DOE/NV/10322-24 /gva q , P w ~~~~~~WM DOE/NV/1 0322-24 U engineering construction mnanagemi ent wrj IDOCKET CL'NTROL CENTER 7 COT 15 All :30 I RECORD COPY NNWSI DRILLING AND MINING SUMMARY r JULY, 1987 FENIX & SCISSON, INC. 6450 SO. LEWIS STREET BRIDGEPORT III TULSA, OKLAHOMA 74136 FENIX & SCISSON, INC. P. 0. BOX 498 MERCURY, NEVADA 89023 U.S. DEPARTMENT OF ENERGY CONTRACT DE ACOS 84NV10322

Upload: others

Post on 04-Feb-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

  • DOE/NV/10322-24 /gva q

    , P w ~~~~~~WM

    DOE/NV/1 0322-24

    U

    engineeringconstructionmnanagemi ent

    wrj

    IDOCKET CL'NTROLCENTER

    7 COT 15 All :30

    I RECORD COPY

    NNWSIDRILLING AND MINING

    SUMMARY

    r

    JULY, 1987

    FENIX & SCISSON, INC.6450 SO. LEWIS STREET

    BRIDGEPORT IIITULSA, OKLAHOMA 74136

    FENIX & SCISSON, INC.P. 0. BOX 498

    MERCURY, NEVADA 89023

    U.S. DEPARTMENT OF ENERGY CONTRACT DE ACOS 84NV10322

  • DISCLAIMER

    This report was prepared as an account of work sponsored by theUnited States Government. Neither the United States nor theUnited States Department of Energy, nor any of their employees,makes any warranty, express or implied, or assumes any legalliability or responsibility for the accuracy, completeness, orusefulness of any information, apparatus, product, or processdisclosed, or represents that its use would not infringe privatelyowned rights. Reference herein to any specific commercialproduct, process, or service by trade name, mark, manufacturer, orotherwise, does not necessarily constitute or imply itsendorsement, recommendation, or- favoring by the United StatesGovernment or any agency thereof. The views and opinions ofauthors expressed herein do not necessarily state or reflect thoseof the United States Government or any agency thereof.

    Printed in the United States of AmericaAvailable from:

    National Technical Information ServiceU. S. Department of Commerce5285 Port Royal RoadSpringfield, Virginia 22161

    Price: Printed CopyMicrofiche A01

  • DOE/NV/1 0322-24 DO E/NV/1 0322-24

    NNWSIDRILLING AND MINING

    SUMMARY

    BY

    FENIX & SCISSON, INC.

    PREPARED FORU. S. DEPARTMENT OF ENERGYNEVADA OPERATIONS OFFICE

    UNDER CONTRACT DE-AC08-84NV1 0322

    JULY, 1987

  • Prepared by Nevada Nuclear Waste Storage Investigations (NNWSI) ProjectParticipants as part of the Civilian Radioactive Waste ManagementProgram. The NNWSI Project is managed by the Waste Management ProjectOffice of the U. S. Department of Energy, Nevada Operations Office.NNWSI Project work is sponsored by the U. S. Department of Energy,Office of Civilian Radioactive Waste Management, Washington D.C.

  • Contents

    Paae

    Abstract1 ---------------------------------------------------------- I

    Area 1----------------------------- 3Area 5--------------------------------------------------------------- 5Area 16---------------- 7Area 17-------------------------------------------------------------- 9Area 25-------------------------------------------------------------- 13Area 26-------------------------------------------------------------- 29Area 29-------------------------------------------------------------- 31Area 30-------------------------------------------------------------- 33NNWSI Off-Site------------------------------------------------------ 35

    ii

  • NNWSI

    Drilling And Mining

    Summary

    by

    Reports and CEP Section

    Abstract

    This is a summary report for all boreholes drilled prior to July 1,1987 in support of the Nevada Nuclear Waste Storage Investigation(NNWSI). The boreholes were drilled in Areas 1, 5, 16, 17, 25, 26, 29,and 30 of the Nevada Test Site and in Bureau of Land Management landadjacent to the Nevada Test Site. The report contains the boreholedesignation, As-Built or Lay-Out (L/O) coordinates, ground levelelevation, REECo work order number, casing depths and diameters, drillhole depths and diameters, spud (start) and completion (** - Suspendedand *** - Abandoned) dates, and pertinent remarks for all NNWSI andrelated boreholes. The report also gives the DOE report number fromwhich detailed information can be obtained for each borehole. Thereport is scheduled to be updated biannually.

    1

  • HOLENUMBER

    0. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    WASTE ISOLATION HOLES

    DOE Publication - Pending

    UE-lmEleana

    N 825,407.5E 657,842.0

    4478.0 3313-101 8.75' .5 1/2" 514'290' 1 1/4" Tubing

    3.990" 3-2-76 4-6-76

    UE-InEleana

    DE-loEleana

    N 825,329.0E 657,760.7

    N 825,417.5E 657,755.8

    4479.9 3313-101

    4479.5 3313-101

    5'

    5'

    5 1/2"

    5 1/2"

    5'

    5'

    7 7/8"

    7 7/8"

    3-8-76

    3-8-76

    3-8-76**

    3-8-76**

    UE-lpEleana

    N 826,268.7E 662,298.8

    4232.4 3313-104A 38.5' 7 5/8" 773'782'

    6 1/4"3.990"

    7-15-76 8-16-76

    wA

    07-01-87 Area 1--Page 1

  • HOLENUMBER

    G. L. WORK ORDERLOCATION ELEY. NUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    NNWSI SEISMIC HOLES

    DOE Publication - DOE/NV/10322-25

    U-5Seismic #1

    N 749,607.0E 668,098.7

    3868.7 3404-192 139' 8" 140' 12 1/4" 4-11-84 4-13-84

    U-5Seismic #2

    N 749,623.0E 668,121.7

    3867.7 3404-192 138' 8" 140' 12 1/4" 4-13-84 4-16-84

    an

    07-01 -87 Area 5--Page 1

  • HOLENUMBER

    C. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    WASTE ISOLATION HOLES

    DOE Publication - Pending

    UE-16bEleana

    N 839,498.2E 641,345.2

    4890.2 3313-104A 34' 7 5/8" 355' 6 1/4"361' 3.990"

    (Stemmed with peagravel from 331' to 240'from 114' to 102'.)

    6-28-76

    and

    10-7-82(Recompleted)

    UE-16cEleana

    N 844,958.4E 644,556.9

    4726.3 3313-104A 42'134

    7 5/8"1 1/4"

    tubing

    137'144'

    6 1/4"3.990"

    7-2-76 7-8-76

    UE-16d N 844,877.6Eleana E 646,566.9

    1 Sidetrack(Waterwell)

    4684.2 9080-105A 80' 10 3/4" 2321' 6 1/4" 5-17-772117' 7"(Plugged with cement from 2228' to 2130', bridge plug

    2130'- 3000' 6 1/4"(7" casing perforated from 1310' to 1145'.)

    3-5-81(Recompleted)

    at 2020'.)

    UE-16fEleana

    N 832,355.2E 648,843.9

    4651.5 9103-105 1293.' 9 5/8" 1479' 8 3/4" 8-1-77 9-27-77

    07-01-87 Area 16--Page 1

  • 'HOLENUMBER

    G. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    WASTE ISOLATION HOLES

    DOE Publication - Pending

    UE-1 7aEleana

    N 846,138.1E 645,990.6

    4696.5 3313-104A 1210' 4 1/2"(USGS instruments

    1214'in hole.)

    6 1/4" 7-2-76 9-23-76(Recompleted)

    UE-17bEleana

    N 849,216.6E 646,469.6

    4780.1 3313-104A 39'220'

    7 5/8"1 1/4"

    Tubing

    250' 6 1/41"256.5' 3.990"

    7-28-76 8-17-76

    UE-17cEleana

    to UE-17dEleana

    N 857,444.4E 650,047.4

    N 847,189.0E 647,787.5

    4834.7 3313-104A

    4677.6 3313-104

    38' 7 5/8"538.5' 1 1/4"

    Tubing

    39.5' 7 5/8"392' 1 1/4"

    Tubing

    575'586'

    390'398'

    6 1/4"3.990"

    6 1/4"3.990"

    7-15-76

    8-9-76

    7-29-76

    8-20-76

    UE-17eEleana

    N 853,204.7E 646,447.8

    4934.2 EY-77-B-08-001

    10' 6"2992' 1.6"

    3000' 3.937" 11-24-76 1-9-77

    UE-17fEleana

    UE-17gEleana

    N 853,320.9E 646,031.6

    N 853,291.0E 646,514.8

    4929.9 9080-1034

    4928.9 9080-1034

    10'

    10'

    4 1/2"

    4 1/2"

    100'

    104.'

    3.990"

    3.990"

    5-2-77

    5-6-77

    5-4-77

    5-10-77

    07-01-87 Area 17--Page 1

  • HOLENUMBER LOCATION

    HEAT TRANSFER EXPERIMENT

    DOE Publication - Pending

    SI-1 Heater N 853,330.2

    Hole E 646,487.5

    Heater N N/AAngle E

    Hole #lA

    Heater N N/AAngle E

    Hole #2A

    SI-2 N 853,332.2

    E 646,487.9

    SI-3 N 853,329.8E 646,489.6

    SI-4 N 853,330.4

    E 646,485.6

    SI-5 N 853,334.1E 646,488.2

    SI-6 N 853,329.4E 646,491.5

    SI-7 N 853,326.2

    E 646,486.8

    G. L.ELEV.

    4931.8

    N/A

    N/A

    4931.9

    4931.9

    4931.9

    4931.9

    4931.9

    4931.9

    WORK ORDERNUMBER

    9101-103

    3401-106

    3401-106

    9101-103

    9101-103

    9101-103

    9101-103

    9101-103

    9101-103

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    60' if

    No Casing(Sidetrack

    No Casing(Sidetrack

    60' 4

    60' 4

    60' 4

    60' 4

    60' 4

    60' 4

    6i" 80'

    110'

    85'off of S1-I Heater

    85'off of S1-i Heater

    1/2" 92.5'

    1/2" 80'115'

    1/2" 92.5'

    1/2" 83.5'

    1/2" 80'

    1/2" 82.5'

    14"7 7/8"

    3.875"Hole.)

    3.875"Hole.)

    3.875"

    3.875"3 3/4"

    3.875"

    3.875"

    3.875"

    3.875"

    SPUDDATE

    9-21-77

    5-3-79

    4-30-79

    9-7-77

    9-9-77

    8-11-77

    8-9-77

    9-12-77

    9-6-77

    COMPLETIONDATE

    4-19-78(Recompleted)

    5-7-79

    5-2-79

    9-27-77

    4-19-78(Recompleted)

    9-28-77

    9-30-77

    9-26-77

    9-29-77

    07-01-87 Area 17--Page 2

  • HOLENUMBER

    G. L. WORK ORDERLOCATION ELEY. NUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    77.5' 3.875"

    SPUD COMPLETIONDATE DATE

    SI-8

    SI-8A

    SI-9

    SI-la

    SI-II

    SI-11A'-b

    SI-12

    SI-13

    SI-14

    SI-15

    SI-16

    853,328.0646,484.3

    853,323.9646,478.5

    853,330.8646,483.6

    853,337.0646,488.8

    853,323.2646,486.3

    853,319.4646,485.6

    853,331.3646,480.7

    853,341.0646,489.5

    853,328.2646,498.4

    853,332.1646,476.6

    853,373.5646,495.2-

    4931.9

    4931.9

    4931.9

    4931.9

    4931.9

    4931.9

    4931.9

    4931.9

    4931.9

    4931.9

    4931.9

    9101 -103

    9101-103

    9101-103

    9101-103

    9101-103

    9101-103

    .9101-103

    9101-103

    9101-103

    9101-103

    9101 -103

    60'

    60'

    60'

    60'

    60'

    60'

    60'

    60'

    60'

    60'

    60'

    4 1/2"

    1/2"

    1/2"

    1/2"

    1/2"

    1/2"

    1/2"

    1/2"

    1/2"

    1/2"

    1/2"

    60'

    80'

    84.5'

    82.5'

    60'

    77.5'

    84.5'

    80'

    77.5'

    84'

    7 5/8"

    3.875"

    3.875"

    3.875"

    6 1/4"

    3.875 "

    3.990"

    3.875"

    3.875"

    3.875"

    8-30-77

    9-19-77

    8-12-77

    8-5-77

    9-16-77

    9-2-77

    8-25-77

    8-3-77

    9-13-77

    8-26-77

    7-29-77

    9-28-77

    9-21 -77**

    9-28-77

    9-27-77

    9-29-77

    9-6-77**

    9-30-77

    9-30-77

    9-26-77

    9-28-77

    9-28-77

    07-01-87 . Area 17--Page 3

  • HOLENUMBER

    Test Hole#1

    Test Ho le#2

    Test Ho le#3

    Test Hole#4

    Test Hole#5

    Test Hole#6

    LOCATION

    N 853,342.5E 646,479.0

    N 853,344.3E 646,477.7

    N 853,348.3E 646,478.6

    N 853,351.7E 646,491.5

    N 853,353.7E 646,491.7

    N N/AE

    G. L.ELEV.

    4932.2

    4932.2

    4931.7

    4931.7

    4931.6

    N/A

    WORK ORDERNUMBER

    9101-103

    9101-103

    9101-103

    9101-103

    9101-103

    9101-103

    CASINGDEPTH DIAMETER

    60' 4 1/2"(Plugged to surface

    60' 4 1/2"(Plugged to surface

    60' 4 1/2"(Plugged to surface

    60' 4 1/2"

    60' 4 1/2"

    7' 24"

    HOLEDEPTH DIAMETER

    80' 3.875"with cement.)

    80' 3.875"with cement.)

    80' 3.875"with cement.)

    80' 3.875"

    80' 3.875".

    7' 26"

    SPUDDATE

    8-23-77

    8-19-77

    1-30-78

    1-31-78

    1-31-78

    1-31-78

    COMPLETIONDATE

    4-3-78***

    4-3-78***

    4-3-78***

    2-27-78

    3-2-78

    4-3-78***,-_MN3

    07-01-87 Area 17--Page 4

  • HOLENUMBER

    G. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    NNWSI HOLES

    DOE Publication - DOE/NV/10322-9. .

    UE-25a #1Geologic

    Hole

    N 764,900.2E 566,349.9

    3934.4 3402-107 28' 13 3/8" 1297'2450' 2 3/4" 2501'(HQ rods, core barrel, and bitfluid probe at 2495'.)

    3.875" 6-25-78 9-2-782.980"from 1264.5' to 1297';USGS

    UE-25a #3Geologic

    Hole

    N 769,321.1E 602,938.8

    4545.8 3402-110 190' 4 1/2" 1963.5' 3.900"2530' 3.032"

    8-11-78 10-10-78

    UE-25a #4/Inst.

    c GeologicHole

    N 767,971.9E 564,471.6

    4100.7 3404-106 119' 8 5/8" 500' 6 1/8" 7-2-79(Instrumented, stemmed, and grouted from 499' to 0'.)

    7-3-82(Recompleted)

    UE-25a #5Geologic

    Hole

    UE-25a #6GeologicHole

    N 766,956.4E 564,755.1

    N 765,899.5E 564,501.7

    4056.5 3404-107

    4052.9 3404-109

    120'

    57'493'

    8 5/8"

    8 5/8"2 3/8"

    487'

    500'

    6 1/8"

    6 1/8"

    6-26-79

    7-19-79

    7-12-79

    8-8-79

    UE-25a #7Geologic

    Hole

    N 766,249.9E 565,468.5

    4004.6 3404-110 134'956'

    8 5/8"2 3/8"

    501' 5 1/2"1002' 3.875"

    8-10-79 10-5-80(Recompleted)

    07-01-87 Area 25--Page 1

  • HOLENUMBER

    6. L. WORK ORDER CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATELOCATION ELEV. NUMBER

    DOE Publication - DOE/NV/10322-13

    UE-25b #1HydrologicTest Hole

    NE

    765,243.4 3939.0566,416.4

    3404-131 292' 16" 1705'1700' 9 5/8" 2131'3935' 2 7/8" 4002'

    Tubing(Packer set at 3935'.)

    12 1/4"8 3/4"8 1/2"

    4-3-81 9-22-81

    DOE Publication - DOE/NV/10322-14

    UE-25c #1HydrologicTest Hole

    UE-25c #2- Hydrologic

    Test Hole

    N 757,095.9E 569,680.4

    N 756,848.8E 569,633.8

    3708.7 3404-177

    3714.1 3404-185

    30'362'1365'

    39.5'319'1365'

    30"16"10 3/4"

    30"16"10 3/4"

    1515'2990'3000'

    320'1520'3000'

    14 3/4"9 7/8"8 3/4"

    24"14 3/4"9 7/8"

    8-13-83

    1-9-84

    10-17-83

    3-21-84

    UE-25c #3HydrologicTest Hole

    N 756,909.9 3714.2E 569,554.9

    3404-186 39'313'1323'

    30"16"10 3/4"

    315'1520'3000'

    24"14 3/4"9 7/8"

    3-20-84 6-11-84

    DOE Publication - DOE!NV/L0322-15

    UE-25h #1Horz. CoreHole

    N 748,353.1E 574,461.4

    3409.4(T/csg)

    3409-104 20'240'

    4 1/2"3 1/2"

    20'240'400'

    6.25"3.937"3.032"

    12-10-82 1-30-83

    (Junk at unknown depth.)

    07-01-87 Area 25--Page 2

  • HOLENUMBER

    C. L.LOCATION ELEY.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    ROLE 6DEPTH DIAMETER

    SPUnDATE

    COMPLETIONDATE

    DOE Publication - DOE/NV/10322-16

    UE-25p #1PretertiaryTest Hole

    N 756,171.2E 571,484.5

    3654.6(T/csg)

    3404-151A 36' 24"325' 16"1564' 10 3/4"

    1487'-4256' 7 5/8"Liner

    1371' 1.9"Tubing

    1355' 1.9"Tubing

    341'1598'4279'4322

    17 1/2"14 3/4"9 7/8"6 7/8"

    11-13-82 5-24-83

    5900' 6 3/4"

    5923 6 1/8"

    DOE Publication - DOE/NV/10322-11

    UE-25 RF #1Repository

    '3 Facility

    N 762,189.7E 570,889.9

    3688.5 9222-214 99' 7 5/8" 98'145'

    9 7/8"8 3/4"

    1-23-84 2-8-84

    UE-25 RF #2RepositoryFacility

    N 758,800.0E 570,334.8

    3656.8 9222-214 29' 7 5/8" 52' 8 3/4" 1-18-84 1-23-84

    UE-25 RF #3RepositoryFacility

    N 765,575.1E 571,100.0

    3657.7 9222-227 138' 811 151'144'151'301'

    9 7/8"4 1/2"3.987"3.937"

    3-30-84 7-22-85(Recompleted)

    UE-25 RF #3BRepositoryFacility

    N 765,695.3E 571,065.6

    3661.1 9222-227 106' 5 1/2" 106'111'

    6"3.937"

    7-18-85 7-23-85

    07-01-87 Area 25--Page 3

  • .

    HOLENUMBER

    C. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    UE-25 RF #4RepositoryFacility

    UE-25 RF #5RepositoryFacility

    UE-25 RF #7RepositoryFacility

    UE-25 RF #7ARepositoryFacility

    UE-25 RF #8RepositoryFacility

    N 762,090.8E 572,063.2

    N 759,198.7E 568,097.7

    N 768,804.0E 571,170.9

    N 768,767.8E 570,268.8

    N 765,630.8E 568,789.9

    3636.8 9222-214

    3813.7 9222-214

    3756.1 9222-214

    3755.9 9222-214

    3787.9 9222-214

    36'280'306'

    112'

    100'

    18'

    90'

    8" 112'122'

    8" 140'150'

    9 7/8"6 3/4"3.90"

    9 7/8"3.937"

    9 7/8"3.937"

    9 7/8"3.987"

    3.937"

    2-10-84

    5-24-84

    5-31-84

    6-29-84

    7-9-84

    2-28-84

    5-30-84

    6-6-84

    7-6-84

    7-12-84

    8" 150'153'

    0-.'

    8" 128'

    UE-25 RF #9RepositoryFacility

    UE-25 RF #10RepositoryFacility

    UE-25 RF #11RepositoryFacility

    N 765,945.0E 570,643.3

    N 765,307.7E 570,229.9

    N 765,621.5E 570,434.6

    3674.4(T/csg)

    3672.2(T/csg)

    3668.6(T/csg)

    9222-227

    9222-227

    9222-243

    106'

    60'

    78'

    6" Pvc

    6" PVC

    6" PVC

    106'

    60'

    78'

    9 7/8"

    9 7/8"

    9 7/8"

    6-27-85

    7-24-85

    7-30-85

    7-9-85

    7-29-85

    8-2-85

    07-01-87 Area 25--Page 4

  • HOLENUMBER

    C. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    DOE Publication - DOE/NV/10322-20

    UE-25 UZ #4 N 768,715.6 3938.5Unsaturated E 566,139.3Zone

    UE-25 UZ #5 N 768,591.0 3951.6Unsaturated E 566,135.2Zone

    DOE Publication - DOE/NV/10322-21

    3404-197 60' 5 1/2" 367' 4.25" 9-6-84 10-10-84

    (Junk in hole below 140'.)

    3404-198 18' 5 1/2" 365' 6" 10-11-84 11-19-84

    (Junk in hole, depth unknown.)

    UE-25 UZN #1UnsaturatedZone-Neutron

    N 769,328.9E 565,224.3

    3995.1 3404-196 50' 5 1/2" 50' 6" 10-17-84 10-18-84

    UE-25 UZN #2UnsaturatedZone-NeutronUE-25 UZN #3UnsaturatedZone-Neutron

    UE-25 UZN #4UnsaturatedZone-Neutron

    UE-25 UZN #5UnsaturatedZone-Neutron

    N 768,605.5E 566,113.6

    N 768,630.4E 566,119.4

    N 768,663.4E 566,127.1

    N 768,689.4E 566,133.8

    3947.2 3404-196A

    3940.8 3404-196A

    3942.4 3404-196A

    3942.9 3404-196A

    50'

    15'

    30'

    50'

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    50'

    15'

    30'

    50'

    6"

    6"

    6"

    6"

    6-11-84

    6-15-84

    6-15-84

    6-18-84

    6-14-84

    6-15-84

    6-15-84

    6-21-84

    07-01-87 Area 25--Page 5

  • HOLENUMBER

    G. L. WORK ORDERLOCATION ELEV. NUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    UE-25 UZN #6UnsaturatedZone-Neutron

    UE-25 UZN #7UnsaturatedZone-Neutron

    UE-25 UZN #8UnsaturatedZone-Neutron

    UE-25 UZN #9UnsaturatedZone-Neutron

    UE-25 UZN #10UnsaturatedZone-Neutron

    UE-25 UZN #12UnsaturatedZone-Neutron

    UE-25 UZN #13UnsaturatedZone-Neutron

    UE-25 UZN #14UnsaturatedZone-Neutron

    N 768,705.6E 566,136.6

    N 768,724.1E 566,141.2

    N 768,743.0E 566,146.5

    N 768,781.5E 566,155.9

    N 769,868.6E 564,744.1

    N 768,650.9E 566,695.2

    N 768,024.6E 568,255.1

    N 767,967.2E 568,232.9

    3938.0 3404-196A

    3938.8 3404-196

    3938.9 3404-196

    3941.2 3404-196

    4038.3 3404-196

    3906.8 3404-196

    3821.3 3404-196

    3823.9 3404-196

    45 '

    45'

    45'

    40'

    94'

    50'

    65'

    55'

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    45'

    45'

    45'

    6"1

    6"'

    6"

    40'

    6-21-84

    7-13-84

    7-16-84

    7-17-84

    12-2-85

    7-23-84

    7-18-84

    7-20-84

    6-22-84

    7-16-84

    7-17-84

    7-18-84

    12-4-85

    7-24-84

    7-19-84

    7-23-84

    94'99'

    50'

    65'

    6"4.25"

    6"

    6"

    55'

    07-01-87 Area 25--Page 6

  • HOLENUMBER

    G. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    UE-25 UZN #18UnsaturatedZone-Neutron

    UE-25 UZN #19UnsaturatedZone-Neutron

    UE-25 UZN #20UnsaturatedZone-Neutron

    N 766,472.4E 565,246.5

    N 763,688.9E 564,570.6

    N 763,759.9E 564,579.3

    4018.5 3404-196

    4024.9 3404-196

    4027.2 3404-196

    61'

    40'

    41'

    5 1/2"

    5 1/2"

    5 1/2"

    61'

    40'

    41'

    6"

    6"

    6"

    5-16-84

    11-6-85

    5-15-84

    5-18-84

    11-8-85

    5-16-84

    1�to

    UE-25 UZN #21UnsaturatedZone-Neutron

    UE-25 UZN #22UnsaturatedZone-Neutron

    UE-25 UZN #23UnsaturatedZone-Neutron

    N 763,806.1E 564,591.0

    N 763,880.3E 564,604.5

    N 763,973.1E 564,545.4

    4027.5 3404-196

    4028.8 3404-196

    4043.1 3404-196

    40'

    89'

    35'

    5 1/2"

    5 1/2"

    5 1/2"

    40'42'

    94'95'

    35'

    6"3.937"

    6"3.937"

    6"

    11-8-85 11-14-85

    11-14-85 11-18-85

    11-19-85 11-21-85

    UE-25 UZN #28UnsaturatedZone-Neutron

    N 763,091.2E 565,319.7

    3958.1 3404-196 25' 5 1/2" 25'26'failure

    6"4"to retrieve

    11-21-85 11-25-85***

    drive sample tube.)(Role abandoned after

    UE-25 UZN #29UnsaturatedZone-Neutron

    N 762,613.1E 565,173.3

    3972.9 3404-196 35' 5 1/2" 35' 6" 11-26-85 11-27-85

    07-01-87 Area 25--Page 7

  • HOLENUMBER

    6. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    UE-25 UZN #30UnsaturatedZone-Neutron

    N 762,047.6E 565,232.8

    3958.8 3404-196 35 ' 5 1/2" 35' 6" 11-27-85 12-2-85

    UE-25 UZN #56UnsaturatedZone-Neutron

    UE-25 UZN #60UnsaturatedZone-Neutron

    N 760,393.5E 565,480.0

    N 759,756.9E 566,567.0

    3959.8 3404-196

    3892.1 3404-196

    60'

    35'

    5 1/2"

    5 1/2"

    60'

    35'

    6"

    6"

    8-23-84

    8-21-84

    8-23-84

    8-23-84

    0

    UE-25 UZN #85UnsaturatedZone-Neutron

    UE-29 UZN #92UnsaturatedZone-Neutron

    N 750,715.8E 577,567.8

    N 778,009.5E 583,558.5

    3337.1 3404-196 80' 5 1/2" 80' 6" 5-6-85

    1-13-86not Area 29.)

    5-8-85

    1-15-863669.2 3404-196 105'(Due to boundary change,

    1/2" 120' 4.25"hole is located in Area 25,

    UE-25 UZN #97UnsaturatedZone-Neutron

    N 763,093.8E 565,320.6

    3958. 1 3404-196 60' 5 1/2" 60' 6" 11-25-85 11-26-85

    UE-25 UZNC #1UnsaturatedZone-NeutronCalibration

    UE-25 UZNC #2UnsaturatedZone-NeutronCalibration

    N 764,670.6E 566,158.9

    N 764,668.4E 566,157.5

    3928.5 3404-196

    3928.4 3404-196

    5'(Backfilled to surface.)

    5'(Backfilled to surface.)

    6"

    6"

    2-26-86

    2-26-86

    2-26-86

    2-26-86

    07-01-87 Area 25--Page 8

  • ROLENUMBER

    G. L. WORK ORDER CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONLOCATION ELEV. NUMBER DATE DATE

    DOE Publication - DOE/NV/10322-1O

    UE-25 WT #3Water TableHole

    N 745,995.1E 573,384.4

    3379.5(T/csg)

    3404-159 13.5'40'1125'

    16"10 3/4"2 7/8"Tubing

    13.5'41'1142'

    48"14 3/4"8 3/4"

    4-29-83 5-25-83

    UE-25 WT #4Water TableHole

    N 768,511.8E 568,040.2

    3834.6 3404-167 48' 10 3/4"1567' 2 7/8"

    Tubing

    50' 14 3/4"1580' 8 3/4"

    5-28-83 6-6-83

    UE-25 WT--#5(Abandoned)

    N 761,826.0E 574,249.7

    3559.0 3404-168 40' 10 3/4" 40'*1330'

    1018'.)

    14 3/4"8 3/4"c

    6-7-83 6-18-83***

    (Junk in hole at

    lr UE-25 WT #6Water TableHole

    N 780,575.8E 564,523.9

    4312.3 3404-169 65'251'1221'

    10 3/4"7 5/8"2 7/8"Tubing

    69'250'1250'1256.5'

    14 3/4"9 7/8".6 3/4"'6 1/4"

    6-20-83 6-29-83

    UE-25 WT #12Water TableHole

    N 739,725.9E 567,011.0

    3526.6 3404-176 70' 10 3/4"1276' 2 7/8"

    Tubing

    70' 15"1308' 8 3/4"

    8-11-83 8-16-83

    UE-25 WT #13Water TableHole

    N 756,715.0E 578,756.7

    3386.0 3404-170 222' 10 3/4"1136' 2 7/8"

    Tubing

    48.5'224'1150'1160'

    15" 014 3/4"8 3/4"8 1/16"

    6-29-83 7-7-83

    UE-25 WT #14Water TableHole

    N 761,650.6E 575,210.1

    3529.9 3404-179 120' 10 3/4"1303' 2 7/8"

    Tubing

    125.5' 15"1310' 8 3/4"

    8-17-83 9-30-83

    07--01-87r Area 25--Page 9

  • HOLENUMBER

    G. L. WORK ORDERLOCATION ELEV. NUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    UE-25 WT #15Water TableHole

    N 766,116.6E 579,805.7

    3552.5 3404-180A 127' 10 3/4"1335' 2 7/8"

    Tubing

    130' 14 3/4"1360' 8 3/4"

    11-12-83 11-22-83

    UE-25 WT #16Water TableHole

    N 774,419.7E 570,394.9

    3971.4 3404-181A 102' 10 3/4"1686' 2 7/8"

    Tubing

    108' 14 3/4"1710' 8 3/4"

    11-2-83 11-10-83

    UE-25 WT #17Water TableHole

    N 748,419.6E 566,211.9

    3688.5 3404-182 55 ' 10 3/4"1376' 2 7/8"

    Tubing

    55' 14 3/4"1453' 8 3/4"

    10-20-83 10-30-83

    UE-25 WT #18Water Table

    N 771,167.1E 564,855.0

    4383.0 3404-188 86' 10 3/4"1965' 2 7/8"

    Tubing(Electric log tool

    88' 14 3/4" 5-9-842043' 8 3/4"

    in hole below 200', 5-21-84.)

    5-23-84

    "3

    NNWSI SEISMIC HOLES

    DOE Publication - DOE/NV/10322-25

    U-25Seismic #1

    U-25Seismic #2

    N 778,912.6E 560,456.9

    N/A 3404-134

    3404-134

    200'

    200'

    4 1/2"PVC

    4 1/2"PVc

    200'

    200'

    6 1/4"

    6 1/4"

    9-4-81

    9-10-81

    9-9-81

    9-12-81N 779,088.9 5106.8E 560,362.5

    U-25Seismic #3

    U-25Seismic #4

    N 779,265.1E 560,268.1

    N 779,441.4E 560,173.7

    5110.8 3404-134

    5113.5 3404-134

    200'

    200'

    4 1/2 "PVC

    4 1/2"PVC

    200'

    200'

    6 1/4"

    6 1/4"

    9-4-81

    9-3-81

    9-8-81

    9-4-81

    07-01-87 Area 2 5--Page 10

  • HOLENUMBER

    U-25Seismic #5

    U-25Seismic #6

    U-25Seismic #7

    U-25Seismic #8

    U-25Seismic #9

    U-25Seismic #10

    U-25Seismic #11

    U-25Seismic #12

    U-25-Seismic #13

    U-25Seismic #14

    U-25Seismic #15

    G. L. WORK ORDER CASING HOLE SPUD COMPLETIONDATE DATELOCATION ELEY. NUMBER DEPTH DIAMETER DEPTH DIAMETER

    779,617.6560,079.3

    779, 793.9559,984.9

    779,970.1559,890.5

    780,146.4559, 796.1

    780,322.6559,701.7

    780,498.9559,607.4

    780,675.1559,513.0

    780,851.3559,418.6

    778,736.4560,551.3

    778,383.9560,740.1

    778,207.7560,834.5

    5120.9

    5085.0

    5141.0

    5152.8

    5161.6

    5171.0

    5179.2

    5185.3

    5096.0

    5076.0

    5064.2

    3404-134

    3404-134

    3404-134

    3404-134

    3404-134

    3404-134

    3404-134

    3404-134

    3404-134

    3404-134

    3404-134

    200'

    200'

    200'

    200'

    200'

    200'

    200'

    200'

    200'

    200'

    200'

    4 1/2"PVC

    1 /2"PVC

    1/2 "PVC

    1/2"PVC

    1/2"PVC

    1/2"PVC

    1/2 "PVC

    1/2 "PVC

    1/2 "PVC

    1/2 "PVC

    1/2"PVC

    200'

    200'

    200'

    200'

    200'

    200'

    200'

    200'

    200'

    200'

    200'

    6 1/4"

    1/4"

    1/8"

    1/8"

    1/4"

    1/4"

    1/4"

    1/4"

    1/4"

    1/8"

    1/4"

    9-2-81

    9-1-81

    8-30-81

    8-27-81

    9-18-81

    9-18-81

    9-16-81

    9-14-81

    9-13-81

    9-17-81

    9-15-81

    9-3-81

    9-2-81

    9-12-81(Recompleted)

    9-12-81(Recompleted)

    9-20-81

    9-19-81

    9-17-81

    9-16-81

    9-14-81

    9-17-81

    9-16-81

    07-01-87 Area 25--Page 11

  • HOLENUMBER

    G. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASING HOLE SPUD COMPLETIONDATE DATEDEPTH DIAMETER DEPTH DIAMETER

    U-25Seismic

    U-25Seismic

    U-25Seismic

    U-25Seismic

    U-25Seismic

    r'o U-2542 Seismic

    U-25Seismic

    U-25Seismic

    U-25Seismic

    U-26

    #16

    #17

    #18

    #19

    #20

    #21

    #22

    #23

    #24

    778,031.4560,928.9

    777,855.2561,023.3

    777,678.9561,117.7

    777,502.7561,212.0

    747,172.5593,171.2

    746,904.2569,427.4

    718,334.3581,267.8

    741,125.8580,246.1

    769,056.8580,906.9

    746,150.3

    5051.6

    5040.2

    5027.7

    5017.5

    3357.0

    3526.1

    2948.6

    3215.3

    3554.8

    3848.4

    3404-134

    3404-134

    3404-134

    3404-134

    3404-192

    3404-192

    3404-192

    3404-192

    3404-192

    3404-192

    200'

    200'

    200'

    200'

    140'

    139.5'

    139'

    139.5'

    140'

    4 1/2"PVC

    4 1/2"PVc

    4 1/2"PVC

    4 1/2"PVc

    8"

    8"

    8"

    8"

    8"

    200'

    200'

    200'

    200'

    140'

    5'140'

    5'144'

    145'

    5'147'

    6 1/4"

    6 1/4"

    6 1/8"

    6 1/4"

    12 1/4"

    15"10 5/8"

    15"12 1/4"

    12 1/4"

    15"12 1/4"

    5"12 1/4"

    9-14-81

    9-13-81

    9-11-81

    9-9-81

    4-18-84

    4-19-84

    4-23-84

    4-26-84

    5-1-84

    4-17-84

    9-15-81

    9-13-81

    9-12-81

    9-11-81

    4-19-84

    4-20-84

    4-26-84

    4-27-84

    5-3-84

    4-18-84139.5' 8"Seismic #1 E 629,834.4

    5'140'

    (Hole located in Area 25.)

    07-01-87 Area 2 5 -- Page 12

  • ROLENUMBER

    G. L. WORK ORDER CASINGLOCATION ELEY.

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATENUMBER DEPTH DIAMETER

    NNWSI SEISMIC LINE HOLES

    DOE Publication - DOE/NV/10322-25_ _ _ _ _ _ _ _ _ _

    _ _ _ _ _, , _ _ _ _ _

    US-25 #1Seismic

    US-25 #2Seismic

    US-25 #3Seismic

    US-25 #4Seismic

    rU

    US-25 #5Seismic

    US-25 #6Seismic

    US-25 #7Seismic

    .US-25 #8Seismic

    US-25 #9Seismic

    N 762,631.0E 565,423.7

    N 762,402.6E 566,427.3

    N 762,075E 572,454

    N 762,458E 567,853

    N 762,432E 567,853

    . 762,377E 568,551

    N 762,354E 568,551

    N 762,317E 569,332

    N 762,285E 569,329

    4258.5 9222-209 50' 6" hose 53' 8 3/4"

    (T/csg)

    4316.2(T/csg)

    L/O3620

    L/O3800

    L/O3799

    L/O3783

    L/O3783

    L/O3757

    L/O3755

    9222-209

    9222-209

    9222-209

    9222-209

    9222-209

    9222-209

    9222-209

    9222-209

    50'

    50'

    50'

    50'

    50'

    50'

    50'

    50'

    6"

    6"

    6"

    6"

    6"

    6"

    6"

    6"

    hose

    hose

    hose

    hose

    hose

    hose

    hose

    hose

    53'

    52'

    50'

    52'

    52'

    52'

    52'

    50'

    3/4"

    3/4"s

    3/4"

    3/4 "

    3/4"

    3/4"

    3/4"

    3/4"

    9-23-83

    9-21-83

    9-20-83

    9-19-83

    9-16-83

    9-15-83

    9-14-83

    9-12-83

    9-9-83

    9-26-83

    9-23-83

    9-21-83

    9-19-83

    9-16-83

    9-16-83

    9-15-83

    9-14-83

    9-12-83

    07-01-87 Area 25--Page 13

  • HOLENUMBER

    G. L. WORK ORDER CASING HOLE SPUD COMPLETIONDATE DATELOCATION ELEV. NUMBER DEPTH DIAMETER DEPTH DIAMETER

    US-25 #10Seismic

    US-25 #11Seismic

    US-25 #12Seismic

    US-25 #13Seismic

    US-25 #14Seismic

    o US-25 #15Seismic

    US-25 #16Seismic

    US-25 #17Seismic

    US-25 #18Seismic

    US-25 #19Seismic

    US-25 #20Seismic

    762,251570, 112

    762,226570,111

    762,198570,894

    762,168570,891

    762,137571,675

    762, 106571,670

    762,046572,453

    761,986573,627

    761,895574,709

    761,746576,242

    761,613577,175

    L/03724

    L/03724

    L/03688

    L/03688

    L/03653

    L/03654

    L/03620

    L/03576

    L/03545

    L/03499

    L/03485

    9222-209

    9222-209

    9222-209

    9222-209

    9222-209

    9222-209

    9222-209

    9222-209

    9222-209

    9222-209

    9222-209

    50'

    50'

    50'

    50'

    50'

    50'

    50'

    50'

    50'

    50'

    50'

    6" hose

    6"

    6"

    6"

    6"

    6"

    6"

    6"

    6"

    6"0

    611

    hose

    hose

    hose

    hose

    hose

    hose

    hose

    hose

    hose

    hose

    50'

    52'

    52'

    52'

    50'

    50'

    50'

    50'

    50'

    50'

    50'

    8 3/4"

    3/4"

    3/4'"

    3/4"

    3/4"

    3/4"

    3/4"

    3/4"

    3/4"

    3/4"

    3/4"

    9-8-83

    9-7-83

    9-6-83

    9-2-83

    8-31-83

    8-30-83

    8-30-83

    8-29-83

    8-26-83

    8-25-83

    8-24-83

    9-8-83

    9-7-83

    9-7-83

    9-6-83

    9-2-83

    8-31-83

    8-30-83

    8-29-83

    8-29-83

    8-26-83

    8-26-83

    07-01-87 Area 25--Page 14

  • HOLENUMBER

    G. L.LOCATION ELEY.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    US-25 #21Seismic

    N 761,628.4E 578,543.1

    3481.4 9222-209 49' 6" hose 50' 8 3/4" 8-23-83 8-26-83

    DOE Publication - Pending

    J-11 N 740,968.2E 611,764.2

    3445.0 3404-103 1327' 12 3/4"(Sandia instrument

    1329'in hole.)

    1957

    J-1IPrime

    N 740,890E 611,821

    L/ON/A

    3403-103 30'(Sandia

    10 3/4"instrument in

    220'hole.)

    9 7/8" 2-28-78 3-3-78

    J-12Water Well

    N 733,508E 581,012

    3130 3311-001 887' 12 3/4" 1139' 11 3/4" ? 1968(Recompleted)-

    J-13" Water Well

    (was USGSHTH #6)

    N 749,209E 579,651

    3318 AT(29-2)- 444' 18"1302 13 3/8" &

    1546' 11 3/4"1484'- 3385' 5 1/2" Liner

    1561'2020'3488'

    9 7/8"9".7 5/8'!

    9-12-62 1-8-63

    07-01-87 Area 25--Page 15

  • HOLE.NUMBER

    G. L. WORK ORDERLOCATION ELEY. NUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    . NNWSI SEISMIC HOLE

    DOE Publication - DOE/NV/10322-25

    U-26Seismic #1

    N 746,150.3 3848.4 3404-192E 629,834.4

    139.5' 8" 5, 5",12 1/4"

    4-17-84 4-18-84140'

    (Hole located in Area 25.)

    POto

    07-01 -87 Area 26--Page 1

  • HOLENUMBER

    C. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    NNWSI HOLES

    DOE Publication - DOEINV/10322-12

    UE-29a #1HydrologicTest Hole

    NE

    797,729.0 3986.7585,574.9

    3404-132A 35' 30" 215' 26" 9-25-81 10-6-81 ***

    UE-29a #2HydrologicTest Hole

    N 797,744.9E 585,546.9

    3987.4 3404-135 39'160'284'811'1172'

    30"20"16"10 3/4'1.6" Tu

    40' 36"160' 26"295' 18 1/2"

    '' 814' 14 3/4"ibing 1165' 15"

    1383' 9 7/8"perforated from 285' to

    10-7-81 12-3-81

    (10 3/4" casing 700', 1-11-82.)wI.-

    DOE Publication - DOE/NV/10322-21

    UE-29 UZN #91 N 797,275.0 3646.9Unsaturated E 585,340.9Zone-Neutron

    3404-196 89' 5 1/2" 94' 4.25" 1-16-86 1-21-86

    UE-29 UZN #92 N 778,009.5 3669.2Unsaturated E 583,558.5Zone-Neutron

    3404-196 105' 5 1/2"(Due to boundary change, hole

    120' 4.25" 1-13-86 1-15-86is located in Area 25, not Area 29.)

    NNWSI SEISMIC HOLE

    DOE Publication - DOE/NV/10322-25

    U-29Seismic #1

    N 791,868.4 3878.0E 585,139.5

    3404-192 137.5' 8" 5,2142 '

    15"12 1/4"

    5-3-84 5-7-84

    07-01-87 Area 29--Page 1

  • HOLENUMBER

    G. L.LOCATION ELEY.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    NNWSI SEISMIC HOLES

    DOE Publication - DOE/NV/10322-25

    U-30 N 837,370.0Seismic #1 E 604,819.3

    4753.0 3404-196 140' 8"5 51'142'

    15"12 1/4"

    5-8-84 5-9-84

    U-30Seismic #2

    N 837,376.9E 604,800.1

    4753.7 3404-196 140' 8" 5'140'

    15"12 1/4"

    5-9-84 5-10-84

    wAwA

    07-01-87 Area 30--Page 1

  • ROLENUMBER

    G. L. WORK ORDERLOCATION ELEV. NUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    NNWSI OFF-SITE HOLES

    DOE Publication - DOE/NV/10322-19

    USW G-1GeologicHole

    N 770,500.2E 561,000'.5

    4348.6 3404-113 280' 13 3/8"290' 7 5/8"1016' 4 1/2"(Sandia instrument

    6000' 3.875"

    in hole, 4-8-82.)

    3-12-80 9-17-80

    USW G-2GeologicHole

    N 778,824.2E 560,503.9

    5098.4 3404-130A 278'795'

    13 3/8"9 5/8"

    2670'4115'4719.5'6006'

    8 3/4"6 1/4"6 1/8"2.98"

    3-25-81 11-17-82(Recompleted)

    USW G-3X Geologic@' Hole

    N 752,779.8E 558,483.1

    4856.5 3404-133 13 3/8" 1160' 8 3/4"2364' 6 3/4"

    1-8-82 3-21-82

    (Original hole plugged with cement from1362' to 1160'; radioactive loggingsource below 1247'.)2598' 5 1/2" 1144'-2600' 8 3/4"

    2608' 4 3/4"5031' 3.937"

    Sidetrack

    USW G-4GeologicHole

    N 765,807.1E 563,081.6

    4166.9 3404-150 39' 13 3/8"2017' 9 5/8"

    3001' 8 3/4"3003 8 3/8"

    8-23-82 1-13-83

    USW GA-1GeologicAngle Hole

    N 779,365.4E 559,247.0

    5186.8 3404-127 6'148'

    13 3/8"4 1/2"

    148'551'

    6 1/4"3.937"

    3-15-81 3-21-81

    07-01-87 NNWSI Off-Site Holes--Page 1

  • HOLENUMBER

    G. L. WORK ORDERLOCATION ELEV. NUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    USW GU-3GeologicUnsaturatedHole

    N 752,690.1 4856.6E 558,501.3

    3404-140 34' 13 3/8"1144' 5 1/2"

    1144'1768'2644'

    6 3/4"3.937"2.980"

    1-26-82 6-12-82

    (Sandia instrument lost in holes 5-87.)

    DOE Publication - DOE/NV/10322-18

    USW H-1/Inst.HydrologicTest Hole

    N 770,254.3E 562,388.0

    4274.4 3404-114 38.5' 30" 384'334' 16" 1740'2255' 9 5/8" 2257'

    6000'(Instrumented and grouted from

    15" 9-3-8013 1/4"12 1/4"8 3/4"5950' to 2207'.)

    7-6-82( Recompleted)

    orM~

    USW H-3HydrologicTest Hole

    USW H-4HydrologicTest Hole

    N 756,542.1E 558,451.7

    N 761,643.6E 563,911.1

    4866.4 3404-139

    4096.5 3404-143

    29'126'2600'(10 3/4"

    30"16"10 3/4"

    130'2650'4000'

    casing perforated.)

    26"14 3/4"8 3/4"

    26"20"14 3/4"8 3/4"

    1-27-82

    3-22-82

    3-19-82

    6-7-8235' 30"311' 16"1839' 10 3/4"3896' 2 7/8"

    Tubing1725' 1.9"

    Tubing

    153'316'1850'4000'

    USW H-5HydrologicTest Hole

    N 766,634.3E 558,908.7

    4850.8 3404-146 38'311'2585'(10 3/4"3600'2324'

    30" 311'16" 2599'10 3/4" 4000'casing perforated.)2 7/8" Tubing1.9" Tubing

    20"14 3/4"8 3/4"

    5-19-82 8-1-82

    07-01-87 NNWSI Off-Site Holes--Page 2

  • HOLENUMBER

    G. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUDDATE

    COMPLETIONDATE

    USW H-6HydrologicTest Hole

    N 763,298.9 4270.6E 554,074.9

    3404-149 31' 30" 1912'311' 16" 3990'1906' 10 3/4" 4002'2468' 2 7/8" Tubing1751.5' 1.9" Tubing

    14 3/4"8 3/4"6 1/8"

    8-7-82 10-28-82

    DOE Publication - DOE/NV/10322-17

    USw VH-lVolcanicHydrologyHole

    N 743,355.5E 533,626.0

    3161.0 3404-117C 48'911'

    9 5/8"7 5/8"

    912' 8 3/4"2501' 6 1/4"

    10-28-80 2-18-81

    USW VH-2Volcanic

    X Hydrology- Hole

    N 748,319.4 3197.1E 526,264.2

    3404-155A 19'198'720'3986'

    13 3/8"9 5/8"5 1/2"1.9" Tubing

    20'197'716'4000'

    17 1/2"12 1/4"8 3/4"3.937"

    2-15-83 4-27-83

    DOE Publication -- DOE/NV/10322-20

    USw UZ-1/Inst.UnsaturatedZone TestHole.

    N 7719275.8E 560,220.8

    4426.2(T/csg)

    3404-154 39.5' 42" 41.5'97'101'1265'1269'1270'

    plugged

    48" 4-27-8336"24"17 1/2"15"9 1/4"

    with cement to 1221'.

    7-31-83

    (Junk at 1243', holeInstrumented, stemmed and grouted from 1213' to surfaces10-24-83.)

    07-01-87 NNWSI Off-Site Holes--Page 3

  • HOLENUMBER

    G. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    USW UZ-6UnsaturatedZone Test

    N 759,731E 558,325

    L/O4925

    3404-193 40'324'

    26 3/4"20"

    341' 24"1887' 17 1/2"

    6-18-84 4-28-86(secured)

    USW UZ-6sUnsaturatedZone Test

    N 759,909.3E 558,050.4

    4949.2 3404-208 3' 7 5/8" 494.5' 8 11/32"519' 3.990"

    4-23-85 9-9-85

    USW UZ-7UnsaturatedZone Test

    N 760,836.1E 562,911.3

    4169.3 3404-206 20' 5 1/2" 207' 6" 1-4-85 1-22-85

    USw UZ-8UnsaturatedZone

    N 760,762.2E 562,293.5

    4227.0 3404-214 55' 5 1/2" 55'57'

    6"4.25"

    3-5-86 4-21-86**

    co USW UZ-13UnsaturatedZone Test

    N 751,953.2E 558,488.7

    4815.8 3404-207 330' 5 1/2" 417'430'

    6"3.937"

    1-24-85 4-19-85

    DOE Publication - DOE/NV/10322-21

    USW UZ-N24UnsaturatedZone--Neutron

    USW UZ-N25UnsaturatedZone-Neutron

    NE

    768,005.4 4226.5562,054.2

    3404-196

    3404-196

    30'

    59'

    5 1/2"

    5 1/2"

    75'

    59'

    6"

    6"

    2-4-86

    2 -11-86

    2-26-86

    2-12-86N 768,430.4 4334.7E 561,218.9

    07-01 -87 NNWS1 Off-Site Holes--Page 4

  • HOLENUMBER

    G. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUDDATE

    COMPLETIONDATE

    USW UZ-N26UnsaturatedZone-Neutron

    N 768,757.2E 561,022.9

    4384.1 3404-196 35 ' 5 1/2" 35' 6" 2-10-86 2-11-86

    USW UZ-N40UnsaturatedZone-Neutron

    USW UZ-N41UnsaturatedZone-Neutron

    USW UZ-N42UnsaturatedZone-Neutron

    USW UZ-N43UnsaturatedZone-Neutron

    N 766,175.8E 564,221.3

    N 765,867.2E 563,520.9

    N 765,728.6E 562,858.5

    N 765,997.0E 563,263.6

    4079.4 3404-196

    4117.5 3404-196

    4179.1 3404-196

    4149.4 3404-196

    35'

    35'

    35'

    45'

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    35'

    35'37'

    35'40'

    45'

    6"

    6"4.25"

    6"4.25"

    6"

    12-19-85 1-7-86

    12-12-85 12-16-85

    12-16-85 12-17-85

    w

    12-5-85 12-9-85

    USW UZ-N44UnsaturatedZone-Neutron

    USW UZ-N45UnsaturatedZone-Neutron

    USW UZ-N46UnsaturatedZone-Neutron

    N 766,192.5E 563,139.6

    N 765,976.7E 563,429.2

    4161.5 3404-196

    4129.9 3404-196

    4500.5 3404-196

    35'

    45'

    99'

    5 1/2"

    5 1/2"

    5 1/2"

    35'36'

    45'

    99'

    6"4.25"

    6"

    6"

    12-18-85

    12-9-85

    1-21-86

    12-19-85

    12-12-85

    1-31-86NE

    772,262.3559,747.7

    07-01-87 NNWSI Off-Site Holes--Page 5

  • HOLENUMBER

    C. l.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    USW UZ-N47UnsaturatedZone-Neutron

    USW UZ-N48UnsaturatedZone-Neutron

    USW UZ-N49UnsaturatedZone-Neutron

    N 771,967.5E 559,783.5

    N 760,834.9E 562,413.6

    N 760,860.4E 562,321.8

    4480.4 3404-196

    4211.1 3404-196

    4228.5 3404-196

    85 '

    35'

    35'

    5 1/2"

    5 1/2"

    5 1/2"

    85'86'

    35'

    35'36'

    6"4.25"

    6"

    6"4.25"

    1-24-86

    1-7-86

    1-9-86

    1-29-86

    1-8-86

    1-10-86

    g

    USW UZ-N50UnsaturatedZone-Neutron

    USW UZ-N51UnsaturatedZone-Neutron

    N 760,775.9E 562,911.7

    N 760,860.8E 562,909.4

    4173.2 3404-196

    4169.0 3404-196

    20'

    20'

    5 1/2"

    5 1/2"

    20'

    20'

    6"

    6"

    8-24-84

    8-24-84

    8-24-84

    8-24-84

    USW UZ-N52UnsaturatedZone-Neutron

    N 760,893.8E 562,908.8

    4172.2 3404-196 25' 5 1/2" 25' 6" 8-24-84 8-24-84

    USW UZ-N65UnsaturatedZone-Neutron

    USW UZ-N66UnsaturatedZone-Neutron

    N 758,627.1E 562,537.1

    N 758,433.5E 561,881.1

    4371.9 3404-196

    4355.5 3404-196

    50'

    50'

    5 1/2"

    5 1/2"

    50'

    50'

    6"

    6"

    11-27-84 11-27-84

    11-27-84 11-28-84

    07-01-87 NNWSI Off-Site Holes--Page 6

  • HOLENUMBER

    C. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    USW UZ-N67UnsaturatedZone-Neutron

    USW UZ-N68UnsaturatedZone-Neutron

    USW UZ-N69UnsaturatedZone-Neutron

    USW UZ-N70UnsaturatedZone-Neutron

    USW UZ-N71UnsaturatedZone-Neutron

    N 753,634.2E 563,799.0

    N 753,962.4E 564,005.8

    N 754,460.9E 564,401.7

    N 769,250.7E 560,164.7

    N 761,025.9E 558,405.6

    3920.2 3404-196

    3924.7 3404-196

    3918.2 3404-196

    4542.1 3404-196

    4924.9 3404-196

    25'

    55'

    35'

    35'

    52'

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    25'

    55'

    35'

    35'

    52'

    6"

    6"

    6"9

    6"1

    6"1

    7-25-84

    7-25-84

    7-26-84

    2-6-86

    5-18-84

    7-25-84

    7-25-84

    7-26-84

    2-10-86

    5-18-84I.-

    USW UZ-N72UnsaturatedZone-Neutron

    USW .UZ-N73UnsaturatedZone-Neutron

    N 761,067.9E 558,626.1

    N 761,049.1E 558,926.0

    4889.2 3404-196

    4866.6 3404-196

    30'

    30'

    5 1/2"

    5 1/2"

    30'

    30'

    6"

    6"1

    11-20-84 11-20-84

    11-20-84 11-21-84

    USW UZ-N74UnsaturatedZone-Neutron

    N 7619362.2E 558,559.9

    4903.7 3404-196 35' 5 1/2" 35'37'

    6"4.25"

    2-18-86 2-18-86

    07-01-87 NNWSI Off-Site Holes--Page 7

  • HOLENUMBER

    G. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    USW UZ-N75UnsaturatedZone-Neutron

    N 761,462.4E 559,075.9

    4799.0 3404-196 35 ' 5 1/2" 35'37'

    6"4.25"

    2-19-86 2-20-86

    USW UZ-N76UnsaturatedZone-Neutron

    N 761,353.2E 559,047.7

    4958.0 3404-196 35' 5 1/2" 40' 6" 11-21-84 11-26-84

    (Junk in hole, depth unknown.)

    USW UZ-N77UnsaturatedZone-Neutron

    USW UZ-N78UnsaturatedZone-Neutron

    N 755,526.1E 554,397.2

    N 757,557.8E 556,262.3

    3900.5 3404-196

    4182.2 3404-196

    50'

    30'

    5 1/2"

    5 1/2"

    50'

    30'

    6"

    6"

    11-30-84 11-30-84

    12-10-84 12-11-84

    USW UZ-N79UnsaturatedZone-Neutron

    USW UZ-N80UnsaturatedZone-Neutron

    USW UZ-N81UnsaturatedZone-Neutron

    N 757,733.2E 556,333.9

    N 757,634.3E 557,201.1

    N 757,807.1N 555,595.1

    4154.9 3404-196

    4332.2 3404-196

    4065.2 3404-196

    32'

    52'

    70'

    5 1/2"

    5 1/2"

    5 1/2"

    32'

    52'

    70'

    6"

    6"

    6"

    12-7-84

    12-6-84

    12-3-84

    12-10-84

    12-7-84

    12-6-84

    USW UZ-N82UnsaturatedZone-Neutron

    N 757,498.1E 554,689.7

    3974.8 3404-196 40' 5 1/2" 40' 6" 11-30-84 12-3-84

    07-01-87 NNWSI Off-Site Holes--Page 8

  • ROLENUMBER

    G. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    USW UZ-N83UnsaturatedZone-Neutron

    USW UZ-N84UnsaturatedZone-Neutron

    USW UZ-N86UnsaturatedZone-Neutron

    USW UZ-N87UnsaturatedZone-Neutron

    USW UZ-N88UnsaturatedZone-Neutron

    USW UZ-N89UnsaturatedZone-Neutron

    USW UZ-N90UnsaturatedZone-Neutron

    N 760,624.2E 556,349.0

    N 760,717.0E 555,887.8

    N 760,614.5E 556,460.3

    N 760,714.1E 555,887.1

    4157.4 3404-196

    4111.8 3404-196

    4171.9 3404-196

    4111.6 3404-196

    4201.7 3404-196

    4089.6 3404-196

    4089.6 3404-196

    70'

    45'

    30'

    45'

    30'

    45'

    45'

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    70'

    45'

    30'

    45'

    30'

    45'

    45'

    6"

    6"

    6"

    6"

    6"

    6"

    6"~

    12-12-84 12-13-84

    12-12-84 12-19-84(Recompleted)

    12-18-84 12-18-84

    12-20-84 12-20-84

    12-17-84 12-17-84

    12-19-84 12-19-84

    12-14-84 12-17-84

    (Ji

    NE

    760,796.9556,551.2

    N 760,610.4E 555,588.7

    N 760,608.4E 5559587.2

    USW UZ-N93UnsaturatedZone-Neutron

    N 759,584.3E 558,320.7

    4924.0 3404-196 40' 5 1/2" 40' 6" 7-27-84 7-27-84

    07-01-87 NNWSI Off-Site Holes--Page 9

  • HOLENUMBER

    G. L.LOCATION ELEV.

    WORK ORDERNUMBER

    CASINGDEPTH DIAMETER

    HOLEDEPTH DIAMETER

    SPUD COMPLETIONDATE DATE

    USW UZ-N94UnsaturatedZone-Neutron

    USW UZ-N95UnsaturatedZone-Neutron

    USW UZ-N96UnsaturatedZone-Neutron

    USW UZ-N98UnsaturatedZone-Neutron

    N 759,723.5E 558,236.2

    N 759,899.0E 558,172.3

    N 759,445.8E 558,403.1

    N 767,996.2E 562,083.5

    4926.1 3404-196

    4929.0 3404-196

    4893.4 3404-196

    4223.1 3404-196

    30'

    20'

    35'

    31'

    5 1/2"

    5 1/2"

    5 1/2"

    5 1/2"

    30'

    20'

    35'

    75'

    6"

    6"

    6"

    6"

    8-15-84

    8-15-84

    8-16-84

    2-20-86

    8-15-84

    8-16-84

    8-16-84

    2-25-86

    DOE Publication - DOE/NV/10322-10

    USW WT-1Water TableHole

    USW WT-2Water TableHole

    USw WT-7Water TableHole

    N 753,940.6E 563,739.2

    N 760,660.5E 561,923.6

    3942.5(T/csg)

    4269. 7(T/csg)

    3404-157

    3404-158

    3404-174

    32.5' 10 3/4"1665' 2 7/8"

    Tubing

    58' 10 3/4"2040' 2 7/8"

    Tubing

    52' 10 3/4"1579' 2 7/8"

    Tubing

    33.5' 26"1689' 8 3/4"

    58' 14 3/4"2060' 8 3/4 "

    53' 14 3/4"1610' 8 3/4"

    4-28-83

    7-8-83

    7-19-83

    5-18-83

    7-16-83

    7-26-83N 755,569.8 3927.2E 553,891.3

    07-01-87 NNWSI Off-Site Holes--Page 10

  • HOLENUMBER

    USW WT-10Water TableHole

    LOCATION

    N 748,770.9E 553,302.1

    G. L.ELEV.

    3686.0

    WORK ORDERNUMBER

    3404-171

    CASINGDEPTH DIAMETER

    114' 10 3/4"1321' 2 7/8"

    Tubing

    ROLEDEPTH DIAMETER

    116' 14 3/4"1413' 8 3/4"

    DATE

    7-26-83

    DATE

    8-2-83

    SPUD COMPLETION

    USw WT-l1Water TableHole

    N 739,070.4E 558,376.8

    3591.4 3404-175 44.5' 10 3/4"1365' 2 7/8"

    Tubing

    45' 14 3/4"1446' 8 3/4"

    8-3-83 8-9-83

    cn

    07-01-87 NNWSI Off-Site Holes--Page 11