Kaedah Penilaian
IBS Content Scoring System (“IBS Score”)
Keluasan penggunaan kaedah pasangsiap (precast) beam/column/slab
= 750m2 = 75%
Table 1, for precast beam/column/slab, F = 1.0
Keluasan penggunaan kaedahkonvensional (insitu)
= 250 m2 = 25%
Jumlah keluasan pembinaan 1,000 m2
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 4/21
Kaedah Penilaian
IBS Content Scoring System (“IBS Score”)
Keluasan penggunaan kaedah pasang siap
(precast) beam/column/slab= 750m2 = 75%
Table 1, for precast beam/column/slab, F = 1.0
Table 1, for in-situ, F = 0
Keluasan penggunaan kaedahkonvensional (insitu)
= 250 m2 = 25%
Jumlah keluasan pembinaan 1,000 m2
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 6/21
Kaedah Penilaian
IBS Content Scoring System (“IBS Score”)
Keluasan penggunaan kaedah pasangsiap (precast) beam/column/slab
= 750m2 = 75%
From Table 1, for precast beam/column/slab, F = 1.0
From Table 1, for in-situ, F = 0
Area using in-situ
= 250 m2 = 25%
Jumlah keluasan pembinaan 1,000 m2
Maka, bagi Part 1 (Structural System) IBS Score= ( (75% x 1.0) + (25% x 0) ) x 50%
= 37.5 %
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 7/21
Kaedah Penilaian
IBS Content Scoring System (“IBS Score”)
Panjang dinding panel pasangsiap (precast
panel)= 7,500m = 75%
Table 2, panel pasangsiap, F = 1.0
Table 2, dinding bata, F = 0
Panjang dinding bata (brick)
= 2,500 m = 25%
Jumlah panjang keseluruhan dinding
ialah = 10,000 m run
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 9/21
Panjang dinding panel pasangsiap
(precast panel) = 7,500m = 75%
Table 2, panel pasang siap, F = 1.0
Table 2, dinding bata, F = 0
Panjang dinding bata (brick)
= 2,500 m = 25%
Jumlah panjang keseluruhan dinding
ialah = 10,000 m run
Maka, jumlah score Part 2 (Wall System)
= ( (75% x 1.0) + (25% x 0) ) x 20%= 15%
Kaedah Penilaian
IBS Content Scoring System (“IBS Score”)
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 11/21
EXAMPLE
IBS Score Calculation
&
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 12/21
Example 1
2-storey Terrace House
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 13/21
Say, from measurement taken from drawings:
1) Construction area
i) Construction area ground floor = 117.0 m2ii) Construction area 1st floor = 117.0 m2
iii) Construction roof area = 117.0 m2
Total construction area = 351.0 m2
2)Structural Systems
i) Beams: Precast concrete beams
ii) Columns : In-situ concrete using steel formworks
iii) Floor slab: Precast half slabs floor
iv) Roof truss: Prefabricated timber roof truss.
3) Wall System
i) Internal wall: Precast concrete panel
ii) External wall: Precast blockworks
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 14/21
Other simplified construction solutions
i) Beams: 60% complies to MS 1064
Columns: 100% complies to MS 1064
Walls and slabs: Less than 50% complies to MS 1064
Doors : 80% complies to MS 1064
Windows: 0% complies to MS 1064
ii) Horizontal repetition of structure = 100%
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 15/21
72.1 IBS CONTENTS SCORE OF PROJECT (Part 1 + Part 2 + Part 3)
16 Total Part 3
6100%iv) Horizontal repetition of structure = 100%
480%iii) 80% of door sizing follow MS 1064 Part 4: 2001
4100%ii) 100% of column sizing follow MS 1064 Part 10: 2001
260%i) 60% beam sizes follow MS 1064 Part 10: 2001
Part 3: Other simplified construction solutions
14.81.00 167.3m Total Part 2
0.48 x 1.0 x 20
=9.6
(79.5/167)
=0.481.0079.5mInternal wall using precast concrete panel
0.52 x 0.5 x 20
=5.2
(87.8/167)
=0.520.587.8mExternal wall using precast concrete blockworks
Part 2: Wall System
41.3 1.00 351.0 m2 Total Part 1
0.33 x 1.0 x 50
=16.5
(117/351)
=0.331.0117.0 m2
Roof truss using prefab roof truss
Roof area = 117.0m2
0.33 x 0.6 x 50
=9.9
(117 / 351)
=0.330.6117.0 m2
Precast beams + in-situ column with reusable formwork
(no floor)
1st floor area = 117.0m2
0.33 x 0.9 x 50
=14.9
(117 / 351)
=0.330.9117.0 m2
Precast beams + in-situ column with reusable formwork+ precast concrete half slab floor.
Ground floor area = 117.0m2
Part 1: Structure Elements
IBS
SCORE COVERAGE
IBS
FACTOR(1)
AREA (m2) or
Length (m) ELEMENTS
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 16/21
Example 2
18 StoreyCondominium
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 17/21
Say, from measurement taken from drawings:
1) Construction Area Area for 1 unit of condominium = 94.4 m2
Lift lobby area = 140 m2 Area for 1 floor = [94.4 x 6 units + 140] = 706.4 m2
2) Structural Systems i) Tunnel formwork systemii) Roof truss: prefab steel roof truss.
3) Wall System/ floor i) precast blockworks (6 units + lobby area)= 263 m lengthii) Tunnel formwork (6 units + lobby area) = 120 m length
4) Other simplified construction solutions i) Doors : 100% comply to MS 1064
Windows: 100% comply to MS 1064ii) Repetition of floor to floor height = 90%
Vertical repetition of structural floor layout = 80%
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 18/2153.6 IBS CONTENTS SCORE OF PROJECT (Part 1 + Part 2 + Part 3)
12 Total Part 3
280%iv) Vertical repetition of structure floor layout = 80%
290%iii) Repetition of floor height = 90%
4100%ii) 100% of windows complies to MS1064
4100%i) 100% door sizes complies to MS1064
Part 3: Other simplified construction solutions
Total Part 2 10.61.006,894
0.31x 0.6 x 20
=3.722,160/6,894 =0.310.62,160
ii) Tunnel formwork
Total length= 120 m x 18 storey
0.69 x 0.5 x 20
=6.94,734/6,894 =0.690.54,734
i) Internal wall: precast blockwork
Total length
= 263 m x 18 storey
Part 2: Wall System
31.0 1.0013,421.4 m2 Total Part 1
0.05 x 1.0 x 50
=2.5
706.4/13,421.4
=0.05
1.0706.4 m2 ii) Roof truss - prefab steel
Roof area = 706.4m2
0.95 x 0.6 x50
=28.5
12,715 / 13,421.4
=0.950.6012,715 m2
i) Tunnel formwork system
Total area
= 706.4m2 x 18 storey = 12,715m2
Part 1: Structure Elements
IBS
SCORE COVERAGE FACTOR
AREA (m2) or
Length (m) ELEMENTS
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 19/21
Example 3
Ibs score for project (group
of buildings)
Pro ect n ormat on:
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 20/21
Pro ect n ormat on:- Main buildings in the development consist of 5 blocks of buildings. TheIBS score for each building are:-
i) Block A - 5 storey apartmentConstruction area, QST (building)A = 3,000 m2IBS Score(building A) = 83
ii) Block B - 5 storey apartmentConstruction area, QST (building)B = 3,000 m2IBS Score(building B) = 87
iii) Block C - 4 storey apartmentConstruction area, QST (building)C = 3,200 m2IBS Score(building C) = 35
iv) Block D - 4 storey apartment
Construction area, QST (building)D = 3,200 m2IBS Score(building D) = 47
v) Block E - 3 storey office blockConstruction area, QST (building)E = 3,000 m2IBS Score(building E) = 75
Total construction area (block A + B + C + D + E ) = 15,400m2
8/10/2019 IBS Score Calculation.ppt
http://slidepdf.com/reader/full/ibs-score-calculationppt 21/21
Block Construction
Area (m2) Coverage
IBS
Score(building) IBS Score(project)
A 3,000
3000 /
15400 =
0.195
83 0.195 x 83 = 16.2
B 3,000
3000 /
15400 =
0.195
87 0.195 x 87 = 17.0
C 3,200
3200 /
15400 =
0.21
35 0.21 x 35 = 7.4
D 3,200
3200 /
15400 =
0.21
47 0.21 x 47 = 9.9
E 3,000
3000 /
15400 =
0.195
75 0.195 x 75 = 14.6
Total 15,400 1.0 65.1