    S.No. Contractor Discipline NCR Ref. Rev.No. Building Ref: NCR Description Date of Issue Target Closure Date Date of Closure Status Remarks

    21 L & T St ructura l D09- PMC-NCR-QA-021 0 ONE ICC/TWO

    ICC

    C racks in core wall/slabs (Isolated locations) 23-09-2015 15-03-2016 Open 90% of the repair works done,

    Target Date is 29/02/16

    25 L & T St ructura l D09- PMC-NCR-QA-025 0 ONE I CC Cracks ha ve b een o bserved in Slab a t isola ted locat ions 01-10-2015 15-03-2016 Open

    Repair works will be

    commenced from 01/03/16

    and will be closed by 15/03/16

    ONE ICC & TWO ICC

    NONCONFORMANCE REPORT LOG OPEN

    Date : 22-02-2016

    IS

    Document No: D09-NCRP-01-LG Rev.0Revision Date: 15-May-2015