• To know what is meant by GS-R-3 requirements … need revised Guides for GSR Part 2!
• To validate my own processes – gap analysis
• To use as a resource: The words work very well in the purpose and description of procedures
• To develop orientation for process owners
• To prepare for OSART missions
Safety is Paramount
“Safety is the paramount consideration guiding decisions and actions” (N286-12 Principle #1)
“Safety – a business objective directed at preserving and protecting workers, the public, the environment, and assets against harm resulting from known conditions, natural occurrences, malicious acts, accidents and risks at a nuclear facility that causes radiological and non-radiological effect.” (N286-12 Definition)
For Internal Use Only
3
GSR Part 2 Requirement 6
Integration of the Management System
“The management system shall integrate its
elements, including safety, health,
environment, security, quality, human-an-
organizational factor, societal, and
economics elements, so that safety is not compromised”
Integration of Requirements
5
SAFETYEnvironmental
Health
Security
Economic
Quality
OtherStakeholder
5
For Internal Use Only
“This standard integrates the management system requirements
for health, safety, environment, security, economics and quality.”
CSA N286-12 Management System Requirements for Nuclear Facilities, Clause 1.2
Process & Document Structure
6
For Internal Use Only
The Hierarchy
Management System Manual
BP-MSM-1
Program
Matrix
Sheet 0001
Approved Reference Chart
Authorities & Responsibilities
Sheet 0002
Applicable Governing Acts
Regulations, Codes &
Standards
Sheet 0003
Program Summaries
Sheet 0004
Environment Management
BP-PROG-00.02
Health &
Safety Management
BP-PROG-00.06
Human Performance Management
BP-PROG-00.07
Business Plan Management
BP-PROG-01.01
Other
Programs
…..
BP-PROG-##.##
Conduct
of Plant Operations
BP-PROG-12.01
Contractor Management
BP-PROG-14.02
Nuclear Oversight
Management
BP-PROG-15.01
Bruce A
Operating
Policies & Principles
BP-OPP-00001
Bruce B
Operating
Policies & Principles
BP-OPP-00002
CMLF
Operating
Policies & Principles
BP-OPP-00003
Mgmt System vs Quality Mgmt
Safety is the paramount consideration guiding decisions & actions
The business is defined, planned, and controlled
The organization is defined and understood
8
For Internal Use Only
PLAN
ACT
CHECK
DO
Resources are managed
Communication is effective
Information is managed
Work is managed
Assessments are performed
Experience is sought, shared and used
Problems are identified and resolved
Changes are controlled
The management system is continually improved
N286 Framework Safety, Quality, Health, Security, Env. & Business Requirements
Corporate
Planning Engineering Safety Maintenance
Process ViewOrganizational View
Operations
Facility Manager
Processes cross organizational boundaries
Process Owners (CFAMs and lower tier document owners) play a key role in promoting integrated, ‘systems’ thinking, and managing temptations to
‘bolt-on’ new programs without considering their fit within the system
9
For Internal Use Only
PROCESS based
Process Owner Responsibilities
UNDERSTAND all requirements associated with their Process Group
For Internal Use Only
10
PLAN
ACT
CHECK
DODEVELOP processes, procedures, tools, etcdesigned to meet the requirements and achieve the Business Plan
MONITOR performance & CONFIRM we meet business, legal & regulatory requirements
RESOLVE problems & MANAGE CHANGES to requirements
Oversight to Monitor & Drive Results In Process (Line) Oversight• Quality Control by Line
– Field observation & coaching
– Station performance review meetings
Functional (Process) Oversight • Requirements Management by Process Owner
– Self-Assessments
– Trend analysis
– State of Functional Area Reviews
Independent Oversight• Independent Oversight / Assurance by NORA
– Systematic Audit, Assessment and Surveillance program
• Nuclear Safety Review Board
External Oversight• Periodic Inspections by CNSC,
• Evaluations by WANO, IAEA, others
• Stakeholder oversight11
For Internal Use Only
GSR Part 2 Requirement 11
Management of the Supply Chain
“The organization shall put in place
arrangements with Vendors, Contractors
and Suppliers for specifying, monitoring and
managing the supply of it to items, products
and services that may influence safety”
Management System Manual
StandardsCodes
RequirementsSub Set ofStandards
CodesRequirements Sub Set of
StandardsCodes
Requirements
Level 2 Processes
Level 3-X Processes & Procedures
Vendor Program
VerifiedApproved
for use
Oversight
VerifiedApproved
for use
Vendor Oversight
Plan
BP-PROC-14800
Maintaining BPMS with Vendors
For Internal Use Only
13
Vendor Oversight – Fit for Purpose
QA/QC Oversight
HU Program Oversight
Partnering
& Cultural Alignment
S
C
O
P
E
RISK SHARING
1414
Assessing Effectiveness of the BPMS
Expectations of the SOFA Process
Ø SOFA Assessment Report - Record
Ø Identify improvement opportunities and risks
Ø Evaluate each functional area based on programmatic effectiveness ANDresults of key performance metrics
Ø Identify functional area gaps to excellence and cross-functional strategic themes/trends for senior leader consideration
Ø Meet CSA N286-12 effectiveness review requirements
Ø “Grade” BPMS Programs based on their importance & complexity
State of Functional Area Assessment
Governance & Oversight
Survey: Actual vs current standards
Templates: Results of Oversight,
standard metrics definitions, etc
Performance/Results
Review achievement against
current metrics and targets
Triennial Review of Safety Culture &
Oversight Trends & Themes
Review Safety Culture Monitoring,
Assessments and Oversight Trends
& Themes including:
• Root Cause Investigations
• Self Evaluation Activities
• Internal & External Independent
Oversight Activities
Categorize against
CSA N286 Principles &
Traits of a Healthy
Nuclear Safety Culture
Summary Presentation and Report to Executive Team
CFAMs NORA
Senior Leader Challenge
Continuous Improvement
Consider gaps to excellence and
identify key initiatives to close
gaps
Link to Improvement Initiatives
and “One Plan”
15
Questions to Help Advance the BPMS
16
For Internal Use Only
Is there already governance that exists for this?
Is it integrated?
Who is the Process Owner?
Have we considered the change management implications?
Is there a Change Plan?
What is our oversight & monitoring telling us? What do we look at and
when did we last look?
Are we measuring the right things?