CHENAB ENGINEERING WORKS & FOUNDRIES (PVT) LTD. Date: 25-04-2015 MACHINING COST ( hydraulic Ram) Total Weight = 5.5 kg Sr.No. Operation Name: Standard Production Labor Cost Electricity Cost Tooling Cost overhead cost per kg per kg per kg 1 Countering 120 4.1666667 4 2 Casting Balancing 68 7.3529412 4 3 Main bore rough & Final 34 14.705882 11 22 4 4 Main bore rough & Final 34 14.705882 11 22 4 5 Total Length 68 7.3529412 11 22 4 6 Gallery Boring 68 7.3529412 11 22 4 7 Spherical & 6.35mm Drilling 50 10 11 22 4 8 Cam Dia Machining 68 7.3529412 11 22 4 9 Final Broaching 50 10 11 22 4 10 Grinding 120 4.1666667 11 22 4 11 Number Punching 120 4.1666667 4 12 Hardness 68 7.3529412 4 13 Line Inspection 68 7.3529412 4 14 Final Inspection 68 7.3529412 4 15 Cleaning 120 4.1666667 4 16 Packing 120 4.1666667 4

Upload: junaid-khawaja

Post on 15-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: HYR

CHENAB ENGINEERING WORKS & FOUNDRIES (PVT) LTD.

Date: 25-04-2015

MACHINING COST ( hydraulic Ram)

Total Weight = 5.5 kg

Sr.No. Operation Name: Standard Production Labor CostElectricity Cost Tooling Cost overhead cost

per kg per kg per kg

1 Countering 120 4.16666667 4

2 Casting Balancing 68 7.35294118 4

3 Main bore rough & Final 34 14.7058824 11 22 4

4 Main bore rough & Final 34 14.7058824 11 22 4

5 Total Length 68 7.35294118 11 22 4

6 Gallery Boring 68 7.35294118 11 22 4

7 Spherical & 6.35mm Drilling 50 10 11 22 4

8 Cam Dia Machining 68 7.35294118 11 22 4

9 Final Broaching 50 10 11 22 4

10 Grinding 120 4.16666667 11 22 4

11 Number Punching 120 4.16666667 4

12 Hardness 68 7.35294118 4

13 Line Inspection 68 7.35294118 4

14 Final Inspection 68 7.35294118 4

15 Cleaning 120 4.16666667 4

16 Packing 120 4.16666667 4

Page 2: HYR

117.54902 88 176 64 445.549

Page 3: HYR

CHENAB ENGINEERING WORKS & FOUNDRIES (PVT) LTD.

Date: 25-04-2015MACHINING COST ( hydraulic Ram)

Sr.No. Operation Name Labor Cost

3 Main bore Rough 15.824 Main bore Final 15.825 Total Length 7.96 Gallery Boring 7.97 Spherical & 6.35mm Drilling 10.768 Cam Dia Machining 7.99 Final Broaching 10.76

10 Grinding 4.4811 Number Punching 4.4812 Hardness 7.913 Line Inspection 7.914 Final Inspection 7.915 Cleaning 4.4816 Packing 4.48

118.48

Total Weight = 5.5 kgElectrcity cost / kg

Tooling Cost / kg = 5 RsOver Head Cost / kg = 4 Rs.

Total Cost / kg = 5.5*11Overall Cost 118.48+60.5

Rs. 178.98

= 2 Rs.

Page 4: HYR

CHENAB ENGINEERING WORKS & FOUNDRIES (PVT) LTD.Date: 25-04-2015

MACHINING COST ( hydraulic Ram)

Sr.No. Operation Name Labor Cost

3 Main bore Rough 15.824 Main bore Final 15.825 Total Length 7.96 Gallery Boring 37 Spherical & 6.35mm Drilling 58 Cam Dia Machining 7.99 Final Broaching 90

10 Grinding 211 Number Punching 212 Hardness 315 Cleaning 216 Packing 2

156.44

Total Weight = 5.5 kgElectrcity cost / kg = 2 Rs.

Tooling Cost / kg = 5 Rs.Over Head / kg = 4 Rs.Total Cost / kg 5.5 x 11 = 60.5

Overall Cost 156.44+60.5Rs. 216.94