Presented by: Albert Altarejos MAGALANG Climate Change Office-Environmental Management Bureau Department of Environment & Natural Resources /Philippine DNA for CDM Identifying and Monitoring of Sustainable Development Benefits on CDM Projects and PoAs

Upload: lamhuong

Post on 15-Aug-2019

213 views

Category:

Documents


0 download

TRANSCRIPT

Presented by:

Albert Altarejos MAGALANG

Climate Change Office-Environmental Management Bureau

Department of Environment & Natural Resources

/Philippine DNA for CDM

Identifying and Monitoring

of Sustainable Development Benefits

on CDM Projects and PoAs

Outline of the Presentation

CDM Process and Key Players

Minimum CDM Requirement

Role of DNA

National Approval Process (Basic Steps)

Evaluation of CDM Project Application

SD Criteria/Indicators

Measuring and Monitoring SD Benefits

Survey on the Implementation of CDM Projects

Minimum CDM Eligibility Requirement

CDM eligibility depends on specific project circumstances. At the

minimum, the main CDM eligibility criteria are as follows:

not a baseline scenario

Is an additional

Contributes to sustainable development

Host country participation is voluntary

Both host and investor country have ratified KP

Participating country parties have their respective DNA for CDM

Role of DNA

Formulates and develops a national CDM policy

Develops the criteria, indicators, standards, systems and procedures, and evaluation tools

Undertakes the assessment of proposed CDM projects

Monitors the implementation of CDM projects

CDM National Approval Process

Basic Steps

• Project

Application

Project Proponent

• Project Evaluation

Technical Evaluation Committee

• Project Endorsement

CDM Steering Committee

• Project Approval/ Non Approval

DNA

(DENR Secretary)

Project Application Monitoring by the CDM Secretariat

Needed Documents for Host Country

Approval

Notarized Project Design Document (PDD) or Project

Application Document (PAD)

Sustainable Development Benefits Description

(SDBD)

Documentation of Stakeholders Consultation

Proofs of Legal Capacity (Articles of Incorporation, SEC

Registration, etc.)

Evaluation of CDM Project Application

The evaluation is based on sustainable development criteria

with the following dimensions:

Economic Dimension

Environmental Dimension

Social Dimension

SD Criteria

ECONOMIC DIMENSION

Provides livelihood and other economic opportunities in the community

Provides proper safety nets and compensatory measures for affected stakeholders

Promotes the use of cleaner, more efficient and environment-friendly technology

Provides new financial resources

ENVIRONMENTAL DIMENSION

Complies with environmental policies and standards

Improves local environment (e.g. air, water, soil) quality

Promotes sustainable use of natural resources

SOCIAL DIMENSION

Provides education and training which build the capacities of local stakeholders

Provides vulnerable groups access to local resources and services

Promotes local participation in the project

Proposed Guidelines/Scheme for

Measuring and Monitoring SD Benefits in

the Philippines (Point System)

A proposed scheme for measuring and monitoring SD

benefits was developed by the EMB (CDM Secretariat) with

assistance from IGES.

The guidelines cover both proposed and existing projects by

giving scores to a set of sustainable development (SD)

criteria/indicators that is applicable to a particular project.

Economic Dimension SD Criteria/Indicators Points

Additional employment generated (permanent) per Php 1,000,000 CER revenue 10

Additional employment generated (temporary) per Php 1,000,000 CER revenue 5

Additional PhP 100,000 generated in livelihood activities per Php 1,000,000 CER revenue 5

Additional PhP 100,000 generated in micro-financing activities per Php 1,000,000 CER revenue 5

Per 1% of compensation paid for relocation, resettlement 2

Additional employment generated (perm) in livelihood activities per PhP 1,000,000 CER revenue 10

Additional employment generated (temp) in livelihood activities per PhP 1,000,000 CER revenue 5

A well-designed or well-maintained pollution control facility/system 5

For each program on clean technology, energy and water conservation in use 5

For each community environmental outreach program in place 5

For each program on waste reduction in specific media (e.g., solid, liquid) 5

For every $1000,000 new investment generated internationally (i.e., direct foreign investment) 10

For every $1000,000 new investment generated domestically (i.e., from local banks) 5

Environmental dimension SD Criteria/Indicators Points

Compliance with all required environmental permits 5

For every environmental award (local/provincial) 5

For every environmental award (national) 10

For every environmental award (international) 20

For every pollution level of effluent/emission better than standards 2

for every pollution level of effluent/emission 20% better than standards 5

Environmental Management System is in place 10

per PhP 100,000 allocated in outreach program on sustainable use of natural

resources per PhP 1,000,000 CER revenue

5

per PhP 50,000 allocated in direct investment on natural resources (e.g.,

reforestation) per PhP 1,000,000 CER revenue

5

Social dimension SD Criteria/Indicators Points

per PhP 100,000 allocated to training activities per PhP 1,000,000 CER revenue 5

per PhP 50,000 allocated to (formal school) scholarship per PhP 1,000,000 CER revenue 5

per PhP 100,000 allocated to basic services (e.g., water, health, sanitation) per PhP 1,000,000

CER revenue

5

per PhP 50,000 allocated to special services targeted for vulnerable groups per PhP 1,000,000

CER revenue

5

per 10% of community involvement as measured in participation in MMT, monitoring activities,

company events, etc.

5

per PhP 50,000 allocated to IEC campaign on CDM per PhP 1,000,000 CER revenue 10

per PhP 50,000 of goods or services from CDM projects given to residents for free (e.g.,

compost, electricity)

5

per PhP 100,000 of goods or services from CDM projects given to residents at below market

cost (e.g., compost, electricity subsidy)

5

Post-2012 Assessment and Monitoring

of CDM Projects

The DNA in cooperation with IGES and ASoG conducted a survey last year on CDM implementation in the Philippines to look into the progress of CDM project activities in the country. Specifically, the survey aims to:

Get updates on the stage of development of the CDM project activities;

Identify problems and issues of project developers;

Provide recommendations to address the issues

Survey Summary Results

Some of the proposed projects will not be pursued due to their failure to meet the December 2012 CDM registration deadline causing the cancellation of the Emission Reduction Purchase Agreement (ERPA);

Some of the other reasons for the discontinuation of the CDM process are low market price of carbon credits, change in management priorities, lack of incentives from national policy, additionality, and low emission reduction potential;

Only one non-operational project disclosed having no financial closure; Only one project activity engaged in waste management disclosed technical barrier in the issuance of CER.

All three (3) projects with CER issuances have a 10-year CER purchase contract covering 100% of the CER generated. CER price of the two (2) project activities are at market rate and the other one at fixed rate.

Survey Summary Results

CER issuances as compared to planned range from 32% - 79%.

Due to the low CER price and high transaction cost, some project proponents are deferring verification and CER issuance;

Most CDM projects implemented are able to deliver the sustainable benefits to the nearby community.

(the lack of revenue from CERs was the reason for the non-delivery of the economic and social benefits of one project activity )

Conclusions

Project activities are in different stages of development primarily

depending on the start date of the CDM process;

Most of the project activities are in the power generation sector,

followed by the waste management sector;

CDM-PoA are already being adopted in the sectors of waste

management, power generation and energy efficiency;

CER market is the most pressing concern of many project developers

Conclusions

There are CDM-specific and non-CDM specific reasons affecting

the decision-making of project proponents at different stages of

project development.

CDM specific reasons include carbon market price and technical

barriers, which can be addressed by the improvement of the

mechanism itself.

But non CDM specific reasons such as national policies can only

be addressed by the broader approach of the national

government.

Recommendations

Explore other mechanisms such as the Nationally Appropriate Mitigation Actions (NAMAs) or new market mechanism as an alternative market for carbon credits generated by mitigation projects implemented in the Philippines;

Actively support the improvement of the modalities and procedures of CDM to encourage better participation;

National policies should promote the participation of the small players in the industry especially in the energy sector;

The DNA needs a regular reporting system to facilitate better monitoring and feedback mechanism for the CDM projects implemented in the Philippines.