla

nt

1 A

ug

-2

00

5A

xia

l1

53

0

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a2

Zh

elin

Po

we

r P

lan

t J

an

-2

00

1A

xia

l1

52

6

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a4

Ka

lun

lll

Ma

y -

20

02

Axia

l1

52

0

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a3

Ge

lata

n P

ow

er

Pla

nt

1 A

pr

-2006

Axia

l1

39

5

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a3

Fu

jinb

a P

ow

er

Sta

tio

n1

Ma

y -

20

06

Axia

l1

24

0

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a2

Xia

fu P

ow

er

Pla

nt

1 J

un

-2

00

6A

xia

l1

24

0

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a3

Ju

pu

du

Po

we

r P

lan

t1

Apr

-2006

Axia

l1

21

0

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a4

Nir

ji P

ow

er

Pla

nt

Fra

ncis

2 J

un

-2

00

4R

ad

ial

11

70

Do

ng

fan

g E

lectr

ica

l M

ach

ine

ryE

tho

pia

2T

eke

ze

Hyd

rop

ow

er

Pla

nt

Fra

ncis

3 J

an

-2

00

6R

ad

ial

11

60

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a2

Zh

ou

ba

Po

we

r P

lan

t1

Apr

-2006

Axia

l1

13

0

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a2

Xis

ha

n P

ow

er

Pla

nt

3 S

ep

-2

00

6R

ad

ial

10

70

Ce

ntr

al A

rizo

na

Wa

ter

Co

nse

rva

tio

n

Dis

tric

tU

.S.A

.H

ava

su

, C

olo

rad

o R

ive

rH

ita

ch

i P

um

p

Ju

l -1

99

5R

ad

ial

10

67

Febru

ary

02,

2009

Pa

ge

1 o

f 3

Th

ord

on

Ra

dia

l a

nd

Axia

l S

eg

me

nte

d S

ha

ft S

ea

ls Sh

aft

Dia

me

ter

Cu

sto

me

rC

ou

ntr

y

No

. o

f

Tu

rbin

es

with

Se

als

Po

we

r P

lan

t /

Da

mT

urb

ine

/

Pu

mp

No

. o

f

Rin

gs /

Tu

rbin

e

Initia

l

Insta

llatio

n

Da

teT

yp

e o

f

Se

al

(mm

)

Hydro

Quebec

Canada

Be

au

ha

rno

is G

en

era

tin

g S

tatio

n A

ug

-1

98

8R

ad

ial

10

22

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a2

Ba

ish

an

Po

we

r P

lan

tP

um

p

Tu

rbin

e3

Au

g -

20

05

Ra

dia

l1

01

5

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a4

Ka

ng

ya

ng

Po

we

r S

tatio

n1

Au

g -

20

05

Axia

l9

70

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a1

Fe

ng

ma

n P

ow

er

Sta

tio

n2

Au

g -

20

03

Ra

dia

l9

70

IMP

SA

Hyd

roA

rge

ntin

a S

ep

-2

00

1A

xia

l9

70

Ca

lifo

rnia

De

pa

rtm

en

t o

f W

ate

r R

eso

urc

es

U.S

.A.

Sa

n L

uis

Da

m M

ar

-2003

Ra

dia

l9

40

Me

rid

an

En

erg

yN

ew

Ze

ala

nd

Ma

na

po

uri

Po

we

r S

tatio

n J

an

-1

98

2R

ad

ial

91

0

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a6

Ba

ng

lan

g P

ow

er

Pla

nt

Fra

ncis

6 M

ay -

20

02

Axia

l8

92

Do

ng

fan

g E

lectr

ic M

ach

ine

ryC

hin

a4

Na

lan

Po

we

r P

lan

tF

ran

cis

1 O

ct

-20

05

Axia

l8

92

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a1

Sa

nxia

Po

we

r P

lan

t1

No

v -

20

01

Ra

dia

l8

92

Do

ng

fan

g E

lectr

ic M

ach

ine

ryC

hin

a3

Ao

luke

Po

we

r P

lan

t1

No

v -

20

06

Axia

l8

35

U.S

. B

ure

au

of

Re

cla

ma

tio

nU

.S.A

.G

ran

d C

ou

lee

Da

mT

osh

iba

Mar

-1988

Ra

dia

l7

92

U.S

. B

ure

au

of

Re

cla

ma

tio

nU

.S.A

.G

ran

d C

ou

lee

Da

mT

osh

iba

Ja

n -

20

03

Ra

dia

l7

92

Mig

hty

Riv

er

Po

we

rN

ew

Ze

ala

nd

Ara

tia

tia

Po

we

r S

tatio

n J

an

-1

99

2R

ad

ial

75

5

Do

ng

fan

g E

lectr

ica

l M

ach

ine

ryC

hin

a3

Fe

nsh

uiji

an

g P

ow

er

Pla

nt

3 J

un

-2

00

5R

ad

ial

72

0

No

rth

ern

Wa

sco

Co

. P

.U.D

. O

reg

on

U.S

.A.

McN

ary

Da

m A

ug

-1

99

8R

ad

ial

65

0

Ge

ne

sis

Po

we

rN

ew

Ze

ala

nd

3R

an

gip

o P

ow

er

Sta

tio

n D

ec -

19

96

Ra

dia

l6

44

Mig

hty

Riv

er

Po

we

r P

lan

tN

ew

Ze

ala

nd

Ma

rae

tai P

ow

er

Sta

tio

n J

un

-1

99

9R

ad

ial

63

5

Febru

ary

02,

2009

Pa

ge

2 o

f 3

Th

ord

on

Ra

dia

l a

nd

Axia

l S

eg

me

nte

d S

ha

ft S

ea

ls Sh

aft

Dia

me

ter

Cu

sto

me

rC

ou

ntr

y

No

. o

f

Tu

rbin

es

with

Se

als

Po

we

r P

lan

t /

Da

mT

urb

ine

/

Pu

mp

No

. o

f

Rin

gs /

Tu

rbin

e

Initia

l

Insta

llatio

n

Da

teT

yp

e o

f

Se

al

(mm

)

Ha

rbin

Ele

ctr

ic M

ach

ine

ryC

hin

a2

Hu

ilon

g P

ow

er

Pla

nt

Pu

mp

T

urb

ine

3 N

ov -

20

04

Ra

dia

l6

20

LA

De

pt.

of

Wa

ter

Po

we

r (L

AD

WP

)U

.S.A

. S

ep

-1

99

7R

ad

ial

49

9

Se

att

le C

ity L

igh

t, W

ash

ing

ton

U.S

.A.

Ce

ntr

alia

City L

igh

t P

ow

er

Pla

nt

Ma

y -

19

96

Ra

dia

l3

37

Ce

dill

o P

ow

er

Sta

tio

nS

pa

inC

ed

illo

Po

we

r S

tatio

nA

xia

l3

30

EN

EC

OIt

aly

7C

en

tra

le D

i C

assa

no

D'A

dd

aF

ran

cis

2 A

ug

-2

00

5A

xia

l2

40

Sn

oh

om

ish

Co

. P

.U.D

. W

ash

ing

ton

U.S

.A.

He

nry

M.

Ja

ckso

n P

roje

ct

Fra

ncis

No

v -

19

98

Axia

l

Febru

ary

02,

2009

Pa

ge

3 o

f 3

3225 Mainway Drive, Burlington, Ontario L7M 1A6 Canada Tel: +1.905.335.1440 Fax: +1.905.335.4033

www.ThordonBearings.com

Supply and Service: Geared toprovide quick response tocustomer needs, ThordonBearings understands theimportance of quick delivery andreduced down time. Thordonproducts can be designed,produced to the exactrequirements of the customer andshipped quickly.

Distribution: With Thordonbearings specified all around theworld, an extensive distributionnetwork has been established inover 70 countries. Inventories ofcommon bearing sizes are stockedby local Thordon Distributors andare backed up by large regionaland head office Thordon stocks.

Application Engineering:Thordon Bearing’s engineers workclosely with customers to provideinnovative bearing system designsthat meet or exceed the technicalrequirements of the application.

Manufacturing: Thordon’s modernpolymer processing facility isstaffed with experienced anddedicated employees. Bearings upto 2.2 m (86") in diameter havebeen supplied and bearings up to1.5 m (60") O.D. have beenmachined in-house.Quality: Thordon Bearings Inc. is aCanadian company manufacturing to ISO 9001:2000 Quality Systemrequirements. With over 30 yearsexperience in elastomeric bearingdesign, application engineering

and manufacturing, Thordonbearings are recognizedworldwide for both quality andperformance.

Research and Development:Thordon bearings are beingcontinuously tested by our BearingTest Facility. The Facility evaluatesnew designs and applicationsbefore they are put into service.Ongoing testing not only allows fordesign refinements, but ensuresquality and performance afterinstallation. Our polymer laboratoryevaluates new and modifiedpolymers in a continuing quest toimprove Thordon bearingperformance and search for newploymer bearing solutions. to ord.

CUSTOMER FOCUSED TO SUPPORT YOUR IMMEDIATE AND FUTURE NEEDS

T H O R D O N B E A R I N G S I N C.

ZERO POLLUTION | HIGH PERFORMANCE | BEARING SYSTEMS