NELSAP PIPELINE PROJECTS FOR PREPARATION FUNDS PRE-SELECTION
NELSAP PROJECTS PI PELIN E2016 - 2019 -
Project Name Countries Project Objectives -
Project Project status Project
Executing (TOR) &Scope of Preparation/
Agency Study Study cost
Project
Investment
cost
No.
Power Transmission/Interconnection Projects Inteconnection &Uganda (Olwiyo)-South Sudan (Juba) Power Uganda/South Sudan NELSAP Feasibility Study 3.0 170.0
Transmission interconnection, 400KV of 254 Km
1
Trade
Inteconnection & NELSAP2 Ethiopia (Oedesa-Tepi) - South Sudan (Bor-Juba) Ethiopia/South Sudan Feasibility Study 3.0 420.0
Power TL, 400kV AC/500HVOC of 700 km Trade
3 Burundi (Jiji - Mulembwe) - Tanzania (Kigoma) Burundi/Tanzania Inteconnection & NELSAP 2.0Feasibility Study 80.0
Power Transmission Line, 220KV of 180km Trade
4 Ethiopia (Gambella) - South Sudan (Malakal) Power Inteconnection & NELSAP 3.0 102.0
TL (Phase 1), 230kV of 357 km
Ethiopia/South Sudan Feasibility Study
Trade
S South Sudan (Juba-Torit-Kapoeta)- Inteconnection &South Sudan/Kenya NELSAP Feasibility Study 3.0 86.0
Kenya(Lokichogio) in220kV of 480km Trade
6 Renk - Malakal TL in South Sudan in 220 kV of 320 In-countrySouth Sudan NELSAP Feasibility Study 3.0 154.0
km + 3 substations reinforcement with
regional impact
7 South Sudan(Bor) - South S(Malakal) Power TL-400 In-country NELSAP 3.0 108.0
kVof 366 km
South Sudan Feasibility Study
reinforcement with
regional impact
8 Malakal - Bentiu TL in South Sudan in 220 kV of 222 In-countrySouth Sudan NELSAP Feasibility Study 3.0 52.0
km reinforcement with
Iregional impact I
Power Generation Projects 6.0 '
2
1 Semuliki Hydropower Project (72 MW) I Power generatio~Uganda,ORC NELSAP Feasibilty Study
Mugomba Hydropower Project, ( 100 MW) 6.0
3
ORC Power generation NELSAP Feasibilty Sudy
Akanyaru river Small hydropower Projects (SHP) ( 3.0
25MW) (6+13+6)
4
Rwanda/Burundi Power generation NELSAP Feasibilty Sudy
5.0
study
Bedden 596 HPP (S40MW) South Sudan Power generation NEL5AP Update Feasibility
~
Financiers/
Donors
interested
AfDB
Page 1 of 2
I
5
6
Lakki 524 HPP (South S)(410MW)
Shukoli HPP 235 MW
South Sudan
South Sudan
Power generation
Power generation
NELSAP
NEL5AP
Update Feasibility
study
Update Feasibility
study
5.0
4.0
Sub-Total for Power Projects ..
1 Shared Soono Multipurpose Water Resources
Development Project (Kenya/Uganda) - for Power
sector, Water resources development (Hydro Power
generation). Industry, and Trade
Transboundarv Multipurpose Water Projects Kenya/Uganda Hydrpower NELSAP Identification done
generation & Water FS & ESIA to be done
Supply
S2.0
1.1
1,172.0
10.0
2 5hared Angolola Multipurpose Water Resources
Development Project
Kenya/Uganda Hydrpower
generation & Water
Supply
NELSAP FS and ESIA to be
done
3.0 67.0
3 Integrated Fisheries Management of Jebel Awhia Sudan/South Sudan
Dam Reservoir of 629km length 2/3 in Sudan & 1/3 in
S.Sudan
Reservoir
Management
NELSAP Pre-Feasibility 2.0 30.0
4 Preparation of an Inland Waterway Sector
Investment Program in the Lake Albert, Albert Nile,
Bahr EI-Jebel river basins and the main Nile
Uganda, South Sudan,
Sudan
Waterway Transport NElSAP Pre-Feasibility 6.0
5 Akanyaru Multipurpose Water Resources
Development Project (12,474 Ha; Water Supply
614,200 persons)
Burundi/Rwanda Hydrpower
generation & Water
Supply
NELSAP Prefeasibility done 2.0 6S.0
6 Rehabilitation of the navigation route from Khartoum Uganda, South Sudan,
to Juba (White Nile + Bahr EI Gebel) Sudan
Waterway Transport NELSAP Pre-Feasibility 3.0
7 Bahr Elarab/ Bahr EIGazal Basin Management and Sudan/South Sudan
Development project.
Sub-Tota'i for Trans'boundary Wat,er Re.sources Projects
Hydrpower
generation & Water
Supply
NELSAP Pre-Feasibility 3.0
20.1 --
172.0'
GRAND TOTALS·NElSAP PREPARATION FUND REQUIREMENTS 72.1 1,344.0