ICHARM’SICHARM’SICHARM’SICHARM’S CAPACITY BUILDING: CAPACITY BUILDING: CAPACITY BUILDING: CAPACITY BUILDING: CHALLENGES AND FUTURE PROSPECTS REGARDING CHALLENGES AND FUTURE PROSPECTS REGARDING CHALLENGES AND FUTURE PROSPECTS REGARDING CHALLENGES AND FUTURE PROSPECTS REGARDING
WATERWATERWATERWATER----RELATED ISSUES IN BANGLADESH RELATED ISSUES IN BANGLADESH RELATED ISSUES IN BANGLADESH RELATED ISSUES IN BANGLADESH
Md. Khairul IslamExecutive Engineer,
Bangladesh Water Development Board,
Dhaka, Bangladesh.
Date : March 2, 2016
TOKYO UNIVERSITY
ASIA WATER CYCLE SYMPOSIUM 2016ASIA WATER CYCLE SYMPOSIUM 2016ASIA WATER CYCLE SYMPOSIUM 2016ASIA WATER CYCLE SYMPOSIUM 2016
CONTENTS OF THE PRESENTATIONCONTENTS OF THE PRESENTATIONCONTENTS OF THE PRESENTATIONCONTENTS OF THE PRESENTATION
� The Organization I work for
� Challenges my organization is facing currently
regarding water-related issues
� My current activities and responsibilities
� My ambitions (expectations, prospects) for the future
for contributing to water-related issues in my country
BANGLADESH WATER DEVELOPMENT BOARD (BWDB) BANGLADESH WATER DEVELOPMENT BOARD (BWDB) BANGLADESH WATER DEVELOPMENT BOARD (BWDB) BANGLADESH WATER DEVELOPMENT BOARD (BWDB)
A statutory body under the Ministry
of Water Resources, Government of
Bangladesh.
BANGLADESH WATER DEVELOPMENT BOARD (BWDB) BANGLADESH WATER DEVELOPMENT BOARD (BWDB) BANGLADESH WATER DEVELOPMENT BOARD (BWDB) BANGLADESH WATER DEVELOPMENT BOARD (BWDB)
�Development of rivers, flood control, drainage, surface irrigation
� By Constructing dams, barrages, reservoirs, embankments, regulators
�Improvement of water flows
� By dredging, re-excavation and de-siltation of water channels.
�Protection of places of historical and public importance
� By river training and river bank protection works
�Flood forecasting and warning
� By Flood Forecasting and Warning Center
�Development of water user’s association
� By training and participating in all project phases.
� Water Logging: due to absence of adequate drainage route (Beel Dakatia).
� River Pollution: mainly due to industrial effluent, domestic sewage,
encroachment
BWDB CHALLENGESBWDB CHALLENGESBWDB CHALLENGESBWDB CHALLENGES� Flood: A common phenomenon in Bangladesh
1996
� Urban Drainage Congestion: due to Backwater effect of river flooding,
Hindrance by infrastructures
� River Bank Erosion: A major impact of river flooding at the time of
recession
� Inundation: due to placement of dam or other intervention (fringe area in
the Kaptai reservoir). But often no distinction is made between flooding
and inundation.
CURRENT ACTIVITIES AND RESPONSIBILITIES CURRENT ACTIVITIES AND RESPONSIBILITIES CURRENT ACTIVITIES AND RESPONSIBILITIES CURRENT ACTIVITIES AND RESPONSIBILITIES
� Improvement of water flows of Buriganga river
� By dredging, re-excavation and de-siltation of water channels.
� Buriganga river pollution around Dhaka city
� mainly due to industrial effluent, domestic sewage, encroachment.
BURIGANGABURIGANGABURIGANGABURIGANGA RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT � Background
�Water flow declined significantly
�Water became polluted � Posing serious threat
�Does not receive flows from the feeder river
�Nearly no flow condition during dry season.
� To meet the above issues and challenges the Project has been
taken up for achieving sustainable development by water
diversion of Jamuna river.
Jamuna
(Lower Brahmaputra)
New Dhaleswari
Pungli
Bangshi
Turag
Buriganga
Offtake of New Dhaleswari: 245 m3/sOfftake of New Dhaleswari: 245 m3/s
DhakaDhaka
Turag-Tongi Khal offtake: 162 m3/s
Tongi Khal: 19 m3/sTongi Khal: 19 m3/s
Buriganga: 141 m3/sBuriganga: 141 m3/s
Lakhya: 16 m3/sLakhya: 16 m3/s
BURIGANGABURIGANGABURIGANGABURIGANGA RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT
BURIGANGABURIGANGABURIGANGABURIGANGA RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT
� Objective of the Project
�Specific objectives: maintain dry season minimum flow for
�Improving water quality
�Meeting navigational depth
At the peripheral rivers of the Dhaka city.
� Others
� Irrigation and fisheries development.
� Improvement of overall economic, social & environmental condition.
� Unauthorized encroachment control along Buriganga River
BURIGANGABURIGANGABURIGANGABURIGANGA RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT � Main Physical component of the project:
� Dredging/re-excavation of Rivers 162.5 km� Stop Log Sand barrier 1 no.� Flush sluice 1 no.� Training Bank 300 m� Sediment Basin 1 no.
� Project Cost: Tk. 24440.00 million
BURIGANGABURIGANGABURIGANGABURIGANGA RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT RIVER RESTORATION PROJECT � Challenges
�New Dhaleswari off-take been silting up regularly
�Solution: Off-take management by different structures
�Dredging may damage foundations of 22 bridges
�Solution: Re-construction and foundation treatment
�Reduction of planned dredging section
� Illegal Encroachment along the river system
FUTURE PROSPECTS TO WATERFUTURE PROSPECTS TO WATERFUTURE PROSPECTS TO WATERFUTURE PROSPECTS TO WATER----RELATED ISSUES RELATED ISSUES RELATED ISSUES RELATED ISSUES
� Water Resources Management
�Comprehensive river management development for all major rivers
�Rationalizing flood management systems
� Increasing water use efficiency in surface and ground water irrigation
� Increasing availability of surface water
�Ensuring effective stakeholders’ participations
� Institutional development and inter-institutional management
FUTURE PROSPECTS TO WATERFUTURE PROSPECTS TO WATERFUTURE PROSPECTS TO WATERFUTURE PROSPECTS TO WATER----RELATED ISSUES RELATED ISSUES RELATED ISSUES RELATED ISSUES � Disaster Risk Reduction
�Development of a reliable long-term prediction of river bank erosion
�Reliable predictions of extreme climatic events
�Development of a community-based flood forecasting system
� Environment
� Improving connectivity between flood plains with the river systems to
revitalize water dependent eco-systems
� Waste water & water quality
�A comprehensive waste water management system
�Conducting water quality monitoring regularly and rigorously
Thank you for all of your attention