0 2 4 6 8 1 Miles I-20 East Texas Corridor Study DRAFT SUBJECT TO CHANGE Draft Implementation Plan: Draft Implementation Plan: Dallas and Kaufman Counties Dallas and Kaufman Counties DALLAS AE-1 Median Barrier Installation I-635 to FM 740 (2015-2020) AF-1 Frontage Roads Lawson Road to FM 740 (2015-2020) AF-2 Frontage Roads FM 740 to FM 741 (2015-2020) TC-4 Added Capacity FM 741 to SH 557 (2021-2030) TC-3 Added Capacity Dallas County Line to FM 741 (2021-2030) AF-3 Frontage Roads Spur 557 to FM 138 (2015-2020) TC-6 Added Capacity CR 310 to Van Zandt County Line (2021-2030) TC-5 Added Capacity Wilson Rd to CR 310 (2021-2030) FM 2965 TB-2 Ramp Improvement (2021-2030) Van Z AF-13 Frontage Roads FM 741 to SH 557 (2021-2030) Wilson Rd AD-3 Ramp Improvement (2021-2030) CR 310 TD-1 Ramp Improvement (2021-2030) SH 34 TJ-10 Bridge Replacement (2015-2020) AB-1 Ramp Improvement (2015-2020) TJ-8 Bridge Modification (2015-2020) FM 429 AD-4 Ramp Improvement (2021-2030) AD-1 Ramp Improvement (2015-2020) AC-1 Added Capacity SH 557 to Wilson Road (2021-2030) TJ Br TB Ra 2 243 1390 460 598 688 2728 2932 2757 3039 740 1392 1389 986 2965 1641 740 2728 987 2728 429 2727 548 741 2578 2578 429 429 148 148 87 243 557 205 352 34 34 34 175 175 80 80 80 80 635 20 20 20 Post Oak Bend Talty Terrell Balch Springs Seagoville Sunnyvale Dallas Mesquite Wilmer Forney Kaufman Combine Crandall Oak Ridge UP LOCATION MAP SMITH SMITH DALLAS DALLAS HARRISON HARRISON KAUFMAN KAUFMAN VAN ZANDT VAN ZANDT GREGG GREGG Date: 9/19/2014 City Mid Term Ramp Improvement AF-4 Frontage Roads FM 47 to US 64 (2015-2020) US 69 TA-2 Ramp Improvement (2015-2020) Project Code Project Type Limits Timeframe Interchange Project Code Project Type Timeframe * I-69 System (I-369) Harrison County/Marshall Working Group Interstate Route Option Preliminary Recommendation ( August 2014 ) Potential Interstate route option location is based on a high level planning study and is for illustrative purposes only. Exact location and configuration will be determined during the environmental process. Railroads I-20 Study Area Counties Long Term Ramp Improvement Near Term Ramp Improvement Near Term Vertical Clearance Adjustment Near Term Proposed Frontage Roads Mid Term Proposed Frontage Roads Long Term Proposed Frontage Roads Mid Term Addition of Capacity Long Term Addition of Capacity Near Term Bridge Replacement Near Term Median Barrier Installation

Upload: truongbao

Post on 10-Mar-2018

216 views

Category:

Documents


3 download

TRANSCRIPT

0 2 4 6 81Miles

I-20 East Texas Corridor Study

DRAFTSUBJECT TO

CHANGE

D r a f t I m p l e m e n t a t i o n P l a n :D r a f t I m p l e m e n t a t i o n P l a n : D a l l a s a n d K a u f m a n C o u n t i e sD a l l a s a n d K a u f m a n C o u n t i e s

D A L L A S

AE-1Median Barrier

InstallationI-635 to FM 740

(2015-2020)

AF-1Frontage Roads

Lawson Road to FM 740(2015-2020)

AF-2Frontage Roads

FM 740 to FM 741(2015-2020)

TC-4Added Capacity

FM 741 to SH 557(2021-2030)

TC-3Added Capacity

Dallas County Line to FM 741(2021-2030)

AF-3Frontage Roads

Spur 557 to FM 138(2015-2020)

TC-6Added Capacity

CR 310 to Van Zandt County Line(2021-2030)

TC-5Added Capacity

Wilson Rd to CR 310(2021-2030)

FM 2965TB-2Ramp Improvement(2021-2030)

TC-7Added Capacity

Van Zandt County Line toFM 47

TB-4Ramp

AF-4Frontage

Roads

AF-13Frontage Roads

FM 741 to SH 557(2021-2030)

Wilson RdAD-3Ramp Improvement(2021-2030)

CR 310TD-1Ramp Improvement(2021-2030)

SH 34TJ-10Bridge Replacement(2015-2020)AB-1Ramp Improvement(2015-2020)TJ-8Bridge Modification(2015-2020)

FM 429AD-4Ramp Improvement(2021-2030)AD-1Ramp Improvement(2015-2020)

AC-1Added Capacity

SH 557 to Wilson Road(2021-2030)

TJ-11Bridge

TB-3Ramp

352

243

244

352

205

1140

2515

549

1390

2475

780

1389

2965

1388

550

740

751

1836

47

1390

460

598

688

27282932

2757

3039

740

1392

1389

986

2965

1641740

2728

987

2728

429

2727

548

741

2578

2578429

429

148

148

87

243

557

205

35234

34

34

175

175

80

8080

80

635

2020

20

Post OakBend

Talty

Terrell

BalchSprings

Seagoville

Sunnyvale

Dallas

Mesquite

Wilmer

Forney

KaufmanCombine

CrandallOak

Ridge

UP

LOCATION MAP

S M I T HS M I T H

D A L L A SD A L L A S

H A R R I S O NH A R R I S O NK A U F M A NK A U F M A N V A N Z A N D TV A N Z A N D TG R E G GG R E G G

Date: 9/19/2014

City

Mid Term Ramp Improvement AF-4Frontage RoadsFM 47 to US 64

(2015-2020)

US 69TA-2Ramp Improvement(2015-2020)

Project CodeProject TypeLimitsTimeframe

InterchangeProject CodeProject TypeTimeframe

* I-69 System (I-369) Harrison County/Marshall Working Group Interstate Route Option Preliminary Recommendation ( August 2014 )Potential Interstate route option location is based on a high level planning study and is for illustrative purposes only. Exact location and configuration will be determined during the environmental process.

RailroadsI-20 Study Area Counties

Long Term Ramp Improvement

Near Term Ramp Improvement

Near Term Vertical Clearance Adjustment

Near Term Proposed Frontage RoadsMid Term Proposed Frontage RoadsLong Term Proposed Frontage RoadsMid Term Addition of CapacityLong Term Addition of Capacity

Near Term Bridge Replacement

Near Term Median Barrier Installation

0 2 4 6 81Miles

I-20 East Texas Corridor Study

DRAFTSUBJECT TO

CHANGE

D r a f t I m p l e m e n t a t i o n P l a n :D r a f t I m p l e m e n t a t i o n P l a n : V a n Z a n d t C o u n t yV a n Z a n d t C o u n t yTC-6Added Capacity

CR 310 to Van Zandt County Line(2021-2030)

TC-5Added Capacity

Wilson Rd to CR 310(2021-2030)

FM 2965TB-2Ramp Improvement(2021-2030)

AF-6Frontage Roads

Spur 557 to FM 138(2031-2040)

TC-7Added Capacity

Van Zandt County Line to FM47

(2021-2030)

TC-8Added CapacityFM 47 to US 64

(2021-2030)

CR 3412TB-4Ramp Improvement(2021-2030)

AF-4Frontage RoadsFM 47 to US 64

(2015-2020)

US 64TB-5Ramp Improvement(2021-2030)

SH 19TA-1Ramp Improvement(2021-2030)

FM 1255TB-6Ramp Improvement(2031-2040)

CR 1308

TD-4Ramp Improvement(2031-2040)

TI-11Bridge Modification(2015-2020)

CR 1311TB-7Ramp Improvement(2031-2040)

FM 314TB-1Ramp Improvement(2015-2020)

CR 110TI-9Ramp Improvement(2031-2040)

CR 426TD-6Ramp Improvement(2031-2040)

CR 310TD-1Ramp Improvement(2021-2030)

FM 859TJ-9Bridge Modification(2015-2020)

TJ-11Bridge Modification(2015-2020)TB-3Ramp Improvement(2021-2030)

FM 47

TD-3Ramp Improvement(2021-2030)

FM 17TJ-12Bridge Modifications(2015-2020)

FM 773/ FM 16TD-5Bridge Modifications(2031-2040)TJ-14Ramp Improvement(2015-2020)

TJ-13Bridge Modifications(2015-2020)

Hayden Rd/CR 3442

TD-2Ramp Improvement(2031-2040)

69

64

19

1799

8581653

2965

1391

2909

314

90

859

47

16531651

1651

2965

314

1651

857

857

2909

1504

1805

90

1652

1255

1253

3227

1995

859

773

16

16

1255

1255

17

17

47

47

198 19

19

110

110

243

243

64

64

64

20

20

20

GrandSaline

Van

Canton

LOCATION MAP

S M I T HS M I T H

D A L L A SD A L L A S

H A R R I S O NH A R R I S O NK A U F M A NK A U F M A N V A N Z A N D TV A N Z A N D TG R E G GG R E G G

Date: 9/19/2014

City

Mid Term Ramp Improvement AF-4Frontage RoadsFM 47 to US 64

(2015-2020)

US 69TA-2Ramp Improvement(2015-2020)

Project CodeProject TypeLimitsTimeframe

InterchangeProject CodeProject TypeTimeframe

* I-69 System (I-369) Harrison County/Marshall Working Group Interstate Route Option Preliminary Recommendation ( August 2014 )Potential Interstate route option location is based on a high level planning study and is for illustrative purposes only. Exact location and configuration will be determined during the environmental process.

RailroadsI-20 Study Area Counties

Long Term Ramp Improvement

Near Term Ramp Improvement

Near Term Vertical Clearance Adjustment

Near Term Proposed Frontage RoadsMid Term Proposed Frontage RoadsLong Term Proposed Frontage RoadsMid Term Addition of CapacityLong Term Addition of Capacity

Near Term Bridge Replacement

Near Term Median Barrier Installation

0 2.5 5 7.5 101.25Miles

I-20 East Texas Corridor Study

DRAFTSUBJECT TO

CHANGE

D r a f t I m p l e m e n t a t i o n P l a n :D r a f t I m p l e m e n t a t i o n P l a n : S m i t h C o u n t yS m i t h C o u n t y

AF-6Frontage Roads

Spur 557 to FM 138(2031-2040)

TC-16Added CapacityToll 49 to US 69

(2031-2040)

TC-20Added Capacity

US 271 to Gregg County Line(2021-2030)

AF-7Frontage RoadsToll 49 to US 271

(2021-2030)TC-19

Added CapacitySH 155 to US 271

(2031-2040)

TG-7Frontage Roads

US 271 to Gregg County Line(2031-2040)

TG-8

TC-22TC-21

TB-1Ramp

FM 849

TI-10Ramp Improvement(2031-2040)

TJ-6Bridge Modifications(2015-2020)

TC-17Added CapacityUS 69 to FM 14

(2031-2040) TC-18Added CapacityFM 14 to SH 155

(2031-2040)

CR 3111TD-11Ramp Improvement(2021-2030)

CR 3101TD-10Ramp Improvement(2021-2030)

US 271TI-11Ramp Improvement(2031-2040)

FM 757TD-9Ramp Improvement(2021-2030)

SH 155TD-8Ramp Improvement(2021-2030)

FM 2015TB-9Ramp Improvement(2021-2030)

FM 14TD-12Ramp Improvement(2021-2030)

US 69TA-2Ramp Improvement(2015-2020)

FM 35TB-8RampImprovementCR 431

TD-7Ramp Improvement(2021-2030)

TI-9Ramp Improvement(2031-2040)

CR 426TD-6Ramp Improvement(2031-2040)

TD-14 TJ-1

TJ-14Ramp

80

164

155

57

124

485

248364

32342

206

3311

3226

2422

2911

2607918

2010

1639

3204

858

2659

1795

1404

757

848

1804

2012

2685

314

2661

850

14

1639

315

16B

2010850

2661

2016

2685

3311

1805

3053

850

16

2015

1804

314

1253

2908

849

1995

16

757

2015

2710

724

1252

279

14

14

2767

2767

16

1616

155 124235

135

147

323

323

155

155

64

64

110

110

31

31

31

80

69

69271

271

271

20

20

20

BigSandy

Winona

TylerEdom

Lindale

Hideaway

Gladewater

UP

UP

UP

UP

LOCATION MAP

S M I T HS M I T H

D A L L A SD A L L A S

H A R R I S O NH A R R I S O NK A U F M A NK A U F M A N V A N Z A N D TV A N Z A N D TG R E G GG R E G G

Date: 9/19/2014

City

Mid Term Ramp Improvement AF-4Frontage RoadsFM 47 to US 64

(2015-2020)

US 69TA-2Ramp Improvement(2015-2020)

Project CodeProject TypeLimitsTimeframe

InterchangeProject CodeProject TypeTimeframe

* I-69 System (I-369) Harrison County/Marshall Working Group Interstate Route Option Preliminary Recommendation ( August 2014 )Potential Interstate route option location is based on a high level planning study and is for illustrative purposes only. Exact location and configuration will be determined during the environmental process.

RailroadsI-20 Study Area Counties

Long Term Ramp Improvement

Near Term Ramp Improvement

Near Term Vertical Clearance Adjustment

Near Term Proposed Frontage RoadsMid Term Proposed Frontage RoadsLong Term Proposed Frontage RoadsMid Term Addition of CapacityLong Term Addition of Capacity

Near Term Bridge Replacement

Near Term Median Barrier Installation

0 1 2 3 40.5Miles

I-20 East Texas Corridor Study

DRAFTSUBJECT TO

CHANGE

D r a f t I m p l e m e n t a t i o n P l a n :D r a f t I m p l e m e n t a t i o n P l a n : G r e g g C o u n t yG r e g g C o u n t y

TJ-2Bridge Modification(2015-2020)

TC-20Added Capacity

US 271 to Gregg County Line(2021-2030)

TG-7Frontage Roads

US 271 to Gregg County Line(2031-2040)

TC-23Added Capacity

SH 42 to FM 2087(2021-2030)

TG-8Smith County Line to SH 42

(2031-2040)

TC-22Added CapacitySH 135 to SH 42

(2021-2030)

TC-21Added Capacity

Smith County Line to SH 135(2021-2030)

TG-9Frontage Roads

SH 42 to FM 2087(2031-2040)

TC-25Added Capacity

Gregg County Line to L 281 E(2021-2030)

CR 3111

TD-11Ramp Improvement(2021-2030)

CR 3101

TD-10Ramp Improvement(2021-2030)

TG-12 / AF-8Frontage Roads

Gregg County Line to Loop 281(2021-2030)

SH 135TD-14Ramp Improvement(2021-2030)

SH 42TI-13Ramp Improvement(2021-2030)

SH-31AD-2Ramp Improvement(2021-2030)

TC-24Added Capacity

FM 2087 to Harrison County Line(2021-2030)

TG-10Frontage Roads

FM 2087 to Loop 281W(2021-2030)

TG-11Frontage RoadsLoop 281W to

Harrison CountyLine

(2021-2030)Loop 281 E

TI-16Bridge Modification(2015-2020)

Fritz Swanson RdTJ-1Bridge Modification(2015-2020)

MLK Blvd

TJ-2Bridge Modification(2021-2030)FM 2087

TJ-3Bridge Modification(2015-2020)

TJ-15Bridge Modification(2015-2020)

48563

28126053272

1639

22042011

259G

1845

968

2208

2205

2276

3053

2011

2206

2087

2087

2207

2207

349349

1252

1252

30050263

322

32231

149

31

31

281

281

42

42135

135

271

259

259

8080

20 2020

Kilgore

Longview

WhiteOak

Lakeport

ClarksvilleCity

BNSF

UP

UP

UP

LOCATION MAP

S M I T HS M I T H

D A L L A SD A L L A S

H A R R I S O NH A R R I S O NK A U F M A NK A U F M A N V A N Z A N D TV A N Z A N D TG R E G GG R E G G

Date: 9/19/2014

City

Mid Term Ramp Improvement AF-4Frontage RoadsFM 47 to US 64

(2015-2020)

US 69TA-2Ramp Improvement(2015-2020)

Project CodeProject TypeLimitsTimeframe

InterchangeProject CodeProject TypeTimeframe

* I-69 System (I-369) Harrison County/Marshall Working Group Interstate Route Option Preliminary Recommendation ( August 2014 )Potential Interstate route option location is based on a high level planning study and is for illustrative purposes only. Exact location and configuration will be determined during the environmental process.

RailroadsI-20 Study Area Counties

Long Term Ramp Improvement

Near Term Ramp Improvement

Near Term Vertical Clearance Adjustment

Near Term Proposed Frontage RoadsMid Term Proposed Frontage RoadsLong Term Proposed Frontage RoadsMid Term Addition of CapacityLong Term Addition of Capacity

Near Term Bridge Replacement

Near Term Median Barrier Installation

0 2.5 5 7.5 101.25Miles

I-20 East Texas Corridor Study

DRAFTSUBJECT TO

CHANGE

D r a f t I m p l e m e n t a t i o n P l a n :D r a f t I m p l e m e n t a t i o n P l a n : H a r r i s o n C o u n t yH a r r i s o n C o u n t yT E

XA

ST E

XA

SL O

UI S

I AN

AL O

UI S

I AN

ATC-25Added Capacity

Gregg County Line toL 281 E

(2021-2030)

TG-14Frontage Roads

FM 450 to FM 968(2031-2040)

AF-9Frontage RoadsFM 968 to SH 43

(2031-2040)

AF-11Frontage Roads

FM 31 to FM 2199(2021-2030)

TC-33Added CapacityUS 80 to FM 134

(2031-2040)

TC-34Added Capacity

FM 134 to State Line(2031-2040)

AF-10Frontage RoadsSH 43 to FM 31

(2021-2030)

AF-12Frontage Roads

FM 2199 to US 80(2021-2030)

TG-12 / AF-8Frontage Roads

Gregg County Line toLoop 281

(2021-2030)

TC-24

TG-10Frontage

TG-11

Loop 281 ETI-16Bridge Modification(2015-2020)

369

Lansing Switch RdTJ-7Bridge Modification(2015-2020)

FM 450

TJ-4Bridge Modification(2015-2020)

TJ-16Bridge Modification(2015-2020)

US 59TJ-17Bridge Modification(2015-2020)

TJ-3

80

43

156

449

63

502

322

281

149

43

2E

2B 2

3245

2751

1794

2198

450

1797

2204

1249

1793

2011

959

1997

1716

1794

1186

2208

2983

349

1997

3379

450

2682

2963

1186

968

17931997

2906451

3251

1999

2199

2879

2208

9

1998

9

450

134

968

968

31

31

449

449

2625

2625

2625

322

281

149

154

43390

43

43

79

80

259

59

59

80

80

80

20

20

Marshall

HallsvilleWaskom

Longview

Scottsville

Lakeport

Easton

Nesbitt

KCS

UP

SEPC

BNSF

UP

LOCATION MAP

S M I T HS M I T H

D A L L A SD A L L A S

H A R R I S O NH A R R I S O NK A U F M A NK A U F M A N V A N Z A N D TV A N Z A N D TG R E G GG R E G G

Date: 9/19/2014

City

Mid Term Ramp Improvement AF-4Frontage RoadsFM 47 to US 64

(2015-2020)

US 69TA-2Ramp Improvement(2015-2020)

Project CodeProject TypeLimitsTimeframe

InterchangeProject CodeProject TypeTimeframe

* I-69 System (I-369) Harrison County/Marshall Working Group Interstate Route Option Preliminary Recommendation ( August 2014 )Potential Interstate route option location is based on a high level planning study and is for illustrative purposes only. Exact location and configuration will be determined during the environmental process.

RailroadsI-20 Study Area Counties

Long Term Ramp Improvement

Near Term Ramp Improvement

Near Term Vertical Clearance Adjustment

Near Term Proposed Frontage RoadsMid Term Proposed Frontage RoadsLong Term Proposed Frontage RoadsMid Term Addition of CapacityLong Term Addition of Capacity

Near Term Bridge Replacement

Near Term Median Barrier Installation