idocket cl'ntrol p w center u wrj · participants as part of the civilian radioactive waste...
TRANSCRIPT
-
DOE/NV/10322-24 /gva q
, P w ~~~~~~WM
DOE/NV/1 0322-24
U
engineeringconstructionmnanagemi ent
wrj
IDOCKET CL'NTROLCENTER
7 COT 15 All :30
I RECORD COPY
NNWSIDRILLING AND MINING
SUMMARY
r
JULY, 1987
FENIX & SCISSON, INC.6450 SO. LEWIS STREET
BRIDGEPORT IIITULSA, OKLAHOMA 74136
FENIX & SCISSON, INC.P. 0. BOX 498
MERCURY, NEVADA 89023
U.S. DEPARTMENT OF ENERGY CONTRACT DE ACOS 84NV10322
-
DISCLAIMER
This report was prepared as an account of work sponsored by theUnited States Government. Neither the United States nor theUnited States Department of Energy, nor any of their employees,makes any warranty, express or implied, or assumes any legalliability or responsibility for the accuracy, completeness, orusefulness of any information, apparatus, product, or processdisclosed, or represents that its use would not infringe privatelyowned rights. Reference herein to any specific commercialproduct, process, or service by trade name, mark, manufacturer, orotherwise, does not necessarily constitute or imply itsendorsement, recommendation, or- favoring by the United StatesGovernment or any agency thereof. The views and opinions ofauthors expressed herein do not necessarily state or reflect thoseof the United States Government or any agency thereof.
Printed in the United States of AmericaAvailable from:
National Technical Information ServiceU. S. Department of Commerce5285 Port Royal RoadSpringfield, Virginia 22161
Price: Printed CopyMicrofiche A01
-
DOE/NV/1 0322-24 DO E/NV/1 0322-24
NNWSIDRILLING AND MINING
SUMMARY
BY
FENIX & SCISSON, INC.
PREPARED FORU. S. DEPARTMENT OF ENERGYNEVADA OPERATIONS OFFICE
UNDER CONTRACT DE-AC08-84NV1 0322
JULY, 1987
-
Prepared by Nevada Nuclear Waste Storage Investigations (NNWSI) ProjectParticipants as part of the Civilian Radioactive Waste ManagementProgram. The NNWSI Project is managed by the Waste Management ProjectOffice of the U. S. Department of Energy, Nevada Operations Office.NNWSI Project work is sponsored by the U. S. Department of Energy,Office of Civilian Radioactive Waste Management, Washington D.C.
-
Contents
Paae
Abstract1 ---------------------------------------------------------- I
Area 1----------------------------- 3Area 5--------------------------------------------------------------- 5Area 16---------------- 7Area 17-------------------------------------------------------------- 9Area 25-------------------------------------------------------------- 13Area 26-------------------------------------------------------------- 29Area 29-------------------------------------------------------------- 31Area 30-------------------------------------------------------------- 33NNWSI Off-Site------------------------------------------------------ 35
ii
-
NNWSI
Drilling And Mining
Summary
by
Reports and CEP Section
Abstract
This is a summary report for all boreholes drilled prior to July 1,1987 in support of the Nevada Nuclear Waste Storage Investigation(NNWSI). The boreholes were drilled in Areas 1, 5, 16, 17, 25, 26, 29,and 30 of the Nevada Test Site and in Bureau of Land Management landadjacent to the Nevada Test Site. The report contains the boreholedesignation, As-Built or Lay-Out (L/O) coordinates, ground levelelevation, REECo work order number, casing depths and diameters, drillhole depths and diameters, spud (start) and completion (** - Suspendedand *** - Abandoned) dates, and pertinent remarks for all NNWSI andrelated boreholes. The report also gives the DOE report number fromwhich detailed information can be obtained for each borehole. Thereport is scheduled to be updated biannually.
1
-
HOLENUMBER
0. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
WASTE ISOLATION HOLES
DOE Publication - Pending
UE-lmEleana
N 825,407.5E 657,842.0
4478.0 3313-101 8.75' .5 1/2" 514'290' 1 1/4" Tubing
3.990" 3-2-76 4-6-76
UE-InEleana
DE-loEleana
N 825,329.0E 657,760.7
N 825,417.5E 657,755.8
4479.9 3313-101
4479.5 3313-101
5'
5'
5 1/2"
5 1/2"
5'
5'
7 7/8"
7 7/8"
3-8-76
3-8-76
3-8-76**
3-8-76**
UE-lpEleana
N 826,268.7E 662,298.8
4232.4 3313-104A 38.5' 7 5/8" 773'782'
6 1/4"3.990"
7-15-76 8-16-76
wA
07-01-87 Area 1--Page 1
-
HOLENUMBER
G. L. WORK ORDERLOCATION ELEY. NUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
NNWSI SEISMIC HOLES
DOE Publication - DOE/NV/10322-25
U-5Seismic #1
N 749,607.0E 668,098.7
3868.7 3404-192 139' 8" 140' 12 1/4" 4-11-84 4-13-84
U-5Seismic #2
N 749,623.0E 668,121.7
3867.7 3404-192 138' 8" 140' 12 1/4" 4-13-84 4-16-84
an
07-01 -87 Area 5--Page 1
-
HOLENUMBER
C. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
WASTE ISOLATION HOLES
DOE Publication - Pending
UE-16bEleana
N 839,498.2E 641,345.2
4890.2 3313-104A 34' 7 5/8" 355' 6 1/4"361' 3.990"
(Stemmed with peagravel from 331' to 240'from 114' to 102'.)
6-28-76
and
10-7-82(Recompleted)
UE-16cEleana
N 844,958.4E 644,556.9
4726.3 3313-104A 42'134
7 5/8"1 1/4"
tubing
137'144'
6 1/4"3.990"
7-2-76 7-8-76
UE-16d N 844,877.6Eleana E 646,566.9
1 Sidetrack(Waterwell)
4684.2 9080-105A 80' 10 3/4" 2321' 6 1/4" 5-17-772117' 7"(Plugged with cement from 2228' to 2130', bridge plug
2130'- 3000' 6 1/4"(7" casing perforated from 1310' to 1145'.)
3-5-81(Recompleted)
at 2020'.)
UE-16fEleana
N 832,355.2E 648,843.9
4651.5 9103-105 1293.' 9 5/8" 1479' 8 3/4" 8-1-77 9-27-77
07-01-87 Area 16--Page 1
-
'HOLENUMBER
G. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
WASTE ISOLATION HOLES
DOE Publication - Pending
UE-1 7aEleana
N 846,138.1E 645,990.6
4696.5 3313-104A 1210' 4 1/2"(USGS instruments
1214'in hole.)
6 1/4" 7-2-76 9-23-76(Recompleted)
UE-17bEleana
N 849,216.6E 646,469.6
4780.1 3313-104A 39'220'
7 5/8"1 1/4"
Tubing
250' 6 1/41"256.5' 3.990"
7-28-76 8-17-76
UE-17cEleana
to UE-17dEleana
N 857,444.4E 650,047.4
N 847,189.0E 647,787.5
4834.7 3313-104A
4677.6 3313-104
38' 7 5/8"538.5' 1 1/4"
Tubing
39.5' 7 5/8"392' 1 1/4"
Tubing
575'586'
390'398'
6 1/4"3.990"
6 1/4"3.990"
7-15-76
8-9-76
7-29-76
8-20-76
UE-17eEleana
N 853,204.7E 646,447.8
4934.2 EY-77-B-08-001
10' 6"2992' 1.6"
3000' 3.937" 11-24-76 1-9-77
UE-17fEleana
UE-17gEleana
N 853,320.9E 646,031.6
N 853,291.0E 646,514.8
4929.9 9080-1034
4928.9 9080-1034
10'
10'
4 1/2"
4 1/2"
100'
104.'
3.990"
3.990"
5-2-77
5-6-77
5-4-77
5-10-77
07-01-87 Area 17--Page 1
-
HOLENUMBER LOCATION
HEAT TRANSFER EXPERIMENT
DOE Publication - Pending
SI-1 Heater N 853,330.2
Hole E 646,487.5
Heater N N/AAngle E
Hole #lA
Heater N N/AAngle E
Hole #2A
SI-2 N 853,332.2
E 646,487.9
SI-3 N 853,329.8E 646,489.6
SI-4 N 853,330.4
E 646,485.6
SI-5 N 853,334.1E 646,488.2
SI-6 N 853,329.4E 646,491.5
SI-7 N 853,326.2
E 646,486.8
G. L.ELEV.
4931.8
N/A
N/A
4931.9
4931.9
4931.9
4931.9
4931.9
4931.9
WORK ORDERNUMBER
9101-103
3401-106
3401-106
9101-103
9101-103
9101-103
9101-103
9101-103
9101-103
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
60' if
No Casing(Sidetrack
No Casing(Sidetrack
60' 4
60' 4
60' 4
60' 4
60' 4
60' 4
6i" 80'
110'
85'off of S1-I Heater
85'off of S1-i Heater
1/2" 92.5'
1/2" 80'115'
1/2" 92.5'
1/2" 83.5'
1/2" 80'
1/2" 82.5'
14"7 7/8"
3.875"Hole.)
3.875"Hole.)
3.875"
3.875"3 3/4"
3.875"
3.875"
3.875"
3.875"
SPUDDATE
9-21-77
5-3-79
4-30-79
9-7-77
9-9-77
8-11-77
8-9-77
9-12-77
9-6-77
COMPLETIONDATE
4-19-78(Recompleted)
5-7-79
5-2-79
9-27-77
4-19-78(Recompleted)
9-28-77
9-30-77
9-26-77
9-29-77
07-01-87 Area 17--Page 2
-
HOLENUMBER
G. L. WORK ORDERLOCATION ELEY. NUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
77.5' 3.875"
SPUD COMPLETIONDATE DATE
SI-8
SI-8A
SI-9
SI-la
SI-II
SI-11A'-b
SI-12
SI-13
SI-14
SI-15
SI-16
853,328.0646,484.3
853,323.9646,478.5
853,330.8646,483.6
853,337.0646,488.8
853,323.2646,486.3
853,319.4646,485.6
853,331.3646,480.7
853,341.0646,489.5
853,328.2646,498.4
853,332.1646,476.6
853,373.5646,495.2-
4931.9
4931.9
4931.9
4931.9
4931.9
4931.9
4931.9
4931.9
4931.9
4931.9
4931.9
9101 -103
9101-103
9101-103
9101-103
9101-103
9101-103
.9101-103
9101-103
9101-103
9101-103
9101 -103
60'
60'
60'
60'
60'
60'
60'
60'
60'
60'
60'
4 1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
60'
80'
84.5'
82.5'
60'
77.5'
84.5'
80'
77.5'
84'
7 5/8"
3.875"
3.875"
3.875"
6 1/4"
3.875 "
3.990"
3.875"
3.875"
3.875"
8-30-77
9-19-77
8-12-77
8-5-77
9-16-77
9-2-77
8-25-77
8-3-77
9-13-77
8-26-77
7-29-77
9-28-77
9-21 -77**
9-28-77
9-27-77
9-29-77
9-6-77**
9-30-77
9-30-77
9-26-77
9-28-77
9-28-77
07-01-87 . Area 17--Page 3
-
HOLENUMBER
Test Hole#1
Test Ho le#2
Test Ho le#3
Test Hole#4
Test Hole#5
Test Hole#6
LOCATION
N 853,342.5E 646,479.0
N 853,344.3E 646,477.7
N 853,348.3E 646,478.6
N 853,351.7E 646,491.5
N 853,353.7E 646,491.7
N N/AE
G. L.ELEV.
4932.2
4932.2
4931.7
4931.7
4931.6
N/A
WORK ORDERNUMBER
9101-103
9101-103
9101-103
9101-103
9101-103
9101-103
CASINGDEPTH DIAMETER
60' 4 1/2"(Plugged to surface
60' 4 1/2"(Plugged to surface
60' 4 1/2"(Plugged to surface
60' 4 1/2"
60' 4 1/2"
7' 24"
HOLEDEPTH DIAMETER
80' 3.875"with cement.)
80' 3.875"with cement.)
80' 3.875"with cement.)
80' 3.875"
80' 3.875".
7' 26"
SPUDDATE
8-23-77
8-19-77
1-30-78
1-31-78
1-31-78
1-31-78
COMPLETIONDATE
4-3-78***
4-3-78***
4-3-78***
2-27-78
3-2-78
4-3-78***,-_MN3
07-01-87 Area 17--Page 4
-
HOLENUMBER
G. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
NNWSI HOLES
DOE Publication - DOE/NV/10322-9. .
UE-25a #1Geologic
Hole
N 764,900.2E 566,349.9
3934.4 3402-107 28' 13 3/8" 1297'2450' 2 3/4" 2501'(HQ rods, core barrel, and bitfluid probe at 2495'.)
3.875" 6-25-78 9-2-782.980"from 1264.5' to 1297';USGS
UE-25a #3Geologic
Hole
N 769,321.1E 602,938.8
4545.8 3402-110 190' 4 1/2" 1963.5' 3.900"2530' 3.032"
8-11-78 10-10-78
UE-25a #4/Inst.
c GeologicHole
N 767,971.9E 564,471.6
4100.7 3404-106 119' 8 5/8" 500' 6 1/8" 7-2-79(Instrumented, stemmed, and grouted from 499' to 0'.)
7-3-82(Recompleted)
UE-25a #5Geologic
Hole
UE-25a #6GeologicHole
N 766,956.4E 564,755.1
N 765,899.5E 564,501.7
4056.5 3404-107
4052.9 3404-109
120'
57'493'
8 5/8"
8 5/8"2 3/8"
487'
500'
6 1/8"
6 1/8"
6-26-79
7-19-79
7-12-79
8-8-79
UE-25a #7Geologic
Hole
N 766,249.9E 565,468.5
4004.6 3404-110 134'956'
8 5/8"2 3/8"
501' 5 1/2"1002' 3.875"
8-10-79 10-5-80(Recompleted)
07-01-87 Area 25--Page 1
-
HOLENUMBER
6. L. WORK ORDER CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATELOCATION ELEV. NUMBER
DOE Publication - DOE/NV/10322-13
UE-25b #1HydrologicTest Hole
NE
765,243.4 3939.0566,416.4
3404-131 292' 16" 1705'1700' 9 5/8" 2131'3935' 2 7/8" 4002'
Tubing(Packer set at 3935'.)
12 1/4"8 3/4"8 1/2"
4-3-81 9-22-81
DOE Publication - DOE/NV/10322-14
UE-25c #1HydrologicTest Hole
UE-25c #2- Hydrologic
Test Hole
N 757,095.9E 569,680.4
N 756,848.8E 569,633.8
3708.7 3404-177
3714.1 3404-185
30'362'1365'
39.5'319'1365'
30"16"10 3/4"
30"16"10 3/4"
1515'2990'3000'
320'1520'3000'
14 3/4"9 7/8"8 3/4"
24"14 3/4"9 7/8"
8-13-83
1-9-84
10-17-83
3-21-84
UE-25c #3HydrologicTest Hole
N 756,909.9 3714.2E 569,554.9
3404-186 39'313'1323'
30"16"10 3/4"
315'1520'3000'
24"14 3/4"9 7/8"
3-20-84 6-11-84
DOE Publication - DOE!NV/L0322-15
UE-25h #1Horz. CoreHole
N 748,353.1E 574,461.4
3409.4(T/csg)
3409-104 20'240'
4 1/2"3 1/2"
20'240'400'
6.25"3.937"3.032"
12-10-82 1-30-83
(Junk at unknown depth.)
07-01-87 Area 25--Page 2
-
HOLENUMBER
C. L.LOCATION ELEY.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
ROLE 6DEPTH DIAMETER
SPUnDATE
COMPLETIONDATE
DOE Publication - DOE/NV/10322-16
UE-25p #1PretertiaryTest Hole
N 756,171.2E 571,484.5
3654.6(T/csg)
3404-151A 36' 24"325' 16"1564' 10 3/4"
1487'-4256' 7 5/8"Liner
1371' 1.9"Tubing
1355' 1.9"Tubing
341'1598'4279'4322
17 1/2"14 3/4"9 7/8"6 7/8"
11-13-82 5-24-83
5900' 6 3/4"
5923 6 1/8"
DOE Publication - DOE/NV/10322-11
UE-25 RF #1Repository
'3 Facility
N 762,189.7E 570,889.9
3688.5 9222-214 99' 7 5/8" 98'145'
9 7/8"8 3/4"
1-23-84 2-8-84
UE-25 RF #2RepositoryFacility
N 758,800.0E 570,334.8
3656.8 9222-214 29' 7 5/8" 52' 8 3/4" 1-18-84 1-23-84
UE-25 RF #3RepositoryFacility
N 765,575.1E 571,100.0
3657.7 9222-227 138' 811 151'144'151'301'
9 7/8"4 1/2"3.987"3.937"
3-30-84 7-22-85(Recompleted)
UE-25 RF #3BRepositoryFacility
N 765,695.3E 571,065.6
3661.1 9222-227 106' 5 1/2" 106'111'
6"3.937"
7-18-85 7-23-85
07-01-87 Area 25--Page 3
-
.
HOLENUMBER
C. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
UE-25 RF #4RepositoryFacility
UE-25 RF #5RepositoryFacility
UE-25 RF #7RepositoryFacility
UE-25 RF #7ARepositoryFacility
UE-25 RF #8RepositoryFacility
N 762,090.8E 572,063.2
N 759,198.7E 568,097.7
N 768,804.0E 571,170.9
N 768,767.8E 570,268.8
N 765,630.8E 568,789.9
3636.8 9222-214
3813.7 9222-214
3756.1 9222-214
3755.9 9222-214
3787.9 9222-214
36'280'306'
112'
100'
18'
90'
8" 112'122'
8" 140'150'
9 7/8"6 3/4"3.90"
9 7/8"3.937"
9 7/8"3.937"
9 7/8"3.987"
3.937"
2-10-84
5-24-84
5-31-84
6-29-84
7-9-84
2-28-84
5-30-84
6-6-84
7-6-84
7-12-84
8" 150'153'
0-.'
8" 128'
UE-25 RF #9RepositoryFacility
UE-25 RF #10RepositoryFacility
UE-25 RF #11RepositoryFacility
N 765,945.0E 570,643.3
N 765,307.7E 570,229.9
N 765,621.5E 570,434.6
3674.4(T/csg)
3672.2(T/csg)
3668.6(T/csg)
9222-227
9222-227
9222-243
106'
60'
78'
6" Pvc
6" PVC
6" PVC
106'
60'
78'
9 7/8"
9 7/8"
9 7/8"
6-27-85
7-24-85
7-30-85
7-9-85
7-29-85
8-2-85
07-01-87 Area 25--Page 4
-
HOLENUMBER
C. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
DOE Publication - DOE/NV/10322-20
UE-25 UZ #4 N 768,715.6 3938.5Unsaturated E 566,139.3Zone
UE-25 UZ #5 N 768,591.0 3951.6Unsaturated E 566,135.2Zone
DOE Publication - DOE/NV/10322-21
3404-197 60' 5 1/2" 367' 4.25" 9-6-84 10-10-84
(Junk in hole below 140'.)
3404-198 18' 5 1/2" 365' 6" 10-11-84 11-19-84
(Junk in hole, depth unknown.)
UE-25 UZN #1UnsaturatedZone-Neutron
N 769,328.9E 565,224.3
3995.1 3404-196 50' 5 1/2" 50' 6" 10-17-84 10-18-84
UE-25 UZN #2UnsaturatedZone-NeutronUE-25 UZN #3UnsaturatedZone-Neutron
UE-25 UZN #4UnsaturatedZone-Neutron
UE-25 UZN #5UnsaturatedZone-Neutron
N 768,605.5E 566,113.6
N 768,630.4E 566,119.4
N 768,663.4E 566,127.1
N 768,689.4E 566,133.8
3947.2 3404-196A
3940.8 3404-196A
3942.4 3404-196A
3942.9 3404-196A
50'
15'
30'
50'
5 1/2"
5 1/2"
5 1/2"
5 1/2"
50'
15'
30'
50'
6"
6"
6"
6"
6-11-84
6-15-84
6-15-84
6-18-84
6-14-84
6-15-84
6-15-84
6-21-84
07-01-87 Area 25--Page 5
-
HOLENUMBER
G. L. WORK ORDERLOCATION ELEV. NUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
UE-25 UZN #6UnsaturatedZone-Neutron
UE-25 UZN #7UnsaturatedZone-Neutron
UE-25 UZN #8UnsaturatedZone-Neutron
UE-25 UZN #9UnsaturatedZone-Neutron
UE-25 UZN #10UnsaturatedZone-Neutron
UE-25 UZN #12UnsaturatedZone-Neutron
UE-25 UZN #13UnsaturatedZone-Neutron
UE-25 UZN #14UnsaturatedZone-Neutron
N 768,705.6E 566,136.6
N 768,724.1E 566,141.2
N 768,743.0E 566,146.5
N 768,781.5E 566,155.9
N 769,868.6E 564,744.1
N 768,650.9E 566,695.2
N 768,024.6E 568,255.1
N 767,967.2E 568,232.9
3938.0 3404-196A
3938.8 3404-196
3938.9 3404-196
3941.2 3404-196
4038.3 3404-196
3906.8 3404-196
3821.3 3404-196
3823.9 3404-196
45 '
45'
45'
40'
94'
50'
65'
55'
5 1/2"
5 1/2"
5 1/2"
5 1/2"
5 1/2"
5 1/2"
5 1/2"
5 1/2"
45'
45'
45'
6"1
6"'
6"
40'
6-21-84
7-13-84
7-16-84
7-17-84
12-2-85
7-23-84
7-18-84
7-20-84
6-22-84
7-16-84
7-17-84
7-18-84
12-4-85
7-24-84
7-19-84
7-23-84
94'99'
50'
65'
6"4.25"
6"
6"
55'
07-01-87 Area 25--Page 6
-
HOLENUMBER
G. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
UE-25 UZN #18UnsaturatedZone-Neutron
UE-25 UZN #19UnsaturatedZone-Neutron
UE-25 UZN #20UnsaturatedZone-Neutron
N 766,472.4E 565,246.5
N 763,688.9E 564,570.6
N 763,759.9E 564,579.3
4018.5 3404-196
4024.9 3404-196
4027.2 3404-196
61'
40'
41'
5 1/2"
5 1/2"
5 1/2"
61'
40'
41'
6"
6"
6"
5-16-84
11-6-85
5-15-84
5-18-84
11-8-85
5-16-84
1�to
UE-25 UZN #21UnsaturatedZone-Neutron
UE-25 UZN #22UnsaturatedZone-Neutron
UE-25 UZN #23UnsaturatedZone-Neutron
N 763,806.1E 564,591.0
N 763,880.3E 564,604.5
N 763,973.1E 564,545.4
4027.5 3404-196
4028.8 3404-196
4043.1 3404-196
40'
89'
35'
5 1/2"
5 1/2"
5 1/2"
40'42'
94'95'
35'
6"3.937"
6"3.937"
6"
11-8-85 11-14-85
11-14-85 11-18-85
11-19-85 11-21-85
UE-25 UZN #28UnsaturatedZone-Neutron
N 763,091.2E 565,319.7
3958.1 3404-196 25' 5 1/2" 25'26'failure
6"4"to retrieve
11-21-85 11-25-85***
drive sample tube.)(Role abandoned after
UE-25 UZN #29UnsaturatedZone-Neutron
N 762,613.1E 565,173.3
3972.9 3404-196 35' 5 1/2" 35' 6" 11-26-85 11-27-85
07-01-87 Area 25--Page 7
-
HOLENUMBER
6. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
UE-25 UZN #30UnsaturatedZone-Neutron
N 762,047.6E 565,232.8
3958.8 3404-196 35 ' 5 1/2" 35' 6" 11-27-85 12-2-85
UE-25 UZN #56UnsaturatedZone-Neutron
UE-25 UZN #60UnsaturatedZone-Neutron
N 760,393.5E 565,480.0
N 759,756.9E 566,567.0
3959.8 3404-196
3892.1 3404-196
60'
35'
5 1/2"
5 1/2"
60'
35'
6"
6"
8-23-84
8-21-84
8-23-84
8-23-84
0
UE-25 UZN #85UnsaturatedZone-Neutron
UE-29 UZN #92UnsaturatedZone-Neutron
N 750,715.8E 577,567.8
N 778,009.5E 583,558.5
3337.1 3404-196 80' 5 1/2" 80' 6" 5-6-85
1-13-86not Area 29.)
5-8-85
1-15-863669.2 3404-196 105'(Due to boundary change,
1/2" 120' 4.25"hole is located in Area 25,
UE-25 UZN #97UnsaturatedZone-Neutron
N 763,093.8E 565,320.6
3958. 1 3404-196 60' 5 1/2" 60' 6" 11-25-85 11-26-85
UE-25 UZNC #1UnsaturatedZone-NeutronCalibration
UE-25 UZNC #2UnsaturatedZone-NeutronCalibration
N 764,670.6E 566,158.9
N 764,668.4E 566,157.5
3928.5 3404-196
3928.4 3404-196
5'(Backfilled to surface.)
5'(Backfilled to surface.)
6"
6"
2-26-86
2-26-86
2-26-86
2-26-86
07-01-87 Area 25--Page 8
-
ROLENUMBER
G. L. WORK ORDER CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONLOCATION ELEV. NUMBER DATE DATE
DOE Publication - DOE/NV/10322-1O
UE-25 WT #3Water TableHole
N 745,995.1E 573,384.4
3379.5(T/csg)
3404-159 13.5'40'1125'
16"10 3/4"2 7/8"Tubing
13.5'41'1142'
48"14 3/4"8 3/4"
4-29-83 5-25-83
UE-25 WT #4Water TableHole
N 768,511.8E 568,040.2
3834.6 3404-167 48' 10 3/4"1567' 2 7/8"
Tubing
50' 14 3/4"1580' 8 3/4"
5-28-83 6-6-83
UE-25 WT--#5(Abandoned)
N 761,826.0E 574,249.7
3559.0 3404-168 40' 10 3/4" 40'*1330'
1018'.)
14 3/4"8 3/4"c
6-7-83 6-18-83***
(Junk in hole at
lr UE-25 WT #6Water TableHole
N 780,575.8E 564,523.9
4312.3 3404-169 65'251'1221'
10 3/4"7 5/8"2 7/8"Tubing
69'250'1250'1256.5'
14 3/4"9 7/8".6 3/4"'6 1/4"
6-20-83 6-29-83
UE-25 WT #12Water TableHole
N 739,725.9E 567,011.0
3526.6 3404-176 70' 10 3/4"1276' 2 7/8"
Tubing
70' 15"1308' 8 3/4"
8-11-83 8-16-83
UE-25 WT #13Water TableHole
N 756,715.0E 578,756.7
3386.0 3404-170 222' 10 3/4"1136' 2 7/8"
Tubing
48.5'224'1150'1160'
15" 014 3/4"8 3/4"8 1/16"
6-29-83 7-7-83
UE-25 WT #14Water TableHole
N 761,650.6E 575,210.1
3529.9 3404-179 120' 10 3/4"1303' 2 7/8"
Tubing
125.5' 15"1310' 8 3/4"
8-17-83 9-30-83
07--01-87r Area 25--Page 9
-
HOLENUMBER
G. L. WORK ORDERLOCATION ELEV. NUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
UE-25 WT #15Water TableHole
N 766,116.6E 579,805.7
3552.5 3404-180A 127' 10 3/4"1335' 2 7/8"
Tubing
130' 14 3/4"1360' 8 3/4"
11-12-83 11-22-83
UE-25 WT #16Water TableHole
N 774,419.7E 570,394.9
3971.4 3404-181A 102' 10 3/4"1686' 2 7/8"
Tubing
108' 14 3/4"1710' 8 3/4"
11-2-83 11-10-83
UE-25 WT #17Water TableHole
N 748,419.6E 566,211.9
3688.5 3404-182 55 ' 10 3/4"1376' 2 7/8"
Tubing
55' 14 3/4"1453' 8 3/4"
10-20-83 10-30-83
UE-25 WT #18Water Table
N 771,167.1E 564,855.0
4383.0 3404-188 86' 10 3/4"1965' 2 7/8"
Tubing(Electric log tool
88' 14 3/4" 5-9-842043' 8 3/4"
in hole below 200', 5-21-84.)
5-23-84
"3
NNWSI SEISMIC HOLES
DOE Publication - DOE/NV/10322-25
U-25Seismic #1
U-25Seismic #2
N 778,912.6E 560,456.9
N/A 3404-134
3404-134
200'
200'
4 1/2"PVC
4 1/2"PVc
200'
200'
6 1/4"
6 1/4"
9-4-81
9-10-81
9-9-81
9-12-81N 779,088.9 5106.8E 560,362.5
U-25Seismic #3
U-25Seismic #4
N 779,265.1E 560,268.1
N 779,441.4E 560,173.7
5110.8 3404-134
5113.5 3404-134
200'
200'
4 1/2 "PVC
4 1/2"PVC
200'
200'
6 1/4"
6 1/4"
9-4-81
9-3-81
9-8-81
9-4-81
07-01-87 Area 2 5--Page 10
-
HOLENUMBER
U-25Seismic #5
U-25Seismic #6
U-25Seismic #7
U-25Seismic #8
U-25Seismic #9
U-25Seismic #10
U-25Seismic #11
U-25Seismic #12
U-25-Seismic #13
U-25Seismic #14
U-25Seismic #15
G. L. WORK ORDER CASING HOLE SPUD COMPLETIONDATE DATELOCATION ELEY. NUMBER DEPTH DIAMETER DEPTH DIAMETER
779,617.6560,079.3
779, 793.9559,984.9
779,970.1559,890.5
780,146.4559, 796.1
780,322.6559,701.7
780,498.9559,607.4
780,675.1559,513.0
780,851.3559,418.6
778,736.4560,551.3
778,383.9560,740.1
778,207.7560,834.5
5120.9
5085.0
5141.0
5152.8
5161.6
5171.0
5179.2
5185.3
5096.0
5076.0
5064.2
3404-134
3404-134
3404-134
3404-134
3404-134
3404-134
3404-134
3404-134
3404-134
3404-134
3404-134
200'
200'
200'
200'
200'
200'
200'
200'
200'
200'
200'
4 1/2"PVC
1 /2"PVC
1/2 "PVC
1/2"PVC
1/2"PVC
1/2"PVC
1/2 "PVC
1/2 "PVC
1/2 "PVC
1/2 "PVC
1/2"PVC
200'
200'
200'
200'
200'
200'
200'
200'
200'
200'
200'
6 1/4"
1/4"
1/8"
1/8"
1/4"
1/4"
1/4"
1/4"
1/4"
1/8"
1/4"
9-2-81
9-1-81
8-30-81
8-27-81
9-18-81
9-18-81
9-16-81
9-14-81
9-13-81
9-17-81
9-15-81
9-3-81
9-2-81
9-12-81(Recompleted)
9-12-81(Recompleted)
9-20-81
9-19-81
9-17-81
9-16-81
9-14-81
9-17-81
9-16-81
07-01-87 Area 25--Page 11
-
HOLENUMBER
G. L.LOCATION ELEV.
WORK ORDERNUMBER
CASING HOLE SPUD COMPLETIONDATE DATEDEPTH DIAMETER DEPTH DIAMETER
U-25Seismic
U-25Seismic
U-25Seismic
U-25Seismic
U-25Seismic
r'o U-2542 Seismic
U-25Seismic
U-25Seismic
U-25Seismic
U-26
#16
#17
#18
#19
#20
#21
#22
#23
#24
778,031.4560,928.9
777,855.2561,023.3
777,678.9561,117.7
777,502.7561,212.0
747,172.5593,171.2
746,904.2569,427.4
718,334.3581,267.8
741,125.8580,246.1
769,056.8580,906.9
746,150.3
5051.6
5040.2
5027.7
5017.5
3357.0
3526.1
2948.6
3215.3
3554.8
3848.4
3404-134
3404-134
3404-134
3404-134
3404-192
3404-192
3404-192
3404-192
3404-192
3404-192
200'
200'
200'
200'
140'
139.5'
139'
139.5'
140'
4 1/2"PVC
4 1/2"PVc
4 1/2"PVC
4 1/2"PVc
8"
8"
8"
8"
8"
200'
200'
200'
200'
140'
5'140'
5'144'
145'
5'147'
6 1/4"
6 1/4"
6 1/8"
6 1/4"
12 1/4"
15"10 5/8"
15"12 1/4"
12 1/4"
15"12 1/4"
5"12 1/4"
9-14-81
9-13-81
9-11-81
9-9-81
4-18-84
4-19-84
4-23-84
4-26-84
5-1-84
4-17-84
9-15-81
9-13-81
9-12-81
9-11-81
4-19-84
4-20-84
4-26-84
4-27-84
5-3-84
4-18-84139.5' 8"Seismic #1 E 629,834.4
5'140'
(Hole located in Area 25.)
07-01-87 Area 2 5 -- Page 12
-
ROLENUMBER
G. L. WORK ORDER CASINGLOCATION ELEY.
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATENUMBER DEPTH DIAMETER
NNWSI SEISMIC LINE HOLES
DOE Publication - DOE/NV/10322-25_ _ _ _ _ _ _ _ _ _
_ _ _ _ _, , _ _ _ _ _
US-25 #1Seismic
US-25 #2Seismic
US-25 #3Seismic
US-25 #4Seismic
rU
US-25 #5Seismic
US-25 #6Seismic
US-25 #7Seismic
.US-25 #8Seismic
US-25 #9Seismic
N 762,631.0E 565,423.7
N 762,402.6E 566,427.3
N 762,075E 572,454
N 762,458E 567,853
N 762,432E 567,853
. 762,377E 568,551
N 762,354E 568,551
N 762,317E 569,332
N 762,285E 569,329
4258.5 9222-209 50' 6" hose 53' 8 3/4"
(T/csg)
4316.2(T/csg)
L/O3620
L/O3800
L/O3799
L/O3783
L/O3783
L/O3757
L/O3755
9222-209
9222-209
9222-209
9222-209
9222-209
9222-209
9222-209
9222-209
50'
50'
50'
50'
50'
50'
50'
50'
6"
6"
6"
6"
6"
6"
6"
6"
hose
hose
hose
hose
hose
hose
hose
hose
53'
52'
50'
52'
52'
52'
52'
50'
3/4"
3/4"s
3/4"
3/4 "
3/4"
3/4"
3/4"
3/4"
9-23-83
9-21-83
9-20-83
9-19-83
9-16-83
9-15-83
9-14-83
9-12-83
9-9-83
9-26-83
9-23-83
9-21-83
9-19-83
9-16-83
9-16-83
9-15-83
9-14-83
9-12-83
07-01-87 Area 25--Page 13
-
HOLENUMBER
G. L. WORK ORDER CASING HOLE SPUD COMPLETIONDATE DATELOCATION ELEV. NUMBER DEPTH DIAMETER DEPTH DIAMETER
US-25 #10Seismic
US-25 #11Seismic
US-25 #12Seismic
US-25 #13Seismic
US-25 #14Seismic
o US-25 #15Seismic
US-25 #16Seismic
US-25 #17Seismic
US-25 #18Seismic
US-25 #19Seismic
US-25 #20Seismic
762,251570, 112
762,226570,111
762,198570,894
762,168570,891
762,137571,675
762, 106571,670
762,046572,453
761,986573,627
761,895574,709
761,746576,242
761,613577,175
L/03724
L/03724
L/03688
L/03688
L/03653
L/03654
L/03620
L/03576
L/03545
L/03499
L/03485
9222-209
9222-209
9222-209
9222-209
9222-209
9222-209
9222-209
9222-209
9222-209
9222-209
9222-209
50'
50'
50'
50'
50'
50'
50'
50'
50'
50'
50'
6" hose
6"
6"
6"
6"
6"
6"
6"
6"
6"0
611
hose
hose
hose
hose
hose
hose
hose
hose
hose
hose
50'
52'
52'
52'
50'
50'
50'
50'
50'
50'
50'
8 3/4"
3/4"
3/4'"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
9-8-83
9-7-83
9-6-83
9-2-83
8-31-83
8-30-83
8-30-83
8-29-83
8-26-83
8-25-83
8-24-83
9-8-83
9-7-83
9-7-83
9-6-83
9-2-83
8-31-83
8-30-83
8-29-83
8-29-83
8-26-83
8-26-83
07-01-87 Area 25--Page 14
-
HOLENUMBER
G. L.LOCATION ELEY.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
US-25 #21Seismic
N 761,628.4E 578,543.1
3481.4 9222-209 49' 6" hose 50' 8 3/4" 8-23-83 8-26-83
DOE Publication - Pending
J-11 N 740,968.2E 611,764.2
3445.0 3404-103 1327' 12 3/4"(Sandia instrument
1329'in hole.)
1957
J-1IPrime
N 740,890E 611,821
L/ON/A
3403-103 30'(Sandia
10 3/4"instrument in
220'hole.)
9 7/8" 2-28-78 3-3-78
J-12Water Well
N 733,508E 581,012
3130 3311-001 887' 12 3/4" 1139' 11 3/4" ? 1968(Recompleted)-
J-13" Water Well
(was USGSHTH #6)
N 749,209E 579,651
3318 AT(29-2)- 444' 18"1302 13 3/8" &
1546' 11 3/4"1484'- 3385' 5 1/2" Liner
1561'2020'3488'
9 7/8"9".7 5/8'!
9-12-62 1-8-63
07-01-87 Area 25--Page 15
-
HOLE.NUMBER
G. L. WORK ORDERLOCATION ELEY. NUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
. NNWSI SEISMIC HOLE
DOE Publication - DOE/NV/10322-25
U-26Seismic #1
N 746,150.3 3848.4 3404-192E 629,834.4
139.5' 8" 5, 5",12 1/4"
4-17-84 4-18-84140'
(Hole located in Area 25.)
POto
07-01 -87 Area 26--Page 1
-
HOLENUMBER
C. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
NNWSI HOLES
DOE Publication - DOEINV/10322-12
UE-29a #1HydrologicTest Hole
NE
797,729.0 3986.7585,574.9
3404-132A 35' 30" 215' 26" 9-25-81 10-6-81 ***
UE-29a #2HydrologicTest Hole
N 797,744.9E 585,546.9
3987.4 3404-135 39'160'284'811'1172'
30"20"16"10 3/4'1.6" Tu
40' 36"160' 26"295' 18 1/2"
'' 814' 14 3/4"ibing 1165' 15"
1383' 9 7/8"perforated from 285' to
10-7-81 12-3-81
(10 3/4" casing 700', 1-11-82.)wI.-
DOE Publication - DOE/NV/10322-21
UE-29 UZN #91 N 797,275.0 3646.9Unsaturated E 585,340.9Zone-Neutron
3404-196 89' 5 1/2" 94' 4.25" 1-16-86 1-21-86
UE-29 UZN #92 N 778,009.5 3669.2Unsaturated E 583,558.5Zone-Neutron
3404-196 105' 5 1/2"(Due to boundary change, hole
120' 4.25" 1-13-86 1-15-86is located in Area 25, not Area 29.)
NNWSI SEISMIC HOLE
DOE Publication - DOE/NV/10322-25
U-29Seismic #1
N 791,868.4 3878.0E 585,139.5
3404-192 137.5' 8" 5,2142 '
15"12 1/4"
5-3-84 5-7-84
07-01-87 Area 29--Page 1
-
HOLENUMBER
G. L.LOCATION ELEY.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
NNWSI SEISMIC HOLES
DOE Publication - DOE/NV/10322-25
U-30 N 837,370.0Seismic #1 E 604,819.3
4753.0 3404-196 140' 8"5 51'142'
15"12 1/4"
5-8-84 5-9-84
U-30Seismic #2
N 837,376.9E 604,800.1
4753.7 3404-196 140' 8" 5'140'
15"12 1/4"
5-9-84 5-10-84
wAwA
07-01-87 Area 30--Page 1
-
ROLENUMBER
G. L. WORK ORDERLOCATION ELEV. NUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
NNWSI OFF-SITE HOLES
DOE Publication - DOE/NV/10322-19
USW G-1GeologicHole
N 770,500.2E 561,000'.5
4348.6 3404-113 280' 13 3/8"290' 7 5/8"1016' 4 1/2"(Sandia instrument
6000' 3.875"
in hole, 4-8-82.)
3-12-80 9-17-80
USW G-2GeologicHole
N 778,824.2E 560,503.9
5098.4 3404-130A 278'795'
13 3/8"9 5/8"
2670'4115'4719.5'6006'
8 3/4"6 1/4"6 1/8"2.98"
3-25-81 11-17-82(Recompleted)
USW G-3X Geologic@' Hole
N 752,779.8E 558,483.1
4856.5 3404-133 13 3/8" 1160' 8 3/4"2364' 6 3/4"
1-8-82 3-21-82
(Original hole plugged with cement from1362' to 1160'; radioactive loggingsource below 1247'.)2598' 5 1/2" 1144'-2600' 8 3/4"
2608' 4 3/4"5031' 3.937"
Sidetrack
USW G-4GeologicHole
N 765,807.1E 563,081.6
4166.9 3404-150 39' 13 3/8"2017' 9 5/8"
3001' 8 3/4"3003 8 3/8"
8-23-82 1-13-83
USW GA-1GeologicAngle Hole
N 779,365.4E 559,247.0
5186.8 3404-127 6'148'
13 3/8"4 1/2"
148'551'
6 1/4"3.937"
3-15-81 3-21-81
07-01-87 NNWSI Off-Site Holes--Page 1
-
HOLENUMBER
G. L. WORK ORDERLOCATION ELEV. NUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
USW GU-3GeologicUnsaturatedHole
N 752,690.1 4856.6E 558,501.3
3404-140 34' 13 3/8"1144' 5 1/2"
1144'1768'2644'
6 3/4"3.937"2.980"
1-26-82 6-12-82
(Sandia instrument lost in holes 5-87.)
DOE Publication - DOE/NV/10322-18
USW H-1/Inst.HydrologicTest Hole
N 770,254.3E 562,388.0
4274.4 3404-114 38.5' 30" 384'334' 16" 1740'2255' 9 5/8" 2257'
6000'(Instrumented and grouted from
15" 9-3-8013 1/4"12 1/4"8 3/4"5950' to 2207'.)
7-6-82( Recompleted)
orM~
USW H-3HydrologicTest Hole
USW H-4HydrologicTest Hole
N 756,542.1E 558,451.7
N 761,643.6E 563,911.1
4866.4 3404-139
4096.5 3404-143
29'126'2600'(10 3/4"
30"16"10 3/4"
130'2650'4000'
casing perforated.)
26"14 3/4"8 3/4"
26"20"14 3/4"8 3/4"
1-27-82
3-22-82
3-19-82
6-7-8235' 30"311' 16"1839' 10 3/4"3896' 2 7/8"
Tubing1725' 1.9"
Tubing
153'316'1850'4000'
USW H-5HydrologicTest Hole
N 766,634.3E 558,908.7
4850.8 3404-146 38'311'2585'(10 3/4"3600'2324'
30" 311'16" 2599'10 3/4" 4000'casing perforated.)2 7/8" Tubing1.9" Tubing
20"14 3/4"8 3/4"
5-19-82 8-1-82
07-01-87 NNWSI Off-Site Holes--Page 2
-
HOLENUMBER
G. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUDDATE
COMPLETIONDATE
USW H-6HydrologicTest Hole
N 763,298.9 4270.6E 554,074.9
3404-149 31' 30" 1912'311' 16" 3990'1906' 10 3/4" 4002'2468' 2 7/8" Tubing1751.5' 1.9" Tubing
14 3/4"8 3/4"6 1/8"
8-7-82 10-28-82
DOE Publication - DOE/NV/10322-17
USw VH-lVolcanicHydrologyHole
N 743,355.5E 533,626.0
3161.0 3404-117C 48'911'
9 5/8"7 5/8"
912' 8 3/4"2501' 6 1/4"
10-28-80 2-18-81
USW VH-2Volcanic
X Hydrology- Hole
N 748,319.4 3197.1E 526,264.2
3404-155A 19'198'720'3986'
13 3/8"9 5/8"5 1/2"1.9" Tubing
20'197'716'4000'
17 1/2"12 1/4"8 3/4"3.937"
2-15-83 4-27-83
DOE Publication -- DOE/NV/10322-20
USw UZ-1/Inst.UnsaturatedZone TestHole.
N 7719275.8E 560,220.8
4426.2(T/csg)
3404-154 39.5' 42" 41.5'97'101'1265'1269'1270'
plugged
48" 4-27-8336"24"17 1/2"15"9 1/4"
with cement to 1221'.
7-31-83
(Junk at 1243', holeInstrumented, stemmed and grouted from 1213' to surfaces10-24-83.)
07-01-87 NNWSI Off-Site Holes--Page 3
-
HOLENUMBER
G. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
USW UZ-6UnsaturatedZone Test
N 759,731E 558,325
L/O4925
3404-193 40'324'
26 3/4"20"
341' 24"1887' 17 1/2"
6-18-84 4-28-86(secured)
USW UZ-6sUnsaturatedZone Test
N 759,909.3E 558,050.4
4949.2 3404-208 3' 7 5/8" 494.5' 8 11/32"519' 3.990"
4-23-85 9-9-85
USW UZ-7UnsaturatedZone Test
N 760,836.1E 562,911.3
4169.3 3404-206 20' 5 1/2" 207' 6" 1-4-85 1-22-85
USw UZ-8UnsaturatedZone
N 760,762.2E 562,293.5
4227.0 3404-214 55' 5 1/2" 55'57'
6"4.25"
3-5-86 4-21-86**
co USW UZ-13UnsaturatedZone Test
N 751,953.2E 558,488.7
4815.8 3404-207 330' 5 1/2" 417'430'
6"3.937"
1-24-85 4-19-85
DOE Publication - DOE/NV/10322-21
USW UZ-N24UnsaturatedZone--Neutron
USW UZ-N25UnsaturatedZone-Neutron
NE
768,005.4 4226.5562,054.2
3404-196
3404-196
30'
59'
5 1/2"
5 1/2"
75'
59'
6"
6"
2-4-86
2 -11-86
2-26-86
2-12-86N 768,430.4 4334.7E 561,218.9
07-01 -87 NNWS1 Off-Site Holes--Page 4
-
HOLENUMBER
G. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUDDATE
COMPLETIONDATE
USW UZ-N26UnsaturatedZone-Neutron
N 768,757.2E 561,022.9
4384.1 3404-196 35 ' 5 1/2" 35' 6" 2-10-86 2-11-86
USW UZ-N40UnsaturatedZone-Neutron
USW UZ-N41UnsaturatedZone-Neutron
USW UZ-N42UnsaturatedZone-Neutron
USW UZ-N43UnsaturatedZone-Neutron
N 766,175.8E 564,221.3
N 765,867.2E 563,520.9
N 765,728.6E 562,858.5
N 765,997.0E 563,263.6
4079.4 3404-196
4117.5 3404-196
4179.1 3404-196
4149.4 3404-196
35'
35'
35'
45'
5 1/2"
5 1/2"
5 1/2"
5 1/2"
35'
35'37'
35'40'
45'
6"
6"4.25"
6"4.25"
6"
12-19-85 1-7-86
12-12-85 12-16-85
12-16-85 12-17-85
w
12-5-85 12-9-85
USW UZ-N44UnsaturatedZone-Neutron
USW UZ-N45UnsaturatedZone-Neutron
USW UZ-N46UnsaturatedZone-Neutron
N 766,192.5E 563,139.6
N 765,976.7E 563,429.2
4161.5 3404-196
4129.9 3404-196
4500.5 3404-196
35'
45'
99'
5 1/2"
5 1/2"
5 1/2"
35'36'
45'
99'
6"4.25"
6"
6"
12-18-85
12-9-85
1-21-86
12-19-85
12-12-85
1-31-86NE
772,262.3559,747.7
07-01-87 NNWSI Off-Site Holes--Page 5
-
HOLENUMBER
C. l.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
USW UZ-N47UnsaturatedZone-Neutron
USW UZ-N48UnsaturatedZone-Neutron
USW UZ-N49UnsaturatedZone-Neutron
N 771,967.5E 559,783.5
N 760,834.9E 562,413.6
N 760,860.4E 562,321.8
4480.4 3404-196
4211.1 3404-196
4228.5 3404-196
85 '
35'
35'
5 1/2"
5 1/2"
5 1/2"
85'86'
35'
35'36'
6"4.25"
6"
6"4.25"
1-24-86
1-7-86
1-9-86
1-29-86
1-8-86
1-10-86
g
USW UZ-N50UnsaturatedZone-Neutron
USW UZ-N51UnsaturatedZone-Neutron
N 760,775.9E 562,911.7
N 760,860.8E 562,909.4
4173.2 3404-196
4169.0 3404-196
20'
20'
5 1/2"
5 1/2"
20'
20'
6"
6"
8-24-84
8-24-84
8-24-84
8-24-84
USW UZ-N52UnsaturatedZone-Neutron
N 760,893.8E 562,908.8
4172.2 3404-196 25' 5 1/2" 25' 6" 8-24-84 8-24-84
USW UZ-N65UnsaturatedZone-Neutron
USW UZ-N66UnsaturatedZone-Neutron
N 758,627.1E 562,537.1
N 758,433.5E 561,881.1
4371.9 3404-196
4355.5 3404-196
50'
50'
5 1/2"
5 1/2"
50'
50'
6"
6"
11-27-84 11-27-84
11-27-84 11-28-84
07-01-87 NNWSI Off-Site Holes--Page 6
-
HOLENUMBER
C. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
USW UZ-N67UnsaturatedZone-Neutron
USW UZ-N68UnsaturatedZone-Neutron
USW UZ-N69UnsaturatedZone-Neutron
USW UZ-N70UnsaturatedZone-Neutron
USW UZ-N71UnsaturatedZone-Neutron
N 753,634.2E 563,799.0
N 753,962.4E 564,005.8
N 754,460.9E 564,401.7
N 769,250.7E 560,164.7
N 761,025.9E 558,405.6
3920.2 3404-196
3924.7 3404-196
3918.2 3404-196
4542.1 3404-196
4924.9 3404-196
25'
55'
35'
35'
52'
5 1/2"
5 1/2"
5 1/2"
5 1/2"
5 1/2"
25'
55'
35'
35'
52'
6"
6"
6"9
6"1
6"1
7-25-84
7-25-84
7-26-84
2-6-86
5-18-84
7-25-84
7-25-84
7-26-84
2-10-86
5-18-84I.-
USW UZ-N72UnsaturatedZone-Neutron
USW .UZ-N73UnsaturatedZone-Neutron
N 761,067.9E 558,626.1
N 761,049.1E 558,926.0
4889.2 3404-196
4866.6 3404-196
30'
30'
5 1/2"
5 1/2"
30'
30'
6"
6"1
11-20-84 11-20-84
11-20-84 11-21-84
USW UZ-N74UnsaturatedZone-Neutron
N 7619362.2E 558,559.9
4903.7 3404-196 35' 5 1/2" 35'37'
6"4.25"
2-18-86 2-18-86
07-01-87 NNWSI Off-Site Holes--Page 7
-
HOLENUMBER
G. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
USW UZ-N75UnsaturatedZone-Neutron
N 761,462.4E 559,075.9
4799.0 3404-196 35 ' 5 1/2" 35'37'
6"4.25"
2-19-86 2-20-86
USW UZ-N76UnsaturatedZone-Neutron
N 761,353.2E 559,047.7
4958.0 3404-196 35' 5 1/2" 40' 6" 11-21-84 11-26-84
(Junk in hole, depth unknown.)
USW UZ-N77UnsaturatedZone-Neutron
USW UZ-N78UnsaturatedZone-Neutron
N 755,526.1E 554,397.2
N 757,557.8E 556,262.3
3900.5 3404-196
4182.2 3404-196
50'
30'
5 1/2"
5 1/2"
50'
30'
6"
6"
11-30-84 11-30-84
12-10-84 12-11-84
USW UZ-N79UnsaturatedZone-Neutron
USW UZ-N80UnsaturatedZone-Neutron
USW UZ-N81UnsaturatedZone-Neutron
N 757,733.2E 556,333.9
N 757,634.3E 557,201.1
N 757,807.1N 555,595.1
4154.9 3404-196
4332.2 3404-196
4065.2 3404-196
32'
52'
70'
5 1/2"
5 1/2"
5 1/2"
32'
52'
70'
6"
6"
6"
12-7-84
12-6-84
12-3-84
12-10-84
12-7-84
12-6-84
USW UZ-N82UnsaturatedZone-Neutron
N 757,498.1E 554,689.7
3974.8 3404-196 40' 5 1/2" 40' 6" 11-30-84 12-3-84
07-01-87 NNWSI Off-Site Holes--Page 8
-
ROLENUMBER
G. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
USW UZ-N83UnsaturatedZone-Neutron
USW UZ-N84UnsaturatedZone-Neutron
USW UZ-N86UnsaturatedZone-Neutron
USW UZ-N87UnsaturatedZone-Neutron
USW UZ-N88UnsaturatedZone-Neutron
USW UZ-N89UnsaturatedZone-Neutron
USW UZ-N90UnsaturatedZone-Neutron
N 760,624.2E 556,349.0
N 760,717.0E 555,887.8
N 760,614.5E 556,460.3
N 760,714.1E 555,887.1
4157.4 3404-196
4111.8 3404-196
4171.9 3404-196
4111.6 3404-196
4201.7 3404-196
4089.6 3404-196
4089.6 3404-196
70'
45'
30'
45'
30'
45'
45'
5 1/2"
5 1/2"
5 1/2"
5 1/2"
5 1/2"
5 1/2"
5 1/2"
70'
45'
30'
45'
30'
45'
45'
6"
6"
6"
6"
6"
6"
6"~
12-12-84 12-13-84
12-12-84 12-19-84(Recompleted)
12-18-84 12-18-84
12-20-84 12-20-84
12-17-84 12-17-84
12-19-84 12-19-84
12-14-84 12-17-84
(Ji
NE
760,796.9556,551.2
N 760,610.4E 555,588.7
N 760,608.4E 5559587.2
USW UZ-N93UnsaturatedZone-Neutron
N 759,584.3E 558,320.7
4924.0 3404-196 40' 5 1/2" 40' 6" 7-27-84 7-27-84
07-01-87 NNWSI Off-Site Holes--Page 9
-
HOLENUMBER
G. L.LOCATION ELEV.
WORK ORDERNUMBER
CASINGDEPTH DIAMETER
HOLEDEPTH DIAMETER
SPUD COMPLETIONDATE DATE
USW UZ-N94UnsaturatedZone-Neutron
USW UZ-N95UnsaturatedZone-Neutron
USW UZ-N96UnsaturatedZone-Neutron
USW UZ-N98UnsaturatedZone-Neutron
N 759,723.5E 558,236.2
N 759,899.0E 558,172.3
N 759,445.8E 558,403.1
N 767,996.2E 562,083.5
4926.1 3404-196
4929.0 3404-196
4893.4 3404-196
4223.1 3404-196
30'
20'
35'
31'
5 1/2"
5 1/2"
5 1/2"
5 1/2"
30'
20'
35'
75'
6"
6"
6"
6"
8-15-84
8-15-84
8-16-84
2-20-86
8-15-84
8-16-84
8-16-84
2-25-86
DOE Publication - DOE/NV/10322-10
USW WT-1Water TableHole
USW WT-2Water TableHole
USw WT-7Water TableHole
N 753,940.6E 563,739.2
N 760,660.5E 561,923.6
3942.5(T/csg)
4269. 7(T/csg)
3404-157
3404-158
3404-174
32.5' 10 3/4"1665' 2 7/8"
Tubing
58' 10 3/4"2040' 2 7/8"
Tubing
52' 10 3/4"1579' 2 7/8"
Tubing
33.5' 26"1689' 8 3/4"
58' 14 3/4"2060' 8 3/4 "
53' 14 3/4"1610' 8 3/4"
4-28-83
7-8-83
7-19-83
5-18-83
7-16-83
7-26-83N 755,569.8 3927.2E 553,891.3
07-01-87 NNWSI Off-Site Holes--Page 10
-
HOLENUMBER
USW WT-10Water TableHole
LOCATION
N 748,770.9E 553,302.1
G. L.ELEV.
3686.0
WORK ORDERNUMBER
3404-171
CASINGDEPTH DIAMETER
114' 10 3/4"1321' 2 7/8"
Tubing
ROLEDEPTH DIAMETER
116' 14 3/4"1413' 8 3/4"
DATE
7-26-83
DATE
8-2-83
SPUD COMPLETION
USw WT-l1Water TableHole
N 739,070.4E 558,376.8
3591.4 3404-175 44.5' 10 3/4"1365' 2 7/8"
Tubing
45' 14 3/4"1446' 8 3/4"
8-3-83 8-9-83
cn
07-01-87 NNWSI Off-Site Holes--Page 11