Copyright © 2016 Compass International, Inc. 1 CONTENTS ABOUT THE FIRM 0 DIVISION 0 Introduction and Calibration Factors: includes the following: Location (Calibration) Factors - International values compared to Washington D.C. (Base of 1.00). Calibrations in this application are used to adjust the unit prices / schedule of rates depicted in the following Divisions 1 – 17. 188 # International Cities Location / Calibration Factors. General Conversion Values - Imperial to Metric Units. Import Duties General Sales Tax / Value. Added Tax / Consumption Tax. 284 # USA Location (Calibration) Factors. Detailed Design / Engineering / Architectural and CM Fees 51 # Facility Types. Union Labor Costs. USA and Canada State & Province Sales Tax / GST. Inflation Cost Indexes. 00 DIVISION 00 Cost Models / Cost Benchmarks (14 Number) includes cost and quantity data on the following: Power Station Cost Model. Crude Oil Distillation Complex. High Rise Apartment Building Cost Model. Waste Water Treatment Cost Model. EPCM Home Office Billing Rate Sheet. Consumer Products Facility. Steel Production Cost Model. Beverage Production Facility Cost Model. Petro – Chemical Cost Model. 78 # Engineering / Construction Cost Benchmarks. Class A Office Building UK Pharmaceutical Facility INTERNATIONAL INC. VII 27 SAMPLE

Upload: others

Post on 15-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

Copyright © 2016 Compass International, Inc.

1

CONTENTS

ABOUT THE FIRM

0DIVISION 0Introduction and Calibration Factors: includes the following:Location (Calibration) Factors - International values compared to Washington D.C. (Base of 1.00). Calibrations in this application are used to adjust the unit prices / schedule of rates depicted in the following Divisions 1 – 17.188 # International Cities Location / Calibration Factors.General Conversion Values - Imperial to Metric Units. Import Duties General Sales Tax / Value. Added Tax / Consumption Tax.284 # USA Location (Calibration) Factors.Detailed Design / Engineering / Architectural and CM Fees 51 # Facility Types.Union Labor Costs.USA and Canada State & Province Sales Tax / GST.Inflation Cost Indexes.

00DIVISION 00Cost Models / Cost Benchmarks (14 Number) includes cost and quantity data on the following: Power Station Cost Model.Crude Oil Distillation Complex.High Rise Apartment Building Cost Model.Waste Water Treatment Cost Model.EPCM Home Office Billing Rate Sheet.Consumer Products Facility.Steel Production Cost Model.Beverage Production Facility Cost Model.Petro – Chemical Cost Model.78 # Engineering / Construction Cost Benchmarks.Class A Office BuildingUK Pharmaceutical Facility

I N T E R N A T I O N A L I N C .

VII

27 SAMPLE

Page 2: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

Copyright © 2016 Compass International, Inc.

01DIVISION 01General Requirements / General Conditions / Preliminaries: includes cost data on the following: Rules of thumbInsurance CostsProtection of Completed WorkScaffoldingTemporary Utilities, Structures & FencesPermitsTesting / InspectionSurveysBondsSite Staff / Field Personnel Construction Equipment Costs / RentalTemporary Construction Items

02DIVISION 02Site Construction: includes schedule of rates for:Demolition (including asbestos)ExcavationRock removalHardcore / StoneShoringPlanking & Strutting / Sheet PilingFoundation PilingUtilities Miscellaneous Site ImprovementsPavingConcrete CurbingFencingSite LightingMarine WorkUnderground Storage Tanks

55

77

II. | CONTENTS

SAMPLE

Page 3: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

Copyright © 2016 Compass International, Inc.

03DIVISION 03Concrete Work: includes schedule of rates for:ConcreteFormworkReinforcementPrecast ConcreteGrouting

04DIVISION 04Masonry: includes schedule of rates for:BrickworkMasonryRefractory

05DIVISION 05Metals: includes schedule of rates for:Structural SteelMetal JoistsMetal FramingMiscellaneous IronMetal Decking

06DIVISION 06Wood and Plastics: includes schedule of rates for:Rough CarpentryFinish CarpentryCarpentry Specialties

97

123

133

151

CONTENTS | III.

SAMPLE

Copyright © 2016 Compass International, Inc.

Page 4: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

IV. | CONTENTS

Copyright © 2016 Compass International, Inc.

07DIVISION 07Thermal and Moisture Protection: includes schedule of rates for:Damp proofing and WaterproofingThermal ProtectionRoofing SystemsCaulking & Sealants

08DIVISION 08Doors and Windows: includes schedule of rates for:Wood and Plastic DoorsMetal Doors and FramesWindowsGlazing / Glazed Curtain WallsHardware

09DIVISION 09Finishes: includes schedule of rates for:Plaster and Gypsum BoardTileTerrazzoCeilings Flooring Wall FinishesAcoustical TreatmentPainting and Coatings

10DIVISION 10Specialties: includes schedule of rates for:Visual Display BoardsCompartments and CubiclesLouvers and VentsWall and Corner GuardsMiscellaneous Facility Specialties

161

175

183

195

SAMPLE

Page 5: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

CONTENTS | V.

Copyright © 2016 Compass International, Inc.

11DIVISION 11Equipment: includes schedule of rates for:Maintenance EquipmentLoading Dock EquipmentIndustrial and Process EquipmentLaboratory EquipmentMaterial Handling Equipment

12DIVISION 12Furnishings: includes schedule of rates for:FurnitureManufactured Casework

13DIVISION 13Special Construction: includes schedule of rates for:Pre-Engineered Buildings & StructuresRadiation ProtectionStorage TanksSecurity Access and Surveillance

14DIVISION 14Conveying Systems: includes schedule of rates for:ElevatorsEscalators and Moving WalksHoists and Cranes

203

215

219

227

SAMPLE

Page 6: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

VI. | CONTENTS

Copyright © 2016 Compass International, Inc.

15DIVISION 15Mechanical Work: includes schedule of rates for:Building Services PipingPlumbing FixturesProcess PipingFire Protection PipingHeating, Ventilating & Air Conditioning EquipmentDuctworkInsulation

16DIVISION 16Electrical Work: includes schedule of rates for:Electrical Equipment / TransformersCable / Control wireConduitCable trayCommunicationsInstrumentation and Controls

17DIVISION 17Process Equipment / Major Equipment: includes schedule of rates for:AgitatorsAir HandlersBoilersChillersCompressorsCondensersConveyorsCooling TowersDuctworkHeat ExchangersPumpsTanks

235

305

337 SAMPLE

Page 7: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

06. | DIVISION 0

Copyright © 2016 Compass International, Inc.

Location (Calibration) FactorsINTERNATIONAL VALUES COMPARED TO WASHINGTON D.C. (BASE OF 1.00)

# COUNTRY CITY LOCATION FACTOR A LOCATION FACTOR B

1 Afghanistan 0.91 - 0.96 0.75 - 0.852 Albania 0.89 - 0.93 0.84 - 0.883 Algeria 0.90 - 0.95 0.85 - 0.884 Angola 0.92 - 0.97 0.70 - 0.785 Argentina 0.92 - 0.95 0.86 - 0.916 Armenia 0.90 - 0.94 0.85 - 0.887 Australia Melbourne 1.02 0.98 Australia Perth 1.03 0.99 Australia Sydney 1.03 0.998 Austria 1.04 1.009 Azerbaijan 0.92 - 0.97 0.84 - 0.8910 Bahrain 0.92 - 0.95 0.84 - 0.8811 Bangladesh 0.90 - 0.92 0.65 - 0.7512 Belarus 0.93 - 0.96 0.85 - 0.9013 Belgium 1.01 – 1.04 0.96 - 0.9914 Belize 0.91 - 0.95 0.83 - 0.8915 Benin 0.90 - 0.95 0.67 - 0.7916 Bhutan 0.90 - 0.95 0.71 - 0.8117 Bolivia 0.90 - 0.94 0.76 - 0.8618 Bosnia 0.90 - 0.95 0.80 - 0.8619 Botswana 0.90 - 0.95 0.67 - 0.7820 Brasil 0.88 - 0.96 0.79 - 0.8921 Bulgaria 0.90 - 0.95 0.80 - 0.8522 Burkina Faso 0.88 - 0.95 0.67 - 0.7723 Burundi 0.88 - 0.95 0.67 - 0.7824 Cambodia 0.84 - 0.94 0.67 - 0.7725 Cameroon 0.90 - 0.95 0.70 - 0.7826 Canada Calgary AL 1.05 - 1.10 1.00 - 1.06 Canada Charlottetown PEI 0.96 – 0.99 0.93 Canada Edmonton AL 1.04 - 1.13 1.00 – 1.05 Canada Fort McMurray AL 1.40 - 1.55 1.07 – 1.13 Canada Halifax NS 0.96 – 0.99 0.93 Canada Hamilton ONT 0.95 – 0.98 0.93 Canada Laval QUE 0.95 – 0.97 0.92 Canada Lethbridge AL 0.97 – 0.99 0.93 - 0.96 Canada London ONT 0.95 – 0.98 0.93 Canada Moncton NB 0.94 – 0.97 0.92 – 0.94 Canada Montreal QUE 0.96 – 0.98 0.95 Canada Quebec City QUE 0.96 – 0.98 0.93 - 0.96 Canada Regina SASK 0.96 – 0.98 0.93 – 0.95 Canada Sarnia ONT 0.95 – 0.98 0.93 Canada St Johns NFL 0.96 – 0.98 0.92 – 0.94 Canada Toronto ONT 0.97 - 0.99 0.94 - 0.96 Canada Whitehorse YUK 0.98 – 1.00 0.95 – 0.97 Canada Winnipeg MAN 0.95 – 0.97 0.92 – 0.94

SAMPLE

Page 8: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

58. | DIVISION 1

Copyright © 2016 Compass International, Inc.

4

2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor

Construction Equipment Total

Home or Branch Office Expenses (Overhead) that needs to be added to the final construction selling price of a contractors bid. This includes the costs associated with the Business Owners salary, the cost of employing PM's, Estimators, HO Engineers, Purchasing staff, Legal & Admin staff, office rent & utilities, Professional Society dues, Computers, Telephones, Copy machines that support the field operations.

62 Annual Turnover (Sales) $1 - $5 million % 15% - 20%63 Annual Turnover (Sales) $5 - $25 million % 12.5% - 15%64 Annual Turnover (Sales) $25 - $50 million % 7.5% - 10%

65 Annual Turnover (Sales) $50 - $100 million % 5% - 7.5%Profit that needs to be added to the final construction selling price of a contractors bid.

66 Annual Turnover (Sales) $1 - $5 million % 10% - 15%67 Annual Turnover (Sales) $5 - $25 million % 7.5% - 10%68 Annual Turnover (Sales) $25 - $50 million % 5% - 8%

69 Annual Turnover (Sales) $50 - $100 million % 3.5% - 5.5%

70General Contractors mark up on change orders % 7.5% - 15%

General Contractors (Total Overhead - Home office and Profit) this excludes the construction site overhead i.e. salaries of the non- working General Superintendent, Field Engineers and Site staff, office trailers, Porta Johns, temporary electricity and water, storage sheds, field office supplies.

71 Annual Turnover (Sales) $1 - $5 million % 25% - 35%72 Annual Turnover (Sales) $5 - $25 million % 20% - 25%73 Annual Turnover (Sales) $25 - $50 million % 12.5% - 18%

74 Annual Turnover (Sales) $50 - $100 million % 8.5% - 13%

Fix fee (Optional) Some Contractors and Construction Managers charge a fixed fee on the pass thru value of the construction contract cost (Adjust profit margin above if applicable)

75 Project Size $1 - $5 million % 7.5% - 10%76 Project Size $5 - $25 million % 5% - 6.5%77 Project Size $25 - $100 million % 2.5% - 5%

SAMPLE

Page 9: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

DIVISION 1 | 59.

Copyright © 2016 Compass International, Inc.

5

2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor

Construction Equipment Total

Bid / Performance Bonds

78

Bid / Labor & Material Payment Performance Bond Minimum - Maximum percentage of total project cost % 0.35 - 2.00Field Construction Staff

79 Site Manager / Project Manger (Maximum) MONTH 12,517 12,517

80 Site Manager / Project Manger (Minimum) MONTH 9,776 9,77681 Superintendent (Maximum) MONTH 11,750 11,75082 Superintendent (Minimum) MONTH 9,201 9,20183 Trade Foreman MONTH 7,130 7,13084 Civil Engineer / Field Engineer MONTH 7,361 7,36185 Cost Engineer / Estimator / Planner MONTH 7,706 7,70686 Purchaser / Expediter MONTH 6,670 6,67087 Office Engineer / QA - QC Engineer MONTH 9,891 9,89188 Field Inspector MONTH 7,706 7,70689 Safety Manager MONTH 6,555 6,55590 General Laborer / Runner / Clean up MONTH 2,944 2,94491 Security / Watchman MONTH 4,025 4,02592 Administrator / Secretary / Document MONTH 3,450 3,450

Equipment Mob - Demob Travel and set up costs (On to Site - Off Site) - 2 Events Order of Magnitude Costs

93Bulldozer / Scraper / Front End Loader ( Minimum) EACH 295 295

94Bulldozer / Scraper / Front End Loader (Maximum) EACH 805 805

95 Back Hoe / JCB (Minimum) EACH 115 11596 Back Hoe / JCB (Maximum) EACH 290 29097 Crane 100 Ton Crawler (Minimum) EACH 3,390 3,39098 Crane 100 Ton Crawler (Maximum) EACH 8,450 8,45099 Tower Crane 250' high (Minimum) EACH 16,925 16,925

100 Tower Crane 250' high (Maximum) EACH 28,500 28,500101 500 Ton Heavy Lift Crane (Minimum) EACH 30,000 30,000102 500 Ton Heavy Lift Crane (Maximum) EACH 80,000 80,000

Construction Equipment / Plant Hire (excludes fueling and maintenance)

103 0.5 Ton Pickup truck HOUR Excl Oper 7.30 7.30

104 1 Ton Pickup truck HOUR Excl Oper 9.98 9.98

105 1.5 Ton Flatbed truck HOUR Excl Oper 17.18 17.18

106 10 CY Dump Truck HOUR Excl Oper 68.05 68.05

SAMPLE

Page 10: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

DIVISION 5 | 145.

Copyright © 2016 Compass International, Inc.

13

2016 Division 5 - Structural Steel / Metals - Union Unit Material Labor

Construction Equipment Total

325High strength anchor bolts, c/w bolt, nut and washer 3/4" dia 2" long EACH 1.10 3.07 0.20 4.36

326 Ditto 3" long EACH 1.22 3.30 0.21 4.74327 Ditto 4" long EACH 1.52 3.54 0.23 5.29328 Ditto 6" long EACH 1.77 3.77 0.25 5.79329 Ditto 8" long EACH 2.07 4.01 0.26 6.34

330High strength anchor bolts, c/w bolt, nut and washer 1" dia 4" long EACH 1.34 4.01 0.26 5.61

331 Ditto 6" long EACH 1.49 4.48 0.29 6.26332 Ditto 8" long EACH 1.86 4.95 0.32 7.13333 Ditto 10" long EACH 2.15 5.43 0.35 7.93334 Ditto 12" long EACH 2.53 5.90 0.38 8.81335 Steel lag screws 1/4" dia 2" long EACH 0.17 2.48 0.16 2.81336 Ditto 3" long EACH 0.21 2.59 0.17 2.97337 Steel lag screws 3/8" dia 3" long EACH 0.35 3.07 0.20 3.62338 Ditto 4" long EACH 0.45 3.30 0.21 3.96

Stairs

339Pan type stairs, concrete filled pan 42" wide TREAD 503.66 56.61 3.68 563.95

340 Ditto 48" wide TREAD 589.69 66.05 4.29 660.03

341Vertical steel ladder 24" wide, attached to concrete or masonry wall LF 51.48 25.95 1.69 79.11

342 Ditto with half cage LF 63.34 30.66 1.99 96.00

343Railing 1 1/2" dia steel with 2 rails 42" high and uprights every 36" LF 31.67 11.44 0.74 43.86

344Wall rail 1 1/2" dia attached to concrete or masonry wall LF 17.87 8.96 0.58 27.42

345 Spiral steel stairway 48" dia LF 432.45 12.38 3.28 448.11346 Ditto 60" dia LF 578.63 14.74 3.91 597.28

347Stairs 36" wide with associated handrails and kick plates LF 347.18 21.82 5.78 374.78

348 Ditto 48" wide ditto LF 414.17 28.90 7.66 450.73

349Aluminum railings 42" high attached to floor LF 50.49 7.37 1.95 59.82

350Steel handrail, bolted to wall 1 1/4" dia LF 8.59 7.19 1.91 17.69

351 Ditto 1 1/2" dia LF 9.44 7.96 2.11 19.51352 4" high kick plate LF 5.91 3.95 1.05 10.91

Checker Plate Grating / Flooring

3531/4" thick steel plate with support framing SF 24.16 4.13 1.22 29.51

354 3/8" thick ditto SF 35.02 4.42 1.30 40.75355 1/2" thick ditto SF 45.99 4.72 1.39 52.09356 1/4" ditto galv SF 28.57 4.42 1.30 34.29357 3/8" thick ditto SF 39.53 4.72 1.39 45.64358 1/2" thick ditto SF 50.49 5.01 1.48 56.98

SAMPLE

Page 11: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

DIVISION 7 | 163.

Copyright © 2016 Compass International, Inc.

3

2016 Division 7 - Roofing External Closure - Union Unit Material Labor

Construction Equipment Total

49EPDM -Elastomeric membrane, 45 mils thick to walls SF 1.34 1.03 0.08 2.44

50 Ditto 60 mils SF 1.47 1.11 0.08 2.66

51

EPDM -Elastomeric membrane - nylon reinforced, 45 mils thick to walls SF 1.46 1.02 0.08 2.55

52 Ditto 60 mils SF 1.58 1.11 0.08 2.78

53Plain neoprene membrane - 45 mils thick to walls SF 1.81 1.02 0.08 2.91

54 Ditto 60 mils SF 2.69 1.11 0.08 3.89

55Nylon reinforced neoprene membrane - 45 mils thick to walls SF 1.89 1.02 0.08 2.99

56 Ditto 60 mils SF 2.81 1.11 0.08 4.0157 Waterproof building paper SF 0.03 0.23 0.02 0.28

58Silicone spray on to walls 1 application SF 0.12 0.18 0.01 0.32

59 Ditto 2 applications SF 0.26 0.45 0.03 0.7460 PVC sheeting 10 mils SF 0.23 0.93 0.07 1.2361 Ditto 20 mils SF 0.35 1.05 0.08 1.48

62Asphalt sheeting protection board 1/2" thick SF 0.86 1.45 0.11 2.42

63Rubberized membrane sheeting 1/4" thick SF 0.77 1.23 0.09 2.09

64 Ditto with 1/2" protection board SF 1.66 1.57 0.12 3.35

65Bentonite waterproof panels 3/16" thick SF 1.10 0.65 0.05 1.80

66 Ditto 1/2" thick 1.98 1.23 0.09 3.30

67Ditto 1/4" thick with geotextile backing SF 1.33 0.65 0.05 2.03

68Ditto expanded polystyrene drain board 1 1/2 wide SF 1.42 0.21 0.02 1.65

69 Ditto 2" wide SF 1.93 0.23 0.02 2.18

70

Cement waterproof pargeting, 1/8" thick (trowelled & sprayed on) SF 0.29 0.97 0.07 1.33

71 Ditto 1/4" thick SF 0.38 1.58 0.12 2.0772 Ditto 1/2" thick 0.42 1.97 0.15 2.54

73

Ironite metal fiber painting/ waterproofing -2 coat application to floors SF 0.77 2.56 0.19 3.52

74 Ditto to walls SF 0.77 2.72 0.20 3.70

75

Supply & install board / thermal insulation, 1" thick rigid mineral fiber SF 0.67 0.26 0.02 0.96

76 Ditto 1 1/2" thick SF 0.98 0.35 0.03 1.3577 Ditto 2" thick SF 1.31 0.35 0.03 1.6878 Ditto 3" thick SF 1.66 0.41 0.03 2.10

SAMPLE

Page 12: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

250. | DIVISION 15

Copyright © 2016 Compass International, Inc.

16

2016 Division 15 - Mechanical Work - Union

Unit of Measure Material Labor

Construction Equipment Total

357 Ditto 1" dia EACH 140.04 36.66 3.12 179.82358 Ditto 1 1/2" dia EACH 158.56 36.66 3.12 198.34359 Ditto 2" dia EACH 236.11 48.12 4.09 288.32360 Ditto 3" dia EACH 555.55 48.12 4.09 607.76361 Ditto 4" dia EACH 734.94 54.99 4.67 794.61362 Ditto 6" dia EACH 902.76 68.74 5.84 977.35363 P trap ABS / DWV 2" dia EACH 13.02 32.08 2.41 47.51364 Ditto 3" dia EACH 48.61 36.66 2.75 88.02365 Ditto 4" dia EACH 97.22 41.25 3.09 141.56

366 Interceptor / trap 5 GPM including piping hook up EACH 599.37 219.95 16.50 835.81

367 Interceptor / trap 10 GPM including piping hook up EACH 980.60 263.93 19.79 1,264.32

368 Interceptor / trap 25 GPM including piping hook up EACH 1,805.53 351.86 26.39 2,183.78

369 Interceptor / trap 50 GPM including piping hook up EACH 3,298.56 1,055.71 79.18 4,433.45

370 Interceptor / trap 100 GPM including piping hook up EACH 6,321.70 1,996.17 149.71 8,467.58

371 Cast iron steam trap c/w strainer & relief 1/2" dia EACH 233.79 29.66 2.22 265.67

372 Ditto 3/4" ditto EACH 324.07 36.50 2.74 363.31373 Ditto 1" ditto EACH 423.60 54.75 4.11 482.46374 Ditto 2" ditto EACH 624.99 70.72 5.30 701.02

375 Atmospheric vacuum breaker c/w threaded connection 1/2" dia EACH 45.72 25.09 1.88 72.69

376 Ditto 3/4" ditto EACH 55.55 25.09 1.88 82.53377 Ditto 1" ditto EACH 65.28 31.94 2.40 99.61378 Ditto 1 1/2" ditto EACH 74.65 31.94 2.40 108.99

379 Anti - siphon - brass 1" dia device EACH 145.41 36.50 2.74 184.65380 Ditto 1 1/2" dia EACH 178.24 36.50 2.74 217.48381 Ditto 2" dia EACH 266.20 50.19 3.76 320.15

382 Water heater - gas fired - 25 gallon EACH 879.62 747.14 56.04 1,682.79

383 Ditto 50 gallon EACH 1,130.77 1,152.07 86.41 2,369.25384 Ditto 100 gallon EACH 2,298.58 1,560.43 117.03 3,976.04

385 Water heater - oil fired - 25 gallon EACH 1,249.98 976.41 73.23 2,299.62

386 Ditto 50 gallon EACH 1,782.38 1,243.33 93.25 3,118.96387 Ditto 100 gallon EACH 3,217.54 1,414.43 106.08 4,738.05

388 Water heater - electric - 25 gallon EACH 1,504.61 1,003.79 75.28 2,583.68389 Ditto 50 gallon EACH 2,546.26 1,368.80 102.66 4,017.72390 Ditto 100 gallon EACH 3,819.39 1,756.63 131.75 5,707.76

391 Heat exchanger CS - steam 4" dia x 24" long 10 - 30 GPM EACH 1,597.20 125.47 9.41 1,732.08

SAMPLE

Page 13: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

320. | DIVISION 16

Copyright © 2016 Compass International, Inc.

16

2016 Division 16 - Electrical Work - Union Unit Material Labor

Construct Equipt Total

452 Termination - 750 MCM - armored EACH 138.07 122.81 9.21 270.10

453Termination - 1,000 MCM - armored EACH 140.68 153.52 11.51 305.71Control / Instrument

454Instrument cable (All - in Maximum) LF $5.10 / LF

455Instrument cable (All - in Minimum) LF $3.05 / LF

456 Cable 2/C # 14 LF 0.92 3.45 0.22 4.60457 Cable 3/C # 14 LF 0.98 3.45 0.22 4.66458 1 PR # 16 LF 0.62 3.22 0.21 4.06459 2 PR # 16 LF 0.65 3.22 0.21 4.08460 4 PR # 16 LF 2.36 2.99 0.19 5.54

461Control cable 600 volt 2 wire - # 12 THWN PVC coated LF 0.28 0.92 0.06 1.26

462 Ditto 4 wire LF 0.48 1.38 0.09 1.96463 Fiber optic cable LF 3.28 2.88 0.19 6.34

Lighting (indoor and outdoor) 0 0

464Fluorescent fixture surface mounted with 4' - 1 - 40 w lamp EACH 60.24 82.90 6.22 149.36

465Fluorescent fixture surface mounted with 8' - 1 - 40 w lamp EACH 88.16 89.81 6.74 184.71

466Fluorescent fixture 1' x 4' surface mounted - with 2 - 40 w lamp EACH 117.35 96.72 7.25 221.32

467Fluorescent fixture 2' x 4' surface mounted - with 2 - 40 w lamp EACH 138.06 103.63 7.77 249.46

468Fluorescent fixture 2' x 4' surface mounted - with 3 - 40 w lamp EACH 149.56 115.14 8.64 273.34

469Fluorescent fixture 2' x 4' surface mounted - with 4 - 40 w lamp EACH 158.77 131.26 9.84 299.87

470Clean room 2' x 4' ceiling fixture (Maximum) EACH 1,012.42 414.50 31.09 1,458.01

471Clean room 2' x 4' ceiling fixture (Minimum) EACH 437.18 276.34 20.73 734.24

472Explosion proof lighting 2 lamp - 32 w 4' long EACH 2,830.17 253.31 19.00 3,102.48

473Explosion proof lighting 3 lamp - 32 w 4' long EACH 4,325.79 253.31 19.00 4,598.10

474Explosion proof lighting 2 lamp - 40 w 4' long EACH 2,738.14 253.31 19.00 3,010.44

SAMPLE

Page 14: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

Copyright © 2016 Compass International, Inc.

DIVISION 17

1

2016 Division 17 - Major Equipment - Union Unit Material Labor

Constr Equipt Total

Agitators

1

Agitator / H.D. mixer direct drive clamp mounted 1 HP 230 v TEFC Explosion proof motor stainless steel 3/4" dia shaft 60" long with 2 # 6" propellers EACH 4,191.97 303.20 22.74 4,517.91

2

Agitator / H.D. mixer direct drive clamp mounted 2 HP 230 v TEFC Explosion proof motor stainless steel 3/4" dia shaft 60" long with 2 # 6" propellers EACH 4,877.86 351.69 26.38 5,255.92

3

Agitator / H.D. mixer direct drive clamp mounted 3 HP 230 v TEFC Explosion proof motor stainless steel 3/4" dia shaft 60" long with 2 # 6" propellers EACH 7,341.09 528.36 39.63 7,909.08

4

Agitator / H.D. mixer gear driven clamp mounted 1 HP 230 v TEFC Explosion proof motor stainless steel 3/4" dia shaft 60" long with 2 # 6" propellers EACH 4,823.89 348.10 26.11 5,198.09

5

Agitator / H.D. mixer gear driven clamp mounted 2 HP 230 v TEFC Explosion proof motor stainless steel 3/4" dia shaft 60" long with 2 # 6" propellers EACH 8,251.67 595.79 44.68 8,892.15

6

Agitator / H.D. mixer gear driven clamp mounted 3 HP 230 v TEFC Explosion proof motor stainless steel 3/4" dia shaft 60" long with 2 # 6" propellers EACH 11,737.32 847.61 63.57 12,648.50

7

Agitator - including shaft / propeller / motor - top entry C.S. 1 HP (Maximum) EACH 4,171.23 301.33 22.60 4,495.16

SAMPLE

Page 15: I N T E R N A T I O N A L I N C...2016 Division 1 - General Requirements / Preliminaries - Union Site Unit Material Labor Construction Equipment Total Bid / Performance Bonds 78 Bid

DIVISION 17 | 361.

Copyright © 2016 Compass International, Inc.25

2016 Division 17 - Major Equipment - Union Unit Material Labor

Constr Equipt Total

152

Chiller - Hermetic centrifugal water cooled 50 Ton c/w controls and electrical / piping connections - excludes foundation ands inter-connecting electrical / piping systems EACH 32,919.36 2,320.91 348.14 35,588.41

153

Chiller - Hermetic centrifugal water cooled 100 Ton c/w controls and electrical / piping connections - excludes foundation ands inter-connecting electrical / piping systems EACH 64,581.39 4,553.18 682.98 69,817.54

154

Chiller - Hermetic centrifugal water cooled 250 Ton c/w controls and electrical / piping connections - excludes foundation ands inter-connecting electrical / piping systems EACH 143,804.46 10,137.87 1,520.68 155,463.02

155

Chiller - Hermetic centrifugal water cooled 500 Ton c/w controls and electrical / piping connections - excludes foundation ands inter-connecting electrical / piping systems EACH 270,670.30 19,083.06 2,862.46 292,615.82

156

Chiller - Hermetic centrifugal water cooled 1,000 Ton c/w controls and electrical / piping connections - excludes foundation ands inter-connecting electrical / piping systems EACH 514,284.75 36,183.67 5,427.55 555,895.97

157

Liquid cooled Reciprocating S/T unit 2.5 Ton c/w controls and electrical / piping connections EACH 6,035.22 301.27 45.19 6,381.67

158 Ditto 5 Ton EACH 11,841.83 591.12 88.67 12,521.62159 Ditto10 Ton EACH 21,574.75 1,076.97 161.55 22,813.27160 Ditto 25 Ton EACH 34,027.30 1,698.05 254.71 35,980.06

SAMPLE