I-270 INNOVATIVE CONGESTION MANAGEMENT
![Page 2: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/2.jpg)
I-270 EXISTING CONDITIONS
![Page 3: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/3.jpg)
I-270 INNOVATIVE CONGESTION MANAGEMENT VISIONSolutions to move the most traffic
the furthest and the fastestSafely while minimizing operations
and maintenance costs while being adaptable for the future
No predetermined solutions or requirements
$100 M Fixed Budget
![Page 4: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/4.jpg)
I-270 INNOVATIVE CONGESTION MANAGEMENT SOLICITATION
Competitive Procurement to find highly qualified team who can deliver solutions to best solve problems within budget
Progressive Design-Build ContractPhase One – Design ServicesPhase Two – Construction Services
![Page 5: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/5.jpg)
CONCEPT PROGRAM OF SOLUTIONS
Two-pronged approach Roadway Improvements Innovative Technologies
and Techniques
![Page 6: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/6.jpg)
Southbound SB 1: Extend acceleration and deceleration lanes at MD 80 SB 2: Extend acceleration lane at MD 109 SB 5A: Reconfigure exit lanes to I-370 SB 6: Create auxiliary lane in local lanes south of Shady Grove Road SB 7: Create auxiliary lane in local lanes between MD 28 and MD 189 SB 8: Reconfigure local lanes between MD 189 and Montrose Road SB 10: Maintain three lanes from I-270 and drop right lane on I-495 at I-
270/I-495 merge SB 12: Create additional travel lane between Montrose Road and
Democracy Boulevard
ROADWAY IMPROVEMENTS
![Page 7: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/7.jpg)
Northbound NB 1: Create additional travel lane between Democracy Boulevard and
Montrose Road NB 2: Create auxiliary lane in local lanes between MD 189 and MD 28 NB 3: Close loop ramp from NB Shady Grove Road to NB I-270; Close slip
ramp to express lanes north of Shady Grove Road NB 4: Create auxiliary lane between MD 124 and Watkins Mill Road and
between Watkins Mill Road and WB Middlebrook Road NB 5: Extend third lane to Comus Road bridge NB 7: Extend deceleration lane at MD 118
ROADWAY IMPROVEMENTS
![Page 8: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/8.jpg)
I-270 WEST SPUR AT I-495 OUTER LOOP
BEFORE
AFTER
![Page 9: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/9.jpg)
I-270 SOUTHBOUNDMD 28 TO MD 189
BEFORE
AFTER
![Page 10: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/10.jpg)
I-270 SOUTHBOUND MONTROSE ROAD TO DEMOCRACY BOULEVARD
BEFORE
AFTER
![Page 11: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/11.jpg)
INNOVATIVE TECHNOLOGIES AND TECHNIQUES
![Page 12: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/12.jpg)
INTELLIGENT TRAFFIC SIGNALS –HOW DO THEY WORK?
Intelligent Traffic Signals will break up platoons of vehicles on I-270 by controlling rate at which vehicles enter I-270.
Vehicle Discharge Rates are ADAPTIVE based on real time I-270 traffic flow and ramp demands
Vehicles would be discharged at rate to OPTIMIZE I-270 traffic flow
Results in travel time reductions even with queue on the ramp and results in reduced collisions
![Page 13: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/13.jpg)
![Page 14: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/14.jpg)
SYSTEM COMPONENTS
![Page 15: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/15.jpg)
I-270 WITH PROGRAM OF IMPROVEMENTS
![Page 16: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/16.jpg)
BEFORE
AND
AFTER
![Page 17: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/17.jpg)
![Page 18: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/18.jpg)
WHERE DO WE GO FROM HERE?
![Page 19: I-270 Innovative Congestion Management](https://reader030.vdocument.in/reader030/viewer/2022012723/61b52c85bdfe005b5e253d85/html5/thumbnails/19.jpg)
QUESTIONS?
PROJECT WEBSITE:
HTTP://APPS.ROADS.MARYLAND.GOV/WEBPROJECTLIFECYCLE/PROJECTINFORMATION.ASPX?PROJECTNO=MO0695115
JEFF FOLDEN, PE, DBIACHIEF, INNOVATIVE CONTRACTINGMDOT STATE HIGHWAY [email protected]