HYDROSOLIDARITY IN PRUT RIVER BASIN – KEY ELEMENT IN TRANSBOUNDARY FLOOD MANAGEMENT - CEE NBO & N.A. Apele Romane Ovidiu GABOR, Deputy Director, Vice-President of CEE NBO

Upload: booth

Post on 29-Jan-2016

51 views

Category:

Documents


0 download

DESCRIPTION

HYDROSOLIDARITY IN PRUT RIVER BASIN – KEY ELEMENT IN TRANSBOUNDARY FLOOD MANAGEMENT -. CEE NBO & N.A. Apele Romane Ovidiu GABOR, Deputy Director, Vice-President of CEE NBO. To accomplish the WFD + FD objectives at transboundary river basins level. Harmonizing the National Plans - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: HYDROSOLIDARITY IN PRUT RIVER BASIN – KEY ELEMENT IN TRANSBOUNDARY FLOOD MANAGEMENT -

HYDROSOLIDARITY IN PRUT RIVER BASIN

– KEY ELEMENT IN TRANSBOUNDARY FLOOD MANAGEMENT -

CEE NBO & N.A. Apele Romane

Ovidiu GABOR, Deputy Director, Vice-President of CEE NBO

Page 2: HYDROSOLIDARITY IN PRUT RIVER BASIN – KEY ELEMENT IN TRANSBOUNDARY FLOOD MANAGEMENT -

To accomplish the WFD + FD objectives at transboundary

river basins level

Harmonizing the National Plans

HARMONISED BILATERAL AGREEMENTS ( RO + UA; RO + MD)

Page 3: HYDROSOLIDARITY IN PRUT RIVER BASIN – KEY ELEMENT IN TRANSBOUNDARY FLOOD MANAGEMENT -

BILATERAL AGREEMENTS

Romania – Ukraine:

• Agreement on the cooperation in the transboundary waters field (Galati, 1997)

Flood managementWater qualityExchange data

Romania – Moldova :• Bilateral agreement to

operate Stanca Costesti Dam - 1982

• MoU for the cooperation on the Prut river between N.A. “Apele Romane” / “Romanian Waters” and the related institution from Moldova “Moldavien Waters” – 1995

Page 4: HYDROSOLIDARITY IN PRUT RIVER BASIN – KEY ELEMENT IN TRANSBOUNDARY FLOOD MANAGEMENT -

RIVER PRUT BASINRIVER PRUT BASINGENERAL DATAGENERAL DATA

- RB Prut surface – 10.990 km2 - Prut river length – 742 km- Qmax 1% = 4150 m3/s- Q max 0.1% = 6550 m3/s

STANCA – COSTESTI DAMV = 1,3 bil cm; H = 40 m

Multipurpose reservoir :Flood control, Water supply for

population & irrigation, Hydropower, Fishing

Page 5: HYDROSOLIDARITY IN PRUT RIVER BASIN – KEY ELEMENT IN TRANSBOUNDARY FLOOD MANAGEMENT -

Historical flood event on Prut river24/07 – 31/07/2008

… the greatest flood event registrated on Prut river till present :

– Flow : Qmax = 4650 m3/s > Q1% – Shape of hydrograph : two peaks

• H1max = 1130 cm, exceeding the danger level with 5.30 m • H2max = 1058 cm, exceeding the danger level with 4.58 m

– Volume : 1.400 bil cm– Time : 8 days – Speed : water level in the reservoir increased with 8.64

m in 3 1/2 days (max. increasing being of 2.66 m / day- normally 1m / day).

Page 6: HYDROSOLIDARITY IN PRUT RIVER BASIN – KEY ELEMENT IN TRANSBOUNDARY FLOOD MANAGEMENT -

FLOOD SCENARIO “B”Qout = 1000 CM/S

POTENTIALLY AFECTED People + Goods : - People = 8500 - Houses = 2530 - Roads = 180 km - Agr. Land = 17200 ha

OANCEA

DRINCENI

PRISACANI

UNGHENI

STANCA AVAL

OROFTIANARADAUTI-PRUT

AC. STANCA-COSTESTI

INC. TRIFESTI-SCULENI

INC. SCULENI-TUTORA

INC. TUTORA-GORBAN

FLOOD SCENARIO “C”Qout = 1250 CM/S

POTENTIALLY AFECTED People + Goods : - People = 15000 - Houses = 4575 - Roads = 260 km - Agr. Land = 35841 ha

FLOOD SCENARIO “A”Qout = 750 CM/S

POTENTIALLY AFECTED People + Goods : - People = 2800 - Houses = 721 - Roads = 60 km - Agr. Land = 8400 ha

FLOOD SCENARIO JOINTLY ADOPTEDQin > Q1%;

Qout = 750 m3/s

PROTECTED People + Assets : - People = 15000 - Houses = 4575

- Roads = 260 km - Agr. land = 35841 ha

FLOOD SCENARIOS

Page 7: HYDROSOLIDARITY IN PRUT RIVER BASIN – KEY ELEMENT IN TRANSBOUNDARY FLOOD MANAGEMENT -

CONCLUSIONS

1. Downstream reservoir – no fatalities and not affected properties ;

2. The reservoir has been jointly operated by ROMANIA and MOLDOVA, according to the new operating guide regulation (2007) ;

3. Technical decisions have been permanently harmonized by the involving parts ;

4. Political decisions have been taken based on technical decisions;

5. Permanent information of the population, on both sides of the Prut river ;

6. Necessity of a new trilateral cooperation agreement (Ukraine, Rep. Moldova, Romania).

Page 8: HYDROSOLIDARITY IN PRUT RIVER BASIN – KEY ELEMENT IN TRANSBOUNDARY FLOOD MANAGEMENT -

FLOOD HYDROGRAPH 24.07.-10.08.2008

0

1000

2000

3000

4000

5000

6000

7000

8000

Timp (zi.luna.an ora)

Deb

it (

m3/s

)

SH RADAUTI PRUT KEY EXTRAPOLATEDQmax = 7120 MC/S

SH RADAUTI PRUTKEY RECALCULATED Qmax = 4650 MC/S

SH STANCA AVALQmax= 840 MC/S