ian smith 2013 honeywell project overview
DESCRIPTION
An overview of the various projects I was assigned to during my tenure as an intern from May-August 2013TRANSCRIPT
![Page 1: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/1.jpg)
Summer 2013 Project Overview
Ian SmithInternship Period: May 13th – August 14th
![Page 2: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/2.jpg)
Honeywell Proprietary
Honeywell.com
2
N41-0506-000-000
Introduction
School:- The Ohio State University
Degree:- B.S. Integrated Systems Engineering- Grad. Spring 2015
Manager:-Paul Francis
Mentor:-Karl Suher
Focus Area:-Carbon
![Page 3: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/3.jpg)
Honeywell Proprietary
Honeywell.com
3
N41-0506-000-000
POMSnet Karl Suher, Gretchen N
Problem: -No MES system to keep track of parts throughout plant life
-No system installed to continuously monitor temperature, pressure and gas levels
Task: -Coordinate custom specs and placement of computer enclosures around carbon area for
housing the touch-screen monitors operators will use to interface with POMS
-Create metal tag bar-coding system
-Determine MOC communication strategy to appropriate stakeholders
![Page 4: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/4.jpg)
Honeywell Proprietary
Honeywell.com
4
N41-0506-000-000
POMSnet cont.
Actions: -Ordered, installed and coordinated implementation of metal tag printer (standard work,
work instructions, 5S, machine training, etc.)
-Assigned proper custom specs and placement for Hoffman enclosures
-MOC communication strategy template
Results: -Tag printer ready for plant use
-Hoffman enclosure placement finalized (PO placed for power/data drops)
Future Actions: -POMSnet topics need to be properly communicated to stakeholders before go-live
![Page 5: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/5.jpg)
Honeywell Proprietary
Honeywell.com
5
N41-0506-000-000
POMSnet - MOC Communication Template
![Page 6: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/6.jpg)
Honeywell Proprietary
Honeywell.com
6
N41-0506-000-000
POMSnet - Tag Printer Standard Work
![Page 7: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/7.jpg)
Honeywell Proprietary
Honeywell.com
7
N41-0506-000-000
POMSnet - Tag Template
![Page 8: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/8.jpg)
Honeywell Proprietary
Honeywell.com
8
N41-0506-000-000
POMSnet - Hoffman Enclosure Placement Map
![Page 9: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/9.jpg)
Honeywell Proprietary
Honeywell.com
9
N41-0506-000-000
Gas Tunnel Map Edgar Abad
Problem: -Previously, persons would have to physically go underneath the plant floor to check gas levels
-There is only 1 HMI panel in the carbon area footprint that displays the gas levels digitally
Task: Create a gas tunnel map that can be accessed and displayed on Experion visual interface monitors
Actions: -Used Experion and Kepware (tag aggregator) to communicate with the plant PLC’s to read the methane, propane and oxygen levels
-Organized the readings into a gas tunnel map
Results: Tunnel map allows easy monitoring of gas levels ensuring early detection when the levels near their limits
![Page 10: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/10.jpg)
Honeywell Proprietary
Honeywell.com
10
N41-0506-000-000
Gas Tunnel Map cont.
Future Actions:
Install alarm system with possible email/text message alert capabilities
![Page 11: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/11.jpg)
Honeywell Proprietary
Honeywell.com
11
N41-0506-000-000
Carbon Area Tier 3 Board Paul F
Problem: Carbon Area Tier 3 board currently located in old needling room which is being converted into an additional Binary/BPX room
Task: Create a new Tier 3 board
Actions: Used graphic tape (yes…21 rolls) and labels to create an updated Tier 3 board
Results: Increased organization and visual presentation
![Page 12: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/12.jpg)
Honeywell Proprietary
Honeywell.com
12
N41-0506-000-000
Carbon Area Tier 3 Board cont.
BEFORE
![Page 13: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/13.jpg)
Honeywell Proprietary
Honeywell.com
13
N41-0506-000-000
Carbon Area Tier 3 Board cont.
AFTER
![Page 14: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/14.jpg)
Honeywell Proprietary
Honeywell.com
14
N41-0506-000-000
MOC List Paul F
Problem: There was no centrally located sharepoint sheet for keeping track of projects in process
Task: Create an MOC sharepoint list
Action: -Transferred previous rejected and proposed MOC’s to new sharepoint
-Created separate “views” for proposed, approved, and rejected MOC’s
-Responsible for MOC compliance auditing
Results: Sharepoint list is used at weekly MOC review meetings for increased organization and process flow
![Page 15: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/15.jpg)
Honeywell Proprietary
Honeywell.com
15
N41-0506-000-000
MOC List cont.
![Page 16: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/16.jpg)
Honeywell Proprietary
Honeywell.com
16
N41-0506-000-000
MOC List cont.
VS.
![Page 17: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/17.jpg)
Honeywell Proprietary
Honeywell.com
17
N41-0506-000-000
Char 5S Checklist & Inspection Criteria Karl Suher
Problem: -The current Char 5S checklist was not updated with current photos and proper instructions
-POMS char worksheets lacked specific inspection criteria for operators
Task: Update 5S checklist and outline inspection criteria in POMS worksheet
Action: Spoke with char operators to gain an accurate understanding of work area clean-up and
opinions on proper inspection
Results: Created and posted updated 5S checklist on the floor and included key inspection criteria for POMS use
![Page 18: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/18.jpg)
Honeywell Proprietary
Honeywell.com
18
N41-0506-000-000
Char 5S Checklist & Inspection Criteria cont.
![Page 19: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/19.jpg)
Honeywell Proprietary
Honeywell.com
19
N41-0506-000-000
General Labor Training Matrix Paul F
Problem: Union has intentions on combining all GL’s into 1 department (OT distribution)
Task: To identify area specific training needs, subtle job tasks and standard work items for all GL’s
Actions: -Held meetings with facilities maintenance and ISC supervisors
-Created skills matrix
Results: Increased understanding of the scope of responsibility and job specific needs of GL’s in separate areas
![Page 20: Ian Smith 2013 Honeywell Project Overview](https://reader033.vdocument.in/reader033/viewer/2022061206/5481fd5bb47959f10c8b46b9/html5/thumbnails/20.jpg)
Honeywell Proprietary
Honeywell.com
20
N41-0506-000-000
Lessons Learned
Importance of communication
Paying attention to industry-specific details, jargon and business process/infrastructure
Value of time management
GIT-R-DONE!