Page 1: IAQG 9101:2016 ( Rev . F)

IAQG 9101:2016 (Rev. F)

Ballot Draft

Changes Overview

Prepared by the IAQG 9101 team

December 2015

Page 2: IAQG 9101:2016 ( Rev . F)

9101 AAQG SDR Lockheed Martin

Brian Geer

9101 CB Representative Bureau Veritas

Francois Dumesnil

9101 EAQG SDR GKN Aerospace Engine Systems

Conny Flink

9101 APAQG SDR Mitsubishi Heavy Industries

Masahiro Kawamoto

Bob Keys

9101 Scribe IAQG

Stuart Anthony

9101 CB Representative ABS-QE

Paul Dionne

Insert

P

ictu

re

Here

9101 AAQG Representative United Technologies Corporation

Tom Gallagher

9101 EAQG Representative PFW Aero

Wilfried Weber

9101 EAQG Representative SAFRAN

Alain Bonnel

9101 IDR – Team Leader Mitsubishi Heavy Industries

Masahiro Kawamoto

9101 Team Membership

2

9101 EAQG Representative Zodiac Aerospace

Michel Jacquaniello

9101 EAQG Representative Rolls-Royce

Mark Heaton-Watts

Gary Procter

9101 CB Representative LRQA

9101 CB Representative DNV GL Emeritus

Page 3: IAQG 9101:2016 ( Rev . F)

3

9101 Team Coverage

13 members on the 9101 Team Representing:

Americas, Europe, and Asia-Pacific IAQG sectors

8 IAQG member companies

6 Different countries

4 Certification Body members

1 Dedicated Scribe

Page 4: IAQG 9101:2016 ( Rev . F)

4

9101 Stakeholders

Aviation, Space and Defense supply chain

IAQG member companies

IAQG community and working groups

Accreditation and Certification Bodies

AQMS auditors

Aviation, Space and Defense authorities

Page 5: IAQG 9101:2016 ( Rev . F)

5

9101 Key Revision Summary - Rationale for change

Revisions of ISO 17021-1:2015, ISO9001:2015 and 9100–series:2016 standards influenced the need for change

FAQ’s arising from current version

Feedback through OASIS and from stakeholders

Lessons learned from OPMT oversight of CB audit reports

Support of the OASIS Next Generation (NextGen) project

Page 6: IAQG 9101:2016 ( Rev . F)

Simplified forms to avoid duplication and improve reporting flow

Incorporated revised terminology from new revisions to ISO9001:2015, ISO17021-1:2015 and 9100–series:2016 standards

Rationalized content of clauses relating to Stage 1 audit to align with changes to Form 1.

Recognized the OASIS NextGen project with Form modifications

Changed process effectiveness levels from 4 to 5 and simplified definitions

Changed PEAR application from current 9100-series:2014 clause 7 (Product Realization) to revised 9100-series:2016 clause 8 (Operation)

6

9101 Key Revision Summary -Text

Page 7: IAQG 9101:2016 ( Rev . F)

7

9101 Key Revision Summary -Text Updated Process Evaluation Matrix (PEM)

Simplified process realization wording:

“Defined and implemented” becomes “determined” to align to 9100-series terminology

Assessment levels revised from 4 to 5 and redistributed to provide more balance in relation to the effectiveness result

Clarified the issuing of NCRs relating to the audit findings:

Process Results

“The audit team shall issue an NCR against the relevant 9100-series standard clause

when the process is not delivering the planned results and appropriate

action is not being taken”.

Process Realization

“The audit team shall issue an NCR against the relevant 9100-series standard clause when planned activities of a

process are not realized, or not fully realized”.

Page 8: IAQG 9101:2016 ( Rev . F)

Planned activities

fully realized 2 4 5

Planned

activities not fully

realized 2 3 4

Planned

activities not realized 1 2 2

Planned results not achieved and appropriate action is not

taken

Planned results not achieved, but appropriate action is being

taken

Planned results are achieved

Level 1 means that the process is not

determined and planned actvities are not

realized. Furthermore the process is not

delivering the planned results and appropriate

action is not being taken.

Level 2 here means that the process is not

determined and planned activities are not

realized. The process however is delivering

the planned results or if not, appropriate action

is being taken.

Level 2 here means that the process is determined and planned

activities are partly or fully realized. The process however is not delivering the planned results

and appropriate action is not being taken.

9101 Key Revision Summary -Text

Updated PEM Assessment Levels 1 & 2

8

Page 9: IAQG 9101:2016 ( Rev . F)

Planned activities

fully realized 2 4 5

Planned

activities not fully

realized 2 3 4

Planned

activities not realized 1 2 2

Planned results not achieved and appropriate action is not

taken

Planned results not achieved, but appropriate action is being

taken

Planned results are achieved

Level 4 here means that the process is determined and planned activities are fully realized. The process however is not delivering the planned results but

appropriate action is being taken.

Level 4 here means that the process is

determined but planned activities are not fully realized. The process however is delivering the planned results. Level 3 means that the

process is determined but planned activities are

not fully realized. The process however is not delivering the planned results but appropriate action is being taken.

9101 Key Revision Summary -Text Updated PEM Assessment Levels 3 & 4

9

Page 10: IAQG 9101:2016 ( Rev . F)

Planned activities

fully realized 2 4 5

Planned

activities not fully

realized 2 3 4

Planned

activities not realized 1 2 2

Planned results not achieved and appropriate action is not

taken

Planned results not achieved, but appropriate action is being

taken

Planned results are achieved

Level 5 means that the process is determined and planned activities

are fully realized. Furthermore the process is delivering the planned results and there are no

nonconformities identified.

9101 Key Revision Summary -Text Updated PEM Assessment Level 5

10

Page 11: IAQG 9101:2016 ( Rev . F)

Planned activities

fully realized 2 4 5

Planned

activities not fully

realized 2 3 4

Planned

activities not realized 1 2 2

Planned results not achieved and appropriate action is not

taken

Planned results not achieved, but appropriate action is being

taken

Planned results are achieved

Level 5 means that the process is determined and planned activities are fully realized. Furthermore the process is delivering the

planned results and there are no nonconformities

identified.

Level 1 means that the process is not determined and planned actvities are not realized. Furthermore

the process is not delivering the planned results and appropriate action is not

being taken.

Level 2 here means that the process is not determined and planned activities are not realized. The process however is delivering the planned results or if not,

appropriate action is being taken.

Level 2 here means that the process is determined and

planned activities are partly or fully realized. The

process however is not delivering the planned results and appropriate

action is not being taken.

Level 4 here means that the process is determined and planned activities are fully realized. The process however is not delivering the planned results but appropriate action is

being taken.

Level 4 here means that the process is determined but planned activities are

not fully realized. The process however is

delivering the planned results.

Level 3 means that the process is determined but planned activities are not fully realized. The process however is not delivering the planned results but appropriate action is

being taken.

9101 Key Revision Summary -Text

Updated (PEM)

11

Page 12: IAQG 9101:2016 ( Rev . F)

12

9101 Key Revision Summary -Text Mandatory ‘Audit Approaches’ (9101E clause 4.1.2)

Requirements for using specific ‘Audit Approaches’ to be moved into updated 9101:2016 (Rev. F) “Auditor Guidance Material”.

Relocated auditing of Special Processes for clarity, now included in clause 4.2.2.4.1 in 9101:2016 (Rev. F).

Major / Minor nonconformity definition

ISO17021-1:2015 definitions added

Special Audit

Revised to clarify reason(s) for conducting a Special Audit

Page 13: IAQG 9101:2016 ( Rev . F)

Forms continue to be referenced in Appendix B

Electronic versions of the Forms will remain accessible via the IAQG website together with supporting instructions.

9101 Key Revision Summary -Text

13

http://www.sae.org/iaqg/

Page 14: IAQG 9101:2016 ( Rev . F)

14

General:

Simplified/clarified form entries to support audit reporting using OASIS NextGen

Revised nomenclature to align with ISO 17021-1:2015 and revised 9100-series:2016

Disclaimer statements added in accordance with ISO 17021-1:2015

Clarified form instructions to improve process flow

9101 Key Revision Summary - Forms

Page 15: IAQG 9101:2016 ( Rev . F)

Form 1 (Stage 1 Audit Report):

Alignment to 9100-series:2016 including:

“Exclusions” box changed to “Requirements determined as ‘not applicable’”, “Justification” box added and “Quality Manual” changed to “QMS Documented Information”

”Key Requirements” replaced with “Confirmation of Requirements” to align with the QMS Process Matrix Report

“Key Information” reduced in scope and renamed “Other Information”

9101 Key Revision Summary - Forms

15

Page 16: IAQG 9101:2016 ( Rev . F)

Form 2 (QMS Process Matrix Report):

Clause numbers & titles changed to align with revised 9100-series:2016

Clarified when “N/A” and ‘empty boxes’ can be utilized in populating the matrix

Changed to accommodate Summary of Objective Evidence for clauses 4,5,6,7,9 and 10

Changed to accommodate reporting (5) PEAR levels

Changed to identify common process application across multiple sites, several site, campus, or complex organizations.

9101 Key Revision Summary - Forms

16

Page 17: IAQG 9101:2016 ( Rev . F)

17

9101 Key Revision Summary - Forms Form 3 (PEAR):

Added the box “Responsibility/Authority” for the process to align with revised 9100-series:2016

Assessment levels revised from 4 to 5 and redistributed to provide more balance in relation to the effectiveness result

Copied the PEM image from 9101:2016 Table 3 into the Form to help with PEAR level determination

Page 18: IAQG 9101:2016 ( Rev . F)

Form 4 (NCR):

Added “Cause Code” box to accommodate the allocation of a suitable code from the IAQG listing and to support future IAQG data collection.

Deleted “Signature” boxes to support OASIS NextGen.

9101 Key Revision Summary - Forms

18

Page 19: IAQG 9101:2016 ( Rev . F)

19

9101 Key Revision Summary - Forms

Form 5 (Audit Report):

Audit Type expanded to include reason for “Special Audit”

Improved/Clarified statement for the audit team leader’s certification recommendation

Changed to accommodate reporting (5) PEAR levels

Deleted “Signature” boxes to support OASIS NextGen

Alignment to 9100-series:2016 including:

“Exclusions” box changed to “Requirements determined as ‘not applicable’”, “Justification” box added and “Quality Manual” changed to “QMS Documented Information”

Improved to include a statement regarding the verification of effectiveness of corrective actions taken for nonconformities identified during the previous audit.

Box added to signify Integrated Audit (Yes/No)

Page 20: IAQG 9101:2016 ( Rev . F)

Form 5 (Audit Report) continued:

9101 Key Revision Summary - Forms

20

Page 21: IAQG 9101:2016 ( Rev . F)

Form 6 (Supplemental Audit Report):

Audit Type expanded to include reason for “Special Audit”

Changed to accommodate reporting (5) PEAR levels

Deleted “Signature” boxes to support OASIS NextGen

Box added to signify Integrated Audit (Yes/No)

9101 Key Revision Summary - Forms

21

Page 22: IAQG 9101:2016 ( Rev . F)

9101 revision scheduled in parallel with 9100-series revision 22

9101:2016 Schedule based on 9100 Revision Schedule

IAQG

9100

Ballot

Draft

Long Beach

10/2014

Chengdu

04/2015

Madrid

10/2015 Singapore

04/2016

TBD

10/2016

2016 2014 2015

TBD

04/2017

2017

9100 Publish

/ Ballot

Comments

IAQG 9100

Coordination

Draft for

Comment

9100 Team

Working

Draft 1

Review

ISO 9001

FDIS

Incorporation

ISO 9001

Publication

-ISO 9001 DIS

Comment

-9100 WD1

Opportunities for input

Not complete

Complete

9101 Publish

/Ballot

Comments

Launch

9101

Revision

Coordination

Draft

9101

Ballot

Draft

9100 Revision Schedule

- Coord. Draft: July 2015

- CD Comments Review: Oct. 2015

- Concurrent Balloting: Nov.-Dec. 2015

- BD Comments Review: Mar. 2016

- IAQG 9100:2016 Publish: Apr. 2016

- IAQG 9110:2016 Publish: Apr. 2016

- IAQG 9120:2016 Publish: Apr. 2016

9100

Team

WD2

Review

Team

Working

Draft

9100

ISO 17021-1

FDIS

Incorporation

ISO 17021-1

Publication

9100

Team

CD

Review

Charlotte

08/2015

ISO/IEC 17021-1 Schedule

- FDIS Voting: 5 March - 5 May 2015

- 17021-1:2015 Publish: July 2015

9101 Revision Schedule

- Working Draft: May 2015

- Coord. Draft (30 days): Aug. 2015

- CD Comments Review: Oct. 2015

- Ballot Draft: Dec. 2015

- BD Comments Review : Mar. 2016

- IAQG 9101:2016 Publish: Apr. 2016

CD

Comments

Review