i.( k i-m -mmak v m 11,i. l' project halfmoon …...-light to medium green massive to possibly...

13
I.( K i-M -MMAK V M 11,i. l' Project HALFMOON Date: September 21 to 24 1998 Logged by: Robert Calhoun Drilling Co: Colbert Drilling DDH. HM98-2b Claim Number 1190167 SURVEYS: Acid Test Setup: DejMh 0.0 iJ.LQm 213.0m Azimuth urid south inilh Di]} :46" -42 0 COLLAR LOCATION TIMMINS COORDINATES GRID COORDINATES Northing: Easting Elevation: 00 TD 213 O meters IOI6UN 5 800 E DRILLING DATES Started: September 21, 1998 Finished September 24, 1998 42A12SE2010 2.19963 ROBB 010

Upload: others

Post on 21-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

I.( K i-M -MMAK V M 11,i. l'

Project HALFMOONDate: September 21 to 24 1998Logged by: Robert CalhounDrilling Co: Colbert Drilling

DDH. HM98-2b

Claim Number 1190167

SURVEYS: Acid Test

Setup:DejMh

0.0iJ.LQm 213.0m

Azimuth urid south

inilh Di]}

:46"

-42 0

COLLAR LOCATION

TIMMINS COORDINATES GRID COORDINATES

Northing: Easting Elevation: 00 TD 213 O meters

IOI6UN 5 800 E

DRILLING DATESStarted: September 21, 1998 Finished September 24, 1998

42A12SE2010 2.19963 ROBB 010

Page 2: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

Project HaltniooiiDate' September 21, l W 8Logged By Robert C'alhoun

GEOLOGIC SUMMARY

FROM TO DESCRIPTION INTERVAL SIGNIFICANT ASSAY AVERAGES

(m)

0020.371.8816191.01989213 0

(m)

20371 881 6191 019892130

OverburdenMafic VolcanicMafic IntrusiveMafic VolcanicFelsic VolcanicMafic Volcanic/IntrusiveEnd of Mole

From(m)

To(m)

Width (m)

di ppm

Zn ppm

Pbppm

Agg/t

Aa ppb

COMMENTS

Page 3: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

Diamond Drill Log

Property: Halfmoon

Location: L58QQE/1Q160N

Azimuth: Grid South

Dip: -SO0

Hole Number: HM98-26

Final Depth: 213.0 meters

Dates Drilled: Sept. 21-24/98

Dates Logged: Sept. 23-25/98

Claim Number: 1190167

Logged By: Robert Calhoun

Drilled By: Colbert Diamond Drilling

Signatures

AssaysFrom

0

20.3

71.8

To

20.3

71.8

81 6

Description

Overburden

Mafic Volcanic-fine grained, medium to dark green, soft, chloritic,generally massive to weaKly foliated Amygdules ofcalcite, possible quartz (minor) are randomly distributedand stretched on the foliations

203-250-made with siliceous sections as layers 2-3cm at 50" tocore axis

25.0-42.0-dark green mafic volcanic, amygdules of calcite weaklyfoliated with white quartz veining increasing down sectionto ID-15% from 38.7-42 Om.

42.0-67.2-medium green mafic with abundant calcite as smallvemlets Ocm and discontinuous clots. Weakly foliated,minor pnmary euhedral pyrite grams in small discontinuousvemlets to clusters Dark green chloritic sections suggestspillow selvages.

67.2-71 8-weakly foliated with minor pyrite as foliation relatedlaminae and 1cm veinlets of euhedral grains

Mafic Intrusive

Sample #

From To Length (meter)

Cu ppm

Znppm

Pbppm

Agg/ton

Auppb

Page GeoCal Exploration Services

Page 4: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

Diamond Drill Log Hole# HM98-26

AssaysFrom

81.6

To

191.0

Description

-medium grained, medium to dark green maficintrusive or coarse flow. Quartz veining as 10-30cmveins-5-10% of section Calcite as small veinlets cO 5cm. Abundant whitish flecks (not calcite)may beleucoxene (?). Upper contact 40G to core axis, lower53C to core axis.

Mafic Volcanic-fine grained, medium to dark green chloritic. Unit isgenerally massive with amygdules of calcite smallcalcite filled fractures and variable quartz veining.Pyrite sulfides very minor to trace through most ofunit.

81.6-90.9-massive with amygdules and 57o quartz veins^.Ocm in width.

90.9-92.5-flow breccia-altered pale greenish fragments to 3cm,elongated in foliated to laminated unit. Foliated at620 to core axis.

92.5-109.3-massive to weakly foliated mafic volcanic, possible15cm breccia at 97.1m. Chalcopyrite asdisseminations to <'^% 106. 2-106. 3m associated withquartz vein. This section may be pillowed, largepillow 2m , chloritic selvages.

109.3-110.5-flow breccia with fragments pale green to 2cm,elongated to core width plus.

110.5-141.9-amygduloidal section with amygdules to 7mm, calciteand feldspars Pale to medium green matrix. Quartzand or carbonate ^.Ocm veins, 5 0Xo chalcopyrite asdisseminations and small fracture filling at 1 10.8-110.9m"!:1 07o. This unit is also moderately to stronglyfoliated to laminated giving a fragmental appearanceas at 126.0-130.0, flow breccia. Chalcopyrite occurswith quartz vein at 120.4m, 2cm -^lyo. Foliations 430to core axis.

Sample #

From To Length (meter)

Cu ppm

Zn ppm

\,

Pbppm

Agg/ton

Auppb

Page 2 GeoCal Exploration Services

Page 5: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

Diamond Drill Log Hole# HM98-26

AssaysFrom

191.0

198.9

To

198.9

213.0

213.0

Description

141.9-1534-light to medium green massive to possibly pillowedwith sericitic sections, minor quartz veining as^.Ocm veins. Sericite increases down hole. Largerquartz vein at 151.7m, 20cm white, barren.

1534-166.9-light to medium green, laminated and foliated, withlocal sections which appear brecciated. Unit issericitic to chloritic Calcite as discontinuous veinletsand knots, 100Xo and minor quartz veining ^cm veinsat 52 C to core axis.

166.9-177.5-medium green, massive with abundant calcite,amygdules of calcite, minor pyrite with calcite vein at169.1 meters.

177.5-191.0-laminated to massive, alternating 43" to core axis.Laminated sections locally have altered fragments.Unit is dark green to pale green in laminations.Quartz vein 50Xo as 1cm-2cm veins 48" to core axisand randomly oriented.

Felsic Volcanic-fine grained, light to medium grey, grey green,sericitic, foliated. Unit contains elongated spherulesand knots which contain silica or chloritic material.Unit is foliated at 430 to core axis. Sericite is onfoliations and is locally pervasive as at 195. 4-1 95. 7m.

Mafic Volcanic/Intrusive-medium grained, medium to dark green, with whitishflecks, locally siliceous massive. Upper 1.0-1.5meters is fine grained. Unit is magnetic locally.

205.6-209.3-Felsic Volcanic-light grey, hard, siliceous and hasspherules coalesced to give dappled appearance

End Of HoleAcid Test111.0m -460 213.0m -420

Sample #

From To Length (meter)

Cu ppm

Znppm

Pb ppm

Ag g/ton

Au ppb

Page 3 GeoCal Exploration Services

Page 6: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

Ai. 208*

1190167

HM98-26L 3800 E . lOlOOmN Az- 20ff , Dip -W 298

Z13.00 m.\^ Mafic Voteanle/lntruriv* HUM-2*

100 100

-100

PROSPECTORS ALLIANCE CORPORATION

Exploration Tlmmlra. ONTARIO

HALFMOON LAKE PROJECTROBB TOWNSHIP

SECTION 5800 E DDH HM98-26

NT* 42-V12 PHOJECTi (142

t l l OOt nn

Page 7: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

PAL-HM98-26L 5800 E , 10160mN Az. 206' , Dip -45'

PROSPECTORS ALLIANCE CORPORATION

Exploration Timmins ONTARIO

HALFMOON LAKE PROJECTROBB Township

DIAMOND DRILL PLAN HM98-26

DRAWN: d 4 l DATE: 22/12/99

SUPERVISED: R Colhoun DATE: 22/12/99

NTS: 42-A/12 PROJECT: SH2

FILE: HLFMNPN9

SCALE 1:1 000 (metres)

O 5 10

Page 8: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

Ontario Declaration of Assessment WorkMinistry olNorthern Developmentand Mines Performed on Mining Land

Mining Act, Subsection 66(2) and 66(3), R.S.0.1990

Transaction Number (office use)

asessment Files Research Imaging

subsections 65(2) and 66(3) of the Mining Act. Under section 8 of the Mining Act. tt' iment work and correspond with the mining land holder. Questions about this colleclk ipment and Mines. 3rd Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E 6B5.

1TA12SE2010 2.19963 ROBB 900

instructions: - For work performed on Crown Lands before recording a claim, use form 0240. - Please type or print in ink.

1. Recorded holder(s) (Attach a list if necessary) /. ' -- l-"Name

t"* P \o r f f- S X+-U ' C-o t*-f*0 r xv r,'Client Number - ^

Address Telephone Number

Fax Number

^s-/

MJUName Client Number

Address

ty^ (Jell fTelephone Number

/V oFax Number

l2. Type of work performed: Check (X) and report on only ONE of the following groups for this declaration.

n Geotechnical: prospecting, surveys, LJ assays and work under section 18 (regs)

Physical: drilling stripping, trenching and associated assays D Rehabilitation

XVcxk Type

A ' * Df-rn ^ f i-j f PI A* i? " G f-f ''i'*1-^

Dales Work From ^M fcQ /?PCs ^o -3- S O^? /^f^ Performed Day | Month [ Year Day | Month L Year

Global Positioning System Data (If available) Townehip/Aroa p i i K-o\o\r* '

M or G-Plan Numbm /^ "Z G l C~) CT ^ " (0 ^)

Office Use

Commodity

Total S Value of , ̂ ^~^r^ Work Claimed /CA ~T7(-J

NTS Reference

Mining Division

Resident Geologist District

0^fl^l&s*^-'

77/X-o-Please remember to: - obtain a work permit from the Ministry of Natural Resources as required;

- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for assigning work;- include two copies of your technical report.

3. Person or companies who prepared the technical report (Attach a list if necessary)

Name 6 C &C ^ ̂ ^^^Lor^f*^' L-\~^*'*

.JJicob 3-^0- L-^^'f-^^ il i* c* r*'~- -~.V4 iP^r^/-.*/

1 J H i it-

Name

Address

Telephone Number 70-S 2c^-7 -3 S l (

^U* 1 JUMllsCI

-7ePS aoo - "5 1 -i. i

Telephone Number

fax Number

Telephone Number

Fax Number

4. Certification by Recorded Holder or Agent, do hereby certify that l have personal knowledge of the facts set forth m

this Declaration of Assessment Work having caused the work to be performed or witnessed the same during or after its completion and, to the best of my knowledge, the annexed report is true.

Signature of Recorded Holder or Agent

Telephone Number 5 -2.

Fax Number

OEC 28 1999d'-yo/tfTv

PORCUPINE MINING DIVISION

/W-P^ZP

RECEIVEDDEC 2 4 1999

( GEOSCIENCE ASSESSMENT OFFICE

Page 9: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

luilll.

whric wcik w;is i', .''lined, at Ihc tune woik w.C) peiiurmed A map c.nowuig the coninjuoub.

Mining Claim Number. Or if work was do/re on other eligible mining land, show in this

column the location number indicated on the claim map.

eg

eg

eg

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

TB 7827

1234567

1234568

t/ IOK*-!

/Z-I^&H

Column Totals

Number of Claim Units. For other mining land, list hectares.

16 ha

12

2

,'

/O

-

Value of work performed on this claim or other mining land.

526,825

0

5 8,892

S O "7*7 O

f 0-770

Value of work applied to thisclaim.

N/A

524,000

54,000

^00 O

'-i COG

Value of work assigned to other mining claims.

S24,000

0

0

H ooo

t-t ooo

Blnk. Value 01 to be distribute at a future date

52,825

0

M.892

b "796

67^0

;_______, do hereby certify that the above work credits are eligible(Prim Full Name)

subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment lo contiguous claims or for application to the cis

where the work was done.

Signature of Recorded Holder or AgenjAuthorized in Wrjtjc Date

6. Instructions for cutting back credits that are not approved.

Some of the credits claimed in this declaration may be cut back. Please check fV) in the boxes below to show how you wi prioritize the deletion of credits:

W 1. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated.I& ,' l l...Ml., lin. Ill liu l.Ill lull.l* Oltllllllj V/llll lllU l.lullllvl Hull.l) Idol, //KlHll'J 1/11'.V- //Uf'lw, lil

D 3. Credits are to be cut back equally over all claims listed in this declaration; or

U A. Liudib iiic- lo be- cut b;it.k ;i:. pnoiitizcd on Ilio alUjUicd appendix or a^ follows (describe):

Note: If you have not indicated how your credits are to be deleted, credits will be cut back from the Bank first, followed by option number 2 if necessary.

For Office Use Only_____________________Received Stamp

(03/87)

OEC 28 1999C

PORC NG DIVISION

Deemed Approved Date

Date Approved

Date Notification Sent

Total Value of Credit Approved

Approved for Recording by Mining Recorder (Signature)

Page 10: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

M*i M.ill y ul

Normam Development a,,ii Mines

ul

for Assessment Credit

Personal information collected on this form is obtained undar the authority of subsection 6(1) of the Assessment Work Regulation 6/96. nu section 8 ot the Mining Act. the information is a puolic record. This information will be used lo review the assessment work and correspond the mining land holder. Questions about this collection should be directed lo the Chief Mining Recorder. Mmtatry of Northern Development Mines, 6th Floor. 933 Ramsey Lake Road, Sudbury. Ontario. P3E 685.

Work Type

J-f^^-ab0L (fr/VlcJW} pr-. ll'~^

C A~S /A^O

fer "?o| ecfi^ r -

^ec/et^A-n'l)!- -

Units of WorkDepending on the type of work, list (he numbe of hours/days worked, metres ot drilling, kilo metres of grid line, number of samples, etc.

2- f l tAcJV* i -

AJS. i- T 1 /^ tfwle. -

S" O /^ s '

r^jO/^t -r-^/jH-^s'

Associated Costs (e.g. supplies, mobilization and demobilization).

"r ' o i*-n\f~ s

Transportation Costs

Food and Lodging Costs

Cost Per Unit of work

3*

3&0

.

^* '

6S 7-

Total Value of Assessment Work

Total Cost

7 t 1 H-

12-74

J So 0 .

Vfe

-Sft

. . . __ , -

1604*1~l o (#

to,-? to

.1. ..l..K. ...K ..f l (Hint l IIHUIIIIMlHI

WoiH llUul vvilliiii U*if yuuiM ul f jcii lot li 1,11 it.1 1 to i.luimoij ul MjU".,. i.l lin* i^itit^M lijul /t*ltiw f.l A i. k,t..,

II wfJih li. lniid .iiioi IwO yoars and up to five years after peitorm.mcb, it can only ue ciainieu di 01 ut

101AL VALUL Uf ASiiL^MLN l Vl/UIIK

Note:- Work older than 5 years is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in this statement of costs within 45 days 01 a request for verification and/or correction/clarification. If verification and/or correction/clarification is not made, the Minister may reject all or part of the assessment work submitted.^^^^^^^^^^^^^^^^^^^^^

Certification verifying costs:

t do hereby certify, that the amounts shown are as accurate as ma-,print full name)

reasonably be determined and the costs were incurred while conducting assessment work on the lands mdicaiou

the accompanying

to make this certification

l am.r stale company posiuon

JEC 23 1999

5:y\jxftx\-PORCUPINE MINING DIVISION

signature

Page 11: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

OntarioMinistry of Ministere duNorthern Development Developpement du Nordand Mines et des Mines

Geoscience Assessment Office 933 Ramsey Lake Road

January 26, 2000 6th FloorSudbury, Ontario

Lionel Bonhomme P3E 6B5EXPLORERS ALLIANCE CORPORATION95 WELLINGTON ST. W. SUITE 1800 Telephone: (888) 415-9845TORONTO, ONTARIO Fax: (877)670-1555M5J-2N7

Visit our website at: www.gov.on.ca/MNDM/MINES/LANDS/mlsmnpge.htm

Dear Sir or Madam: Submission Number: 2.19963

Status Subject: Transaction Number(s): W9960.00487 Approval

We have reviewed your Assessment Work submission with the above noted Transaction Number(s). The attached summary page(s) indicate the results of the review. WE RECOMMEND YOU READ THIS SUMMARY FOR THE DETAILS PERTAINING TO YOUR ASSESSMENT WORK.

If the status for a transaction is a 45 Day Notice, the summary will outline the reasons for the notice, and any steps you can take to remedy deficiencies. The 90-day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, will no longer be in effect for assessment work which has received a 45 Day Notice. Allowable changes to your credit distribution can be made by contacting the Geoscience Assessment Office within this 45 Day period, otherwise assessment credit will be cut back and distributed as outlined in Section #6 of the Declaration of Assessment work form.

Please note any revisions must be submitted in DUPLICATE to the Geoscience Assessment Office, by the response date on the summary.

If you have any questions regarding this correspondence, please contact STEVE BENETEAU by e-mail at [email protected] or by telephone at (705) 670-5855.

Yours sincerely,

ORIGINAL SIGNED BYBlair KiteSupervisor, Geoscience Assessment OfficeMining Lands Section

Correspondence ID: 14523

Copy for: Assessment Library

Page 12: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

Work Report Assessment Results

Submission Number: 2.19963

Date Correspondence Sent: January 26, 2000 Assessor: STE VE BENETEAU

Transaction Number

W9960.00487

Section:16 Drilling PDRILL

First Claim Number

1190167

Township(s) l Area(s)

ROBB

Status

Approval

Approval Date

January 18, 2000

Correspondence to:

Resident Geologist South Porcupine, ON

Assessment Files Library Sudbury, ON

Recorded Holder(s) and/or Agent(s):

Lionel BonhommeEXPLORERS ALLIANCE CORPORATIONTORONTO, ONTARIO

FALCONBRIDGE LIMITED TORONTO, ONTARIO

Page: 1

Correspondence ID: 14523

Page 13: I.( K i-M -MMAK V M 11,i. l' Project HALFMOON …...-light to medium green massive to possibly pillowed with sericitic sections, minor quartz veining as ^.Ocm veins. Sericite increases

17 I'll 1 li*"'

*—

40- --

\

'

.

'12929 i

16 UNITS

"l; 10UNITS

i i

' /;

•L - y p-!\ '-y'" f J

u

i. A(

' ' A

12 UNITS

1116S71

1' 1.6670

. J ^116669

:J,s\*

•i r

L

lcr,1116667

12315,42^

* rt———

80

1 — t

UJ /' itr^'y-. . i'

l/ L

y ii

'1

;-'' .-.[^,. ' ****-L,

-•- -,

i

ili

s

,,

W1 ,. -",,

*,

1 IM-V

\

Y\.

/;

-: -^'

;'

,-

1

\

'

l

11

V if-

1irin

-

x

\N

1 ' \

•V -

vf \ ' i

f? Comrnantto . 1 tala:

.'Tk

^

1 ,-,., 1,

11

: - 'i " J !

: 1 *

,

t: - *-'

'1

11 i .

.11 i

- 1 "' '

...i

L

'

^

\ .

.-•~'\^--

f f

f/'

/-"'^

1 = 1 '' .-f

\

——— ; —— *

l

, ' "' . 1, '

.-f'r-- f \~ S "' -. ''J \ ' ;

f ' '

) f ,,. ' '; ' '' ' v ; - ' 'V 1 \ **'.l 'i '"'" 1M*- - ' /' i ' .'- V'i , ' ' 'y

-.')"y . 1 .' j ' - ' " ' l; ' ' ' '^ ! ' " ' 1 -* ; ' . -.1i ' / -' \'* ' * ' . ™

' J - ' " 1 'l ' ' 'f-' ' / '^- 1 ' . .l1

"s ' ; -f - ' .; ; /"^ "L '^ ' -. f ' ' . ' ' } V\,

i y ' ' y v ^i^~J ~ viV. ( [ i - 7 "^"^f \ : y, ^ v -

"A KI\ ' QQ ,---^-(/ '

v)| ,, ^ , if--..'\ f ̂"""w"" "

1 ^ '' ,,, ' . r' .' "' : l i ' . - f ''''f - i' . "' : i i '*! j' .' 1 '' .' . : ' ' 1

'i r/7 . i ^ ;- ' i ,. i, . ^ f . ' . ,

! C' ' - .' ' i \'*~.f - J ' ' ''. '. j :1 f -' 1 '.. '. Lj iKAMISftO^IAj^i .'V' . i : ^ fr "^".Ti .~^ s,' ,pj ' ~ni^

L i ' -' ' | -' HILL ; -1 ."1 \ ' •- i ,, i 1 P1 P 4. 1 ~?~*' ; '. '^

M. f^ fH|J ; , p , ' i :: J ^^ ^~ ^ 1 ' - ,V H ' fs ' \ N -i,' f: ** y

\. 1 ' .. s'' '1 t (J/:\ ,/' i(i\'

s -

^J J"l^ '

^J 1 . J/

iJv

..t.y|L

.7 \VN

L.(

f -fi *f'

_ Ij ___ i ' . . '

. ' 'i

i - ' : ^ ,—' i . ,-V

' V 'i: ' ? "rx

^;I*> . i H L : ,;f ' * '. 1 H ' ,ir — — -'—-- — — -*-.-.- — ^^^ - .. ,

\J^^ - : ' *fl10 i x^f -'v ' ' '

•' A

I6M .-... L----- ^^' ' \ IBM ; : C

i 1 -f TURISIBULL TOWNSHIP. j : ;^'' ' ' '

•O 1*44' 1*41'

v 'i i K'-^r-"""'vMYvr'i.:^

1190104 l - . C L M ^ l 47 t

te^n-SljKl)) ;

:i8 P rt&i&rfiiBMV*"'*;

*f -Ti'HjX ^'r !--7ihfr

ITS) - ~ t———f

,U / ' -'.* ^. i --- --J————~-

Kamiskotia \ ^4236077

' V A r

r" 10

11*40'ZONE 17

?0 40

11*1*' W* I*'

Ministry ofNaturalResources

Ministry ofNorthern Developmentand Mines

Ontario

INPEX TO LAND DISPOSITION

PLAN

G-3968Toufnttup

ROBB

M.H.R. ADMINMTRATIVE DISTRICT

TIMMINSMMIttB DIVISION

PORCUPINELMC TITLES ̂ REGISTRV DflflSKM

COCHRANE

•cat* r WOODItM MM

*MiM

Hid t Hi

IMW HID MH MM HH 7MD MM (•MM^ F*

Centaur Inbrval 1*

AREAS WITHDRAWN FROM DISPOSITION

MHO- Mining Right* Only Surfat* Right*Only

- Mining and SurhJc* Rights

SYMBOLS Onto i*. PH*

Boundary Township, Ma* titan, Baaslin*.

Road allowance, survtyad

Lct/CuncMBuri, surveyed

Parcel surveyed

RlQh1-of-war. road

railway . utmty

Reservation

Cliff. Pit. PH* - Contour . . . . . . . . .

INTO*BUDUCOT

nix ON HLC.

Control poml (horizontal) . - .

Flcodedland . . .,

Mm* haad frame .

Pipeline (above around)

Railway; single l rack . . . . .doubt* trickabandoned . .

Pond. highway. county, lown*Tiip

. A f!St PLANS OF SUBDIVISION - NOT OPEN FOR STAKING

if ail, Quart

Shoreline (original)

TraotmiiKonliiv.

Wooded area

SURFACE RIGHTS DISPOSITION UNDER THE Pi-A. - NOTICE RECFIVED MARCH T, r**l

TWP IB SUBJECT TO FOBCST ACTIVITY IN ll*M/!* THf R WFOBMA'TIOH Of* FILE.

DISPOSITION OF CROWN LANDSf "" "l MIMING AMP SURFACE RIGHTS

R 4 S UNDER SECTION SB OF THE MINING ACT, RAO, 19*01^ JtWei* NO. W,P. 6/17 NW WTED APR. W/ftT

SurtBc* a Mmng Rights Surface Rights Only Mining Bights Only

Learnfiurtac* X Mmtnfi Rights SuifaceRiglnls Onli,-

eQ

Licence of Occ upabor*

Cancelled .

ac9

THE INFORMATION THAT APPEARS ON THIS MAP HAS BEEN COMPILED FROM VARIOUS SOURCES, AND ACCURACY (8 NOT GLJAFUNTEEP. THOee WISHING TO STAKE MIN ING CLAIMS SHOULD CON- Wft.T WITH THE MMINfl reCOHDER. MINISTRY OF NORTHERN OEVEUOP- MENT AND MINES, FOR AD DITIONAL INFORMATION ON THE STATUS Of THE LANDS SHOWN HEREON.

AUOUST IS, BY D.C,CHfCKFD BY C.W.-—

M*p toua Mid land disposition dmttmo by Rurwyt and Mapping i, Ministry (H Natural Resource*

Ttwdiapoilllcrt o4 land, tocinon oltot Hbflc and funM bfiunctur^s on 11* indax w** complM tor adminiBtratrw purposes only

42A12SE2010 2.19963 ROBB 200