iegc 2010 20042011_20apr-11 (2)

Upload: abc123mno

Post on 02-Apr-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    1/63

    SOUTHERN REGIONAL LOAD DESPATCH CENTERPOSOCO, POWERGRID, BANGALORE

    Indian Electricity Grid Code 2010

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    2/63

    7/29/2013 SRLDC 2

    INDIAN ELECTRICITY GRID CODE 2010

    Applicable w.e.f. 3rd May,2010

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    3/63

    IEGC - INTRODUCTION

    The Indian Electricity Grid Code (IEGC) is

    a regulation made by the Central Commission in

    exercise of powers under clause (h) of subsection (1)of Section 79 read with clause (g) of sub-section (2)of Section 178 of the Act.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    4/63

    What is IEGC ?

    A Set of rules, guidelines and standards

    to be followed by various persons and

    participants in the system

    to plan, develop, maintain and operate the

    power system,

    in the most secure, reliable, economic and

    efficient manner, To facilitate healthy competition in the

    generation and supply of electricity

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    5/63

    7/29/2013 SRLDC 5

    INDIAN ELECTRICITY GRID CODE 2010

    IEGC Feb 2000

    IEGC Mar 2002

    IEGC April 2006

    IEGC April 2009

    IEGC April 2010

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    6/63

    OBJECTIVE of IEGC

    The IEGC brings together a single set of technical and commercial rules,encompassing all the Utilities connected to/or using the inter-State transmissionsystem (ISTS) and provides the following:

    Documentation of the principles and procedures which define the relationshipbetween the various Users of the inter-State transmission system (ISTS), NationalLoad Despatch Centre, as well as the Regional and State Load Despatch Centers

    Facilitation of the optimal operation of the grid, facilitation of coordinated and optimalmaintenance planning of generation and transmission facilities in the grid andfacilitation of development and planning of economic and reliable National / RegionalGrid

    Facilitation for functioning of power markets and ancillary services by defining a

    common basis of operation of the ISTS, applicable to all the Users of the ISTS.

    Facilitation of the development of renewable energy sources by specifying thetechnical and commercial aspects for integration of these resources into the grid

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    7/63

    Structure of IEGC

    IEGC contains the following:

    i) Part 2: Role of various Organizations and their linkages

    This Part defines the functions of the various Organizations as arerelevant to IEGC.

    ii) Part 3:Planning Code for inter-State transmission

    This Part provides the guidelines to be adopted in the planning and

    development of bulk power transfer and associated ISTS. The

    Planning Code lays out the detailed information exchange required

    between the planning agencies and the various participants of the

    power system for load forecasting, generation availability, andpower system planning etc. for the future years under study. The

    Planning Code stipulates the various criteria to be adopted during

    the planning process

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    8/63

    Structure of IEGC

    iii) Part 4: Connection CodeThis Part specifies minimum technical and design criteria to be

    complied with by STU, CTU and any User connected to the system

    or seeking connection to the ISTS, to maintain uniformity and

    quality across the system. This also includes procedure forconnection to the ISTS

    iv) Part 5: Operating CodeThis Part describes the operational philosophy to maintain efficient,

    secure and reliable Grid Operation and contains the following

    sections.

    (a) Operating Philosophy

    (b) System security aspectsThis section describes the general security aspects to be

    followed by generating companies and all Regional Entities,

    CTU, STU, and all other Users of the Grid.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    9/63

    Structure of IEGC

    (c) Demand Estimation for operational purposesThis section details the procedures to estimate the demand

    by the SEB/distribution licensees for their systems / SLDCs

    in their control area for the day/week/month/year ahead,

    which shall be used for operational planning.

    (d) Demand management

    This section identifies the methodology to be adopted fordemand control by each SEB/SLDC/Distribution Licensee/

    bulk consumer depending on, overdrawal by the entity,

    frequency, voltage and transmission congestion. and any

    other requirement of grid security.

    (e) Periodic ReportsThis section provides various provisions for reporting of the

    operating parameters of the grid such as frequency profile etc.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    10/63

    Structure of IEGC

    (f) Operational liaisonThis section sets out the requirement for the exchange of

    information in relation to normal operation and/or events in

    the grid.

    (g) Outage Planning

    This section indicates procedure for outage planning.(h) Recovery procedures

    This section contains the procedures to be adopted following

    a major grid disturbance, for black start and

    resynchronization of islands, etc.

    (i) Event InformationThis section indicates the procedure by which events are

    reported and the related information exchange requirements

    etc

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    11/63

    Structure of IEGC

    v) Part 6: Scheduling and Despatch Code

    This section deals with the procedure to be adopted for scheduling and Despatch ofgeneration of the Inter-State Generating Stations (ISGS) and scheduling for othertransactions through long-term access, medium-term and short-term open accessincluding complementary commercial mechanisms, on a day-ahead and intra-daybasis with the process of the flow of information between the ISGS, National LoadDespatch Centre (NLDC), Regional Load Despatch Centre (RLDC), Power Exchanges

    and the State Load Despatch Centres (SLDCs), and other concerned persons .

    Most of the wind and solar energy sources are presently connected and in future arelikely to be connected to the STU or the States distribution utility. However, keeping inview the variable nature of generation from such sources and the effect suchvariability has on the inter- state grid, and in view of the large-scale integration of suchsources into the grid envisaged in view of the Government of Indias thrust onrenewable sources of energy, scheduling of wind and solar energy sources has been

    incorporated in this Code.

    vi) Part 7: Miscellaneous

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    12/63

    Non -compliance of IEGC

    (i) RLDCs shall report to the Commission instances of serious orrepeated violation of any of the provisions of the IEGC andincidences of persistent non-compliance of the directions of theRLDCs issued in order to exercise supervision and control requiredfor ensuring stability of grid operations and for achieving themaximum economy and efficiency in the operation of the powersystem in the region under its control.

    (ii) The Regional Power Committee (RPC) in the region shall alsocontinuously monitor the instances of non-compliance of theprovisions of IEGC and try to sort out all operational issues anddeliberate on the ways in which such cases of non-compliance areprevented in future by building consensus. The Member SecretaryRPC may also report any issue that cannot be sorted out at theRPC forum to the Commission.The RPC shall also file monthlyreports on status of UI payment and installation of capacitors bystates vis--vis the requirement/targets, as decided in the RPC.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    13/63

    Non -compliance of IEGC

    (iii) The Commission may initiate appropriateproceedings upon receipt of report of RPCs or RLDCsreferred to in (i) and (ii) above respectively.

    (iv) In case of non-compliance of any provisions of theIEGC by NLDC, RLDC, SLDC, RPC and any otherperson the matter may be reported by any person to theCERC through petition.

    (v) Notwithstanding anything contained in theseregulations, the Commission, may also take suo-motuaction against any person, in case of non-compliance ofany of the provisions of the IEGC.

    2 R l f SLDC

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    14/63

    2.7 Role of SLDC

    SLDCs apex body for integrated grid operation within theState :

    (a) optimum scheduling and despatch

    (b) monitor grid operations;

    (c) keep accounts of electricity

    (d) supervision and control over the intra-Statetransmission system

    (e) secure and economic real time operations as per theState Grid Code.

    (f) achieve the maximum economy and efficiency(g) accord concurrence or NoC for Open access in ISTSinvolving a state utility

    Every state entity to comply with the directions of SLDC

    SLDC to comply with the directions of the RLDC

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    15/63

    2.8. Role of STU (2.8.1 Sec 39 of the Act, 2003

    (1) (a) intra-State electricity transmission;

    (b) ofplanning and relating to intra-state transmission system

    co-ordination with i) CTU ii) State Governments

    iii) generating companies; iv) Regional Power Committees;

    v) Authority; vi) licensees;

    (c) to ensure development of an efficient, co-ordinated and economical systemof intra-State transmission lines

    (d) to provide non-discriminatory open access to its transmission system

    (2) STU to to operate the SLDC until a Government company or any authority orcorporation is notified by the State Government

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    16/63

    CONNECTION CODE

    4.6.1 Reactive Power Compensationa) STU and users to provide Reactive Power

    compensation and/or other facilities, close to theload points thereby avoiding the need for exchangeof Reactive Power to/from ISTS and to maintain ISTS

    voltage within the specified range.

    b) To provide additional reactive compensation as perRPC and RLDC

    The Users and STUs shall provide information toRPC and RLDC regarding the installation andhealthiness of the reactive compensationequipment on regular basis.

    RPC shall regularly monitor the status in this regard.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    17/63

    CONNECTION CODE

    4.6.2 Data and Communication Facilities

    All users, STU and CTU to provide to RLDC :

    Reliable and efficient speech

    data communication systems

    Systems to telemeter power system parameter such as flow, voltage and

    status of switches/ transformer taps etc.in line with interface requirements and other guideline made available byRLDC.

    Establish data flow up to appropriate data collection point on CTUs system,

    provide the required facilities at their respective ends as specified in theConnection Agreement

    4.6.5 Cyber Security

    All utilities shall have in place, a cyber security framework to identify thecritical cyber assets and protect them so as to support reliable operation ofthe grid.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    18/63

    OPERATING CODE

    All the users to5.1 (d) comply with the directions of RLDC /SLDC to ensure integrated

    grid operation and for achieving the maximum economy and efficiency inthe operation of the power system.

    5.1 (g) Develop a set of detailed operating procedures for each state gridin consistent with IEGC

    5.1 (h) The control rooms of the NLDC, RLDC, all SLDCs, power plants,substation of 132 kV and above, and any other control centres of allregional entities shall be manned round the clock by qualified andadequately trained personnel. Training requirements may be notified bythe Commission from time to time, by orders.

    5.2.(d) Intimate any tripping, as soon as possible, say within ten minutes

    of the event. The reason (to the extent determined) and the likely time ofrestoration shall also be intimated. All reasonable attempts shall be madefor the elements restoration as soon as possible.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    19/63

    7/29/2013 SRLDC Clause

    Frequency Control

    Operating Frequency Range revised - 49.5Hz to 50.2Hz

    Action for curtailing over drawal to be initiated at 49.7Hz

    No overdrawal when frequency is 49.5Hz or below

    Frequency Linked despatch guidelines to be followed

    All SEBs /distribution licensees shall abide by the demand

    management measures of the SLDCs and comply the

    directions of SLDC. Any non-compliance shall be reportedby SLDC to RLDC

    Automatic Load disconnection (Demand side Management)

    scheme shall be implemented by the State utilities before

    01.01.2011

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    20/63

    7/29/2013 SRLDC 20

    Voltage Control

    Generating units of above

    50MW size shall have

    AVRs (Automatic Voltage

    Regulators) in operation

    and PSS (Power SystemStabilizers) shall be got

    properly tuned.

    Operating Range of Voltage

    Nominal Maximum Minimum

    765 800 728

    400 420 380

    220 245 198132 145 122

    110 121 99

    66 72 60

    33 36 30

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    21/63

    7/29/2013 SRLDC 21

    RGMO

    FEATURES OF RGMO

    When system freq is below 50.2Hz, any improvement infrequency shall not lead to reduction in generation.

    When system frequency is above 50.2Hz, any fall in

    frequency shall not lead to increase in generation.

    Otherwise, for any fall in frequency, generation from the unitshall increase by 5% limited to 105% of MCR (maximumcontinuous Rating) subject to the Machine capability.

    Ripple filter of +/- 0.03 Hz. shall be provided so that smallchanges in frequency are ignored for load correction, inorder to prevent governor hunting.

    Clause

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    22/63

    7/29/2013 SRLDC 22

    RGMO

    RGMO Shall be effective from the dates as below:

    For Thermal Generating unit of 200MW & above

    Software based Electro Hydraulic Governor System(EHG) -1.8.2010

    Hardware based EHG system - 1.8.2010

    For Hydro units of 10 MW & above - 1.8.2010

    Clause

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    23/63

    7/29/2013 SRLDC 23

    System Protection Schemes

    AUFR / df/dt Schemes:

    SLDC shall furnish the details of load relief on operation of AUFRor df/dt to RLDC on real time basis.

    RLDC shall report such instances to RPC where there wasno/inadequate response.

    SLDC shall submit a monthly report to RPC in this regard

    RLDC shall submit a comparative record of expected load reliefand actual load relief obtained in Real time system operation toRPC and CERC on monthly basis.

    SPS (SPECIAL PROTECTION SCHEMES) Shall be identified,installed and commissioned to operate the transmission systemcloser to its limits and to protect the same against voltagecollapse, cascade tripping and tripping of important corridors /flow gates

    Clause

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    24/63

    7/29/2013 SRLDC 24

    Demand Estimation

    Demand estimation for operational purposes is to be done on a

    daily/weekly/monthly basis initially, mechanism and facilities

    at SLDCs shall be created at the earliest but not later than

    1.1.2011 to facilitate on-line estimation of demand for daily

    operational use for each 15 minutes block.

    The monthly estimated demand by the SLDC shall be providedto RLDC and RPC

    The SLDC shall take into account the Wind Energy forecasting

    to meet the active and reactive power requirement.

    In order to facilitate estimation of Total Transfer Capability /

    Available Transfer Capability on three month ahead basis , the

    SLDC shall furnish estimated demand and availability data to

    RLDCs.

    Clause

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    25/63

    7/29/2013 SRLDC 25

    Demand side Management

    Contingency Procedure that enable demand disconnection asinstructed by RLDC / SLDC under normal and / or contingentcondition

    State Electricity Boards/Distribution Licensees shall alsoformulate and implement state-of-the-art demand managementschemes for automatic demand management like rotationalload shedding, demand response (which may include lowertariff for interruptible loads) etc. before 01.01.2011. A Reportdetailing the scheme and periodic reports on progress ofimplementation of the schemes shall be sent to the CentralCommission by the concerned SLDC.

    Grouping of Loads by SLDC without overlapping betweendifferent Groups as given below

    Loads for scheduled power cuts/load shedding Loads for unscheduled load shedding

    Loads to be shed through under frequency relays/df/dt relays

    Loads to be shed under any System Protection Schemeidentified at the RPC level.

    Clause

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    26/63

    7/29/2013 SRLDC 26

    Communication System

    Each User, STU, RLDC, NLDC and CTU shallprovide and maintain adequate and reliablecommunication facility internally and with other

    Users / STUs / RLDC / SLDC to ensure exchangeof data / information necessary to maintainreliability and security of the grid.

    Clause

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    27/63

    7/29/2013 SRLDC 27

    Restoration Procedure

    RLDC shall develop detailed plans and procedures for restoration of theregional grid underpartial/total blackout and shall be reviewed / updated

    annually.

    b) Detailed plans and procedures for restoration after partial/total blackout

    ofeach Users/STU/CTU system within a Region, will be finalized by the

    concerned Users/STU/CTU in coordination with the RLDC. The procedurewill be reviewed, confirmed and/or revised once every subsequent year.

    Mock trial runs of the procedure for different subsystems shall be carried

    out by the Users/CTU/STU at least once every six months under intimation

    to the RLDC. Diesel Generator sets for black start would be tested on

    weekly basis and test report shall be sent to RLDC on quarterly basis.

    c) List of generating stations with black start facility, inter-State /

    interregional ties, synchronizing points and essential loads to be restored

    on priority, shall be prepared and be available with NLDC, RLDC and

    SLDC.

    Clause

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    28/63

    7/29/2013 SRLDC 28

    Scheduling Responsibility

    RLDC has Scheduling Responsibility for a) Central Generating Stations (excluding stations where full Share is

    allocated to host state),

    b) Ultra-Mega power projects

    c) If a generating station is connected only to the ISTS, (except forCentral Generating Stations where full Share is allocated to one State)

    d) If a generating station is connected to both ISTS and the Statenetwork and if the state has 50% Share of power or less ( of thegenerating capacity put into commercial operation)

    SLDC has Scheduling Responsibility for

    a) Generating station which is connected only to the State transmissionnetwork

    b) Central Generating Station whose full Share is allocated to host state. c) If a generating station is connected both to ISTS and the State

    network and if the state has more than 50% Share of power (of thegenerating capacity put into commercial operation)

    d) Generating station supplying power to any state other than host state

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    29/63

    7/29/2013 SRLDC 29

    Scheduling Responsibility

    NLDC shall be responsible for

    scheduling and despatch of electricity over inter-regional links in

    accordance with the grid code specified by Central Commission in

    coordination with Regional Load Despatch Centers.

    NLDC shall be responsible for coordination with Regional Load Despatch

    Centers for the energy accounting of inter-regional exchange of power.

    NLDC shall also be responsible for coordination for trans-national

    exchange of power.

    NLDC shall develop a procedure for scheduling of collective transaction

    through Power Exchanges, scheduling of inter-regional power

    exchanges including HVDC setting responsibility and power exchanges

    of the country with other countries., ,

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    30/63

    7/29/2013 SRLDC 30

    Cont..

    All concerned entities (in whose premises the special energymeters are installed) shall take weekly meter readings andtransmit them to the RLDC by Tuesday noon The SLDC mustensure that the meter data from all installations within theircontrol area are transmitted to the RLDC within the aboveschedule.

    Deviations, if any, from the ex-power plant generationschedules / ex-boundary drawal schedule shall beappropriately priced in accordance with UI Regulations. Inaddition, deviations, from schedules causing congestion, shallalso be priced in accordance with the Congestion ChargeRegulations. of CERC

    The operating log books of the generating station shall beavailable for review by the Regional Power Committee. Thesebooks shall keep record of machine operation andmaintenance.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    31/63

    7/29/2013 SRLDC 31

    Revision of Schedule (LTOA & MTOA)

    In the event of system constraint the RLDC shall suo-mottu revisethe schedules which shall become effective from the 4th timeblock. Also, during the first, second and third time blocks of suchan event, the scheduled generation of the ISGS shall be deemed

    to have been revised to be equal to actual generation

    Revision of declared capability by the ISGS(s) having two parttariff with capacity charge and energy charge (except hydrostations) and requisition by beneficiary(ies) for the remainingperiod of the day shall also be permitted with advance notice.

    Revised schedules/declared capability in such cases shallbecome effective from the 6th time block,

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    32/63

    7/29/2013 SRLDC 32

    Revision of STOA on real time operation

    Notwithstanding anything contained in Regulation 6.5(18), in caseof forced outage of a unit for a Short Term bilateral transaction,where a generator of capacity of 100 MW and above is seller, thegenerator shall immediately intimate the same along with therequisition for revision of schedule and estimated time ofrestoration of the unit, to SLDC/RLDC as the case may be. Withthe objective of not affecting the existing contracts, the revision of

    schedule shall be with the consent of the buyer till 31.07.2010.

    Thereafter , consent of the buyer shall not be a pre-requisite forsuch revision of schedule. The schedule of the generator and thebuyer shall be revised, accordingly. The revised schedules shallbecome effective from the 4th time block, counting the time block

    in which the forced outage is declared to be the first one.. TheRLDC shall inform the revised schedule to the seller and thebuyer. The original schedule shall become effective from theestimated time of restoration of the unit. However thetransmission charges as per original schedule shall continue tobe paid for two days.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    33/63

    7/29/2013 SRLDC 33

    Scheduling of Wind Generation

    With effect from 1.1.2011 Scheduling of wind power generation

    plants would have to be done for the purpose of UI where the

    sum of generation capacity of such plants connected at the

    connection point to the transmission or distribution system is 10

    MW and above and connection point is 33 KV and above, and

    where PPA has not yet been signed.

    The schedule by wind power generating stations may be revised

    by giving advance notice to SLDC/RLDC, as the case may be.

    Such revisions by wind power generating stations shall be

    effective from 6th time-block ,the first being the time block inwhich notice was given. There may be maximum of 8 revisions

    for each 3 hour time slot starting from 00:00 hours during the day.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    34/63

    5.2(u) Special requirements for Solar/ wind

    generators

    (u) Special requirements for Solar/ wind generatorsSystem operator (SLDC/ RLDC) shall make all efforts to evacuatethe available solar and wind power and treat as a must-run station.However, System operator may instruct the solar /wind generator toback down generation on consideration of grid security or safety ofany equipment or personnel is endangered and Solar/ wind

    generator shall comply with the same. For this, Data AcquisitionSystem facility shall be provided for transfer of information toconcerned SLDC and RLDC

    (i) SLDC/RLDC may direct a wind farm to curtail its VAr drawl/injectionin case the security of grid or safety of any equipment or personnelis endangered.

    (ii) During the wind generator start-up, the wind generator shall ensurethat the reactive power drawl (inrush currents incase of inductiongenerators) shall not affect the grid performance.

    23 S i l di ti f h d li

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    35/63

    23 . Special dispensation for scheduling

    of wind and solar generation

    i) With effect from 1.1.2011 Scheduling of Solar power

    generation plants (5 MW and above and connection

    point is 33 KV where PPA has not yet been signed)

    In case of solar generation no UI shall be

    payable/receivable by Generator.

    ii) The schedule of solar generation shall be given by the

    generator based on availability of the generator,

    weather forecasting, solar insolation, season and

    normal solar generation curve and shall be vetted bythe RLDC

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    36/63

    7/29/2013 SRLDC 36

    Reactive Power Management

    The charge for VArh shall be at the rate of 10 paise/kVArh w.e.f.1.4.2010, and this will be applicable between the Regional Entity,except Generating Stations, and the regional pool account for VArinterchanges. This rate shall be escalated at 0.5paise/kVArh peryear thereafter, unless otherwise revised by the Commission.

    In general, the Regional Entities except Generating Stations shallendeavor to minimize the VAr drawal at an interchange pointwhen the voltage at that point is below 95% of rated, and shall notreturn VAr when the voltage is above 105%. ICT taps at therespective drawal points may be changed to control the VArinterchange as per a Regional Entity except GeneratingStationss request to the RLDC, but only at reasonable intervals.

    Switching in/out of all 400 kV bus and line Reactors throughoutthe grid shall be carried out as per instructions of RLDC. Tapchanging on all 400/220 kV ICTs shall also be done as perRLDCs instructions only.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    37/63

    7/29/2013 SRLDC 37

    Other Important Features

    Control Area Defined

    Neighboring Country defined as a separate control area

    Provision for reporting consistent Non-compliance of constituents to

    CERC directly by RLDC

    Functions of NLDC defined. NLDC shall supervise inter regional links

    SLDCs shall also develop Operating Procedure for real time grid

    operation.

    Prolonged outage of power system elements shall be monitored byRLDC and report to RPC for suitable action.

    Special exemption limit on UI volume for wind and other renewable

    energy generation

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    38/63

    7/29/2013 SRLDC 38

    THANK YOU

    Typical Graph Depict in g Pr ic ing of Unsch eduled Interchang es

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    39/63

    Incremental Cost(Paise/kWH)U

    I

    Price

    S

    tationGeneration

    Pool Price

    Typical Graph Depict in g Pric ing of Unsch eduled Interchang es

    w .r.t . System Frequency

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    40/63

    CONNECTION CODE

    4.6.2 Data and Communication FacilitiesReliable and efficient speech and data communication systems shall beprovided to facilitate necessary communication and data exchange, andsupervision/control of the grid by the RLDC, under normal and abnormalconditions. All Users, STUs and CTU shall provide Systems to telemeterpower system parameter such as flow, voltage and status of switches/transformer taps etc. in line with interface requirements and other guideline

    made available by RLDC. The associated communication system tofacilitate data flow up to appropriate data collection point on CTUs system,shall also be established by the concerned User or STU as specified byCTU in the Connection Agreement. All Users/STUs in coordination withCTU shall provide the required facilities at their respective ends as specifiedin the Connection Agreement

    4.6.5 Cyber SecurityAll utilities shall have in place, a cyber security framework to identify thecritical cyber assets and protect them so as to support reliable operation ofthe grid.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    41/63

    FGMO

    5.2 (h) All thermal generating units of 200 MW and above and allhydro units of 10 MW and above operating at or up to 100% oftheir Maximum Continuous Rating (MCR) shall normally becapable of (and shall not in any way be prevented from)instantaneously picking up to 105% and 110% of their MCR ,respectively, when frequency falls suddenly. After an increase in

    generation as above, a generating unit may ramp back to theoriginal level at a rate of about one percent (1%) per minute, incase continued operation at the increased level is notsustainable. Any generating unit not complying with the aboverequirements, shall be kept in operation (synchronized with theRegional grid) only after obtaining the permission of RLDC.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    42/63

    FGMO

    5.2 (i) The recommended rate for changing the governor setting, i.e.,supplementary control for increasing or decreasing the output(generation level) for all generating units, irrespective of their typeand size, would be one (1.0) per cent per minute or as permanufacturers limits. However, if frequency falls below 49.7Hz,all partly loaded generating units shall pick up additional load at a

    faster rate, according to their capability.

    5.2 (j) Except under an emergency, or to prevent an imminentdamage to a costly equipment, no User shall suddenly reduce hisgenerating unit output by more than one hundred (100) MW ( 20MW in case of NER) without prior intimation to and consent of the

    RLDC, particularly when frequency is falling or is below 49.5 Hz..Similarly, no User / SEB shall cause a sudden variation in its loadby more than one hundred (100 MW) without prior intimation toand consent of the RLDC.

    Automatic voltage regulators

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    43/63

    Automatic voltage regulators

    (AVRs)

    5.2 (k) All generating units shall normally have theirautomatic voltage regulators (AVRs) in operation. Inparticular, if a generating unit of over fifty (50) MW sizeis required to be operated without its AVR in service,

    the RLDC shall be immediately intimated about thereason and duration, and its permission obtained.Power System Stabilizers (PSS) in AVRs ofgenerating units (wherever provided), shall be gotproperly tuned by the respective generating unit owner

    as per a plan prepared for the purpose by theCTU/RPC from time to time. CTU /RPC will be allowedto carry out checking of PSS and further tuning it,wherever considered necessary.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    44/63

    Frequency Control

    5.2 (m) All Users, SEB,, SLDCs , RLDCs, and NLDC shall take all possiblemeasures to ensure that the grid frequency always remains within the49.550.2 Hz band.

    (n) All SEBS, distribution licensees / STUs shall provide automatic under-

    frequency and df/dt relays for load shedding in their respective systems,to arrest frequency decline that could result in a collapse/disintegrationof the grid, as per the plan separately finalized by the concerned RPCand shall ensure its effective application to prevent cascade tripping ofgenerating units in case of any contingency. All , SEBs, distributionlicensees, CTU STUs and SLDCs shall ensure that the above under-

    frequency and df/dt load shedding/islanding schemes are alwaysfunctional. RLDC shall inform RPC Secretariat about instances when thedesired load relief is not obtained through these relays in real timeoperation. The provisions regarding under frequency and df/dt relays ofrelevant CEA Regulations shall be complied with. SLDC shall furnishmonthly report of UFR and df/dt relay operation in their respective

    system to the respective RPC.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    45/63

    5.2.(o) All Users, STU/SLDC , CTU/RLDC and NLDC, shall

    also facilitate identification, installation and

    commissioning ofSystem Protection Schemes (SPS)

    (including inter-tripping and run-back) in the power

    system to operate the transmission system closer to theirlimits and to protect against situations such as voltage

    collapse and cascade tripping, tripping of important

    corridors/flow-gates etc.. Such schemes would be

    finalized by the concerned RPC forum, and shall alwaysbe kept in service.If any SPS is to be taken out of

    service, permission of RLDC shall be obtained indicating

    reason and duration of anticipated outage from service .

    Frequency Control

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    46/63

    Trip Analysis

    5.2 (r) All the Users , STU/SLDC and CTU

    shall send information/data including

    disturbance recorder/sequential event

    recorder output to RLDC within oneweek for purpose of analysis of any grid

    disturbance /event. No User,SLDC /STU

    or CTU shall block any data/informationrequired by the RLDC and RPC for

    maintaining reliability and security of the

    grid and for analysis of an event.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    47/63

    Voltage Control

    5.2 (s) All Users, RLDC,

    SLDC STUs , CTU and

    NLDC shall take all

    possible measures to

    ensure that the gridvoltage always remains

    within the following

    operating range.

    Voltage (kV rms)

    Nominal Maximum Minimum

    765 800 728

    400 420 380

    220 245 198

    132 145 122

    110 121 99

    66 72 60

    33 36 30

    2( ) S i l i f S l / i d

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    48/63

    5.2(u) Special requirements for Solar/ wind

    generators

    (u) Special requirements for Solar/ wind generatorsSystem operator (SLDC/ RLDC) shall make all efforts to evacuatethe available solar and wind power and treat as a must-run station.However, System operator may instruct the solar /wind generator toback down generation on consideration of grid security or safety ofany equipment or personnel is endangered and Solar/ wind

    generator shall comply with the same. For this, Data AcquisitionSystem facility shall be provided for transfer of information toconcerned SLDC and RLDC

    (i) SLDC/RLDC may direct a wind farm to curtail its VAr drawl/injectionin case the security of grid or safety of any equipment or personnelis endangered.

    (ii) During the wind generator start-up, the wind generator shall ensurethat the reactive power drawl (inrush currents incase of inductiongenerators) shall not affect the grid performance.

    5 3 Demand Estimation for

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    49/63

    5.3 Demand Estimation for

    Operational Purposes

    (a) This section describes the procedures/

    responsibilities of the SLDCs for demand

    estimation for both Active Power and

    Reactive Power.

    (b) The demand estimation is to be done

    on daily /weekly/monthly /yearly basis for

    current year for load - generationbalance planning. The SLDC shall carry

    out system studies for operational

    planning purposes using this demand

    5 3 Demand Estimation for Operational

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    50/63

    (c) Each SLDC shall develop methodologies/mechanisms for daily/weekly/monthly/yearly demand estimation (MW, MVAr and MWh) foroperational purposes. Based on this demand estimate and the estimatedavailability from different sources,

    SLDC shall plan demand management measures like load shedding, powercuts, etc. and shall ensure that the same is implemented by theSEB/distribution licensees. SLDCs. All SEBs/distribution licensees shallabide by the demand management measures of the SLDCs and shallalso maintain historical database for demand estimation.

    (d) Each SLDC shall carry out its own demand estimation from thehistorical data and weather forecast data from time to time. Alldistribution licensees and other concerned persons shall providerelevant data and other information as required by SLDC for demandestimate.

    5.3 Demand Estimation for Operational

    Purposes

    5 3 Demand Estimation for

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    51/63

    (e) While the demand estimation for operational purposes is to be doneon a daily/ weekly/monthly basis initially, mechanisms and facilitiesat SLDCs shall be created at the earliest but not later than 1.1.2011to facilitate on-line estimation of demand for daily operational use foreach 15 minutes block.

    (f) The monthly estimated demand by the SLDC shall be provided toRLDC and RPC for better operation planning

    g) The SLDC shall take into account the Wind Energy forecasting tomeet the active and reactive power requirement.

    (h) In order to facilitate estimation of Total Transfer Capability/Available Transfer Capability on three month ahead basis , theSLDC shall furnish estimated demand and availability data toRLDCs.

    5.3 Demand Estimation for

    Operational Purposes

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    52/63

    5.4.2 Demand Disconnection

    (a) SLDC/ SEB/distribution licensee and bulk consumer shall initiateaction to restrict the drawal of its control area ,from the grid, withinthe net drawal schedule whenever the system frequency falls to49.7 Hz

    (b) The SLDC/ SEB/distribution licensee and bulk consumer shallensure that requisite load shedding is carried out in its control areaso that there is no overdrawl when frequency is 49.5 Hz. or below.

    c) Each User/STU/SLDC shall formulate contingency procedures andmake arrangements that will enable demand disconnection to takeplace, as instructed by the RLDC/SLDC, under normal and/orcontingent conditions. These contingency procedures andarrangements shall regularly be / updated by User/STU andmonitored by RLDC/SLDC. RLDC/SLDC may direct any User/STUto modify the above procedures/arrangement, if required, in theinterest of grid security and the concerned User/STU shall abide bythese directions.

    5 4 2 Demand Disconnection

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    53/63

    d) The SLDC through respective State Electricity Boards/ DistributionLicensees shall also formulate and implement state-of-the-art demandmanagement schemes forautomatic demand management like rotationalload shedding, demand response (which may include lower tariff forinterruptible loads) etc. before 01.01.2011, to reduce overdrawl in order tocomply para 5.4.2 (a) and (b) . A Report detailing the scheme and periodicreports on progress of implementation of the schemes shall be sent to the

    Central Commission by the concerned SLDC.

    e) In order to maintain the frequency within the stipulated band and maintainingthe network security, the interruptible loads shall be arranged in four groupsof loads, for scheduled power cuts/load shedding, loads for unscheduledload shedding, loads to be shed through under frequency relays/ df/dtrelays and loads to be shed under any System Protection Scheme identified

    at the RPC level. These loads shall be grouped in such a manner , thatthere is no overlapping between different Groups of loads. In case of certaincontingencies and/or threat to system security, the RLDC may direct anySLDC/ SEB/ distribution licensee or bulk consumer connected to the ISTSto decrease drawal of its control area by a certain quantum. Such directionsshall immediately be acted upon. SLDC shall send compliance reportimmediately after compliance of these directions to RLDC.

    5.4.2 Demand Disconnection

    5 4 2 D d Di ti

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    54/63

    f) To comply with the direction of RLDC, SLDC may direct

    any SEB/ distribution licensee/bulk consumer connected

    to the STU to curtail drawal from grid. SLDC shall

    monitor the action taken by the concerned entity and

    ensure the reduction of drawal from the grid as directed

    by RLDC.

    g) RLDCs shall devise standard, instantaneous, message

    formats in order to give directions in case of

    contingencies and /or threat to the system security to

    reduce overdrawl by the bulk consumer , SLDC/ State atdifferent overdrawal conditions depending upon the

    severity of the overdrawal. The concerned SLDC shall

    ensure immediate compliance with these directions of

    RLDC and send a compliance report to the concernedRLDC.

    5.4.2 Demand Disconnection

    5 4 2 D d Di ti

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    55/63

    h) All Users, SLDC/ SEB/distribution licensee or bulk consumer shallcomply with direction of RLDC/SLDC and carry out requisite loadshedding or backing down of generation in case of congestion intransmission system to ensure safety and reliability of the system.The procedure for application of measures to relieve congestion inreal time as well as provisions of withdrawl of congestion shall be in

    accordance with Central Electricity Regulatory Commission(Measures to relieve congestion in real time operation) Regulations,2009

    i) The measures taken by the Users, SLDC SEB/ distribution licenseeor bulk consumer shall not be withdrawn as long as the frequencyremains at a level lower than the limits specified in para 5.2 orcongestion continues, unless specifically permitted by the RLDC/SLDC.

    5.4.2 Demand Disconnection

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    56/63

    6.4 Demarcation of responsibilities:

    2. The following generating stations shall come under the respectiveRegional ISTS control area and hence the respective RLDC shallcoordinate the scheduling of the following generating stations :

    a) Central Generating Stations (excluding stations where full Share isallocated to host state),

    b) Ultra-Mega power projects(c) In other cases, the control area shall be decided on the following

    criteria:

    (i) If a generating station is connected only to the ISTS, RLDC shallcoordinate the scheduling, except for Central Generating Stationswhere full Share is allocated to one State.

    (ii) If a generating station is connected only to the State transmissionnetwork, the SLDC shall coordinate scheduling, except for the caseas at (a) above.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    57/63

    6.4 Demarcation of responsibilities:

    (iii) If a generating station is connected both to ISTS and the State network,scheduling and other functions performed by the system operator of acontrol area will be done by SLDC,, only .if state has more than 50%Share of power ,The role of concerned RLDC, in such a case, shall belimited to consideration of the schedule for inter state exchange ofpower on account of this ISGS while determining the net drawalschedules of the respective states. If the State has a Share of 50% or

    less, the scheduling and other functions shall be performed by RLDC.

    (iv) In case commissioning of a plant is done in stages the decisionregarding scheduling and other functions performed by the systemoperator of a control area would be taken on the basis of above criteriadepending on generating capacity put into commercial operation at that

    point of time. Therefore it could happen that the plant may be in onecontrol area (i.e. SLDC) at one point of time and another control area(i.e. RLDC) at another point of time. The switch over of control areawould be done expeditiously after the change, w.e.f. the next billingperiod.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    58/63

    .4 Demarcation of responsibilities:

    7. The SLDC, SEB/distribution licensee shall always endeavour torestrict the net drawal of the state from the grid to within thedrawal schedules, whenever the system frequency is below49.7 Hz. The concerned SEB/distribution licensee User,SLDCshall ensure that their automatic demand management schemementioned in clause 5.4.2 acts to ensure that there is no overdrawl when frequency is 49.5 Hz or below. If the automaticdemand management scheme has not yet been commissioned,then action has to be taken as per manual demandmanagement scheme to ensure zero overdrawal whenfrequency r is 49.5 Hz. or below.

    8. The SLDCs/STUs /Distrbution Licensees shall regularly carry outthe necessary exercises regarding short-term demandestimation for their respective States/area, to enable them toplan in advance as to how they would meet their consumersload without overdrawing from the grid.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    59/63

    12. However, notwithstanding the above, the RLDC may direct theSLDCs/ISGS/other regional entities to increase/decrease theirdrawal/generation in case of contingencies e.g. overloading oflines/transformers, abnormal voltages, threat to system security. Suchdirections shall immediately be acted upon. In case the situation does notcall for very urgent action, and RLDC has some time for analysis, it shallbe checked whether the situation has arisen due to deviations from

    schedules, pursuant to short-term open access. These shall be gotterminated first, before an action, which would affect the scheduledsupplies to the long term and medium term customers is initiated inaccordance with Central Electricity Regulatory Commission (Grant ofConnectivity, Long-term Access and Medium-term Open Access in inter-state Transmission and related matters) Regulations,2009.

    15. All other regional entities should abide by the concept offrequency-linked load despatch and pricing of deviations from schedule, i.e.,unscheduled interchanges. All regional entities should normally beoperated according to the standing frequency-linked load despatchguidelines issued by the RLDC, to the extent possible, unless otherwiseadvised by the RLDC/SLDC.

    6.4 Demarcation of responsibilities:

    6 4 Demarcation of responsibilities

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    60/63

    21. All concerned entities (in whose

    premises the special energy meters are

    installed) shall take weekly meter

    readings and transmit them to the RLDCby Tuesday noon The SLDC must

    ensure that the meter data from all

    installations within their control area aretransmitted to the RLDC within the above

    schedule.

    6.4 Demarcation of responsibilities

    6.5 Scheduling and Despatch

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    61/63

    6.5 Scheduling and Despatch

    procedure

    18. Revision of declared capability by the ISGS(s) having

    two part tariff with capacity charge and energy

    charge(except hydro stations) and requisition by

    beneficiary(ies) for the remaining period of the day

    shall also be permitted with advance notice. Revisedschedules/declared capability in such cases shall

    become effective from the 6th time block, counting

    the time block in which the request for revision has

    been received in the RLDC to be the first one.

    Revision on Forced Outage of

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    62/63

    Revision on Forced Outage of

    Gen unit

    a new subclause,namely, 6.5.18(a) shall be added asunder:

    6.5.18(a). Notwithstanding anything contained inRegulation 6.5.18, in case of forced outages of a unit,

    for those stations who have a two part tariff based oncapacity charge and energy charge for long term andmedium term contracts, the RLDC shall revise theschedule on the basis of revised declared capability.The revised declared capability and the revised

    schedules shall become effective from the fourth timeblock, counting the time block in which the revision isadvised by the ISGS to be the first one.

  • 7/27/2019 iegc 2010 20042011_20apr-11 (2)

    63/63