* I 1 -I. I Page: Job Performance Measure Exam -- 30-May-2006 JF’M NO JR015.004 Perform a Plant Calorimetric per 0-6.3 Revision #: 4 Review Date: 5/30/2006 Location: In Plant Estimated Time (minutes): 20.00 Candidate: Evaluator: Actual Time: .d Trainee Performance: Satisfactory Unsatisfactory Trainee: Instructor: Submitted By Date Reviewed By Date

Upload: others

Post on 24-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

  • * I 1

    -I. I Page: Job Performance Measure Exam -- 30-May-2006

    JF’M NO JR015.004 Perform a Plant Calorimetric per 0-6.3

    Revision #: 4

    Review Date: 5/30/2006

    Location: In Plant

    Estimated Time (minutes): 20.00

    Candidate:

    Evaluator:

    Actual Time: .d

    Trainee Performance: Satisfactory Unsatisfactory

    Trainee:

    Instructor:

    Submitted By Date

    Reviewed By Date

  • Page: 2 Job Performance Measure Exam --

    30-MUY-2006 ~

    ‘L/

    NOTE

    THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

    Initial Conditions: The PPCS calorimetric calculation is not operable and the LEFM is not being used.

    Initiating Cues :

    The Control Room Foreman has directed you to perform a maximum unit power calculation per 0-6.3. For this JPM an Auxiliary Operator will collect field data collect and provide it to you. Although the PPCS calorimetric calculation function is not operable, the PPCS is operable and may be used as necessary.

    ‘W’

  • Page: Job Perfurmanee Measure Exam --

    30-May-2006

    '- Description: Perform a Plant Calorimetric per 0-6.3 (JR015.004)

    JPM Tasks

    Task ID: 193-001-01-01B

    Task Standards :

    In accordance with the procedure

    Tools :

    Calculator

    Safety Glasses

    Hard Hat

    Hearing Protection

    Terminating Cues

    --. Task Completion

    References :

    ID - PRO 0-6.3 PRO 0-6.3.1

    Description Review Date Ref Flag

    MAXIMUM UNIT POWER STEAM GENERATOR BLOWDOWN CORRECTION FACTOR

    Safety Considerations

    Consequences of Inadequate Performance: Thermal design limit challenge

    General Comments :

    Provide a copy of 0-6.3 and 0-6.3.1

    .--

  • Page: 4 Job Performance Measure Exam _- . -

    3 0-May-2 006

    Performance Checklist

    Element : Conditions : Standards : Obtain current 0-6.3 and 0-6.3.1. NOTE: It is permissible to only

    obtain Attachment I and I1 of 0-6.3 and Attachment I of 0-6.3.1.

    Same as element.

    Comments :

    Satisfactory Unsatisfactory

    Element : CRITICAL Conditions : Standards : Properly collect and record data required by 0-6.3 Attachments I and 11. deviation high alarm on PPCS) do -MCB

    NOTE: If either RTD is unreliable (S/G RTD feedwater temperature

    not use RTD data, instead use the average T/C feedwater temperature and apply for both loops.

    Obtains data from: -PPCS if available

    -NIS

    Note: Provide Barton Data obtained by the A 0 to the examinee

    Comments :

    Satisfactory n Unsatisfactory 0 Element : CRITICAL Conditions : Standards : Properly collect and record data for Blowdown Correction Factor per 0-6.3.1, Attachment I.

    CUE: When Data Properly Collected the hand out per collected data for calculations.

    Obtain the S/G blowdown flow, temperature and pressure +/- 20 psig for each S/G from the blowdown panel.

    Comments :

    Satisfactory Unsatisfactory [7

    Element : CRITICAL Conditions : Standards : Properly perform calculations per 0-6.3.1, Attachment I.

    1) Same as element. 2) If interpolate any value between selected rows. 3) Fq +/- .05.

    Comments :

    Satisfactory Unsatisfactory 0

  • I 1

    - . - 5. I Page: Job Performance Measure Exam 30-May-2006 w Element: CRITICAL Conditions : Standards :

    Properly perform calculations per 0-6.3, Attachment I and 11.

    NOTE: If action is required per step 5.3.2, DO NOT take action. Advise the Shift Supervisor or CRF of any problems noted.

    Same as element.

    +/- 0.5% of calculated answer.

    Comments :

    Satisfactory n Unsatisfactory 0 6 Element : Conditions :

    Recommends appropriate action if

    Comments :

    100% power.

    Satisfactory 0

    Standards : Same as element.

    Unsatisfactory 0 7 Element : Conditions : Standards :

    Compares calorimetric to NIS, recommends action if action. disagreement exists.

    TERMINATING CUE: No further Same as element.

    NOTE: Attach completed 0-6.3 and 0-6.3.1 to this JPM.

    Comments :

    Satisfactory 0 Unsatisfactory 0 JPM Questions

    Question

    Answer

    References

    Reference Type Reference ID Description Ref Flag

  • Page: 1 I 25-May-2006 Job Performance Measure Exam -- - -

    JPMNO JR341.002

    0-6.13 Daily Performance Log Attachment I

    Revision #: 0

    Review Date: 4/28/2006

    Location: Simulator

    Estimated Time (minutes): 15.00

    Candidate:

    Evaluator:

    Actual Time: -

    Trainee Performance: Satisfactory Unsatisfactory

    Trainee:

    Instructor:

    Submitted By

    Reviewed By

    Date

    Date

  • Page: - 2 Performame Measure Exam --

    2 5-M~ry-2 0 06 ~

    I I

    '.d

    NOTE

    THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE MAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

    Initial Conditions: Normal plant monitoring in progress.

    Initiating Cues :

    Perform 0-6.13 Attachment I Channel Checks and Instrument Verification

  • 25-May-2006 Job Performance Measure Exam Page: -- . -3. I Description: 0-6.13 Daily Performance Logs Attachment (JR341.002)

    JPM Tasks Task ID: 119-009-03-01B

    Task Standards :

    Identify switch, meter or component out of required position or band.

    Tools :

    Terminating Cues

    Task Completion

    References :

    ID - PRO 0-6.13

    - , --

    Description

    DAILY SURVEILLANCE LOG

    Safetv Considerations

    Consequences of Inadequate Performance: Tech Spec Violation

    General Comments :

    Review Date Ref Flag

    0

    1) Setup the Simulator at any 100% power IC 2) Insert MALF PZR3A, 43% 3) Verify >5% deviation between LT-426 and the other channels 4) Fill out 0-6.13 Attachment I for the last RWST visual check 7/16/06 92%

  • I 1

    P I Page: Job Performance Measure Exam -- 25-May-20 0 6

    -' Performance Checklist

    1 Element : Conditions : Standards : Review 0-6.13 Attachment I CUE: give attachment to examinee Same as element

    Comments :

    Satisfactory 0 Unsatisfactory 0 2 Element : Conditions :

    Perform Attachment I per procedure

    Standards : Locates meters verify parameters are within operability bands and complete Attachment I signoffs

    Comments :

    Satisfactory 0 Unsatisfactory Element : CRITICAL Conditions : Recognize that LT-426 is outside the acceptance band

    Standards : Locates LT-426. Determines that the instrument is inoperable per 0-6.13 and SR3.3.1.1

    Comments :

    Satisfactory Unsatisfactory

    4 Element : Notify the CRS or SM

    ~~~

    Conditions : Standards : CUE: No Further Actions Same as Element

    Comments :

    Satisfactory Unsatisfactory 0

  • I , Page: 5 I 25-May-2006 Job Performance Measure Exum - -

    I

    ..-l)M Ouestions

    Question

    Answer

    References

    Reference Type Reference ID Description Ref Flag

  • I 1

    -l. I Page: Job Performance Measure Exam _- 25-May-2006 .-..../’

    JPM NO JR343.005

    Control of LCO’s for Equipment Out of Service

    Revision #: 0

    Review Date: 4/28/2006

    Location: Simulator

    Estimated Time (minutes): 10.00

    Candidate:

    Evaluator:

    Actual Time: -4

    Trainee Performance: Satisfactory Unsatisfactory

    Trainee:

    Instructor:

    Submitted By Date

    Reviewed By Date

  • P I I 25-May-2006 Job Performame Measure Exam -- Page: I 1

    NOTE

    THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

    Initial Conditions: Plant is at 55% power, Mini-Purge is not in service, no other equipment has an A-52.4 submitted on it.

    Initiating Cues :

    Shift Supervisor requests MOV-852A be deemed inoperable and asks you to fill out an A-52.4 to declare the component inoperable. The equipment will be inoperable due to the breaker being found tripped and cannot be reset. Required testing for operability will be determined after investigation of the problem. Use present date and time for when the component is to be deemed

    - inoperable.

  • 3 I Page: Job Performance Measure Exam -- 25-M~~~-2006 -’ Description: Complete a A-52.4 Limiting Conditions for Operablity Evaluation (JR343.005)

    JPM Tasks

    Task ID: 300-003-01-01A

    Task Standards :

    Correctly determine the allowable time out of service for a single component.

    Tools :

    Terminating Cues

    Task Completion Trainee Says Task is Completed

    References :

    ID - I

    PRA A-52.4

    TECHSP ITS 3.5.2

    DescriDtion Review Date Ref Flag

    CONTROL OF LIMITING CONDITIONS OF OPERATIONS ECCS - MODES 1,2, and 3

    0

    Safetv Considerations

    Consequences of Inadequate Performance: Tech Spec Violation

    General Comments :

    Component Inoperable is the B train of ECCS Tech Spec. 3.5.2

  • I I

    4 I Page: Job Performance Measure Exam -- 25-May-2006 v’

    Performance Checklist

    1 Element : Obtain a controlled copy of A-52.4

    Conditions : Standards : CUE: Give Examinee copy of the procedure

    Same as Element

    Comments :

    Satisfactory 0 Unsatisfactory 0 2 Element : Conditions :

    Fill in EIN, Date, and Time complete step 3.2.1

    Comments :

    Standards : Same as element

    Satisfactory Unsatisfactory 0 3 Element : Conditions :

    Determine Plant mode and complete step 3.2.2

    - Comments: Satisfactory

    Standards : Plant Mode is Mode 1

    Unsatisfactory u *4 Element: CRITICAL Conditions :

    Determine Tech Spec Section and fill in step 3.2.3

    Comments :

    Satisfactory u

    Standards : Enter corect T.S. in 3.2.3. Tech Spec Section 3.5.2 ECCS Modes 1-3

    Unsatisfactory

    5 Element : Conditions : Perform Loss of Safety Function Screening per Attachment I1 fill in step 3.2.4

    Comments :

    Satisfactory

    Standards : Determines that no loss of safety function exists

    Unsatisfactory 0 u - Element : Conditions : Standards :

    Records EOOS PFS and System Colors complete step 3.2.5

    CUE: Colors are both Green Records Colors

  • - - 5. I Page: Job Performance Measure Exam 25-May-2 006

    Comments : u-

    Satisfactory 0 Unsatisfactory 0 *7 Element: CRITICAL Conditions : Standards :

    Determines Required Action time from T.S. 3.5.2 complete step 3.2.6 operable (Table 3.5.2-1)

    Go To T.S. 3.5.2 Determine that A Train is

    Determine Reqired action time from 3.5.2A 72 hours to restore Record in step 3.2.6

    Comments :

    Satisfactory 0 Unsatisfactory *8 Element: CRITICAL Conditions :

    Determines Required Action time not met from T.S. 3.5.2 complete step 3.2.13

    CUE: No further actions Standards : Go to 3.5.2B record time in step 3.2.13 Mode 3 in 6 hours Mode 4 in 12 hours

    Comments :

    Satisfactory 0 Unsatisfactory 0 JPM Questions

    Question

    Answer

    References

    Reference Type Reference ID Description Ref Flag

  • I 1

    -l. I Page: Job Performance Measure Exam -- 25-May-2006 I 1 v

    JPM NO JC119.001

    Complete EPIP 1-5 Status Report (PPCS no avalible)

    Revision #: 0

    Review Date: 5/22/2006

    Location: Simulator

    Estimated Time (minutes): 10.00

    Candidate:

    Evaluator:

    -.- Actual Time:

    Trainee Performance: Satisfactory Unsatisfactory

    Trainee:

    Instructor:

    Submitted By Date

    Reviewed By Date

  • Page: 2 Job Performance Measure Exam --

    25-May-2006 ~

    .--' NOTE

    THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

    Initial Conditions: The Plant was at 100% power when a LOCA occured. An Alert was declared and the Initial notification has been made per EPIP 1-5. The PPCS has failed and the TSC is unable to complete status reports for transmittal. The communicator is currently busy making followup notifications.

    Initiating Cues :

    The Shift Manager directs you to complete and transmit the plant status report per EPIP 1-5 Attachment 3e.

  • r 1

    -- - - 3.1 Page: Job Performance Measure Exam 25-May-2 006

    L- Description: Complete EPIP 1-5 Status Report (PPCS 00s) (JC119.001) JPM Tasks

    Task ID: 1 19-007-03-0 1A

    Task Standards :

    Correctly complete EPIP 1-5 Attachment 3e data sheet.

    Tools :

    Terminating Cues

    The Data sheet is correctly completed

    References :

    - ID Description PREPIP EPIP 1-5 NOTIFICATIONS

    Review Date Ref Flag

    CI

    Safety Considerations

    Consequences of Inadequate Performance: Failure to correctly complete the required data sheet will result in the TSC & EOF being unable to assess plant conditions. This results in an inability of those organization to provide the need support the the Control Room and to protect the public.

    General Comments :

    Setup the Simulator to any at Power IC. Insert a 5000 gpm LOCA and complete E-0. Freeze simulator and record EPIP 1-5 Attachment 3e data for the key.

  • -- . - 4 1 Page: Job Performance Measure Exam 25-May-2006

    u. Performance Checklist

    1 Element : Conditions : Obtain EPIP 1-5 Procedure and review attachment 3e

    Comments :

    Satisfactory 0

    Standards : Obtain Procedure Determine that Attachment 3e must be performed

    Unsatisfactory 0 *2 Element: CRITICAL Conditions :

    Obtain Data for Attachment 3e from the Control Room indications.

    ~

    Standards : Locates MCB indicators and records Data on the attachment

    Comments :

    Satisfactory Unsatisfactory

    ** Element: CRITICAL Conditions : Standards : Transmitts the attachment to the TSC or telephone

    Comments :

    CUE: No further actions Transmits to the TSC via Fax L

    Satisfactory 0 Unsatisfactory c] JPM Questions

    Question

    Answer

    References

    Reference Type Reference ID Description Ref Flag

  • I I

    -l. I Page: Job Performance Measure Exam -- 25-May-2006 \-

    JPM NO JS345.001

    Respond to a Hazardous Chemical Spill

    Revision #: 0

    Review Date: 5/22/2006

    Location: In Plant

    Estimated Time (minutes): 15.00

    Candidate:

    Evaluator: . . ----

    Actual Time:

    Trainee Performance: Satisfactory Unsatisfactory

    Trainee:

    Instructor:

    Submitted By Date

    Reviewed By Date

  • I I

    Page: Performance Measure Exam --

    25-iMry-2006

    I J

    d'

    NOTE

    THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES, ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

    Initial Conditions: The plant is operating durring normal conditions 100% power. Dayshift Midweek. You are the Shift ,Manager.

    Initiating Cues :

    The Stockroom notifies you that they were transporting 2 barrels of Hydrazine from the Warehouse to the Turbine Building. While decending the hill near the Outside Condensate Storage tank one of the barrels fell off the pallet and is leaking.

  • I I

    -3. I Page: Job Performance Measure Exam -- 25-May-2006 'y Description: Respond to a Hazardous Chemical spill

    JPM Tasks

    Task ID: 345-001-05-03A

    Task Standards :

    Implement IP-ENV-3 to contain the spill and notify appropriate responders.

    Tools :

    TerminatinE Cues

    Task Completion

    References :

    ID - PRIP IP-ENV-3

    L-

    Descrbtion Review Date Ref Flag

    RESPONSE TO A SPILL OF HAZARDOUS MATERIAL/WASTE

    Safetv Considerations

    Consequences of Inadequate Performance: Failure to mitigate the effects of a Chemical Spill result in an increase in risk to plant personnel and the public.

    General Comments :

  • Page: 4 Job Performance Measure Exam --

    25-May-2006 ~

    W-

    1

    *2

    *3

    --.

    Performance Checklist

    Element : Conditions : Obtain Copy of IP-ENV-3. Go to the spill response section

    Comments :

    Standards : Same as Element

    Satisfactory Unsatisfactory Iz]

    CRITICAL Conditions : Standards : CUE: Announcement is made.

    Element : Announce spill over PA system Makes the announcement or

    direct operator to make the annoucement

    Comments :

    Satisfactory 0 Unsatisfactory 0 Element : CRITICAL Conditions : Dispatches Personnel to evaluate the spill.

    CUE: Personnel Contacted

    Note: Give the following Cue to the SM after the evaluator has been dispatched.

    Standards : Contacts one of the following to evaluate the spill:

    -Chemical Control Coordinator -Safety Group -Chemistry Group

    -NLO

    CUE: The spill evaluator reports the following; 1. The barrel split open spilling 112 its 35 gal contents. 2. Some of the contents ran into the storm drain located North of the outside CST. 3. The Forklift operator breathed in fumes from the chemical and is feeling ill, he is now in the TSC. 4. The material involed is SCAVOX 35% Hydrazine. 5. The HazMat Coordinator is on scene attempting to contain the spill.

    Comments : -.

    Satisfactory Unsatisfactory 0

  • -- - - 51 Page: Job Performance Memure Exam 25-May-2006 -/ Element: CRITICAL Conditions : Standards :

    Announces a Medical Emergency Note: When the Medical Announcement is made give the following cue. CUE: The CRS is refering to A-7 "Handling Injuries and Medical Emergencies'' and the associated notifications

    Make or Direct annoucement for Medical Response team to report to the TSC

    Comments :

    Satisfactory 0 Unsatisfactory [7 * 5 Element: CRITICAL Conditions :

    Determines that the spill is major

    Comments :

    Satisfactory 0

    Standards : Determine that per attachment 1 and step 3.3.3 A. 2. that the spill is major.

    Unsatisfactory ~ ~

    Element : CRITICAL Conditions : Perform Major spill action (not previously done) the Response coordinator-

    CUE: When notification made to

    MaryEllen Dangler has been notified and is acting as Coordinator and Enviromental response team leader.

    Comments :

    Satisfactory Unsatisfactory

    Standards : Obtains MSDS sheet for the chemical Completes Attachment 2 Notifies the Response coordinator and Enviromental staff

    0 7 Element : Conditions : Standards :

    Evaluate the spill for EPIP 1-0 reporti bility critera was exceeded

    Comments :

    CUE: No Further Actions Detemine that no classifiction

    Satisfactory Unsatisfactory 0

  • Page: 1 I 25-May-2006 Job Performance Measure Exam -- ~

    JPM NO JS343.006

    Loss Of Safety Function Determination

    Revision #: 0

    Review Date: 5/22/2006

    Location: Classroom

    Estimated Time (minutes): 10.00

    Candidate:

    Evaluator:

    . . --- Actual Time:

    Trainee Performance: Satisfactory Unsatisfactory

    Trainee:

    Instructor:

    Submitted By

    Reviewed By

    Date

    Date

  • Page: 2 Pmformance Measure Exam --

    25-MUY-2006 ~

    V'

    NOTE

    THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

    Initial Conditions: 100% Power normal operations. The following equipment is 00s "D" SW pump "B" CNMT Recirc Fan MOV 852A

    Initiating Cues :

    The MCC 1D Supply Breaker trips and cannot be reset. MCC 1D is deenergized. What action must be taken per Tech Specs? -

  • 1

    - - I Page: Job Performance Measure Exam -- 25-May-2 006 -2- Description: Loss of Safety Function Determination

    JPM Tasks

    Task ID: 300-003-03-02C

    Task Standards :

    Correctly Identify that a loss of Safety Function Exists

    Tools :

    Terminating Cues

    Task Completion Trainee Says Task is Completed

    References :

    ID - PRA A-52.4

    TECHSP ITS 3.5.2 TECHSP ITS 3.6.6

    TECHSP ITS 3.7.8 TECHSP ITS 3.8.9

    Description

    CONTROL OF LIMITING CONDITIONS OF OPERATIONS

    Containmen Spray (CS), Contaiment Recirculation Fan Cooler (CRFC), NaOH, and Containment Post-Accident Charcoal Systems Service Water System Distribution Systems - MODES 1,2,3, and 4

    ECCS - MODES 1,2, and 3

    Safety Considerations

    Consequences of Inadequate Performance: Tech Spec Violation

    Review Date Ref Flag

    CI 0

    General Comments :

  • I I

    4 I Page: Job Performance Measure Exam -- 25-May-2006 --.

    Performance Checklist

    1 Element : Conditions : Obtain Copy of Tech Specs and A-53.4

    Standards : Same As Element

    Comments :

    Satisfactory Unsatisfactory 0 *2 Element: CRITICAL Conditions :

    Per TS 3.8.9 determine that "B" train of AC power Dist is inoperable

    Comments :

    Satisfactory

    Standards : Same as Element

    Unsatisfactory c] 3 Element : Conditions :

    Fill out A52.4 steps3.2.1-3.2.3

    -- Comments :

    Satisfactory

    Standards : Same as Element

    Unsatisfactory c]

    *4 Element: CRITICAL Conditions : Perform Saferty Function evaluation (per Attachment 11)

    Comments :

    Satisfactory

    Standards : Evaluate 00s equipment 1) SW pump D- Not in SW spec. therefore 3.8.9 gives guidence 2) "B" Recirc Fan All other fans have normal power supplies therefore do not have a loss of safety function. 3 ) MOV 852A, MCC 1D supplies MOV 852B therefore both trains of RHR are incapable of injection and inoperable.

    Unsatisfactory c]

  • Page: 5 Job Performance Measure Exam - . -

    25-May-2006

    ..-. Element: CRITICAL Conditions : Determine both trains of SI iooperable enter TS 3.5.2B which directs to TS 3.0.3

    Cue: No further actions

    Comments :

    Satisfactory

    Standards : Same as Element

    Unsatisfactory

    JPM Questions

    Question

    Answer

    References

    Reference Type Reference ID Description Ref Flag

  • 1 I

    -l. I Page: Job Performance Measure Exam -- 22-Mi~y-2 006

    JPM NO JS119.0Oi

    Verify Equipment Tagout Boundary

    Revision#: 0

    Review Date: 4/28/2006

    Location: Classroom

    Estimated Time (minutes): 10.00

    Candidate:

    Evaluator:

    *. - Actual Time:

    Trainee Performance: Satisfactory Unsatisfactory

    Trainee:

    Instructor:

    Submitted By Date

    Reviewed By Date

  • 22-May-2006 Job Performance Measure Exam Page: -- 2. I 1,.

    NOTE

    THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAh4INEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

    Initial Conditions: Condensate transfer pump (PCD04) requires pump bearing replacement.

    Initiating Cues :

    The SM has requested you review the completed Isolated Work Area Request (A- 140 1, Figure 1) for isolating the Condensate Transfer Pump (PCD04) to veri@ work area boundaries.

  • :. I Page: Job Performance Measure Exam -- 22-May-2006

    Description: Review Isolated Work Area Request(JS 1 19.001) b..

    JPM Tasks

    Task ID: 342-004-03-02A

    Task Standards :

    1) Determine adequate boundary exists 2) Determine inadequate boundary exists

    Tools :

    P&ID 33013-1234

    P-12

    Terminating Cues

    Trainee Says Task is Completed Task Completion

    v

    References :

    ID - PROPSA A-1401 PRP P-12

    Description

    STATION HOLDING RULES ELECTRICAL SYSTEMS PRECAUTIONS, LIMITATIONS, AND SETPOINTS

    Safety Considerations

    Consequences of Inadequate Performance: Personal Injury

    Equipment Damage

    General Comments :

    Review Date Ref Flag

    0 0

    Provide P&ID and A-1401 Figure 1 to student. Incorporate errors on A-1401 Figure 1 if it is desired to exercise Option 2.

    d'

  • Page: 4 Job Performance Measure Exam - -

    22-May-2006

    v Performance Checklist

    1 Element : Review Isolated Work Boundary.

    Comments :

    Satisfactory

    ~~

    Conditions :

    0 Unsatisfactory 0

    Standards : Same as element.

    *2 Element: CRITICAL Conditions : Standards : Option 1 - Boundary is adequate. Option 2 - Boundary is not adequate.

    CUE: No further actions Option 1 - Determines no errors in boundary. Option 2 - Determines and reports errors in boundary. V-4046 needs to be closed.

    Comments :

    Satisfactory 0 Unsatisfactory 0 M Questions ._

    Question

    Answer

    References

    Reference Type Reference ID Description Ref Flag

  • -: I Page: Job Performance Measure Exam -- 25-May-2006 U’

    JPM NO JS341.002

    Approve Liquid Release per CH-RETS-LIQ-REL (JS341.002)

    Revision #: 1

    Review Date: 5/22/2006

    Location: Classroom

    Estimated Time (minutes): 10.00

    Candidate:

    Evaluator:

    Actual Time: I

    Trainee Performance: Satisfactory Unsatisfactory

    Trainee:

    Instructor:

    Submitted By Date

    Reviewed By Date

  • 25-May-2006 Job Performance Measure Exam Page: -- -: I -'

    NOTE

    THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE 'IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WRITTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF P M REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

    Initial Conditions: The operating crew is preparing to release a Monitor Tank.

    Initiating Cues :

    You are the Shift Manager and are required to review a release form prior to making a Liquid Release of the Monitor Tank per CH-RETS-LIQ-REL "Liquid Waste Release" Figure V

  • I 1

    -: I Page: Job Performance Measure Exam -- 25-May-2006 Description: Approve Liquid Release per CH-RETS-LIQ-REL (JS341.002)

    JPM Tasks Task ID: 341-012-03-03A

    L’

    Task Standards :

    Detects errors in the permit and does not approve the permit until corrected.

    Tools :

    Terminating; Cues

    Task Completion

    References :

    - ID Descrbtion PRCH CH-RETS-LIQ-REL LIQUID WASTE RELEASE

    Safetv Considerations

    Consequences of Inadequate Performance: Exceeding Release rate for a Liquid Release

    General Comments :

    Review Date Ref Flag

    CI

    Complete a CH-RETS-LIQ-REL Attachment V for pre release condition. (May obtain RP assistance) compete pre release parts correctly except @r the sample time being >12 hour prior to the start of the release.

  • I Page: 4

    Job Performance Measure Exam - 25-May-2006

    -

    --. Performance Checklist

    Conditions : Standards : Same as element

    1 Element : Reviews CH-RETS-LIQ-REL form.

    Comments :

    Satisfactory 0 Unsatisfactory 0 *2 Element: CRTTICAL Conditions :

    Evaluate Attacment V for correct Data

    Standards : Determines the form is incorrect in that the release time is outside the allowable time permited. (> 12 hours since the sample time)

    Comments :

    Satisfactory Unsatisfactory [7

    Element : Conditions : Standards : --/ Determine that sample must be Cue No further actions Same as element.

    redone

    Comments :

    Satisfactory Unsatisfactory

    JPM Ouestions

    Question

    Answer

    References

    Reference Type Reference ID Description Ref Flag

  • Page: Job Performance Measure Exam --

    2 5-May-2 006

    -’

    Event Classification

    Revision #: 0

    Review Date: 5/4/2006

    Lo cation: Simulator

    Estimated Time (minutes):

    JPM NO JS340.021

    15.00

    Candidate:

    Evaluator:

    Actual Time: --

    Trainee Performance: Satisfactory Unsatisfactory

    Trainee:

    Instructor:

    Submitted By

    Reviewed By

    Date

    Date

  • I I

    _- . - 21 Page: Job Performance Measure Exam 25-May-2006

    NOTE

    THE EVALUATOR WILL EXPLAIN THE JPM INITIAL CONDITIONS AND PROVIDE CLARIFICATION AS REQUIRED. THE EXAMINEE MAY USE ANY CONTROLLED COPY REFERENCES THAT ARE NORMALLY AVAILABLE IN THE CONTROL ROOM, INCLUDING LOGS. MAKE ALL WIUTTEN REPORTS, ORAL REPORTS, AND LOG ENTRIES AS IF THE EVOLUTION WAS ACTUALLY BEING PERFORMED. THE EVALUATOR WILL BE TAKING NOTES. ASK FOR CLARIFICATION OF JPM REQUIREMENTS PRIOR TO THE BEGINNING OF JPM PERFORMANCE.

    Initial Conditions: The plant experienced the events of the just concluded scenario.

    Initiating Cues :

    Classify this event at the highest required classification per EPIP 1-0.

  • Page: 3 Job Performance Measure Exam --

    25-May-2006 -

    u Description: Event Classification for the 2006 Initial License exam (JS340.02 1)

    JPM Tasks

    Task ID: 340-001-05-02N

    Task Standards :

    Classify per the Nuclear Emergency Response Plan

    Tools :

    Terminating; Cues

    Task Completion Trainee Says Task is Completed

    References :

    ID - - PREPIP EPIP 1-0

    Description

    GINNA STATION EVENT EVALUATION AND CLASSIFICATION

    Review Date Ref Flag

    Safetv Considerations

    Consequences of Inadequate Performance: Failure to correctly Classify the event leads to the Failure to correct implement the Emergency plan, resulting in a unnecessary threat to the health and safety of the public.

    General Comments :

    The JPM is designed to be used with the 2006 Initial NRC License Exam.

  • 1 I

    . - 41 Page: Job Performance Measure Exam 25-May-2006 d'

    Performance Checklist

    1 Element : Conditions : Obtain copy of EPIP 1-0

    Comments :

    Satisfactory

    Standards : May use Procedure or Wall Chart

    Unsatisfactory 0 ~~

    *2 Element: CRITICAL Conditions : Standards : Correctly determine Classification CUE: No futher actions Scenario 06- 1 - 1

    Alert based on RCS Leakage >46 gpm EAL 3.1.2 Scenario 06- 1-2 SAE based on Faulted Ruputed S/G EAL 4.2.1 Scenario 06-1 -3 Alert Based on RCS Leakage > 46 gpm EAL 3.1.2