ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop 5-6 March 2012 Chiang Mai, Thailand. SP/14. 1. List of Contents. The concept of ASBU Who is involved? What is actually an Aviation System Block Upgrade? Module, Block, Thread, PIA - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/1.jpg)
ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS
Present by AEROTHAI
AMHS / SWIM Workshop5-6 March 2012
Chiang Mai, Thailand
1
SP/14
![Page 2: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/2.jpg)
2
List of Contents
• The concept of ASBU• Who is involved?• What is actually an Aviation System Block
Upgrade?– Module, Block, Thread, PIA
• Global Air Navigation Plan & ASBU
![Page 3: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/3.jpg)
3
List of Contents
• ASBU & SWIM– B1-31, B2-31, etc.
• ASBU & AMHS– B0-30, B0-25, etc.
• Summary – Why ASBU is useful for us?• Summary – What can we do now?
![Page 4: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/4.jpg)
4
The concept of ASBU
• ASBU stands for Aviation System Block Upgrades• Excerpt from the ASBU Working Document• “…ICAO therefore initiated the “Aviation System
Block Upgrades” initiative as a programmatic framework that– develops a set of air traffic management (ATM) solutions or
upgrades,– takes advantage of current equipage,– establishes a transition plan, and– enables global interoperability….”
![Page 5: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/5.jpg)
5
The concept of ASBU
• The concept of block upgrades comes from existing implementation plans and initiatives in many regions of the world.– Next Generation Air Transportation System (NextGen)
from the US– Single European Sky ATM Research (SESAR) from the
Europe– Collaborative Actions for Renovation of Air Traffic
Systems (CARATS) programs from Japan– Others
![Page 6: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/6.jpg)
6
The concept of ASBU
• ASBU composes of a suite of “modules” with the following characteristics:– clearly-defined measurable operational improvement and
success metric;– Necessary equipment and/or systems in aircraft and on ground
along with an operational approval or certification plan;– Standards and procedures for both airborne and ground
systems; and– A positive business case over A a clearly defined period of
time.
![Page 7: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/7.jpg)
7
The concept of ASBU
• ASBU will include the development of technology roadmaps, to ensure that standards are mature and to facilitate synchronized implementation between air and ground systems and between regions. The ultimate goal is to achieve global interoperability.
![Page 8: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/8.jpg)
8
The concept of ASBU
• ASBU are organized in five-year time “Block” increments starting in 2013 through 2028 and beyond.
• ASBU will be formalized at the Twelfth Air Navigation Conference, in November 2012
![Page 9: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/9.jpg)
9
Who is involved??
• “EVERYBODY”• Stakeholders include:
– Governing body e.g. ICAO, PIRGs, etc.– Service Providers– Regulators– Airspace Users– Manufacturers
![Page 10: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/10.jpg)
10
What is actually an Aviation System Block Upgrade??
• A Block Upgrade has 4 components:– Module – A deployable package (performance) or capability– Thread – A series of dependent modules across the block
upgrades.– Block – A block is made up of modules that when combined
enable significant improvements and provide access to benefits
– Performance Improvement Area (PIA) – An executive view of the intended evolution of modules in each Block that provide operational and performance objectives.
![Page 11: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/11.jpg)
11
Summary of Blocks Upgrade
![Page 12: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/12.jpg)
12
Sample – Block 0 Modules (Near-term)
B0-65
B0-75
B0-25
B0-30
B0-10
B0-101
B0-05
B0-40
![Page 13: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/13.jpg)
13
• PIA 1 Greener Airport– B0-65 Optimization of approach procedures including
vertical guidance.– B0-75 Improved Runway Safety
• PIA 2 Globally Interoperable Systems and Data– B0-25 Increased Interoperability, Efficiency and
Capacity through Ground-Ground Integration.– B0-30 Service Improvement through Digital
Aeronautical Information Management
Sample – Block 0 Modules(Near-term)
![Page 14: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/14.jpg)
14
• PIA 3 Optimum Capacity and Flexible Flights– B0-10 Improved Operations through Enhanced En-
Route Trajectories– B0-101 ACAS Improvements
• PIA 4 Efficient Flight Path– B0-05 Improved Flexibility and Efficiency in Descent
Profiles (CDOs)– B0-40 Improved Safety and Efficiency through the
initial application of Data Link En-Route
Sample – Block 0 Modules (Near-term)
![Page 15: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/15.jpg)
PIA 2
PIA 4
B0-30
B0-25
B1-31
B1-30
B1-25
B2-31
B2-25
B1-105PIA
3
B0-40
Parallel Progress
Parallel Progress
Related to
Threads & Block
![Page 16: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/16.jpg)
16
Blocks Timeframe
![Page 17: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/17.jpg)
17
Performance Improvement Area (PIA)
Greener Airports
Globally Interoperable Systems and Data – through Globally Interoperable System-Wide Information Management (SWIM)
Optimum Capacity and Flexible Flights – through Global Collaborative ATM
Efficient Flight Path – through Trajectory Based Operations
![Page 18: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/18.jpg)
18
Block 0 In Perspective
![Page 19: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/19.jpg)
19
Global Air Navigation Plan & ASBU
• Global Air Navigation Plan (GANP) is a strategic document in enhancing the efficiency of air navigation systems. – GANP contains guidance for systems improvement
in the near- and medium-term.– For Long-term initiatives, the GANP must be
updated once such concepts are matured.• ICAO aims for the ASBU initiative to be the
global approach for GANP.
![Page 20: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/20.jpg)
20
ASBU & SWIM
• System-Wide Information Management (SWIM) is a critical component in order to achieve ASBU PIA 2 - Globally Interoperable Systems and Data
• SWIM implementation is designated in Block 1 and Block 2 of the ASBU : – B1-31, B2-31 and B2-25
• Relationship (thread) with other modules are not completely developed yet.
![Page 21: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/21.jpg)
21
ASBU & AMHS
• AMHS/ATN is the network and application for exchange of digital information.
• AMHS systems are being deployed around the world.
• AMHS and ATN can be considered as elements contributing to modules in Block 0 (Near-term) of the ASBU : – B0-25, B0-30 and B0-40.
![Page 22: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/22.jpg)
22
Related Modules
• Some modules are pre-requisite of the SWIM-related modules– B1-30, B1-25 and B1-105
![Page 23: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/23.jpg)
PIA 2
PIA 4
B0-30
B0-25
B1-31
B1-30
B1-25
B2-31
B2-25
B1-105PIA
3
B0-40
Parallel Progress
Parallel Progress
Related to
ASBU – SWIM / AMHS related Blocks
23
Block 0 Block 1 Block 2
![Page 24: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/24.jpg)
24
ASBU & SWIM
• SWIM implementation is designated in Block 1 and Block 2 of the ASBU : – B1-31 Performance Improvement through the
application of SWIM– B2-31 Enabling Airborne Participation in
Corroborative ATM through SWIM – B2-25 Improved Coordination through multi-
centre Ground-Ground Integration: (SWIM + Other components)
![Page 25: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/25.jpg)
• Implementation of SWIM services (applications and infrastructure) creating the aviation intranet based on standard data models, and internet-based protocols to maximize interoperability
B1-31 Performance Improvement through the application of SWIM
25
![Page 26: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/26.jpg)
Main Performance Impact KPA-03 Cost-Effectiveness, KPA-05 Environment, KPA-10 Safety
Operating Environment/Phases of Flight
All Phases of Flight
Applicability Considerations Applicable at State level, with increased benefits as more States participate
Global Concept Component(s)
IM – Information Management
Global Plan Initiatives (GPI) GPI-18 Electronic information services
Pre-Requisites Successor of: B0-30Parallel progress with: B1-30
B1-31 Performance Improvement through the application of SWIM
26
![Page 27: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/27.jpg)
PIA 2
PIA 4
B0-30
B0-25
B1-31
B1-30
B1-25
B2-31
B2-25
B1-105PIA
3
B0-40
Parallel Progress
Parallel Progress
Related to
27
Block 0 Block 1 Block 2
![Page 28: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/28.jpg)
Global Readiness Checklist
Status (Ready or Date)Standards Readiness
Est. 2016
Avionics Availability
NA
Ground System Availability
Est. 2018
Procedures Available
Est. 2016
Operation Approvals
Est. 2016
B1-31 Performance Improvement through the application of SWIM
28
![Page 29: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/29.jpg)
• This module allows the aircraft to be fully connected as an information node in SWIM, enabling full participation in collaborative ATM processes with access to voluminous dynamic data including meteorology. This will start with non-safety critical exchanges supported by commercial data links. The applications of this module are integrated into the processes and the information infrastructure which had evolved over the previous blocks.
B2-31 Enabling Airborne Participation in collaborative ATM through SWIM
29
![Page 30: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/30.jpg)
Timescale From 2023
Main Performance Impact KPA-01 Access & Equity, KPA-04 Efficiency, KPA-05 Environment, KPA-08 Participation by the ATM Community, KPA-09 Predictability, KPA-10 Safety
Operating Environment/Phases of Flight
All Phases of Flight
Applicability Considerations long-term evolution potentially applicable to all environments
Global Concept Component(s) IM – Information Management
Global Plan Initiatives (GPI) GPI-17 Implementation of data link applicationsGPI-18 Electronic information services
Pre-Requisites Successor of: B1-30, B1-31, B1-105
B2-31 Enabling Airborne Participation in collaborative ATM through SWIM
30
![Page 31: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/31.jpg)
PIA 2
PIA 4
B0-30
B0-25
B1-31
B1-30
B1-25
B2-31
B2-25
B1-105PIA
3
B0-40
Parallel Progress
Parallel Progress
Related to
31
Block 0 Block 1 Block 2
![Page 32: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/32.jpg)
Global Readiness Checklist
Status (Ready or Date)Standards Readiness
2023
Avionics Availability
2023
Ground System Availability
2023
Procedures Available
2023
Operation Approvals
2023
B2-31 Enabling Airborne Participation in collaborative ATM through SWIM
32
![Page 33: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/33.jpg)
• B2-31 Improved Coordination through multi-centre Ground-Ground Integration: (FF-ICE/1 and Flight Object, SWIM)
• FF-ICE supporting Trajectory based Operations through exchange and distribution of information for multicentre operations using Flight Object implementation and Interoperability (IOP) standards.
• Extension of use of FF-ICE after departure supporting Trajectory based Operations. New system interoperability standards will support the sharing in ATM services that could involve more then two ATSUs.
B2-25 Improved Coordination through multi-centre G-G Integration
33
![Page 34: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/34.jpg)
Timescale From 2023
Main Performance Impact KPA-02 Capacity, KPA-04 Efficiency KPA-06 Flexibility, KPA-07 Global Interoperability, KPA-08 Participation by the ATM community KPA-10 Safety,
Operating Environment/Phases of Flight
All flight phases and all types of ground stakeholders
Applicability Considerations Applicable to all ground stakeholders (ATS, Airports, Airspace Users) in an homogeneous areas, potentially global.
Global Concept Component(s) AUO –Airspace User OperationsAO – Airport OperationsDCB – Demand capacity BalancingCM - Conflict managementIM - Information Management
B2-25 Improved Coordination through multi-centre G-G Integration
34
![Page 35: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/35.jpg)
Global Plan Initiatives (GPI) GPI-7 Dynamic and flexible route managementGPI-12 Functional integration of ground systems with airborne systemsGPI-16 Decision Support Systems
Pre-Requisites Successor of: B1-25, B1-31,
B2-25 Improved Coordination through multi-centre G-G Integration
35
![Page 36: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/36.jpg)
PIA 2
PIA 4
B0-30
B0-25
B1-31
B1-30
B1-25
B2-31
B2-25
B1-105PIA
3
B0-40
Parallel Progress
Parallel Progress
Related to
36
Block 0 Block 1 Block 2
![Page 37: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/37.jpg)
Global Readiness Checklist
Status (Ready or Date)Standards Readiness
Est. 2020
Avionics Availability
No requirement
Ground System Availability
Est. 2020
Procedures Available
Est. 2020
Operation Approvals
Est. 2020
B2-25 Improved Coordination through multi-centre G-G Integration
37
![Page 38: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/38.jpg)
38
ASBU & AMHS
• AMHS and ATN can be considered as elements contributing to modules in Block 0 (Near-term) of the ASBU : – B0-30 Digital AIM – using AIXM and possible AMHS– B0-25 Ground-Ground Integration – using AIDC and
possible AMHS + ATN– B0-40 Initial Application of data link En-route – using
ATN + Other A/G app such as CPDLC, ADS-C
![Page 39: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/39.jpg)
• B0-30 Service Improvement through Digital Aeronautical Information Management
• Initial introduction of digital processing and management of information, by the implementation of AIS/AIM making use of AIXM, moving to electronic AIP and better quality and availability of data.
B0-30 Service Improvement through Digital AIM
39
![Page 40: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/40.jpg)
Main Performance Impact KPA-03 Cost-Effectiveness, KPA-05 Environment, KPA-10 Safety
Operating Environment/Phases of Flight
All Phases of Flight
Applicability Considerations Applicable at State level, with increased benefits as more States participate
Global Concept Component(s)
IM – Information Management
Global Plan Initiatives (GPI) GPI-18 Electronic information services
Pre-Requisites
B0-30 Service Improvement through Digital AIM
40
![Page 41: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/41.jpg)
PIA 2
PIA 4
B0-30
B0-25
B1-31
B1-30
B1-25
B2-31
B2-25
B1-105PIA
3
B0-40
Parallel Progress
Parallel Progress
Related to
41
Block 0 Block 1 Block 2
![Page 42: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/42.jpg)
Global Readiness Checklist
Status (Ready or Date)Standards Readiness
Ready
Avionics Availability
Ready
Ground System Availability
Ready
Procedures Available
Ready
Operation Approvals
Ready
B0-30 Service Improvement through Digital AIM
42
![Page 43: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/43.jpg)
• Increased Interoperability, Efficiency and Capacity through Ground-Ground Integration
• This module supports the coordination between Air Traffic Service Units (ATSU) based using ATS Interfacility Data Communication (AIDC) defined by ICAO Doc 9694 .
• It permits also the transfer of communication in data-link environment in particular for Oceanic ATSU. It is a first step in the ground-ground integration
B0-25 Ground-Ground Integration
43
![Page 44: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/44.jpg)
Main Performance Impact
KPA-02 Capacity, KPA-04 Efficiency, KPA-07 Global Interoperability, KPA-10 Safety
Operating Environment/ Phases of Flight
All flight phases and all type of ATS units
Applicability Considerations
Applicable to at least 2 ACCs dealing with en-route and/or TMA airspace. A greater number of consecutive participating ACCs will increase the benefits.
Global Concept Component(s)
CM - Conflict managementIM - Information Management
Global Plan Initiatives (GPI)
GPI-16 Decision Support Systems
Pre-Requisites Link with B0-40
B0-25 Ground-Ground Integration
44
![Page 45: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/45.jpg)
PIA 2
PIA 4
B0-30
B0-25
B1-31
B1-30
B1-25
B2-31
B2-25
B1-105PIA
3
B0-40
Parallel Progress
Parallel Progress
Related to
45
Block 0 Block 1 Block 2
![Page 46: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/46.jpg)
Global Readiness Checklist
Status (Ready or Date)Standards Readiness
Ready
Avionics Availability
No Requirement
Ground System Availability
Ready
Procedures Available
Ready
Operation Approvals
Ready
B0-25 Ground-Ground Integration
46
![Page 47: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/47.jpg)
• B0-40 Improved Safety and Efficiency through the initial application of Data Link En-Route
• Implementation of an initial set of data link applications for surveillance and communications in ATC.– ADS-C, CPDLC, etc.
B0-40 initial application of Data Link En-Route
47
![Page 48: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/48.jpg)
Main Performance Impact
KPA-02 Capacity, KPA-04 Efficiency, KPA-10 Safety
Operating Environment/ Phases of Flight
En-route flight phases, including areas where radar systems cannot be installed such as remote or oceanic airspace.
Applicability Considerations
Requires good synchronization of airborne and ground deployment to generate significant benefits, in particular to those equipped. Benefits increase with the proportion of equipped aircraft.
Global Concept Component(s)
IM - Information ManagementSDM – Service Delivery Management
48
B0-40 initial application of Data Link En-Route
![Page 49: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/49.jpg)
Global Plan Initiatives (GPI)
GPI-9 Situational awarenessGPI-17 Implementation of data link applicationsGPI-18 Electronic information services
Pre-Requisites Predecessor of: B1-40 (but can also be combined with it)
49
B0-40 initial application of Data Link En-Route
![Page 50: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/50.jpg)
PIA 2
PIA 4
B0-30
B0-25
B1-31
B1-30
B1-25
B2-31
B2-25
B1-105PIA
3
B0-40
Parallel Progress
Parallel Progress
Related to
50
Block 0 Block 1 Block 2
![Page 51: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/51.jpg)
Global Readiness Checklist
Status (Ready or Date)Standards Readiness
Ready
Avionics Availability
Ready
Ground System Availability
Ready
Procedures Available
Ready
Operation Approvals
Ready
51
B0-40 initial application of Data Link En-Route
![Page 52: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/52.jpg)
52
Related Modules
• Some modules are pre-requisite of the SWIM-related modules– B1-30 Service Improvement through Integration of all
Digital ATM Information– B1-25 Increased Interoperability, Efficiency and
Capacity though FF-ICE/1 application before Departure– B1-105 Better Operational Decisions through Integrated
Weather Information (Planning and Near-term Service)
![Page 53: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/53.jpg)
• Implementation of the ATM information reference model integrating all ATM information using UML and enabling XML data representations and data exchange based on internet protocols with WXXM for meteorological Information.
B1-30 Service Improvement through Integration of all Digital ATM Information
53
![Page 54: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/54.jpg)
Main Performance Impact KPA-01 Access & Equity, KPA-03 Cost-Effectiveness, KPA-10 Safety
Operating Environment/Phases of Flight
All Phases of Flight
Applicability Considerations Applicable at State level, with increased benefits as more States participate
Global Concept Component(s)
IM – Information Management
Global Plan Initiatives (GPI) GPI-18 Electronic information services
Pre-Requisites Successor of: B0-30Parallel progress with: B1-25, B1-31
B1-30 Service Improvement through Integration of all Digital ATM Information
54
![Page 55: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/55.jpg)
PIA 2
PIA 4
B0-30
B0-25
B1-31
B1-30
B1-25
B2-31
B2-25
B1-105PIA
3
B0-40
Parallel Progress
Parallel Progress
Related to
55
Block 0 Block 1 Block 2
![Page 56: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/56.jpg)
Global Readiness Checklist
Status (Ready or Date)Standards Readiness
Est. 2018
Avionics Availability
NA
Ground System Availability
Est. 2018
Procedures Available
Ready
Operation Approvals
Est. 2018
B1-30 Service Improvement through Integration of all Digital ATM Information
56
![Page 57: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/57.jpg)
• Increased Interoperability, Efficiency and Capacity though FF-ICE/1 application before Departure
• Introduction of FF-ICE step 1, to implement ground-ground exchanges using common flight information reference model (FIXM) and XML standard format used before departure.
B1-25 FF-ICE/1 application
57
![Page 58: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/58.jpg)
Main Performance Impact KPA-02 Capacity, KPA-04 Efficiency, KPA-07 Global Interoperability, KPA-10 Safety
Operating Environment/ Phases of Flight
Planning Phase for FF-ICE/1
Applicability Considerations
Applicable between ATC units and to facilitate exchange between ASP, Airspace user operations and airport operations.
Global Concept Component(s)
DCM – Demand Capacity BalancingCM - Conflict managementIM - Information Management
B1-25 FF-ICE/1 application
58
![Page 59: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/59.jpg)
Global Plan Initiatives (GPI)
GPI-6 ATFMGPI-7 Dynamic and flexible route managementGPI-16 Decision Support Systems
Pre-Requisites Successor of B0-25 and B0-30 (AIXM)Connection to B1-30 (AIRM) and B1-31 (SWIM)
B1-25 FF-ICE/1 application
59
![Page 60: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/60.jpg)
PIA 2
PIA 4
B0-30
B0-25
B1-31
B1-30
B1-25
B2-31
B2-25
B1-105PIA
3
B0-40
Parallel Progress
Parallel Progress
Related to
60
Block 0 Block 1 Block 2
![Page 61: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/61.jpg)
Global Readiness Checklist
Status (Ready or Date)Standards Readiness
Est. 2018
Avionics Availability
NA
Ground System Availability
Est. 2018
Procedures Available
Ready
Operation Approvals
Est. 2018
B1-25 FF-ICE/1 application
61
![Page 62: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/62.jpg)
• B1-105 Better Operational Decisions through Integrated Weather Information (Planning and Near-term Service)
• This module develops weather information supporting automated decision process or aids involving: weather information, weather translation, ATM impact conversion and ATM decision support.
B1-105 Integrated Weather Information
62
![Page 63: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/63.jpg)
Main Performance Impact KPA-02 Capacity, KPA-04 Efficiency, KPA-09 Predictability, KPA-10 Safety
Operating Environment/ Phases of Flight
All flight phases
Applicability Considerations
Applicable to traffic flow planning, and to all aircraft operations in all domains and flight phases, regardless of level of aircraft equipage.
Global Concept Component(s)
AOM - Airspace Operations and ManagementDCB - Demand and Capacity BalancingAO - Aerodrome Operations
63
B1-105 Integrated Weather Information
![Page 64: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/64.jpg)
Global Plan Initiatives (GPI)
GPI-19 Meteorological SystemsGPI-6 Air Traffic Flow ManagementGPI-16 Decision Support Systems and Alerting Systems
Pre-Requisites Successor of B0-10: Improved En-Route Profiles,B0-15: Runway Arrival Sequencing;B0-35: ATFM/NOP and CDM;
Parallel development withB1-15 AMAN/DMANMetroplex and Linked DMAN/Surface Management (SMAN);B1-35: Enhanced NOP, Integrated Airspace/Flow Management 64
B1-105 Integrated Weather Information
![Page 65: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/65.jpg)
PIA 2
PIA 4
B0-30
B0-25
B1-31
B1-30
B1-25
B2-31
B2-25
B1-105PIA
3
B0-40
Parallel Progress
Parallel Progress
Related to
65
Block 0 Block 1 Block 2
![Page 66: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/66.jpg)
Global Readiness Checklist
Status (Ready or Date)Standards Readiness
Est. 2018
Avionics Availability
2018
Ground System Availability
Est. 2018
Procedures Available
Est. 2018
Operation Approvals
Est. 2018
66
B1-105 Integrated Weather Information
![Page 67: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/67.jpg)
• We have a sense of the whole picture.• We can see all the components and see how they fit
with each other and• We also have a sense of where we are in that “whole
picture”.• We know of “somewhat scope” of what we should
do.• We have a “ somewhat prioritized plan” of what we
should do.
Why ASBU is useful for us??
67
![Page 68: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/68.jpg)
• Follow through with how ASBU is developed.
• Learn, Learn, and Learn some more.• Start coordinating with peer organizations.• Or to put it simply – “BE PREPARED”
What can we do now??
68
![Page 69: ICAO Aviation System Block Upgrades (ASBU) and SWIM/AMHS Present by AEROTHAI AMHS / SWIM Workshop](https://reader034.vdocument.in/reader034/viewer/2022042519/56815e34550346895dcc95ed/html5/thumbnails/69.jpg)
Thank you for your attention.Thank you for your attention.Thank you for your attention.