i-001...section 096813 - tile carpeting 4" cove with toe; coil rb1 resilient base roppe 130...
TRANSCRIPT
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
02/23/18 100% CONSTRUCTION DOCUMENTS0
2/2
4/2
018 6
:03:5
0 P
M
FINISH LEGEND & FINISH
ABBREVIATIONS
I-001
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
G
F
D
C
B
A
ABBREVIATIONS
H
K
M
L
ATCAWT
ACOUSTICAL TILE CEILINGACOUSTICAL WALL TREATMENT
BGBNT
BUMPER GUARDBULL NOSE TILE
CGCHRCPTCTCUBCURT
CORNER GUARDCHAIR RAILCARPETCERAMIT TILECUBICAL CURTAINCURATIN (PRIVACY, STAGE)
DLSDRS
DIMENSIONAL LETTERSDOUBLE ROLLER SHADE
FLSFWP
FLUID APPLIED SPORTS FLOORINGFABRIC WRAPPED PANELS
GLSGLTGT
ARCHITECTURAL TILEGLASS TILEGROUT
HICHLBHPCHR
HIGH IMPACT WALLCOVERINGHORIZONTAL LOUVER BLINDSHIGH-PERFORMANCE COATINGHANDRAIL
KPL KICKPLATE
LINOLKRLVT
LINOLEUMLOCKERLUXURY VINYL TILE
MTMTLMTLB
METAL THRESHOLDMETALMETAL BASE
PPBPCPLAMPMTLPT
PAINTED BASEPOLISHED CONCRETEPLASTIC LAMINATEPAINTED METALPAINT
QQTQTZ
QUARRY TILEQUARTZ SLAB
RRACCRBRBRRESRFSRSN
RESILIENT ACCESSORYRESILIENT BASE (VINYL, RUBBER, TP)RUBBER (TILE AND SHEET)RESING PANELRESILIENT SPORTS FLOORINGPLASTIC RESIN PANEL
SSCNSCBSGNSNCSRPSRSSSMSSTSWSSV
SEALED CONCRETESELVE COVE BASESIGNAGESTAINED CONCRETESLIP RESISTANT PROTECTIVE FLOORINGSINGLE ROLLER SHADESOLID SURFACE MATERIALSTAINLESS STEELSPECIAL WALL SURFACESSHEET VINYL
TTCTERTKBDTPFTS
TOILET COMPARTMENTSTERRAZZOTACKBOARDTRANSPARENT FINISHTRANSITION STRIP
VVCTVWC
VINYL COMPOSITION TILEVINYL WALL COVERING
SS2 SOLID SURFACE AT KITCHEN CORIAN PRIVATE COLLECTION SORREL
SS1 SOLID SURFACE AT VANITY CORIAN PRIVATE COLLECTION BASIL
SECTION 123661.16 SOLID SURFACING COUNTERTOPS
PLAM2 PLASTIC LAMINATE FINISH - NEVAMAR DECORATIVE SURFACES RK60003T VERDICTS IN, TEXTURED
PLAM1
PLASTIC LAMINATE - WALLMOUNTED SHELVES (NOT INCABINET)
NEVAMAR DECORATIVE SURFACES S2050T PORCELAIN, TEXTURED
SECTION 123623.13 PLASTIC-LAMINATE-CLAD COUNTERTOPS
RWS2DOUBLE ROLLER WINDOWSHADE
MECHO SHADE TBD
RWS1A SINGLE ROLLER WINDOW SHADE PER SPECIFICATION LIGHT FILTERING SHADECLOTH TBD
RWS1 SINGLE ROLLER WINDOW SHADE PER SPECIFICATION BLACK OUT SHADECLOTH TBD
122413 - ROLLER WINDOW SHADES
CG1 CORNER GUARD; 4' TALL, 1" LEGS INPRO CORPORATIONS SANDSTONE 0153
10265 - IMPACT-RESISTANT WALL PROTECTION
TOILET COMPARTMENTS PER SPECIFICATION TBD
SECTION 102113.13 METAL TOILET COMPARTMENTS
ST1 STAIN SHERWIN WILLIAMS TBD
SECTION 099300 STAINING AND TRANSPARENT FINISHING
EPT3 PAINT: EXTERIOR METAL SHERWIN WILLIAMS TBD
EPT2PAINT: LATEX - EXTERIORSOFFITS AND CEILINGS
SHERWIN WILLIAMS MATCH EIFS TYPE C
EPT1PAINT: LATEX - EXPOSEDSTRUCTURE & BRACKETS
SHERWIN WILLIAMS MATCH EIFS TYPE A
099113 - EXTERIOR PAINTING
EXPOSED CEILING STRUCTURE
PTML2 PAINT; LATEX SHERWIN WILLIAMS SW 6065 BONA FIDE BEIGE EG-SHEL
DOOR TRIM / FRAMES SEMI-GLOSS
PTML1 PAINT; LATEX SHERWIN WILLIAMS SW 6065 BONA FIDE BEIGE
PT7 PAINT; LATEX DUNN EDWARDS 'AGGIE RED' EG-SHEL
PT6A PAINT; EPOXY SHERWIN WILLIAMS SW 6064 RETICENCE EPOXY
PT6 PAINT; LATEX SHERWIN WILLIAMS SW 6064 RETICENCE EG-SHEL
PT5 PAINT; LATEX SHERWIN WILLIAMS SW 6066 SAND TRAP EG-SHEL
PT4 PAINT; LATEX SHERWIN WILLIAMS SW 7670 GRAY SHINGLE EG-SHEL
PT3A PAINT; EPOXY SHERWIN WILLIAMS SW 2818 RENWICK HEATHER SEMI-GLOSS
PT3 PAINT; LATEX SHERWIN WILLIAMS SW 2818 RENWICK HEATHER EG-SHEL
PT2 PAINT; LATEX SHERWIN WILLIAMS SW 7718 OAK CREEK EG-SHEL
PT1A PAINT; EPOXY SHERWIN WILLIAMS SW 6065 BONA FIDE BEIGE
PT1 PAINT; LATEX SHERWIN WILLIAMS SW 6065 BONA FIDE BEIGE EG-SHEL
099123 - INTERIOR PAINTING
CPTD CARPET TILE NOT USED WALK-OFF TBD
SIZE 50CM X 50CM
CPTC1 CARPET TILE INTERFACE SQUARE OFF COLLECTION & PATTERN LIBRARY GALA
SIZE 50CM X 50CM
CPTC CARPET TILE INTERFACE SQUARE OFF COLLECTION & PATTERN LIBRARY SPRINKLES
SIZE 50CM X 50CM PATTERN: TBD
CPTB1 CARPET TILE INTERFACE SQUARE OFF COLLECTION & PATTERN LIBRARY SPARKLES
SIZE 50CM X 50CM PATTERN: TBD
CPTB CARPET TILE INTERFACE SQUARE OFF COLLECTION & PATTERN LIBRARY JESTER
SIZE 50CM X 50CM PATTERN: TBD
CPTA1 CARPET TILE INTERFACE SQUARE OFF COLLECTION & PATTERN LIBRARY JESTER
SIZE 50CM X 50CM PATTERN: TBD
CPTA CARPET TILE INTERFACE SQUARE OFF COLLECTION & PATTERN LIBRARY SPARKLERS INSTALLATION: NON-DIRECTIONAL
SECTION 096813 - TILE CARPETING
4" COVE WITH TOE; COIL
RB1 RESILIENT BASE ROPPE 130 BUCKSKIN AT ALL LOCATIONS W/ RESILIENT TILEFLOORING, TILE CARPETING, AND SCN.
SECTION 096513 RESILIENT BASE AND ACCESSORIES
LVT1 LUXURY VINYL TILE INTERFACE LEVEL SET COLLECTION, NATURAL WOODGRAINS A00209 MAHAGONY
SECTION 096519 RESILIENT TILE FLOORING
RGAF RECESSED WALK-OFF GRD MATS INC. ADVANCE TRACK LIGHT GREY COORDINATE W/ DRAIN PAN
SECTION 096913 RIGID GRID ACCESS FLOORING
SIZE 24" X 24"
ACT1 ACOUSTIC CEILING TILE & GRID PER SPECIFICATION WHITE
SECTION 095113 ACOUSTIC PANEL CEILING
GROUT CUSTOM BUILDING PRODUCTS EPOXY TBD
SIZE 12" X 12"
W/ 6"X 12" COVE BASE P-36C9TB
CT1A CERAMIC FLOOR TILE DALTILE HEATHLAND WHITE ROCK HL101 PRESEAL TILES PRIOR GROUTING
SECTION 093013 CERAMIC TILING
LOWER CABINATES OPT 2: FORMICA 5487-NT OILED WALNUT,...
PLAM2 PLASTIC LAMINATE OPT 1:NEVAMAR DECORATIVE SURFACES RK60003T VERDICTS IN, TEXTURED
UPPER CABINETS
PLAM1 PLASTIC LAMINATE NEVAMAR DECORATIVE SURFACES S2050T PORCELAIN, TEXTURED
SECTION 064116 PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS &
SECTION MARK DESCRIPTION MANUFACTURER STYLE COLOR REMARKS
FINISH LEGEND
GENERAL FINISH NOTES
A. UNO, ALL DOORS TO HAVE (PMTL1) FINISH; SEMI-GLOSSB. UNO, ALL LVT / CARPETED AREAS TO RECEIVE (RB1)C. UNO, ALL EXPOSED STRUCTURE - DECK/BEAMS/JOIST/
TRUSSES/COLUMNS/ DUCT WORK TO BE PAINTED (PTML2);EG-SHEL FINISH
D. UNO, ALL WALLS TO BE PAINTED (PT1)E. PROVIDE TRANSITION FLOOR STRIPS AS REQUIRED:
LVT/CONCRETE & LVT/TILE.F. UNO, ALL GWB CEILINGS TO BE PAINTED (PT1)G. UNO, GWB FURR DOWNS TO BE PAINTED W/ THE SAME COLOR
ON ALL SIDES (HORIZONTAL & VERTICAL SURFACES)H. UNO, HVAC DIFFUSERS LOCATED ON ACCENT WALLS TO
MATCH IN COLOR ADJ. WALL SURFACE.
BASIS-OF DESIGN: THE MANUFACTURER'S NAME AND THEIR PRODUCTSREFERENCED INDICATED THE COLOR, TEXTURE, PATTERN, MATERIALQUALITY, PERFORMANCE AND MAINTENANCE REQUIRED FOR THEMATERIALS LISTED. THE PRODUCTS FINISHES SHALL MEET THE COLOR,TEXTURE AND PATTERN INDICATED AS WELL AS THE MATERIAL QUALITY,PERFORMANCE AND MAINTENANCE. THE USER OF MANUFACTURER'SNAME AND PRODUCTS DO NOT PRECLUDE THE USE OF OTHER MANUFACURERSPRODUCTS OF APPROVED EQUAL COLOR, TEXTURE, PATTERN, PERFORMANCEAND MAINTENANCE AS LONG AS ALL REQUIREMENTS ARE MET.
PT7
ST
AT
EOF NEW
MEX
ICO
RE
GI S
T ERED ARCHI T
EC
T
HOOKER
2828
KIM M
UPUP
UP
UP
UP
ELEV
EL012
KITCHEN
M
LOUNGE
M
R125
W
R124
HK
J109
ITC
T107
BATH
103R
BED
105
BATH
104R
BED
114BATH
114R
BED
116
BED
132BED
138
STAIR
ST002
BATH
120R
BED
136 BATH
136R
BATH
132R
BED
118
BED
120
BED
134
BED
106
BED
115
BATH
117R
BED
119
BED
117
LVT1 CT1A
SCN
LVT1 LVT1
SCN
CT1A LVT1
CT1A
LVT1LVT1
CT1A
LVT1 LVT1
SCN
LVT1CT1A
LVT1
SCN
SCN
LVT1CT1ALVT1LVT1
SCN
SCN
CT1ALVT1
SCN
LVT1LVT1
SCN
LVT1
SCN
RGAF
LVT2
CT1A
CT1A
CPTA
CPTACPTA
CPTACPTA
CPTA
CPTA
SCNSCN CT1A
LVT1
BIKE STORAGE
102
BED
104
BED
103
STAIR
ST001
N HALL
H113A
NORTH
LOBBY
H121
BED
131
BED
137
BED
135
BATH
135R
BATH
131R
BED
133
OUTDOOR E/W
PASSAGE
H100
VEST
H111
BED1
101A
BED2
101B
BATH
101C
W/D
101DCL
101HCL
101F
M
M112
M
M103
M
M114
M
M118
M
M117
VEST
H122
VEST
H123
BATH
115R
M
M115
M
M131
M
M132
M
M135
M
M136
BED
110
BATH
110R
M
M110
BED
108
M
M108
BED
112
W HALL
H113
BATH
108R
CT1A
RGAF
CT1A
SCN
CT1A
LVT1
LVT1
LVT1
CT1A
LVT1
SCN RGAF SCN
LVT1 LVT1LVT1
SCN
LVT1
3' - 1 9/16"
CT1A
LVT1
LVT1LVT1
LVT1
CT1A
CPTA1 CPTA1
CPTA1 CPTA1
CPTA1
SCN
CPTA1
CPTA1
CPTA1
CPTA1
CARPETLAYOUT; TYP.
1' - 7 1/2"
1' - 7 1/2"
/ I-111AB5
LOUNGE
121B
LOUNGE
121C
RESIDENT
DIRECTOR APT
101
644TYP
644TYP
644 644TYP TYP
645645TYP
645645TYP
645645TYP
645645TYP
644TYP
644TYP
644TYP
644TYP
644 644TYP TYP
645645TYP
645645TYP
645645TYP
644TYP
644TYP
644TYP
645645
TYP
645645
TYP
645TYP
644TYP
644TYP
644
TYP
644
TYP
644TYP
646
647 TYP
647TYP
647 TYP
647647
TYPTYP647
TYP647
TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647 TYP
647TYP
647TYP
M
M010
STAIR
S003
ELEV
EL012
ELEV ROOM
M011
SCN
SCN
LVT1
SCN
PT1
PT1
PT1
CARPETLAYOUT; TYP.STARTING POINT
1' - 7 1/2"
1' - 7 1/2"
CPTA
CPTA1 CPTA1
ALIGN
ALIGN
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
NORTH WING
A
02/23/18 100% CONSTRUCTION DOCUMENTS0
SOUTH WING
B
2/2
4/2
018 6
:03:5
7 P
M
FIRST FLOOR - FINISH
FLOOR PLAN AREA A
I-111A
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
AS INDICATED BY: #
KEY NOTES
NORTH
644 MARBLE THRESHOLD TRANSITION BETWEEN BED ANDBATH PER DETAIL A1/A-701
645 FLOORING TRANSITION FROM CORRIDOR TO BED PERDETAIL A2/A-701
646 FLOORING TRANSITION FROM LOBBY TO PUBLIC RESTROOM PER DETAIL A3/A-701
647 CONTINUE SCHEDULED FLOORING AND BASE UNDERVANITY
1/8" = 1'-0"A1FIRST FLOOR - FINISH FLOOR PLAN AREA A
0 8' 16'4' 1/8" = 1'-0"A5BASEMENT - FINISH FLOOR PLAN
NORTH0 8' 16'4'
1/4" = 1'-0"B5CARPET LAYOUT TYP.
GENERAL NOTES
A. REFERENCE THE INTERIOR MATERIAL LEGEND FOR THE COLORS, PATTERNS ANDTEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIEDCOLORS THAT ARE EXPOSED TO VIEW IN THE FINISHED CONSTRUCTION. WHEN COLORIS NOT DESIGNATED FOR ITEMS, THE CONTRATOR SHALL ASK FOR A COLORSELECTION.
B. REFERENCE INTERIOR ELEVATIONS FOR CLARIFICATION OF WALL FINISHES.
ST
AT
EOF NEW
MEX
ICO
RE
GI
ST
ERED ARCH
I TE
CT
HOOKER
2828
KIM M
GENERAL FINISH NOTESFLOORS:
A. ALL VESTIBULES SHALL RECEIVE RGAF.B. ALL RESIDENCE HALL BED ROOMS SHALL RECEIVE LVT1.C. ALL RESIDENCE HALL BATH ROOMS SHALL RECEIVE CT1A.D. ALL PUBLIC REST ROOMS SHALL RECEIVE CT1A UNO.
BASE BID: SOUTH WING - ALL FLOORS SHALL RECEIVE SCN UNO.ALTERNATE: SOUTH WING FLOOR FINISHES: SCHEDULED FINISHES IN LIEU
OF SCN.
BASE:
A. ALL BASE SHALL BE RB1 U.N.O.B. ALL BATH AND PUBLIC RESTROOMS SHALL RECEIVE CT1A COVE BASE.
BASE BID @ SOUTH WING: PROVIDE SCHEDULED BASE AT ALL ROOMS.
CEILINGS:
A. ALL ACOUSTICAL CEILING SHALL BE ACT1.B. ALL DRYWALL CEILINGS SHALL BE PAINTED PT1 UNO.
UP
CORRIDOR
H182
CLASSROOM B
185
ITC
T159B
BATH
151R
BED
160
BED
138
BED
142BATH
140R
BED
144
BED
143
BED
149
BATH
152R
BED
154BED
158
BED
162
BED
164
BED
163
BATH
161R
BATH
162R
BED
165
BED
166
BED
167
BED
168
BATH
165R
BATH
166R
BED
152
BED
161
STORAGE
184A
N HALL
H157
BATH
156R
BED
156
BED
146
BED
148
BED
150BATH
148R
OFFICE
189
RA
STORAGE
190
FRONT DESK
180B
BED
137
BED
141
BATH
139R
BED
145
BED
147
BATH
147R
BED
140
BED
139
BATH
144R
BATH
143R
M
R187
W
R188
BED
151
VEST
H170
STAIR
ST004
E HALL
H169
M
M140
M
M139
M
M144
M
M143
M
M147
M
150D
M
M156
BATH
160R
M
M161
M
M162
M
M152
CLASSROOM A
184
M
M165
M
M166
M
M151
LVT1
CT1A
LVT1 LVT1
CT1A
LVT1 LVT1
CT1A
LVT1 LVT1CT1A
SCN
LVT1
CT1ACT1A
SCN
LVT1
LVT1
CT1A
LVT1
LVT1
CT1ASCNSCN
LVT1
LVT1
CT1A
LVT1
LVT1LVT1
CT1A
SCN
SCN
CT1A
SCN
LVT1LVT1
CT1A
SCN
LVT1
SCN
LVT1
CT1A
LVT1
SCN
LVT1 LVT1
SCN
SCN SCN
CT1A
LVT1LVT1
RGAF
SCN
CPTA
CT1A
RGAF
LVT1
LVT1 LVT1SCN
SCN
CPTA CPTA CPTA CPTA
CPTA
CPTA
FIRE RISER &
ELEC
M184B
STORAGE
185A
SCN
M
M160
VESTIBULE
H181
HK
J186
SCN
VENDING
180A
CT1A
SCN
CPTA1 CPTA1
CPTA1 CPTA1
CPTA1CPTA1
CPTA1
CPTA1
CPTA1
CPTA1
CPTA1
CPTA1
CPTA1
LVT1
LVT1
LOUNGE
180C
SOUTH
LOBBY
H180
VESTIBULE
H183
LVT1
RGAF
BASE BID FINISHES:
1. ALL SCHEDULED WALL BASE2. PROVIDE SCHEDULED FINISHAT ALL FLOORS NOTED SCN.3. DISREGARD SCHEDULEDFINISH AT ALL OTHER AREASAND PROVIDE SCN AT ALLAREAS EXCEPT VESTIBULES.4. PROVIDE RGAF AT ALLVESTIBULES.
ALTERNATE FINISHES:
1. PROVIDE FLOOR FINISHESSCHEDULED IN THIS AREA -SOUTH WING - IN ADDITION TOTHE BASE BID FINISHES ATVESTIBULES AND STORAGE /ELEC AREAS.
644TYP
644TYP
644644TYPTYP
644TYP
TYP
644TYP
644TYP
644TYP
644TYP
645645TYP
645645TYP
645645TYP
645TYP
644TYP 644
TYP644
644TYP
644TYP
644TYP
644TYP
645645
TYP
645645
TYP
SCN
SCN
646646
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647
TYP647
TYP
647
TYP
647TYP
647
TYP
647TYP
647
TYP
647
TYP
647TYP
647TYP
ELEC
E159A
SCN
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
SOUTH WING
B
02/23/18 100% CONSTRUCTION DOCUMENTS0
NORTH WING
A
2/2
4/2
018 6
:03:5
9 P
M
FIRST FLOOR - FINISH
FLOOR PLAN AREA B
I-111B
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
ST
AT
EOF NEW
MEX
ICO
RE
GI
ST
ERED ARCHI T
EC
T
HOOKER
2828
KIM M
1/8" = 1'-0"A1FIRST FLOOR - FINISH FLOOR PLAN AREA B
NORTH0 8' 16'4'
AS INDICATED BY: #
KEY NOTES
644 MARBLE THRESHOLD TRANSITION BETWEEN BED ANDBATH PER DETAIL A1/A-701
645 FLOORING TRANSITION FROM CORRIDOR TO BED PERDETAIL A2/A-701
646 FLOORING TRANSITION FROM LOBBY TO PUBLIC RESTROOM PER DETAIL A3/A-701
647 CONTINUE SCHEDULED FLOORING AND BASE UNDERVANITY
GENERAL NOTES
A. REFERENCE THE INTERIOR MATERIAL LEGEND FOR THE COLORS, PATTERNS ANDTEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIEDCOLORS THAT ARE EXPOSED TO VIEW IN THE FINISHED CONSTRUCTION. WHEN COLORIS NOT DESIGNATED FOR ITEMS, THE CONTRATOR SHALL ASK FOR A COLORSELECTION.
B. REFERENCE INTERIOR ELEVATIONS FOR CLARIFICATION OF WALL FINISHES.
GENERAL FINISH NOTESFLOORS:
A. ALL VESTIBULES SHALL RECEIVE RGAF.B. ALL RESIDENCE HALL BED ROOMS SHALL RECEIVE LVT1.C. ALL RESIDENCE HALL BATH ROOMS SHALL RECEIVE CT1A.D. ALL PUBLIC REST ROOMS SHALL RECEIVE CT1A UNO.
BASE BID: SOUTH WING - ALL FLOORS SHALL RECEIVE SCN UNO.ALTERNATE: SOUTH WING FLOOR FINISHES: SCHEDULED FINISHES IN LIEU
OF SCN.
BASE:
A. ALL BASE SHALL BE RB1 U.N.O.B. ALL BATH AND PUBLIC RESTROOMS SHALL RECEIVE CT1A COVE BASE.
BASE BID @ SOUTH WING: PROVIDE SCHEDULED BASE AT ALL ROOMS.
CEILINGS:
A. ALL ACOUSTICAL CEILING SHALL BE ACT1.B. ALL DRYWALL CEILINGS SHALL BE PAINTED PT1 UNO.
DW DDDDW W W W
CGCG
STUDY
LOUNGE
222
STAIR
ST001a
LOUNGE
221A
STAIR
ST002a
BED
238
BED
236
BED
234
BED
237BED
235
BATH
235R
BATH
231RBED
233
BED
240
BED
239
ITC
T207
BED
204
BED
203
BATH
203R
BED
205
BATH
204R
BATH
214RBED
216
HK
J209
BATH
218RBED
218
BED
206
BED-3
215
BATH
217RBED
217
LAUNDRY
LOUNGE
200
W HALL
H213
BED
220
BED
219
BED
232
BED
231
LOBBY 2
H221
N HALL
H257
N HALL
H213A
CT1A
SCN LVT1
LVT1LVT1
CT1A SCN SCN CT1A
LVT1 LVT1
SCN
LVT1
LVT1CT1A
SCN
SCN
LVT1 LVT1
SCN
SCN
LVT1 LVT1
CT1A
LVT1
LVT1 LVT2
SCN
LVT1
CPTB
LVT1
LVT1 CT1ALVT1
SCN
SCN
LVT1
CT1A
LVT1 LVT1
CT1A
LVT1
SCN
SCN
LVT1
CT1ALVT1
CT1A
CT1A
ELEV
EL012
BATH
215R
M
M204
M
M203
M
M215
M
M214
M
M218
M
M217
M
M231
BED
210
BATH
210R
M
M210
BED
208
M
M208
BED
214
BED
212
BATH
208R
LVT1LVT1
SCN
CT1A LVT1 LVT1
CT1A
SCN
CPTB
SCN
CPTB
CPTB CPTB
CPTB CPTB
M
M201
BED
202
BED
201
BATH
201R
CT1A
SCN
2' - 11 9/16"
LOUNGE
221B
BATH
236R
M
M232
M
M236
M
M235
BATH
232R
CPTB1 CPTB1
CPTB1 CPTB1
CPTB1
CPTB1
CPTB1
CPTB1
CPTB1
WC
201X
644TYP
644TYP
644TYP
644TYP
645645 TYP645645 TYP
645645 TYP645 TYP
644TYP
644TYP
644TYP
644TYP
644TYP
644TYP
644TYP
644TYP
645645TYP
644 644TYPTYP
644 644TYPTYP
644
TYP
644
TYP
647
TYP
647
TYP
647TYP
647
TYP
647TYP
647
TYP
647
TYP
647
TYP
647
TYP
647
TYP
647
TYP
647
TYP647
TYP
647
TYP
647
TYP
647
TYP
647
TYP
647
TYP
647
TYP
647
TYP
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
NORTH WING
A
02/23/18 100% CONSTRUCTION DOCUMENTS0
SOUTH WING
B
2/2
4/2
018 6
:04:0
7 P
M
SECOND FLOOR - FINISH
FLOOR PLAN AREA A
I-112A
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
1/8" = 1'-0"A1SECOND FLOOR - FINISH FLOOR PLAN AREA A
NORTH
0 8' 16'4'
AS INDICATED BY: #
KEY NOTES
644 MARBLE THRESHOLD TRANSITION BETWEEN BED ANDBATH PER DETAIL A1/A-701
645 FLOORING TRANSITION FROM CORRIDOR TO BED PERDETAIL A2/A-701
647 CONTINUE SCHEDULED FLOORING AND BASE UNDERVANITY
GENERAL NOTES
A. REFERENCE THE INTERIOR MATERIAL LEGEND FOR THE COLORS, PATTERNS ANDTEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIEDCOLORS THAT ARE EXPOSED TO VIEW IN THE FINISHED CONSTRUCTION. WHEN COLORIS NOT DESIGNATED FOR ITEMS, THE CONTRATOR SHALL ASK FOR A COLORSELECTION.
B. REFERENCE INTERIOR ELEVATIONS FOR CLARIFICATION OF WALL FINISHES.
ST
AT
EOF NEW
MEX
ICO
RE
GI
ST
ERED ARCH
I TE
CT
HOOKER
2828
KIM M
GENERAL FINISH NOTESFLOORS:
A. ALL VESTIBULES SHALL RECEIVE RGAF.B. ALL RESIDENCE HALL BED ROOMS SHALL RECEIVE LVT1.C. ALL RESIDENCE HALL BATH ROOMS SHALL RECEIVE CT1A.D. ALL PUBLIC REST ROOMS SHALL RECEIVE CT1A UNO.
BASE BID: SOUTH WING - ALL FLOORS SHALL RECEIVE SCN UNO.ALTERNATE: SOUTH WING FLOOR FINISHES: SCHEDULED FINISHES IN LIEU
OF SCN.
BASE:
A. ALL BASE SHALL BE RB1 U.N.O.B. ALL BATH AND PUBLIC RESTROOMS SHALL RECEIVE CT1A COVE BASE.
BASE BID @ SOUTH WING: PROVIDE SCHEDULED BASE AT ALL ROOMS.
CEILINGS:
A. ALL ACOUSTICAL CEILING SHALL BE ACT1.B. ALL DRYWALL CEILINGS SHALL BE PAINTED PT1 UNO.
STAIR
ST004a
BED
268
BED
238BED
242
BED
237
BED
241
BATH
239R
BED
240
BED
239
BED
249
BATH
252R
BED
254BED
252
BED
246
BED
248
BED
250
BED
245
BED
247
BATH
247R
BATH
243R
BED
262
BED
264
BED
263
BATH
262R
BED
265
BED
266
BATH
265R
BATH
266R
BED
261
BED
260
ACCESS BED
258
ITC
T259B
BED
244
BED
243
BED - 4
251
BED
256
BED
267
SCN
LVT1
CT1A
LVT1LVT1
CT1A
LVT1
SCN
SCN
SCN SCN
LVT1
CT1A
SCNLVT1
LVT1
CPTB
LVT1LVT1
CT1A SCN SCN
SCN
CT1A
LVT1LVT1
LVT1
CT1ASCN SCN
LVT1 LVT1
CT1A
LVT1
CPTBSCN
LVT1
CT1A
LVT1
CT1A
LVT1LVT1LVT1
CT1A
SCN
LVT1 LVT1
CT1A
SCN
LVT1 LVT1
CT1A
SCN
LVT1
LVT1
M
M256
M
M250
M
M251BATH
260R
M
M261
M
M262
M
M265
M
M266
BATH
251R
BATH
256R
CT1ACT1A
CPTB
CPTB
CPTBCPTBCPTBCPTB
M
M240
M
M239
BATH
240R
BATH
244R
M
M244
M
M243
BATH
248R
M
M248
M
M247
M
M252
E HALL
H269
M
M260
SCN
CPTB1 CPTB1
CPTB1 CPTB1
CPTB1
CPTB1
CPTB1CPTB1
CPTB1
CPTB1
CPTB1
CPTB1
CPTB1
WC
261X
644TYP
644TYP
645645 TYP 645645 TYP 645645 TYP 645 TYP
644TYP
644TYP
644TYP
644TYP
644TYP
645645
645TYP
644TYP
644
TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647 647
TYP TYP
647
TYP
647
TYP
647
TYP
647
TYP
647
TYP
647
TYP
SCN
ELEC
E259A
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
SOUTH WING
B
02/23/18 100% CONSTRUCTION DOCUMENTS0
NORTH WING
A
2/2
4/2
018 6
:04:0
9 P
M
SECOND FLOOR - FINISH
FLOOR PLAN AREA B
I-112B
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
ST
AT
EOF NEW
MEX
ICO
RE
GI
ST
ERED ARCH
I TE
CT
HOOKER
2828
KIM M
1/8" = 1'-0"A1SECOND FLOOR - FINISH FLOOR PLAN AREA B
NORTH0 8' 16'4'
AS INDICATED BY: #
KEY NOTES
644 MARBLE THRESHOLD TRANSITION BETWEEN BED ANDBATH PER DETAIL A1/A-701
645 FLOORING TRANSITION FROM CORRIDOR TO BED PERDETAIL A2/A-701
647 CONTINUE SCHEDULED FLOORING AND BASE UNDERVANITY
GENERAL NOTES
A. REFERENCE THE INTERIOR MATERIAL LEGEND FOR THE COLORS, PATTERNS ANDTEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIEDCOLORS THAT ARE EXPOSED TO VIEW IN THE FINISHED CONSTRUCTION. WHEN COLORIS NOT DESIGNATED FOR ITEMS, THE CONTRATOR SHALL ASK FOR A COLORSELECTION.
B. REFERENCE INTERIOR ELEVATIONS FOR CLARIFICATION OF WALL FINISHES.
GENERAL FINISH NOTESFLOORS:
A. ALL VESTIBULES SHALL RECEIVE RGAF.B. ALL RESIDENCE HALL BED ROOMS SHALL RECEIVE LVT1.C. ALL RESIDENCE HALL BATH ROOMS SHALL RECEIVE CT1A.D. ALL PUBLIC REST ROOMS SHALL RECEIVE CT1A UNO.
BASE BID: SOUTH WING - ALL FLOORS SHALL RECEIVE SCN UNO.ALTERNATE: SOUTH WING FLOOR FINISHES: SCHEDULED FINISHES IN LIEU
OF SCN.
BASE:
A. ALL BASE SHALL BE RB1 U.N.O.B. ALL BATH AND PUBLIC RESTROOMS SHALL RECEIVE CT1A COVE BASE.
BASE BID @ SOUTH WING: PROVIDE SCHEDULED BASE AT ALL ROOMS.
CEILINGS:
A. ALL ACOUSTICAL CEILING SHALL BE ACT1.B. ALL DRYWALL CEILINGS SHALL BE PAINTED PT1 UNO.
DDW W WUP
LOUNGE-N
321C
LOBBY
H321
BED
319
KITCHEN
321A
BED
338
BED
336 BATH
336R
BATH
332R
BED
334
BED
337BED
335
BATH
335R
BATH
331R
BED
333
BED
340
BED
339
BATH
320C
BED
318
BATH
315R
BATH
303R
BED
305
BATH
304R
BATH
314R
BED
316
HK
J309
ITC
T307
BED
306
LAUNDRY
LOUNGE
300
LVT1 LVT1
CT1A
LVT1
SCN
LVT1
SCN
SCN
LVT1 LVT1
CT1A
LVT1
SCN
LVT1
LVT1
CT1A
LVT1
LVT1
LVT1
LVT1LVT1
CT1A SCN SCN CT1A
LVT1
CT1A
LVT1
SCN
SCN
CT1ALVT1
LVT1
CPTC
SCN
CT1A
LVT1 LVT1
LVT1
CT1A
LVT1 LVT1
LVT1
SCN
LVT1
SCN
SCN
LVT1
BED-3
315
M
M315
BED
317
BED
320
N HALL
H357
STUDY
LOUNGE
322
STAIR
ST001b
ELEV
EL012
STAIR
ST002b
BED
304
BED
303
BED
332
BED
331
BATH
317R
M
M304
M
M303
M
M318
M
M317
M
M332
M
M331
M
M335
M
M336
N HALL
H313A
BED
310
M
M310
BED
308
M
M308
BED
312
BATH
308R
BED
314
M
M314
W HALL
H313
CT1A SCN
CPTC
SCN
LVT1
CT1A
CT1A
SCN
CPTD
SCN
CPTCCPTC
CPTCCPTC
CPTC
LOUNGE
321B
CPTC1 CPTC1
CPTC1 CPTC1
CPTC1
CPTC1
CPTC1
CPTC1
CPTC1
645645
645645
645645
644 644TYP TYP
644
644 644TYPTYP
TYP
644TYP
644TYP
644TYP
644TYP
644TYP
644TYP
647
TYP
647TYP
647
TYP
647TYP
647
TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647
TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
NORTH WING
A
02/23/18 100% CONSTRUCTION DOCUMENTS0
SOUTH WING
B
2/2
4/2
018 6
:04:1
4 P
M
THIRD FLOOR - FINISH
FLOOR PLAN AREA A
I-113A
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
1/8" = 1'-0"A1THIRD FLOOR - FINISH FLOOR PLAN AREA A
NORTH0 8' 16'4'
AS INDICATED BY: #
KEY NOTES
644 MARBLE THRESHOLD TRANSITION BETWEEN BED ANDBATH PER DETAIL A1/A-701
645 FLOORING TRANSITION FROM CORRIDOR TO BED PERDETAIL A2/A-701
647 CONTINUE SCHEDULED FLOORING AND BASE UNDERVANITY
GENERAL NOTES
A. REFERENCE THE INTERIOR MATERIAL LEGEND FOR THE COLORS, PATTERNS ANDTEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIEDCOLORS THAT ARE EXPOSED TO VIEW IN THE FINISHED CONSTRUCTION. WHEN COLORIS NOT DESIGNATED FOR ITEMS, THE CONTRATOR SHALL ASK FOR A COLORSELECTION.
B. REFERENCE INTERIOR ELEVATIONS FOR CLARIFICATION OF WALL FINISHES.
ST
AT
EOF NEW
MEX
ICO
RE
GI
ST
ERED ARCH
I TE
CT
HOOKER
2828
KIM M
GENERAL FINISH NOTESFLOORS:
A. ALL VESTIBULES SHALL RECEIVE RGAF.B. ALL RESIDENCE HALL BED ROOMS SHALL RECEIVE LVT1.C. ALL RESIDENCE HALL BATH ROOMS SHALL RECEIVE CT1A.D. ALL PUBLIC REST ROOMS SHALL RECEIVE CT1A UNO.
BASE BID: SOUTH WING - ALL FLOORS SHALL RECEIVE SCN UNO.ALTERNATE: SOUTH WING FLOOR FINISHES: SCHEDULED FINISHES IN LIEU
OF SCN.
BASE:
A. ALL BASE SHALL BE RB1 U.N.O.B. ALL BATH AND PUBLIC RESTROOMS SHALL RECEIVE CT1A COVE BASE.
BASE BID @ SOUTH WING: PROVIDE SCHEDULED BASE AT ALL ROOMS.
CEILINGS:
A. ALL ACOUSTICAL CEILING SHALL BE ACT1.B. ALL DRYWALL CEILINGS SHALL BE PAINTED PT1 UNO.
UP STAIR
ST004b
BED
368
BED
338BED
342
BATH
340R
BED
337
BED
341
BATH
339R
BED
340
BED
339
BED
349
BATH
352R
BED
354
BED
352
BED
346
BED
348
BED
350BATH
348R
BED
345
BED
347
BATH
347R
BATH
344R
BATH
343R
BED
362
BED
364
BED
363
BATH
361R
BATH
362R
BED
365
BED
366
BATH
365R
BATH
366R
BED
361
BED
360
ACCESS BED
358
ELEC
E359A
E HALL
H369
BED
367
BED
356
BED-4
351BED
343
BED
344
BATH
360R
M
M365
M
M366
M
M361
M
M362
M
M356
M
M351
M
M352
M
M348
M
M347
M
M343
M
M348
M
M340
M
M339
BATH
356R
BATH
351R
CPTC
SCN
LVT1LVT1
LVT1 SCN SCN CT1A
LVT1LVT1
LVT1LVT1
CT1A SCN
CPTC
SCN CT1A
LVT1LVT1
LVT1
LVT1CT1A
SCN
CT1A
LVT1LVT1
SCN
CT1A
LVT1
CPTC
CT1A
SCN
LVT1LVT1
LVT1
CT1A
SCN
SCN
CPTCCPTC
SCN
SCN
CT1A
LVT1 LVT1
CT1A
LVT1 LVT1
CT1A
LVT1
SCN
SCN
CT1A
LVT1 LVT1 LVT1
CT1A
LVT1 LVT1
CPTC CPTC
CT1A
M
M360
SCN
CPTC1 CPTC1
CPTC1 CPTC1
CPTC1
CPTC1
CPTC1
CPTC1
CPTC1
CPTC1
CPTC1
CPTC1
CPTC1
644
644
TYP
TYP
644
644
TYP
TYP
645645 TYP 645645 TYP 645 TYP
645645
TYP
644 644TYP TYP
644 644TYP TYP
644TYP
644TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647TYP
647 647
TYP TYP
647
TYP
647
TYP
647TYP
647TYP
647TYP
647TYP
SCN
ITC
T359B
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
SOUTH WING
B
02/23/18 100% CONSTRUCTION DOCUMENTS0
NORTH WING
A
2/2
4/2
018 6
:04:1
6 P
M
THIRD FLOOR - FINISH
FLOOR PLAN AREA B
I-113B
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
ST
AT
EOF NEW
MEX
ICO
RE
GI
ST
ERED ARCH
I TE
CT
HOOKER
2828
KIM M
1/8" = 1'-0"A1THIRD FLOOR - FINISH FLOOR PLAN AREA B
NORTH
0 8' 16'4'
AS INDICATED BY: #
KEY NOTES
644 MARBLE THRESHOLD TRANSITION BETWEEN BED ANDBATH PER DETAIL A1/A-701
645 FLOORING TRANSITION FROM CORRIDOR TO BED PERDETAIL A2/A-701
647 CONTINUE SCHEDULED FLOORING AND BASE UNDERVANITY
GENERAL NOTES
A. REFERENCE THE INTERIOR MATERIAL LEGEND FOR THE COLORS, PATTERNS ANDTEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIEDCOLORS THAT ARE EXPOSED TO VIEW IN THE FINISHED CONSTRUCTION. WHEN COLORIS NOT DESIGNATED FOR ITEMS, THE CONTRATOR SHALL ASK FOR A COLORSELECTION.
B. REFERENCE INTERIOR ELEVATIONS FOR CLARIFICATION OF WALL FINISHES.
GENERAL FINISH NOTESFLOORS:
A. ALL VESTIBULES SHALL RECEIVE RGAF.B. ALL RESIDENCE HALL BED ROOMS SHALL RECEIVE LVT1.C. ALL RESIDENCE HALL BATH ROOMS SHALL RECEIVE CT1A.D. ALL PUBLIC REST ROOMS SHALL RECEIVE CT1A UNO.
BASE BID: SOUTH WING - ALL FLOORS SHALL RECEIVE SCN UNO.ALTERNATE: SOUTH WING FLOOR FINISHES: SCHEDULED FINISHES IN LIEU
OF SCN.
BASE:
A. ALL BASE SHALL BE RB1 U.N.O.B. ALL BATH AND PUBLIC RESTROOMS SHALL RECEIVE CT1A COVE BASE.
BASE BID @ SOUTH WING: PROVIDE SCHEDULED BASE AT ALL ROOMS.
CEILINGS:
A. ALL ACOUSTICAL CEILING SHALL BE ACT1.B. ALL DRYWALL CEILINGS SHALL BE PAINTED PT1 UNO.
UP
CG CG
CG
CG
CG
CG
CG
CG
CG CG
CG CG
CG
CG
CG CG
CG
CG
CG
CG
CG CG
CG
CG
CG
CG
CG
CG
CG CG
CG
CG
CG
CG
CG
CG
UP
UP
ELEV
EL012
KITCHEN
M
LOUNGE
M
W
HK
J109
ITC
T107
BIKE STORAGE
102
BED
104
BED
103
BATH
103R
BED
105
BATH
104R
BED
114
BATH
114R
BED
116
BED
132
BED
138
STAIR
ST001
STAIR
ST002
BATH
120R
BED
136 BATH
136RBATH
132R
BED
118BED
120
BED
134
BED
106
BED
115
BATH
117R
BED
119
BED
117
N HALL
H113A
NORTH
LOBBY
H121
BED
131BED
137
BED
135
BATH
135R
BATH
131RBED
133
BED
140
BED
139
OUTDOOR E/W
PASSAGE
H100
VEST
H111
BED1
101A
BED2
101B
BATH
101C
W/D
101D CL
101HCL
101F
M
M112
M
M103
M
M114M
M118
M
M117
VEST
H122
VEST
H123
PT1PT1PT1A
PT1
PT1
PT1PT1PT1A
PT1
PT1
PT1
PT1
PT1A
PT1
PT1
PT1
PT1A
PT1PT1
PT1A
PT1
PT1 PT1
PT1
PT1
PT1
PT1
PT1 PT1 PT1A
PT1 PT1
PT1A PT1 PT1PT1A
PT1PT1
PT1
PT1
PT1
PT1
PT1
PT1A
PT1
PT1
PT1
CT2A
PT1 PT1
PT1A
PT1
PT1
PT1 PT1A
PT1
PT1
PT1
PT1
PT1
PT1
PT1A
PT1A
PT1
BATH
115R
M
M115
M
M131
M
M132
M
M135
M
M136
BED
110
BATH
110R
M
M110
BED
108
M
M108
BED
112
W HALL
H113
BATH
108R
PT1A
PT1
PT1
PT1
PT1A
664 664
664
664
664
664 664 664
664
664
664 664 664 664
664664664664664
664
664664664664664664
664
664
664
PT5
P6 PT2
PT2 PT5PT1 PT1
PT1PT1
PTD
LOUNGE
121B
LOUNGE
121C
RESIDENT
DIRECTOR APT
101
664
RWS1RWS1 RWS1
RWS1
RWS1
RWS1
RWS1RWS1RWS1
RWS1
RWS1
RWS1
RWS1
664 RWS1
664
664
RWS1
664RWS1
664
RWS1
664
RWS1
664
RWS1
664
RWS1
664
RWS1664
RWS1
RWS1A
RWS1
664
RWS1
664
RWS1RWS1 RWS1 RWS1
RWS1 RWS1 RWS1 RWS1RWS1A
RWS1A
664
RWS1A
664RWS1A
RWS1RWS1RWS1RWS1RWS1
664
RWS1A
RWS1A
664 RWS1A
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
NORTH WING
A
02/23/18 100% CONSTRUCTION DOCUMENTS0
SOUTH WING
B
2/2
4/2
018 6
:04:2
3 P
M
FIRST FLOOR - FINISH
WALL PLAN AREA A
I-121A
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
AS INDICATED BY: #
KEY NOTES
NORTH
664 ROLLER WINDOW SHADES
THIS DOCUMENT IS RELEASEDON XX-XX-XXXX FOR THEPURPOSE OF INTERIM REVIEWUNDER THE AUTHORITY OFXXXXXXXXXXXXXXX LICENSE#XXXXX. IT IS NOT TO BE USEDFOR REGULATORY APPROVAL,CONSTRUCTION, BIDDING ORPERMIT PURPOSES.
INTERIOR
1/8" = 1'-0"A1FIRST FLOOR - FINISH WALL PLAN AREA A
0 8' 16'4'
GENERAL NOTES
A. REFERENCE THE INTERIOR MATERIAL LEGEND FOR THE COLORS, PATTERNS ANDTEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIEDCOLORS THAT ARE EXPOSED TO VIEW IN THE FINISHED CONSTRUCTION. WHEN COLORIS NOT DESIGNATED FOR ITEMS, THE CONTRATOR SHALL ASK FOR A COLORSELECTION.
B. REFERENCE INTERIOR ELEVATIONS FOR CLARIFICATION OF WALL FINISHES.
GENERAL FINISH NOTESFLOORS:
A. ALL VESTIBULES SHALL RECEIVE RGAF.B. ALL RESIDENCE HALL BED ROOMS SHALL RECEIVE LVT1.C. ALL RESIDENCE HALL BATH ROOMS SHALL RECEIVE CT1A.D. ALL PUBLIC REST ROOMS SHALL RECEIVE CT1A UNO.
BASE BID: SOUTH WING - ALL FLOORS SHALL RECEIVE SCN UNO.ALTERNATE: SOUTH WING FLOOR FINISHES: SCHEDULED FINISHES IN LIEU
OF SCN.
BASE:
A. ALL BASE SHALL BE RB1 U.N.O.B. ALL BATH AND PUBLIC RESTROOMS SHALL RECEIVE CT1A COVE BASE.
BASE BID @ SOUTH WING: PROVIDE SCHEDULED BASE AT ALL ROOMS.
CEILINGS:
A. ALL ACOUSTICAL CEILING SHALL BE ACT1.B. ALL DRYWALL CEILINGS SHALL BE PAINTED PT1 UNO.
CG CG
CGCG
CG CG CG CGCG CG CG CG
CGCGCG CGCGCGCG CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CGCG CG CG
CG CG CG
CG
CG
CG
UP
CORRIDOR
H182
CLASSROOM B
185
ITC
T159B
BATH
151R
BED
160
BED
138BED
142BATH
140R
BED
144
BED
143
BED
149
BATH
152R
BED
154
BED
158
BED
162
BED
164
BED
163
BATH
161RBATH
162R
BED
165
BED
166
BED
167
BED
168
BATH
165R
BATH
166R
BED
152
BED
161
STORAGE
184A
N HALL
H157
BATH
156RBED
156
BED
146
BED
148
BED
150BATH
148R
OFFICE
189
RA
STORAGE
190
FRONT DESK
180B
BED
137
BED
141
BATH
139R
BED
145
BED
147
BATH
147R
BED
140
BED
139
BATH
144R
BATH
143R
M
R187
W
R188
BED
151
VEST
H170
STAIR
ST004
E HALL
H169
PT1PT1APT1
PT1
PT1A
PT1
PT1
PT1A
PT1
PT1
PT1
PT1A
PT1PT1
PT1
PT1
PT1 PT1
PT1
PT1
PT1
PT1
PT1 PT1 PT1
PT1
PT1A PT1 PT1
PT1
PT1
PT1A PT1 PT1
PT1
PT1
PT1A
PT1PT1PT1A
PT1
PT1PT1PT1A
PT1
PT1
PT1PT1A PT1 PT1
PT1
PT1
PT1
PT1 PT1
PT1A
PT1 PT1
PT1A
PT1 PT1
PT1A
PT1 PT1
PT1A
PT1
PT1 PT1
PT1
M
M140
M
M139
M
M144
M
M143
M
M147
M
150D
M
M156
BATH
160R
M
M161
M
M162
M
M152
CLASSROOM A
184
M
M165
M
M166
M
M151
PT1
664 664 664 664 664 664 664 664
664
664
664
664 664
664
664
664
664
664
664664664664664664664664664664
664664
664664664664664664664
PT1 PT1 PT1 PT1
PT1
PT1
PT2 PT5 PT2PT5
PT5
PT2
FIRE RISER &
ELEC
M184B
STORAGE
185A
M
M160
HK
J186
VENDING
180A
LOUNGE
180C
SOUTH
LOBBY
H180
VESTIBULE
H183
PT1
PT1
PT1A
PT1APT1
PT1
PT5
664
664
664
RWS1
664 664 664
664 664 664 664 664
RWS2 RWS2 RWS2 RWS2 RWS2
RWS2 RWS2 RWS2
RWS1A
RWS1A RWS1A RWS1A RWS1A RWS1A RWS1A
RWS1A
RWS1A
RWS1A
RWS1A
RWS1 RWS1 RWS1
664
RWS1
664
RWS1
664
RWS1
664
RWS1
664
RWS1 RWS1RWS1RWS1RWS1RWS1RWS1
RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1
RWS1
RWS1
RWS1
RWS1
664RWS1
664RWS1
664
RWS1
664
RWS1
664
RWS1
664
664
664
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1A
ELEC
E159A
PT1
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
SOUTH WING
B
02/23/18 100% CONSTRUCTION DOCUMENTS0
NORTH WING
A
2/2
4/2
018 6
:04:2
5 P
M
FIRST FLOOR - FINISH
WALL PLAN AREA B
I-121B
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
ST
AT
EOF NEW
MEX
ICO
RE
GI
ST
ERED ARCHI T
EC
T
HOOKER
2828
KIM M
1/8" = 1'-0"A1FIRST FLOOR - FINISH WALL PLAN AREA B
NORTH0 8' 16'4'
AS INDICATED BY: #
KEY NOTES
664 ROLLER WINDOW SHADES
GENERAL NOTES
A. REFERENCE THE INTERIOR MATERIAL LEGEND FOR THE COLORS, PATTERNS ANDTEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIEDCOLORS THAT ARE EXPOSED TO VIEW IN THE FINISHED CONSTRUCTION. WHEN COLORIS NOT DESIGNATED FOR ITEMS, THE CONTRATOR SHALL ASK FOR A COLORSELECTION.
B. REFERENCE INTERIOR ELEVATIONS FOR CLARIFICATION OF WALL FINISHES.
GENERAL FINISH NOTESFLOORS:
A. ALL VESTIBULES SHALL RECEIVE RGAF.B. ALL RESIDENCE HALL BED ROOMS SHALL RECEIVE LVT1.C. ALL RESIDENCE HALL BATH ROOMS SHALL RECEIVE CT1A.D. ALL PUBLIC REST ROOMS SHALL RECEIVE CT1A UNO.
BASE BID: SOUTH WING - ALL FLOORS SHALL RECEIVE SCN UNO.ALTERNATE: SOUTH WING FLOOR FINISHES: SCHEDULED FINISHES IN LIEU
OF SCN.
BASE:
A. ALL BASE SHALL BE RB1 U.N.O.B. ALL BATH AND PUBLIC RESTROOMS SHALL RECEIVE CT1A COVE BASE.
BASE BID @ SOUTH WING: PROVIDE SCHEDULED BASE AT ALL ROOMS.
CEILINGS:
A. ALL ACOUSTICAL CEILING SHALL BE ACT1.B. ALL DRYWALL CEILINGS SHALL BE PAINTED PT1 UNO.
DW DDDDW W W W
CG CG
CG
CG
CG
CG
CG
CG CG
CG CG
CG
CG
CG CG
CG
CG
CG
CG CG
CG
CG CG
CG CG
CG
CG
CG
CG
CG
CG
CG CG
CGCG
UP
CG
CGCG
STUDY
LOUNGE
222
STAIR
ST001a
LOUNGE
221A
STAIR
ST002a
BED
238
BED
236
BED
234
BED
237
BED
235
BATH
235R
BATH
231R
BED
233
BED
240
BED
239
ITC
T207
BED
204
BED
203
BATH
203R
BED
205
BATH
204R
BATH
214R
BED
216
HK
J209
BATH
218R
BED
218
BED
206
BED-3
215
BATH
217RBED
217
LAUNDRY
LOUNGE
200
W HALL
H213
BED
220
BED
219
BED
232
BED
231
LOBBY 2
H221
N HALL
H257
N HALL
H213A
ELEV
EL012
BATH
215R
M
M204
M
M203
M
M215
M
M214
M
M218
M
M217
M
M231
BED
210
BATH
210R
M
M210
BED
208
M
M208
BED
214
BED
212
BATH
208R
PT1PT1
PT1A
PT1
PT1PT1
PT1
PT1 PT1
PT1A PT1 PT1 PT1A
PT1 PT1
PT1 PT1
PT1
PT1APT1
PT1
PT1 PT1APT1
PT1A
PT1
PT1
PT1A
PT1
PT1 PT1
PT1
PT1A
PT1
PT1
PT1
PT1A
PT1
PT1
PT1
PT1
PT1
PT1PT1 PT1
PT1
PT1A
PT1
PT1A
PT1
PT1A
PT1
PT1
PT1A
PT1
PT1
PT1
PT1PT1
664 664 664 664
664664664664664 664
664
664
664664664664664664
664
664
664 664
664
664 664 664
664
664
664
PT5
PT3PT5
PT3 PT5PT1 PT1
PT1PT1
PT1
PT1A
M
M201
BED
202
BED
201
BATH
201R
WC
201X
LOUNGE
221B
BATH
236R
M
M232
M
M236
M
M235
BATH
232R
PT5
664
664
RWS1A
RWS1
RWS1A
RWS1A
RWS1A
RWS1A
RWS1
RWS1A
RWS1A
RWS1A RWS1ARWS1A
664
RWS1
664
RWS1
664
RWS1 RWS1 RWS1 RWS1
664 664
RWS1 RWS1 RWS1 RWS1 RWS1
664664664
RWS1RWS1RWS1RWS1RWS1RWS1RWS1RWS1RWS1
664
664
RWS1
RWS1
RWS1
RWS1
RWS1
664
RWS1
RWS1
RWS1
664
RWS1RWS1RWS1
664 664
664
RWS1 RWS1
RWS1
664664664 RWS1A
664
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
NORTH WING
A
02/23/18 100% CONSTRUCTION DOCUMENTS0
SOUTH WING
B
2/2
4/2
018 6
:04:3
2 P
M
SECOND FLOOR - FINISH
WALL PLAN AREA A
I-122A
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
AS INDICATED BY: #
KEY NOTES
664 ROLLER WINDOW SHADES
THIS DOCUMENT IS RELEASEDON XX-XX-XXXX FOR THEPURPOSE OF INTERIM REVIEWUNDER THE AUTHORITY OFXXXXXXXXXXXXXXX LICENSE#XXXXX. IT IS NOT TO BE USEDFOR REGULATORY APPROVAL,CONSTRUCTION, BIDDING ORPERMIT PURPOSES.
INTERIOR
1/8" = 1'-0"A1SECOND FLOOR - FINISH WALL PLAN AREA A
NORTH
0 8' 16'4'
GENERAL NOTES
A. REFERENCE THE INTERIOR MATERIAL LEGEND FOR THE COLORS, PATTERNS ANDTEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIEDCOLORS THAT ARE EXPOSED TO VIEW IN THE FINISHED CONSTRUCTION. WHEN COLORIS NOT DESIGNATED FOR ITEMS, THE CONTRATOR SHALL ASK FOR A COLORSELECTION.
B. REFERENCE INTERIOR ELEVATIONS FOR CLARIFICATION OF WALL FINISHES.
GENERAL FINISH NOTESFLOORS:
A. ALL VESTIBULES SHALL RECEIVE RGAF.B. ALL RESIDENCE HALL BED ROOMS SHALL RECEIVE LVT1.C. ALL RESIDENCE HALL BATH ROOMS SHALL RECEIVE CT1A.D. ALL PUBLIC REST ROOMS SHALL RECEIVE CT1A UNO.
BASE BID: SOUTH WING - ALL FLOORS SHALL RECEIVE SCN UNO.ALTERNATE: SOUTH WING FLOOR FINISHES: SCHEDULED FINISHES IN LIEU
OF SCN.
BASE:
A. ALL BASE SHALL BE RB1 U.N.O.B. ALL BATH AND PUBLIC RESTROOMS SHALL RECEIVE CT1A COVE BASE.
BASE BID @ SOUTH WING: PROVIDE SCHEDULED BASE AT ALL ROOMS.
CEILINGS:
A. ALL ACOUSTICAL CEILING SHALL BE ACT1.B. ALL DRYWALL CEILINGS SHALL BE PAINTED PT1 UNO.
CG CG
CGCG
CG CG
CGCG
CG CG CG CGCG CG CG CG
CGCGCG CGCGCGCG CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CGCG
CG
CG
UP
UPSTAIR
ST004a
BED
268
BED
238
BED
242
BED
237
BED
241
BATH
239R
BED
240
BED
239
BED
249
BATH
252R
BED
254
BED
252
BED
246
BED
248
BED
250
BED
245
BED
247
BATH
247RBATH
243R
BED
262
BED
264
BED
263
BATH
261R
BATH
262R
BED
265
BED
266
BATH
265R
BATH
266R
BED
261
BED
260
ACCESS BED
258
ITC
T259B
BED
244
BED
243
BED - 4
251
BED
256
BED
267
M
M256
M
M250
M
M251BATH
260R
M
M261
M
M262
M
M265
M
M266
BATH
251R
BATH
256R
PT1 PT1
PT1PT1
PT1A PT1 PT1 PT1A
PT1PT1
PT1 PT1
PT1A PT1 PT1 PT1A
PT1 PT1
PT5
PT1
PT1
PT1APT1A
PT1
PT1PT1A
PT1
PT1PT1
PT1A
PT1
PT1PT1
PT1A
PT1
PT1PT1
PT1A
PT1
PT1PT1
PT1A
PT1
PT1
PT1
PT1A
PT1
PT1 PT1
PT1
PT1A
PT1 PT1
PT1
PT1A
PT1 PT1
PT1
664
664
664
664
664
664664
664
664
664664
664664664664664664664
664664664664664664664664664664
PT3PT5 PT5 PT3
PT3
PT1
PT1
PT1PT1PT1PT1
M
M240
M
M239
BATH
240R
BATH
244R
M
M244
M
M243
BATH
248R
M
M248
M
M247
M
M252
E HALL
H269
M
M260
PT1
PT5
664
664 664 664 664 664
RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1
664 664 664
RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1
664
664
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1A
664
664
664
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
664
RWS1
ELEC
E259A
PT1
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
SOUTH WING
B
02/23/18 100% CONSTRUCTION DOCUMENTS0
NORTH WING
A
2/2
4/2
018 6
:04:3
4 P
M
SECOND FLOOR - FINISH
WALL PLAN AREA B
I-122B
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
ST
AT
EOF NEW
MEX
ICO
RE
GI
ST
ERED ARCH
I TE
CT
HOOKER
2828
KIM M
1/8" = 1'-0"A1SECOND FLOOR - FINISH WALL PLAN AREA B
NORTH0 8' 16'4'
AS INDICATED BY: #
KEY NOTES
664 ROLLER WINDOW SHADES
GENERAL NOTES
A. REFERENCE THE INTERIOR MATERIAL LEGEND FOR THE COLORS, PATTERNS ANDTEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIEDCOLORS THAT ARE EXPOSED TO VIEW IN THE FINISHED CONSTRUCTION. WHEN COLORIS NOT DESIGNATED FOR ITEMS, THE CONTRATOR SHALL ASK FOR A COLORSELECTION.
B. REFERENCE INTERIOR ELEVATIONS FOR CLARIFICATION OF WALL FINISHES.
GENERAL FINISH NOTESFLOORS:
A. ALL VESTIBULES SHALL RECEIVE RGAF.B. ALL RESIDENCE HALL BED ROOMS SHALL RECEIVE LVT1.C. ALL RESIDENCE HALL BATH ROOMS SHALL RECEIVE CT1A.D. ALL PUBLIC REST ROOMS SHALL RECEIVE CT1A UNO.
BASE BID: SOUTH WING - ALL FLOORS SHALL RECEIVE SCN UNO.ALTERNATE: SOUTH WING FLOOR FINISHES: SCHEDULED FINISHES IN LIEU
OF SCN.
BASE:
A. ALL BASE SHALL BE RB1 U.N.O.B. ALL BATH AND PUBLIC RESTROOMS SHALL RECEIVE CT1A COVE BASE.
BASE BID @ SOUTH WING: PROVIDE SCHEDULED BASE AT ALL ROOMS.
CEILINGS:
A. ALL ACOUSTICAL CEILING SHALL BE ACT1.B. ALL DRYWALL CEILINGS SHALL BE PAINTED PT1 UNO.
DDW W W
CG
CG
CG CG
CG
CG
CG
CG
CG
CG
CG CG
CG CG
CG
CG
CG CG
CG
CG
CG
CG
CG CG
CG
CG
CG
CG
CG CG
CG
CG
CG
CG
CG
CG
CG CG
CGCG
CG
UP
LOUNGE-N
321C
LOBBY
H321
BED
319
KITCHEN
321A
BED
338
BED
336
BATH
336R
BATH
332R
BED
334
BED
337
BED
335
BATH
335R
BATH
331R
BED
333
BED
340
BED
339
BATH
320C
BED
318
BATH
315R
BATH
303R
BED
305
BATH
304R
BATH
314R
BED
316
HK
J309
ITC
T307
BED
306
LAUNDRY
LOUNGE
300
BED-3
315
M
M315
BED
317
BED
320
N HALL
H357
STUDY
LOUNGE
322
PT1PT1PT1
PT1A
PT1
PT1
PT1 PT1
PT1A
PT1
PT1
PT1 PT1
PT1A
PT1
PT1A
PT1 PT1PT1
PT1
PT1
PT1
PT1
PT1A
PT1
PT1PT1
PT1A
PT1
PT1
PT1 PT1
PT1A
PT1
PT1
PT1
PT1A
PT1
PT1
PT1
PT1
PT1 PT1
PT5
PT1A PT1 PT1 PT1A
PT1
PT1
PT1 PT1
PT4
STAIR
ST001b
ELEV
EL012
STAIR
ST002b
BED
304
BED
303
BED
332
BED
331
BATH
317R
M
M304
M
M303
M
M318
M
M317
M
M332
M
M331
M
M335
M
M336
N HALL
H313A
BED
310
M
M310
BED
308
M
M308
BED
312
BATH
308R
BED
314
M
M314
W HALL
H313
PT1A
PT1A
PT1
PT1
PT1
664
664
664 664 664
664664664664664664
664
664
664
664 664 664 664
664664664664664664
664
664
664
664
664
PT4 PT5
PT5
PT1PT1
PT1
PT1
PT1
PT5
664
664 664 664
RWS1A RWS1A RWS1A RWS1 RWS1 RWS1 RWS1 RWS1 RWS1
RWS1A
RWS1A
664664664
RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1
664
664
RWS1
RWS1
RWS1
RWS1
RWS1
664
664
RWS1
RWS1
RWS1
RWS1 RWS1 RWS1 RWS1
RWS1A
RWS1A
RWS1A
RWS1A
RWS1 RWS1 RWS1 RWS1
664664
RWS1 RWS1
664
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
NORTH WING
A
02/23/18 100% CONSTRUCTION DOCUMENTS0
SOUTH WING
B
2/2
4/2
018 6
:04:4
1 P
M
THIRD FLOOR - FINISH
WALL PLAN AREA A
I-123A
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
ST
AT
EOF NEW
MEX
ICO
RE
GI
ST
ERED ARCH
I TE
CT
HOOKER
2828
KIM M
1/8" = 1'-0"A1THIRD FLOOR - FINISH WALL PLAN AREA A
NORTH0 8' 16'4'
AS INDICATED BY: #
KEY NOTES
664 ROLLER WINDOW SHADES
GENERAL NOTES
A. REFERENCE THE INTERIOR MATERIAL LEGEND FOR THE COLORS, PATTERNS ANDTEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIEDCOLORS THAT ARE EXPOSED TO VIEW IN THE FINISHED CONSTRUCTION. WHEN COLORIS NOT DESIGNATED FOR ITEMS, THE CONTRATOR SHALL ASK FOR A COLORSELECTION.
B. REFERENCE INTERIOR ELEVATIONS FOR CLARIFICATION OF WALL FINISHES.
GENERAL FINISH NOTESFLOORS:
A. ALL VESTIBULES SHALL RECEIVE RGAF.B. ALL RESIDENCE HALL BED ROOMS SHALL RECEIVE LVT1.C. ALL RESIDENCE HALL BATH ROOMS SHALL RECEIVE CT1A.D. ALL PUBLIC REST ROOMS SHALL RECEIVE CT1A UNO.
BASE BID: SOUTH WING - ALL FLOORS SHALL RECEIVE SCN UNO.ALTERNATE: SOUTH WING FLOOR FINISHES: SCHEDULED FINISHES IN LIEU
OF SCN.
BASE:
A. ALL BASE SHALL BE RB1 U.N.O.B. ALL BATH AND PUBLIC RESTROOMS SHALL RECEIVE CT1A COVE BASE.
BASE BID @ SOUTH WING: PROVIDE SCHEDULED BASE AT ALL ROOMS.
CEILINGS:
A. ALL ACOUSTICAL CEILING SHALL BE ACT1.B. ALL DRYWALL CEILINGS SHALL BE PAINTED PT1 UNO.
CG CG
CGCG
CG CG
CGCG
CG CG CG CGCG CG CG CG
CGCGCG CGCGCGCG CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
UPSTAIR
ST004b
BED
368
BED
338BED
342BATH
340R
BED
337
BED
341
BATH
339R
BED
340
BED
339
BED
349
BATH
352R
BED
354
BED
352
BED
346
BED
348BED
350BATH
348R
BED
345BED
347
BATH
347R
BATH
344R
BATH
343R
BED
362
BED
364
BED
363
BATH
361R
BATH
362R
BED
365
BED
366
BATH
365R
BATH
366R
BED
361
BED
360
ACCESS BED
358
ELEC
E359A
E HALL
H369
BED
367
BED
356
BED-4
351
BED
343
BED
344
BATH
360R
M
M365M
M366
M
M361
M
M362
M
M356
M
M351
M
M352
M
M348
M
M347M
M343
M
M348
M
M340
M
M339
BATH
356R
BATH
351R
PT1
PT1A
PT1
PT1 PT1PT1A
PT1
PT1 PT1 PT1A
PT1
PT1
PT1
PT1PT1
PT1A
PT1
PT5
PT1
PT1A PT1 PT1 PT1A
PT1
PT1
PT1 PT1
PT1PT1
PT1APT1 PT1 PT1A
PT1 PT1
PT1 PT1
PT1PT1
PT1A
PT1
PT1PT1
PT1A
PT1
PT1PT1PT1
PT1
PT1
PT1A
PT1 PT1 PT1
PT1A
PT1
PT1
PT1A
664
664
664
664
664
664
664
664
664
664664
664664664664664664664
664 664 664 664 664 664 664 664 664 664
PT4 PT5 PT4
PT4
PT5 PT1 PT1PT1 PT1
PT1
PT1
PT5
664
664 664 664 664 664
RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1 RWS1
664
664
664
RWS1 RWS1 RWS1 RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
664
664
664 664
664
RWS1 RWS1 RWS1 RWS1 RWS1RWS1 RWS1 RWS1 RWS1 RWS1
664
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1
RWS1A
RWS1A
664
PT1
ITC
T359B
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
SOUTH WING
B
02/23/18 100% CONSTRUCTION DOCUMENTS0
NORTH WING
A
2/2
4/2
018 6
:04:4
2 P
M
THIRD FLOOR - FINISH
WALL PLAN AREA B
I-123B
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
ST
AT
EOF NEW
MEX
ICO
RE
GI
ST
ERED ARCH
I TE
CT
HOOKER
2828
KIM M
1/8" = 1'-0"A1THIRD FLOOR - FINISH WALL PLAN AREA B
NORTH0 8' 16'4'
AS INDICATED BY: #
KEY NOTES
664 ROLLER WINDOW SHADES
GENERAL NOTES
A. REFERENCE THE INTERIOR MATERIAL LEGEND FOR THE COLORS, PATTERNS ANDTEXTURES REQUIRED FOR INTERIOR FINISHES, INCLUDING BOTH FACTORY APPLIEDCOLORS THAT ARE EXPOSED TO VIEW IN THE FINISHED CONSTRUCTION. WHEN COLORIS NOT DESIGNATED FOR ITEMS, THE CONTRATOR SHALL ASK FOR A COLORSELECTION.
B. REFERENCE INTERIOR ELEVATIONS FOR CLARIFICATION OF WALL FINISHES.
GENERAL FINISH NOTESFLOORS:
A. ALL VESTIBULES SHALL RECEIVE RGAF.B. ALL RESIDENCE HALL BED ROOMS SHALL RECEIVE LVT1.C. ALL RESIDENCE HALL BATH ROOMS SHALL RECEIVE CT1A.D. ALL PUBLIC REST ROOMS SHALL RECEIVE CT1A UNO.
BASE BID: SOUTH WING - ALL FLOORS SHALL RECEIVE SCN UNO.ALTERNATE: SOUTH WING FLOOR FINISHES: SCHEDULED FINISHES IN LIEU
OF SCN.
BASE:
A. ALL BASE SHALL BE RB1 U.N.O.B. ALL BATH AND PUBLIC RESTROOMS SHALL RECEIVE CT1A COVE BASE.
BASE BID @ SOUTH WING: PROVIDE SCHEDULED BASE AT ALL ROOMS.
CEILINGS:
A. ALL ACOUSTICAL CEILING SHALL BE ACT1.B. ALL DRYWALL CEILINGS SHALL BE PAINTED PT1 UNO.
UP
CLASSROOM B
185
ELEV
EL012
KITCHEN
101G
M
M101D
LOUNGE
121A
M
R125
W
R124
HK
J109
ITC
T107
ITC
T159B
BATH
151R
BATH
103R
BED
105
BATH
104R
BED
114
BATH
114R
BED
116
BED
132
BED
138
STAIR
ST002
BATH
120R
BED
136
BATH
136R
BATH
132R
BED
118
BED
120
BED
134
BED
106
N HALL
H157
BED
115
BATH
117RBED
119
BED
117
BED
160
BIKE STORAGE
102
BED
104
BED
103
BED
142BATH
140R
BED
144
BED
143BED
149
BATH
152R
BED
154BED
158
STAIR
ST001
BED
162
BED
164
BED
163
BATH
161R
BATH
162R
BED
165
BED
166
BED
167
BED
168
BATH
165RBATH
166R
BED
152
BED
161
STORAGE
184A
N HALL
H113A
BATH
156RBED
156
NORTH
LOBBY
H121
BED
146
BED
148
BED
150BATH
148R
OFFICE
189
RA
STORAGE
190
FRONT DESK
180B
BED
131
BED
137BED
141
BATH
139RBED
135
BATH
135R
BATH
131R
BED
133BED
145
BED
147
BATH
147R
BED
140
BED
139
BATH
144R
BATH
143R
M
R187
W
R188
BED
151
OUTDOOR E/W
PASSAGE
H100
VEST
H111
BED1
101A
BED2
101B
BATH
101C
W/D
101DCL
101H
CL
101F
M
M112
M
M103
M
M114
M
M118
M
M117
VEST
H122
VEST
H123
VEST
H170
STAIR
ST004
E HALL
H169
BATH
115R
M
M115
M
M131
M
M140
M
M139
M
M144
M
M143
M
M147
M
150DM
M156
BATH
160R
M
M161
M
M162
M
M152
N HALL
H157
M
M132
M
M135
M
M136
BED
110
BATH
110R
M
M110
BED
108
M
M108
BED
112
W HALL
H113
BATH
108R
N HALL
H157
N HALL
H157
N HALL
H157
N HALL
H157
N HALL
H157
N HALL
H157
N HALL
H157
N HALL
H157
N HALL
H157
N HALL
H157
N HALL
H157
N HALL
H157
N HALL
H157
N HALL
H157
CORRIDOR
H182
CLASSROOM A
184
M
M165
M
M166
M
M151
FIRE RISER &
ELEC
M184B
STORAGE
185A
M
M160
VESTIBULE
H181
HK
J186
VENDING
180A
LOUNGE
180C
SOUTH
LOBBY
H180
LOUNGE
121B
LOUNGE
121C
RESIDENT
DIRECTOR APT
101
VESTIBULE
H183
ELEC
E159A
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
NORTH WING
SOUTH WING
A
B
02/23/18 100% CONSTRUCTION DOCUMENTS0
SOUTH WING
BNORTH WING
A
2/2
4/2
018 6
:04:4
5 P
M
FIRST FLOOR FURNITURE
PLAN
I-131
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
ST
AT
EOF NEW
MEX
ICO
RE
GI
ST
ERED ARCHI T
EC
T
HOOKER
2828
KIM M
3/32" = 1'-0"A1FIRST FLOOR OVERALL FURNITURE PLAN
GENERAL NOTES
A. FURNITURE SHOWN WITH DASHED LINES IS OWNER PROVIDED AND THE PURCHASE OFTHE FURNITURE IS NOT IN SCOPE. THE CONTRACTOR IS RESPONSIBLE FOR THEFOLLOWING:
B. * COORDINATE THE INSTALLATION OF FURNITURE PROVIDED BY OWNER'S FURNITUREVENDOR.
C. * COORDINATE POWER AND DATA LOCATIONS.D. * THE FURNITURE SHOWN IS REPRESENTATIVE OF THE QUANTITY AND SIZES PLANNED
FOR PURCHASE.E. * FURNITURE IS SHOW TO ALLOW BIDDERS TO DETERMINE THE SCOPE OF THE
COORDINATION ACTIVITY REQUIRED.F. * INCLUDE THE FURNITURE INSTALLATION ACTIVITY IN THE OVERALL CONSTRUCTION
SCHEDULE.G. * COMPLETE ALL CONTRACTOR RESPONSIBILITIES PER SECTION 01 11 00 "SUMMARY,"
PARAGRAPH 1.4.
NORTH
0 4' 8' 20'
DDW W W
DW DDDDW W W W
CGCG
LOUNGE-N
321C
LOBBY
H321
BED
319
KITCHEN
321A
STAIR
ST004b
BED
368
BED
338
BED
342BATH
340R
BED
336BATH
336R
BATH
332R
BED
334
BED
337
BED
341
BATH
339RBED
335
BATH
335R
BATH
331R BED
333
BED
340
BED
339
BED
349
BATH
352R
BED
354
BED
352BED
346
BED
348
BED
350BATH
348R
BED
345
BED
347
BATH
347R
BATH
344R
BATH
343R
BED
362
BED
364
BED
363
BATH
361R
BATH
362R
BED
365
BED
366
BATH
365R
BATH
366R
BED
361
BED
360
ACCESS BED
358
ELEC
E359ABATH
320C
BED
318
BATH
315R
BATH
303R
BED
305
BATH
304R
BATH
314R
BED
316
HK
J309
ITC
T307
BED
306
E HALL
H369
LAUNDRY
LOUNGE
300
BED-3
315
M
M315
BED
317
BED
320
N HALL
H357
STUDY
LOUNGE
322
BED
367
STAIR
ST001b
ELEV
EL012
STAIR
ST002b
BED
304
BED
303
BED
356
BED-4
351BED
343
BED
344BED
332
BED
331
BATH
317R
M
M304
M
M303
M
M318
M
M317
BATH
360R
M
M365
M
M366
M
M361
M
M362
M
M356
M
M351
M
M352
M
M348
M
M347M
M343
M
M348
M
M340
M
M339
M
M332
M
M331
M
M335
M
M336
N HALL
H313A
BED
310
M
M310
BED
308
M
M308
BED
312
BATH
308R
BED
314
M
M314
W HALL
H313
BATH
356R
BATH
351R
LOUNGE
321B
M
M360
BATH
310R
ITC
T359B
STUDY
LOUNGE
222
STAIR
ST001a
LOUNGE
221A
STAIR
ST002a
BED
238
BED
236
BED
234
BED
237
BED
235
BATH
235R
BATH
231R BED
233
BED
240
BED
239
ITC
T207
BED
204
BED
203
BATH
203R
BED
205
BATH
204R
BATH
214RBED
216
HK
J209
BATH
218RBED
218
BED
206
BED-3
215BATH
217R
BED
217
LAUNDRY
LOUNGE
200
W HALL
H213
BED
220
BED
219
BED
232
BED
231
LOBBY 2
H221
N HALL
H257
N HALL
H213A
ELEV
EL012
BATH
215R
M
M204
M
M203
M
M215
M
M214
M
M218
M
M217
M
M231
BED
210
BATH
210R
M
M210
BED
208
M
M208
BED
214
BED
212
BATH
208R
M
M201BED
202
BED
201
BATH
201R
STAIR
ST004a
BED
268
BED
242
BED
241
BATH
239RBED
249
WC
252X
BATH
252R
BED
254
BED
252
BED
246
BED
248
BED
250
BED
245
BED
247
BATH
247R
BATH
243R
BED
262
BED
264
BED
263
BATH
261R
BATH
262R
BED
265
BED
266
BATH
265R
BATH
266R
BED
261
BED
260
ACCESS BED
258
ITC
T259B
BED
244
BED
243
BED - 4
251
BED
256
BED
267
M
M256 M
M250M
M251BATH
260R
M
M261
M
M262
M
M265
M
M266
BATH
251R
BATH
256R
LOUNGE
221B
BATH
236R
M
M232
M
M236
M
M235
BATH
232R
M
M240
M
M239
BATH
240R
BATH
244R
M
M244
M
M243
BATH
248R
M
M248
M
M247
M
M252
E HALL
H269
M
M260
E HALL
H269
4' -
0 2
9/1
28" ELEC
E259A
ISSUING OFFICE: PROJECT NO:
KEY PLAN
654321
654321
A
B
C
D
E
NO DATE DESCRIPTION
NORTH WING
SOUTH WING
A
B
02/23/18 100% CONSTRUCTION DOCUMENTS0
SOUTH WING
BNORTH WING
A
2/2
4/2
018 6
:04:5
6 P
M
SECOND & THIRD FLOOR
FURNITURE PLAN
I-132
NEW RESIDENCE
HALL
100% CONSTRUCTION
DOCUMENTS
1525 INTERNATIONAL MALL
LAS CRUCES, NEW MEXICO 88003
LAS CRUCES 8919.17
02/23/2018
RE
VIT
_v16
ST
AT
EOF NEW
MEX
ICO
RE
GI
ST
ERED ARCH
I TE
CT
HOOKER
2828
KIM M
1/16" = 1'-0"A1THIRD FLOOR OVERALL FURNITURE PLAN
GENERAL NOTES
A. FURNITURE SHOWN WITH DASHED LINES IS OWNER PROVIDED AND THE PURCHASE OFTHE FURNITURE IS NOT IN SCOPE. THE CONTRACTOR IS RESPONSIBLE FOR THEFOLLOWING:
B. * COORDINATE THE INSTALLATION OF FURNITURE PROVIDED BY OWNER'S FURNITUREVENDOR.
C. * COORDINATE POWER AND DATA LOCATIONS.D. * THE FURNITURE SHOWN IS REPRESENTATIVE OF THE QUANTITY AND SIZES PLANNED
FOR PURCHASE.E. * FURNITURE IS SHOW TO ALLOW BIDDERS TO DETERMINE THE SCOPE OF THE
COORDINATION ACTIVITY REQUIRED.F. * INCLUDE THE FURNITURE INSTALLATION ACTIVITY IN THE OVERALL CONSTRUCTION
SCHEDULE.G. * COMPLETE ALL CONTRACTOR RESPONSIBILITIES PER SECTION 01 11 00 "SUMMARY,"
PARAGRAPH 1.4.
NORTH
1/16" = 1'-0"C1SECOND FLOOR OVERALL FURNITURE PLAN
0 16' 32'8'