i-229 exit 9 (benson road) interchange study & …bensonroadproject.com/assets/documents/public...
TRANSCRIPT
![Page 1: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/1.jpg)
Benson Road
60th Street N.
Benson Road
60th Street N.
Public Informational MeetingOctober 25th, 20185:30 pm to 6:30 pm
Water Reclamation Facility
I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY &
ENVIRONMENTAL DOCUMENTPL0100(82) P3616, PCN 06MF
![Page 2: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/2.jpg)
Project History Environmental Process Purpose and Need / Discussion Current Study Evaluation Concepts and Process Next Steps
PRESENTATION AGENDA
![Page 3: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/3.jpg)
PROJECT HISTORY
I-229 Major Investment Corridor Study:Solberg Avenue Overpass to60th Street N OverpassDuration from 2013 – 20175 Interchange StudiesOverall I-229 Studyhttp://www.i229study.com
Project Purpose:Define and Prioritize Improvements required for the corridor over the next 30-40 years
Corridor Study Area Map
![Page 4: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/4.jpg)
Study Area MapCl
iff Av
enue
Syca
more
Ave
Syca
more
Ave
Lewi
s Ave
nue
Limits of construction
Bahn
son A
venu
e
Limits of study for traffic planning purpose
PROJECT HISTORY
![Page 5: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/5.jpg)
BENSON ROAD CORRIDOR OVERVIEWHigh Crash History @ Benson
Rd / Cliff Avenue
Large vehicles enter Benson Road causing delays.
PROJECT HISTORY
![Page 6: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/6.jpg)
BENSON ROAD CORRIDOR OVERVIEW
N. Potsdam Avenue
Lewis Avenue serves large employee base; congestion during
peak hours.
Stop-controlled approaches are over capacity in the existing condition.
Intersection spacing inhibits signalization, congestion on Benson Road makes it
difficult to enter during peak hours.
Pedestrians are not accommodated along this
corridor.
PROJECT HISTORY
![Page 7: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/7.jpg)
BENSON ROAD CORRIDOR OVERVIEWInterchange West terminal
intersection projected to be over capacity with added development
Intersection is over capacity now and will continue to degrade with additional development to the East
Review interchange options that allow for additional
capacity
PROJECT HISTORY
![Page 8: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/8.jpg)
EXISTING TRAFFIC VOLUMES
PROJECT HISTORY
![Page 9: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/9.jpg)
BENSON ROAD CORRIDOR OVERVIEWBenson Road east of I-229
currently serves low traffic volumes; construction of the Bahnson
Avenue Extension will provide additional access to I-229 and will
increase traffic volumes.
Projected development will increase traffic volumes on Benson
Road in the near future
PROJECT HISTORY
![Page 10: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/10.jpg)
Option Description Traffic Operations Safety Environmental Property Impacts Construction &
ROW CostDRAFT
Recommendation
Concept ID
Interchange and Corridor Type
•Traffic Delay
•Level of Service
•Interchange Year of Failure
Predicted Crash Reduction during 2012-2035
Potential impact to wetlands, historical resources, threatened and endangered species, public lands, and floodplains
Total Right of Way (ROW) Required and Acquisitions
Total Constuction Cost (including ROW)
Advanceor
Eliminate
Evaluation Factors:
Evaluation Matrix to Compare Concepts Recommended Action
CONCEPT EVALUATION PROCESS
PROJECT HISTORY
![Page 11: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/11.jpg)
CONCEPTS FOR FURTHER CONSIDERATION BENSON-1A
PROJECT HISTORY
![Page 12: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/12.jpg)
CONCEPTS FOR FURTHER CONSIDERATIONBENSON-1B
PROJECT HISTORY
![Page 13: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/13.jpg)
CONCEPTS FOR FURTHER CONSIDERATIONBENSON-4
PROJECT HISTORY
![Page 14: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/14.jpg)
CONCEPTS FOR FURTHER CONSIDERATIONBENSON IMPROVEMENTS
PROJECT HISTORY
![Page 15: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/15.jpg)
Benson Road Interchange and Corridor improvements = High Priority
BENSON ROAD PRELIMINARY PROJECT PRIORITY
Project Development Process = 5 year timeline when initiated by SDDOT & Cityo Prepare Interchange Modification Justification Report and Environmental
Document
o Develop Project Design
o Acquire Right of Way
o Construction
![Page 16: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/16.jpg)
ENVIRONMENTAL PROCESS
Current Progress Thru Here 2nd Public Meeting
![Page 17: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/17.jpg)
ENVIRONMENTAL PROCESS
Current Progress Thru Here 2nd Public Meeting
Major Environmental Considerationso Wetlands / Streams / Floodplain
o Land Use Impacts
o Cultural Resource Findings
o Economic Impacts
o Environmental Conditions Noted
o Input from the Public / Stakeholders
![Page 18: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/18.jpg)
PURPOSE AND NEED
PROJECT PURPOSE: To improve traffic operations and enhance mobility for other modes of transportation(i.e. Transit, Bikes, Pedestrians)
PROJECT NEED:1.) Capacity for existing and future traffic volumes2.) lack of accessibility for non-automobile transportation
![Page 19: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/19.jpg)
ENVIRONMENTAL CONSIDERATIONS
![Page 20: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/20.jpg)
EVALUATION CONCEPTS FOR CONSIDERATION
The Final Three (3) Options from I-229 Major Investment Corridor Study at Exit 9 were further screened, refined, and compared as part of this advanced document process. The final three (3) options after additional considerations turned into 7 total options….
Figure I-1 – Alternative Scenario 1a
Figure I-2 – Alternative Scenario 1b
Figure I-3 – Alternative Scenario 1c
Figure I-4 – Alternative Scenario 1d
Figure I-5 – Alternative Scenario 1e
Figure I-6 – Alternative Scenario 4a
Figure I-7 – Alternative Scenario 4b
![Page 21: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/21.jpg)
OPTIONS FOR CONSIDERATION – Scenario 1a
![Page 22: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/22.jpg)
OPTIONS FOR CONSIDERATION – Scenario 1a
Dual Rights that are free unless pedestrian signal is actuated
![Page 23: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/23.jpg)
OPTIONS FOR CONSIDERATION – Scenario 1b
![Page 24: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/24.jpg)
OPTIONS FOR CONSIDERATION – Scenario 1b
Off Ramp shifted to align with NB On ramp
![Page 25: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/25.jpg)
OPTIONS FOR CONSIDERATION – Scenario 1c
Added Lane to BSR Bridge
![Page 26: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/26.jpg)
Rendered Loop Ramp Option
![Page 27: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/27.jpg)
OPTIONS FOR CONSIDERATION – Scenario 1d
![Page 28: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/28.jpg)
OPTIONS FOR CONSIDERATION – Scenario 1d
Intersection Fails if Right Turns on Red are not allowed
![Page 29: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/29.jpg)
OPTIONS FOR CONSIDERATION – Scenario 1e
Intersection Fails if Right Turns on Red are not allowed
Added Lane to BSR Bridge
![Page 30: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/30.jpg)
OPTIONS FOR CONSIDERATION – Scenario 4a
![Page 31: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/31.jpg)
OPTIONS FOR CONSIDERATION – Scenario 4a
Triple Lefts
Dual Rights that are free unless pedestrian signal is actuated
![Page 32: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/32.jpg)
OPTIONS FOR CONSIDERATION – Scenario 4a
Triple Lefts
Dual Rights that are free unless pedestrian signal is actuated
![Page 33: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/33.jpg)
OPTIONS FOR CONSIDERATION – Scenario 4a
Triple Lefts
Dual Rights that are free unless pedestrian signal is actuated
![Page 34: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/34.jpg)
OPTIONS FOR CONSIDERATION – Scenario 4b
![Page 35: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/35.jpg)
OPTIONS FOR CONSIDERATION – Scenario 4b
Triple Lefts
Dual Rights that are free unless pedestrian
signal is actuated
New Bridge north of Existing
Bridge
![Page 36: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/36.jpg)
OPTIONS FOR CONSIDERATION – Scenario 4b
Triple Lefts
Dual Rights that are free unless pedestrian
signal is actuated
New Bridge north of Existing
Bridge
![Page 37: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/37.jpg)
Rendered DDI Option
![Page 38: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/38.jpg)
OPTIONS FOR CONSIDERATIONBenson Road West of I-229
![Page 39: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/39.jpg)
OPTIONS FOR CONSIDERATIONBenson Road East of I-229
![Page 40: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/40.jpg)
PROJECT EVALUATION CATEGORIES
![Page 41: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/41.jpg)
NEXT STEPS
Hold Initial Public Meeting – TODAY!!!!! Submit Draft Interchange Justification Modification Report – October 2018
Hold 2nd Public Meeting (Present Preferred Option) – February/March 2019
Submit Final Environmental Documentation – April 2019
Prelim and Final Design – Nov 2018 thru May 2020
Permitting and ROW – May 2020 thru Dec 2021
Project Bid 2022 with Construction in 2023
![Page 42: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/42.jpg)
PROJECT WEBSITE Website: http://www.bensonroadproject.com
![Page 44: I-229 EXIT 9 (BENSON ROAD) INTERCHANGE STUDY & …bensonroadproject.com/assets/documents/Public Meeting... · 2018. 10. 26. · Benson Road. 60. th. Street N. Benson Road. 60. th](https://reader034.vdocument.in/reader034/viewer/2022052018/603115041860f76cf97cdf12/html5/thumbnails/44.jpg)
Benson Road
60th Street N.
Benson Road
60th Street N.
Thanks for attending!
PROJECT CONTACTS:Jason Kjenstad – HDR Engineering, Inc.605-977-7740 or [email protected]
Aaron Fagerness– HDR Engineering, Inc.605-977-7744 or [email protected]
Shannon Ausen – City of Sioux Falls605-367-8607 or [email protected]
Steve Gramm – SDDOT Project Development605-773-6641 or [email protected]
Stacy Duchene – SDDOT Project Coordinator605-367-5680 or [email protected]